CN206438417U - The nacelle device of bridge construction - Google Patents
The nacelle device of bridge construction Download PDFInfo
- Publication number
- CN206438417U CN206438417U CN201720072319.4U CN201720072319U CN206438417U CN 206438417 U CN206438417 U CN 206438417U CN 201720072319 U CN201720072319 U CN 201720072319U CN 206438417 U CN206438417 U CN 206438417U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- bridge
- fixed pulley
- pulley group
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Present patent application belongs to the method or equipment technical field for being exclusively used in setting up or assembling bridge, specifically disclose a kind of nacelle device of bridge construction, including hanging basket, steel wire rope is provided with the top of the hanging basket, it is connected with the first fixed pulley group and the second fixed pulley group on steel wire rope in turn, the side of the second fixed pulley group is provided with coiling machine, and steel wire rope is connected with coiling machine, the 3rd fixed pulley group is provided between the first fixed pulley group and hanging basket, the 3rd fixed pulley group is located on bridge;The side that the hanging basket is contacted with bridge is provided with groove, scalable in groove to be connected with roller;The hanging basket side relative with bridge is provided with skid resistant course, the art of this patent is compared with prior art, roller and skid resistant course is set to make roller contact with bridge to slide up and down in this programme, hanging basket is avoided directly to contact with bridge in motion process with bridge, so as to improve the service life of hanging basket, the degree of wear that hanging basket is subject to during raising and lowering is reduced.
Description
Technical field
The utility model belongs to the method or equipment technical field for being exclusively used in setting up or assembling bridge.
Background technology
Bridge, refers to and is erected in rivers,lakes and seas, the building for making traffic etc. smoothly to pass through, referred to as bridge.Bridge one
As be made up of superstructure, substructure and attached structure, superstructure refers mainly to bridge span structure and support system;Lower junction
Structure includes abutment, bridge pier and basis;Attached structure then refers to transition slab at bridge head, truncated cone banking, shore protection, training works etc..In bridge
Build and maintenance during, can usually use many Architectural Equipments, hanging basket is exactly one kind therein, nacelle device quality it is good
The bad life security and building progress for directly affecting builder.In the hanging basket of existing bridge construction, usually occur,
Hanging basket low intensity, operation is unstable, and inclination, the phenomenon slid occur during long-term use, occurs when serious
The phenomenon dropped, has a strong impact on the life security of operating personnel.
In order to ensure the life security of operating personnel, there is the patent that a notification number is CN205205690U in the prior art
File, discloses a kind of nacelle device of bridge construction, with hanging basket body, and the upper end of the hanging basket body is connected by steel wire rope
Multigroup running block is connect, the steel wire penetrating running block connects the first fixed pulley group on top, the first fixed pulley group
The other end of steel wire rope connect the second fixed pulley group, the other end connection of the steel wire rope of the second fixed pulley group multigroup is batched
Machine.
The concrete operations flow of the nacelle device of the bridge construction is:When operating personnel need to move up and down hanging basket body
When, it is only necessary to control coiling machine to realize the rise and fall of hanging basket body, due to there are two strands on the upper surface of hanging basket body
Steel wire rope is around being connected on a movable pulley.So hanging basket body is very steady during operation, additional first is added calmly sliding
The transmission of wheel group, can make it that this running body of hanging basket is more steady, improve safety coefficient.
But said apparatus is in use, hanging basket is directly contacted with bridge, then in long-term raising and lowering mistake
Hanging basket is highly prone to abrasion in journey, or even can damage hanging basket, causes operating personnel to come to harm.
Utility model content
The purpose of this utility model is to provide a kind of nacelle device of bridge construction, it is to avoid hanging basket is worn, and improves
The security of operating personnel.
In order to achieve the above object, base case of the present utility model provides a kind of nacelle device of bridge construction, including
It is provided with the top of hanging basket, the hanging basket on steel wire rope, steel wire rope and is connected with the first fixed pulley group and the second fixed pulley group, second in turn
The side of fixed pulley group is provided with coiling machine, and steel wire rope is connected with coiling machine, and the is provided between the first fixed pulley group and hanging basket
Three fixed pulley groups, the 3rd fixed pulley group is located on bridge;The hanging basket is provided with groove, groove with the close side of bridge and is hinged
There is cylinder, cylinder is provided with internal thread, internal thread inside one end away from groove and is threaded with threaded rod, and threaded rod is away from circle
One end of cylinder is hinged with roller;The outer side of cylinder is provided with support bar, and the one end of support bar away from expansion link is hinged with groove;It is described
The hanging basket side relative with bridge is provided with skid resistant course.
