CN206431003U - A kind of equipment for detecting Snow Agent performance - Google Patents

A kind of equipment for detecting Snow Agent performance Download PDF

Info

Publication number
CN206431003U
CN206431003U CN201720128435.3U CN201720128435U CN206431003U CN 206431003 U CN206431003 U CN 206431003U CN 201720128435 U CN201720128435 U CN 201720128435U CN 206431003 U CN206431003 U CN 206431003U
Authority
CN
China
Prior art keywords
reaction tube
detection
inner chamber
mould
snow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720128435.3U
Other languages
Chinese (zh)
Inventor
孙心淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jianshi Environmental Protection Technology Co Ltd
Original Assignee
Tianjin Jianshi Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Jianshi Environmental Protection Technology Co Ltd filed Critical Tianjin Jianshi Environmental Protection Technology Co Ltd
Priority to CN201720128435.3U priority Critical patent/CN206431003U/en
Application granted granted Critical
Publication of CN206431003U publication Critical patent/CN206431003U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model provides a kind of equipment for detecting Snow Agent performance, including Thaw performance detection part and corrosive nature detection part, the Thaw performance detection part is disposed adjacent with the corrosive nature detection part, the Thaw performance detection part is set to be made up of Thaw performance detection body, ice hockey forming room and thawing room, the inner chamber of the Thaw performance detection body is neighbouring to set the ice hockey forming room and the thawing room, and the upper part of the inner chamber of Thaw performance detection body also sets up a longeron.The utility model uses the equipment, can carry out Snow Agent Thaw performance and corrosive reliable detection, so as to ensure that low dose of, cost is low and have the accurate development of the Snow Agent of fast snow melting performance.

Description

A kind of equipment for detecting Snow Agent performance
Technical field
The utility model is related to Snow Agent performance detection technical field, more particularly to a kind of detects setting for Snow Agent performance It is standby.
Background technology
Winter Snow is that road network operation brings great interference, to be icy on road and smooth etc. caused by reduction snowfall Problem, it is ensured that wagon flow it is unimpeded, and travel safety is improved, so using mechanically or chemically being removed the snow.Snow removal with machine With maneuverability, speed it is fast, do not limited by temperature, it is applied widely the features such as, but there is poor, fragile road surface of removing rate etc. Deficiency, and chemistry snow removing fado carries out snow melt using Snow Agent, can make up the deficiency of snow removal with machine, be a kind of effective snow melt Freezing cold section.But, Snow Agent is larger to environmental hazard to traffic infrastructure seriously corroded, and improper use will also cause greening Vegetation mortality, in addition, the snow-broth containing Snow Agent composition is penetrated into after earth's surface, can also pollute rivers, underground water, destruction is ecological Environment, though and organic Snow Agent based on CMA has environmentally friendly, free of contamination feature, its exist it is expensive, melt The shortcomings of dust and penetrating odor being formed when snowization ice ability is not as sodium chloride, spreading, therefore, with fast snow melting performance, And adding that dosage is small, the development of the low Snow Agent of use cost receives people and more and more paid close attention to, among these, for snow melt The check and evaluation device of agent performance is then to ensure one of important tool that Snow Agent is developed.
The content of the invention
Main purpose of the present utility model is that snow melt can be carried out there is provided one kind by solving problems of the prior art Agent Thaw performance and corrosive reliable detection, so as to ensure that low dose of, cost is low and there is the Snow Agent of fast snow melting performance Accurate development, to realize the efficient snow removing of winter road network, and reduce the detection of the infringement to environment and traffic infrastructure and melt The equipment for avenging agent performance.
In order to solve the above technical problems, the technical solution adopted in the utility model is:It is a kind of to detect setting for Snow Agent performance It is standby, wherein the equipment of the detection Snow Agent performance includes Thaw performance detection part and corrosive nature detection part, it is described to melt Snow performance detection part is disposed adjacent with the corrosive nature detection part, and the Thaw performance detection part is set to by snow melt Performance detection body, ice hockey forming room and thawing room's composition, the Thaw performance detect the neighbouring setting institute in inner chamber of body Ice hockey forming room and the thawing room are stated, and the upper part of the inner chamber of Thaw performance detection body also sets up a longeron;
The ice hockey forming room is set to include refrigerating plant, motor, rotating shaft, guide rail, upper mould and lower shaping mould Tool, the refrigerating plant is corresponding to be arranged on the left and right wall of the inner chamber of the ice hockey forming room, and the motor is arranged at institute On the top cover for stating Thaw performance detection body, and the output shaft of the motor is set to connect one end of the rotating shaft, the rotating shaft Two parts up and down oppositely oriented external screw thread is set, the bottom split-phase of the rotating shaft coordinates is arranged a sliding block, and the rotating shaft The left and right sides is corresponding to be vertically arranged the guide rail, and the guide rail is fixed on the rear wall of the inner chamber of the ice hockey forming room, institute State mould by movable block be slideably positioned in the upper part of the rotating shaft with the guide rail, and on this on mould Water inlet and delivery port are set, and the upper mould is engaged with the structure of the lower mould, and the upper shaping mould Tool is homogeneously correspondingly arranged between two groups of left and right, upper mould described in two groups of left and right with the lower mould passes through an inverted U Pipe is connected, and the lower mould is articulated with the longeron by a supporting plate, and the lower surface of the supporting plate is hinged one Push rod, the other end of the push rod is articulated with the sliding block;
The thawing room is set to include left reaction tube, right reaction tube and U-tube, the left reaction tube and the right reaction Cylinder is corresponding respectively to be arranged at the lower section that mould is played described in two groups of left and right, the bottom of the left reaction tube and the right reaction tube Portion is connected by the U-tube, and the left reaction tube is respectively provided with a weight sensor, the left side with the right reaction tube bottom The top of reaction tube, which is set up separately, puts an inlet, a centrally disposed control valve for the U-tube.
Further, the corrosive nature detection part is set to include corrosive nature detection body, the first reaction tube, the Two reaction tubes, water replanishing device and lowering or hoisting gear, the inner chamber of the corrosive nature detection body are disposed adjacent the described of same size First reaction tube and second reaction tube, and the inner chamber of corrosive nature detection body is horizontally disposed with an installing plate, described the One reaction tube is respectively provided with the water replanishing device with second reaction tube, and the water replanishing device is arranged at the corrosive nature detection On the rear wall of the inner chamber of body, the lowering or hoisting gear passes vertically through the installing plate, and the lower end of the lowering or hoisting gear sets sample Product.
Further, the water replanishing device is set to include water supply tank, siphon pipe and pressure sensor, and the water supply tank is set On the rear wall for being placed in the inner chamber of the corrosive nature detection body, and the lower end of the water supply tank sets a water inlet, the siphon The water supply tank is inserted in one end of pipe, and the other end of the siphon pipe inserts first reaction tube or second reaction tube Interior, the pressure sensor is arranged on the bottom wall of the water supply tank.
Further, the lowering or hoisting gear is set to include electromagnetic adsorption seat, support bar, spring, magnetic element and spring Lock, the electromagnetic adsorption seat is arranged on the top cover of the corrosive nature detection body, and the underface of electromagnetic adsorption seat is erected Coaxial line on the support bar, the support bar is directly set to be arranged the spring, the top center of the support bar sets described Magnetic element, the bottom of the support bar is connected by cotton rope also sets up a row bayonet socket, institute on the test agent, and the support bar The upper surface that springlock is arranged at the installing plate is stated, and the springlock is arranged on the support bar.
Further, the lower part of the rotating shaft also sets up a retaining mechanism.
Further, the lower surface of the upper mould sets an annular protrusion, the upper surface of the lower mould One annular groove of corresponding setting, the annular protrusion is engaged with the structure of the annular groove, in the annular groove also One sealing ring is set, and the sealing ring is interference fitted with the annular protrusion.
Further, it is respectively provided with a heat-insulation layer on the inner chamber wall of the ice hockey forming room.
The utility model has the advantages and positive effects of:
(1) by the setting of Thaw performance detection part and corrosive nature detection part, Snow Agent performance can be carried out Assess, so that the accurate development of low dose of, low cost and the Snow Agent with fast snow melting performance is better achieved, ice hockey shaping Room and the Integral design of thawing room, improve the automaticity of detection device, and simplify operating process.
(2) refrigerating plant of ice hockey forming room, motor, rotating shaft, guide rail, upper mould and lower mould, energy are passed through Enough when being tested so that upper mould well engages with lower mould, then is entered by the water inlet of upper mould Water, when the delivery port of mould on opposite side, which detects current, to be overflowed, control section control stops supplying water, while starting system Device for cooling works, when the water-setting between upper mould and lower mould forms ice hockey, closes refrigerating plant, starts motor Rotate forward, rotating shaft drives movable block to be moved up and down respectively simultaneously with sliding block, so that the steady rising of mould is realized, and under Mould is gradually tilted under the cooperation of push rod and sliding block, and ice hockey is fallen into the reaction tube in thawing room, the experiment of two groups of left and right, The accuracy of the testing result is improved, in addition, the setting of inverted U pipe ensure that the volume phase of the two groups of dies cavity water in left and right Together.