The principle of this base case is:In use, coiling machine is fixed on bridge, operating personnel enter hanging basket, so
After start coiling machine, begin paying out steel wire rope, so that hanging basket is slided along bridge, now operating personnel start to rotate screw thread
Bar, threaded rod is screwed out from cylinder, while pulling threaded rod, makes threaded rod drive support bar to stretch, so that support bar will
Threaded rod is pushed against, and now support bar, threaded rod and groove directly form the rock-steady structure of triangle, improves the smooth of hanging basket movement
Property, roller is pushed out groove with the final roller of the rotation of threaded rod, and roller directly offsets with bridge surface, and roller is in bridge
Surface scrolls realize that hanging basket is moved, and hanging basket is not contacted directly with bridge during hanging basket is moved.
When hanging basket is slid to operating position, opposite direction rotates threaded rod to operating personnel again, and threaded rod is revolved again
Enter cylinder, while cylinder is pushed back into inside grooves, now hanging basket is contacted with bridge, the skid resistant course on hanging basket and bridge directly against
Close, make hanging basket keep being relatively fixed with bridge, now operating personnel start bridge floor work, after operating personnel complete work, behaviour
Make personnel and just directly screw out threaded rod release roller again according to aforesaid way, roller protrudes again from groove to be contacted with bridge,
Hanging basket is pulled on into bridge again.
The beneficial effect of this base case is:Roller and skid resistant course are set in this programme roller is contacted with bridge so that
Slide up and down, it is to avoid hanging basket is directly contacted with bridge in motion process with bridge, so that the service life of hanging basket is improved,
The degree of wear that hanging basket is subject to during raising and lowering is reduced, so as to avoid hanging basket from being worn, while using anti-skidding
Layer is relatively fixed with bridge, and when the operating personnel is worked, hanging basket will not shake, the peace that raising operating personnel work in hanging basket
Quan Xing,
Scheme two:Scheme is preferred based on this, and the hanging basket bottom is provided with bearing.
After operating personnel complete work, hanging basket is placed on bridge surface, hanging basket bottom is not contacted directly with bridge,
Avoid hanging basket bottom from being worn, improve the service life of hanging basket.
Scheme three:This is preferred for scheme two, and the hanging basket side is hinged with the door-plate for being available for personnel to come in and go out.
Operating personnel just push door-plate open after completing work, then walk out, are jumped out compared to operating personnel from hanging basket from hanging basket,
Operating personnel, which directly walk out, more to be facilitated.
Scheme four:This is preferred for scheme three, and the steel wire rope at the top of the hanging basket is two strands, and two strand steel wire ropes are fixed along the 3rd
The direction that assembly pulley is rotated is around being connected in the 3rd fixed pulley group.
Two strand steel wire ropes are separately positioned on the both sides at the top of hanging basket, advantageously keep balancing in hanging basket, it is to avoid hanging basket exists
Tilted in the course of work, so as to improve the stability of hanging basket work.
Scheme five:This is preferred for scheme four, and the first fixed pulley group bottom is provided with mounting bracket.
First fixed pulley group is arranged on bridge by mounting bracket, easier for installation.
Scheme six:This is preferred for scheme five, and the coiling machine is connected with drive motor.
Worked using drive motor coiling machine, realize the movement of steel wire rope, so that steel wire rope drives hanging basket to rise
And decline, make hanging basket motion quicker.
Brief description of the drawings
Fig. 1 is the structural representation of the nacelle device of the utility model embodiment bridge construction;
Fig. 2 is the sectional view at A in Fig. 1.
Embodiment
The utility model is described in further detail below by embodiment:
Reference in Figure of description includes:Bridge 1, coiling machine 2, motor 3, the second fixed pulley group 4, first are calmly sliding
Wheel group 5, the 3rd fixed pulley group 6, hanging basket 7, steel wire rope 8, roller 9, bearing 10, cylinder 11, threaded rod 12, support bar 13.