(3) left reaction tube, right reaction tube and the U-tube set by thawing room, be able to will first be matched somebody with somebody in ice-melt by inlet The Snow Agent liquid put is added in left reaction tube, under the cooperation of U-tube, left reaction tube and the liquid capacity in right reaction tube All the time equal, after experiment setting solution addition terminates, then control section closing control valve causes the ice hockey of ice hockey forming room again Fall into each reaction tube, the data finally according to the two groups of experiments in left and right calculate the Thaw performance of the Snow Agent.
(4) setting by the reaction tube of corrosive nature detection part first, the second reaction tube, water replanishing device and lowering or hoisting gear Meter, results in more accurate experimental data, and water replanishing device then can guarantee that and fill into the temperature of water close to the water in reaction tube Temperature, is prevented effectively from interference of the temperature difference to experimental result.
Brief description of the drawings
Fig. 1 is cross section structure diagram of the present utility model.
Fig. 2 is the partial enlargement structural representation in Fig. 1.
Fig. 3 is the right side structural representation of corrosive nature detection part in Fig. 1.
Fig. 4 is structural representation when Thaw performance detection part works in Fig. 1.
In figure:10- Thaw performance detection parts, 101- Thaw performances detection body, 1011- longerons, the shaping of 102- ice hockeys Shaping mould under room, 1021- refrigerating plants, 1022- motors, 1023- rotating shafts, 1024- guide rails, the upper moulds of 1025-, 1026- Tool, 1027- sliding blocks, 1028- inverted U pipes, 1029- push rods, 103- thawing room, the left reaction tubes of 1031-, the right reaction tubes of 1032-, 1033- weight sensors, 20- corrosive nature detection parts, 201- corrosive natures detection body, the reaction tubes of 202- first, 203- Second reaction tube, 204- installing plates, 205- test agents, 206- water supply tanks, 207- siphon pipes, 208- pressure sensors, 209- electricity Magnetic suck seat, 210- support bars, 211- magnetic elements, 212- springlocks.
Embodiment
In order to be better understood from the utility model, traveling one is entered to the utility model with reference to specific embodiments and the drawings The description of step.
As Figure 1-Figure 4, a kind of equipment for detecting Snow Agent performance, including Thaw performance detection part 10 and corrosivity Energy detection part 20, Thaw performance detection part 10 is disposed adjacent with corrosive nature detection part 20, Thaw performance detection part 10 are set to be made up of Thaw performance detection body 101, ice hockey forming room 102 and thawing room 103, Thaw performance detection body 101 inner chamber is neighbouring to set ice hockey forming room 102 and thawing room 103, and the Thaw performance detects the inner chamber of body 101 Upper part also sets up a longeron 1011, can by the setting of Thaw performance detection part 10 and corrosive nature detection part 20 Snow Agent performance is estimated, so that the Snow Agent that low dose of, low cost is better achieved and there is fast snow melting performance Accurate to develop, the Integral design of ice hockey forming room 102 and thawing room 103 improves the automaticity of detection device, and simplify Operating process.
Ice hockey forming room 102 is set to include refrigerating plant 1021, motor 1022, rotating shaft 1023, guide rail 1024, upper shaping Mould 1025 and lower mould 1026, the left and right wall of the corresponding inner chamber for being arranged at ice hockey forming room 102 of refrigerating plant 1021 On face, motor 1022 is arranged on the top cover of Thaw performance detection body 101, and the output shaft of the motor 1022 is set to connection One end of rotating shaft 1023, two parts up and down of rotating shaft 1023 set oppositely oriented external screw thread, and the bottom split-phase of rotating shaft 1023 is matched somebody with somebody Trap sets a sliding block 1027, and the rotating shaft 1023 the left and right sides it is corresponding be vertically arranged guide rail 1024, guide rail 1024 is fixed on On the rear wall of the inner chamber of ice hockey forming room 102, upper mould 1025 is slideably positioned in the top of rotating shaft 1023 by movable block Divide with setting water inlet and delivery port, upper mould 1025 and lower shaping on guide rail 1024, and on this on mould 1025 The structure of mould 1026 is engaged, and upper mould 1025 is homogeneously correspondingly arranged two groups of left and right with lower mould 1026, left Connected on right two groups between mould 1025 by an inverted U pipe 1028, lower mould 1026 is cut with scissors by a supporting plate It is connected on longeron 1011, the lower surface of supporting plate is hinged a push rod 1029, and the other end of push rod 1029 is articulated with sliding block 1027, When being tested so that upper mould 1025 well engages with lower mould 1026, then passes through upper mould 1025 Water inlet is intake, when the delivery port of mould 1025 on opposite side, which detects current, to be overflowed, and control section control stops supplying Water, while start refrigerating plant work, when the water-setting between upper mould 1025 and lower mould 1026 forms ice hockey, Refrigerating plant is closed, starts motor 1022 and rotates forward, rotating shaft 1023 drives movable block to be moved up and down respectively simultaneously with sliding block 1027, from And the steady rising of upper mould 1025 is realized, and lower mould 1026 is under the cooperation of push rod 1029 and sliding block 1027 Gradually tilt, ice hockey is fallen into the reaction tube in thawing room 103, the experiment of two groups of left and right improves the accuracy of the testing result, In addition, the setting of inverted U pipe 1028 ensure that the volume of the two groups of dies cavity water in left and right is identical.
Thawing room 103 is set to include left reaction tube 1031, right reaction tube 1032 and U-tube, left reaction tube 1031 and the right side The reaction tube 1032 corresponding lower section for being arranged at mould 1026 under two groups of left and right, left reaction tube 1031 and right reaction tube respectively 1032 bottom is connected by U-tube, and left reaction tube 1031 is respectively provided with a weight sensor with the right bottom of reaction tube 1032 1033, the top of left reaction tube 1031, which is set up separately, puts an inlet, a centrally disposed control valve for the U-tube, during ice-melt, first by Inlet adds the Snow Agent liquid configured in left reaction tube 1031, under the cooperation of U-tube, left reaction tube 1031 and the right side Liquid capacity in reaction tube 1032 is equal all the time, after experiment setting solution addition terminates, control section closing control valve, then Again so that the ice hockey of ice hockey forming room 102 is fallen into each reaction tube, the data finally according to the two groups of experiments in left and right calculate the snow melt The Thaw performance of agent.
It is anti-that corrosive nature detection part 20 is set to include corrosive nature detection body 201, the first reaction tube 202, second Answer cylinder 203, water replanishing device and lowering or hoisting gear, it is first anti-that the inner chamber of corrosive nature detection body 201 is disposed adjacent same size The reaction tube 203 of cylinder 202 and second is answered, and the inner chamber of corrosive nature detection body 201 is horizontally disposed with an installing plate 204, first The reaction tube 203 of reaction tube 202 and second is respectively provided with water replanishing device, and water replanishing device is arranged at the interior of corrosive nature detection body 201 On the rear wall of chamber, lowering or hoisting gear passes vertically through installing plate 204, and the lower end of the lowering or hoisting gear sets test agent 205, the first reaction The setting of the reaction tube 203 of cylinder 202 and second, results in more accurate experimental data, and water replanishing device then can guarantee that and fill into The temperature of water is prevented effectively from interference of the temperature difference to experimental result close to the water temperature in reaction tube.
Water replanishing device is set to include water supply tank 206, siphon pipe 207 and pressure sensor 208, and water supply tank 206 is arranged at On the rear wall of the inner chamber of corrosive nature detection body 201, and the lower end of the water supply tank 206 sets a water inlet, siphon pipe 207 Water supply tank 206 is inserted in one end, and the other end of the siphon pipe 207 is inserted in the first reaction tube 202 or the second reaction tube 203, pressure Force snesor 208 is arranged on the bottom wall of water supply tank 206, constant using solution concentration in siphon principle maintenance reaction cylinder, it is ensured that The uniformity of experiment condition, pressure sensor 208 detects the hydraulic pressure in water supply tank in real time, to realize control section to water supply tank 206 carry out timely water filling, improve accuracy of detection.
Lowering or hoisting gear is set to include electromagnetic adsorption seat 209, support bar 210, spring, magnetic element 211 and springlock 212, electromagnetic adsorption seat 209 is arranged on the top cover of corrosive nature detection body 201, and the underface of electromagnetic adsorption seat 209 Coaxial line sheathed spring on support bar 210, support bar 210 is vertically arranged, the top center of support bar 210 sets magnetic element 211, the bottom of support bar 210 is connected by cotton rope also sets up a row bayonet socket, springlock on test agent 205, and the support bar 210 212 are arranged at the upper surface of installing plate 204, and the springlock 212 is arranged on support bar 210, are carried out using alternation of wetting and drying method The corrosive nature detection of Snow Agent, when needing test agent 205 to immerse in the snow melt agent solution in reaction tube, control section is opened Springlock 212, test agent 205 extends to be displaced downwardly in snow melt agent solution and reacted in the presence of spring power, and is needing When wanting test agent 205 positioned at Snow Agent superjacent, then electromagnetic adsorption seat 209 is powered, magnetic element 211 is acted in absorption affinity Under rise with support bar 210, after electromagnetic adsorption seat 209 and the adhesive of magnetic element 211, control springlock 212 and bayonet fittings Realize that support bar 210 is locked, then electromagnetic adsorption seat 209 is powered off, so as to complete a During Flooding And Draining Alternating Process.