Embodiment
Substantially as shown in Figures 1 and 2:The device of hanging basket 7 that bridge 1 is constructed, including the coiling machine 2 on bridge 1,
The side of coiling machine 2, which is provided with the motor 3 of driving coiling machine 2, coiling machine 2, is provided with steel wire rope 8, and steel wire rope 8, which bypasses second, to be determined
The fixed pulley group 5 of assembly pulley 4 and first, the bottom of the first fixed pulley group 5 passes through integrally formed with mounting bracket, the first fixed pulley group 5
It is arranged between installation on bridge 1, the steel wire rope 8 for bypassing the first fixed pulley group 5 bypasses the 3rd fixed pulley group 6, and steel wire rope 8 is worn
The 3rd fixed pulley group 6 is crossed with the upper port both sides of hanging basket 7 to be connected.
The bottom of hanging basket 7 is integrally formed with bearing 10, the right side of hanging basket 7(Right side described in the present embodiment be in figure with the phase of bridge 1
To side)Integrally formed with rubber layer, and hanging basket 7 and the right side opening of bridge 1 are fluted, and cylinder 11, cylinder are hinged with groove
Internal thread is provided with inside 11 one end away from groove, internal thread is connected with threaded rod 12, the one end of threaded rod 12 away from cylinder 11
It is hinged with roller 9;The outer side of cylinder 11 is provided with support bar 13, and the one end of support bar 13 away from expansion link is hinged with groove;Hanging basket 7
Front end(Front end described in the present embodiment be in figure just to side)It is hinged with the door-plate for being come in and gone out for personnel.
In use, coiling machine 2 is fixed on bridge 1, operating personnel enter hanging basket 7, then start coiling machine 2, start
Steel wire rope 8 is released, so that hanging basket 7 is slided along bridge 1, now operating personnel start to rotate threaded rod 12, by threaded rod 12
Screwed out from cylinder 11, while pulling makes threaded rod 12 drive support bar 13 to stretch in threaded rod 12, drawing process, by threaded rod
12 when turning to fixed position, stops operating, due to threaded rod 12 can only threads turn realize movement, therefore now threaded rod 12
No longer moved after stopping operating, so that support bar 13 pushes against threaded rod 12, now support bar 13, threaded rod 12 and groove are straight
The rock-steady structure to form triangle is connect, the smoothness that hanging basket 7 is moved is improved, roller 9 is with the final roller 9 of the rotation of threaded rod 12
Groove is pushed out, and roller 9 directly offsets with the surface of bridge 1, roller 9 realizes that hanging basket 7 is moved in the surface scrolls of bridge 1, is hanging
Hanging basket 7 is not contacted directly with bridge 1 during basket 7 is moved.
When hanging basket 7 is slid to operating position, opposite direction rotates threaded rod 12 to operating personnel again, by the weight of threaded rod 12
New precession cylinder 11, while cylinder 11 is pushed back into inside grooves, now hanging basket 7 is contacted with bridge 1, the skid resistant course on hanging basket 7 and
Bridge 1 is directly fitted, and makes hanging basket 7 keep being relatively fixed with bridge 1, now operating personnel start bridge floor work, work as operating personnel
Complete work after, operating personnel just directly again according to aforesaid way screw out threaded rod 12 release roller 9, roller 9 from groove again
Secondary protrusion is contacted with bridge 1, and hanging basket 7 is pulled on into bridge 1 again, door-plate is then pushed open, operating personnel is walked out from hanging basket 7.
Above-described is only that the known general knowledge such as concrete structure and characteristic is herein in embodiment of the present utility model, scheme
Excessive description is not made.It should be pointed out that for those skilled in the art, not departing from the premise of the utility model structure
Under, several modifications and improvements can also be made, these should also be considered as protection domain of the present utility model, and these are all without influence
Effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim
It is defined, embodiment in specification etc. records the content that can be used for explaining claim.
Claims (6)
1. it is provided with the nacelle device of bridge construction, including hanging basket, at the top of the hanging basket on steel wire rope, steel wire rope and is connected with the in turn
Certain assembly pulley and the second fixed pulley group, the side of the second fixed pulley group are provided with coiling machine, and steel wire rope is connected with coiling machine, and it is special
Levy and be, the 3rd fixed pulley group is provided between the first fixed pulley group and hanging basket, the 3rd fixed pulley group is located on bridge;It is described
Hanging basket is provided with groove, groove with the close side of bridge and is hinged with cylinder, and cylinder is provided with interior spiral shell inside one end away from groove
Threaded rod is threaded with line, internal thread, the one end of threaded rod away from cylinder is hinged with roller;The outer side of cylinder is provided with support
Bar, the one end of support bar away from expansion link is hinged with groove;The hanging basket side relative with bridge is provided with skid resistant course.
2. the nacelle device of bridge construction according to claim 1, it is characterised in that:The hanging basket bottom is provided with bearing.
3. the nacelle device of bridge construction according to claim 2, it is characterised in that:The hanging basket side, which is hinged with, to be available for
The door-plate that personnel come in and go out.
4. the nacelle device of bridge construction according to claim 3, it is characterised in that:Steel wire rope at the top of the hanging basket is
Two strands, the direction that two strand steel wire ropes are rotated along the 3rd fixed pulley group is around being connected in the 3rd fixed pulley group.
5. the nacelle device of bridge construction according to claim 4, it is characterised in that:The first fixed pulley group bottom is set
There is mounting bracket.
6. the nacelle device of bridge construction according to claim 5, it is characterised in that:The coiling machine is connected with driving horse
Reach.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720072319.4U CN206438417U (en) | 2017-01-20 | 2017-01-20 | The nacelle device of bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720072319.4U CN206438417U (en) | 2017-01-20 | 2017-01-20 | The nacelle device of bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206438417U true CN206438417U (en) | 2017-08-25 |
Family
ID=59635965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720072319.4U Expired - Fee Related CN206438417U (en) | 2017-01-20 | 2017-01-20 | The nacelle device of bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206438417U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284431A (en) * | 2019-05-23 | 2019-09-27 | 黄永华 | A kind of bridge construction fall arrest device |
-
2017
- 2017-01-20 CN CN201720072319.4U patent/CN206438417U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284431A (en) * | 2019-05-23 | 2019-09-27 | 黄永华 | A kind of bridge construction fall arrest device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2698763Y (en) | Lifting safety device for tower crane | |
CN104762932B (en) | Bottom support pivot rotating turnover gate opened and closed by winch type gate hoist | |
CA3041149C (en) | Gradient-adaptive elevator | |
CN101786577A (en) | Dual-machine loading-and-walking type hydraulic numerical control deck erection gantry and control system and control method | |
CN205636607U (en) | Bridge is with water spray heat sink | |
CN206438417U (en) | The nacelle device of bridge construction | |
CN205034922U (en) | Perpendicular elevator of shallow pit and car toeguard thereof | |
CN105155416B (en) | A kind of cable wire tower integral slipping vertical transfer device | |
CN201286668Y (en) | Special-shaped suspension platform | |
CN111005321B (en) | Assembled bridge building butt-joint equipment | |
CN103306218A (en) | Bottom width overhaul hanging basket of bridge | |
CN113089477A (en) | Hanging basket suspension system | |
CN209468675U (en) | A kind of suspension cross a river pontoon bridge | |
CN205063835U (en) | Novel hydraulic drive derrick mechanism | |
CN105200918B (en) | Bridge detection structure and bridge detection method adopting same | |
CN104149987B (en) | A kind of arrester for power conveying arrangement | |
CN208219414U (en) | Bridge construction hanging basket | |
CN113235460B (en) | Prefabricated segment swinging method for bridge cantilever assembly | |
CN102502428B (en) | Synchronous lifting mechanism | |
CN208632958U (en) | A kind of bridge inspection device being advantageously implemented both ends synchronously control | |
CN205576743U (en) | A mechanism that is used for suspension bridge catwalk main rope to put cable | |
CN204898521U (en) | Bridge detects structure | |
CN208632957U (en) | A kind of novel steel truss bridge inspection device | |
CN201735075U (en) | Novel simple escape device | |
CN204324662U (en) | A kind of route-variable elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170825 Termination date: 20190120 |