The lower part of rotating shaft 1023 also sets up a retaining mechanism, and sliding block 1027 is fixed in rotating shaft 1023 by retaining mechanism, So that upper mould 1025 well engages with lower mould 1026, the consistent of Thaw performance test experience condition is realized Property, further improve experimental precision.
The lower surface of upper mould 1025 sets an annular protrusion, and the upper surface of lower mould 1026 is corresponding to be set One annular groove, annular protrusion is engaged with the structure of annular groove, and a sealing ring, sealing ring and ring are also set up in annular groove Shape projection interference fit, the cooperation of annular protrusion, annular groove and interference seal circle effectively enhances the close of mould chamber Sealing property, to ensure into the experimental precision during ice.
A heat-insulation layer is respectively provided with the inner chamber wall of ice hockey forming room 102, ice hockey during ice is ensured into by heat-insulation layer The temperature of forming room 102, reduces energy resource consumption.
The equipment of the detection Snow Agent performance provided using the utility model, can carry out Snow Agent Thaw performance and corrosion Property reliable detection, so as to ensure that low dose of, cost is low and accurate development of Snow Agent with fast snow melting performance.When this sets During standby work so that upper mould 1025 well engages with lower mould 1026, then entering by upper mould 1025 The mouth of a river intakes, when the delivery port of mould 1025 on opposite side, which detects current, to be overflowed, and control section control stops supplying water, Start refrigerating plant work simultaneously, when the water-setting between upper mould 1025 and lower mould 1026 forms ice hockey, close Refrigerating plant is closed, and is added the Snow Agent liquid configured in left reaction tube 1031 by inlet, under the cooperation of U-tube, Left reaction tube 1031 is equal all the time with the liquid capacity in right reaction tube 1032, after experiment setting solution addition terminates, control unit Divide closing control valve, then restart motor 1022 and rotate forward, rotating shaft 1023 drives movable block with sliding block 1027 while above and below respectively It is mobile, so as to realize the steady rising of mould 1025, and lower mould 1026 in push rod 1029 and sliding block 1027 Cooperation under gradually tilt, ice hockey is fallen into the reaction tube in thawing room 103, finally by weight sensor 1033 detection believe Cease, and the Thaw performance of the Snow Agent is calculated according to the data of the two groups of experiments in left and right, during being somebody's turn to do, while being injected in reaction tube Snow melt agent solution, and it is constant using solution concentration in siphon principle maintenance reaction cylinder by water replanishing device, and pressure sensor 208 is real When detection water supply tank in hydraulic pressure, to realize that control section carries out timely water filling to water supply tank 206, using alternation of wetting and drying method carry out The corrosive nature detection of Snow Agent, when needing test agent 205 to immerse in the snow melt agent solution in reaction tube, control section is opened Springlock 212, test agent 205 extends to be displaced downwardly in snow melt agent solution and reacted in the presence of spring power, and is needing When wanting test agent 205 positioned at Snow Agent superjacent, then electromagnetic adsorption seat 209 is powered, magnetic element 211 is acted in absorption affinity Under rise with support bar 210, after electromagnetic adsorption seat 209 and the adhesive of magnetic element 211, control springlock 212 and bayonet fittings Realize that support bar 210 is locked, then electromagnetic adsorption seat 209 is powered off, so as to complete a During Flooding And Draining Alternating Process, multiple alternation of wetting and drying After experiment, take out test agent 205 and remove its surface iron rust, drying is heavy, record Weight loss data is to analyze, finally according to difference The Thaw performance and corrosivity of Snow Agent are improved development.
Embodiment of the present utility model is described in detail above, but the content is only of the present utility model preferable Embodiment, it is impossible to be considered as being used to limit practical range of the present utility model.All impartial changes made according to the utility model scope Change and improvement etc., all should still be belonged within this patent covering scope.

Claims (7)

1. a kind of equipment for detecting Snow Agent performance, it is characterised in that:The equipment of the detection Snow Agent performance includes snow melt Energy detection part and corrosive nature detection part, the Thaw performance detection part is adjacent with the corrosive nature detection part to be set Put, the Thaw performance detection part is set to be made up of Thaw performance detection body, ice hockey forming room and thawing room, described to melt The neighbouring setting ice hockey forming room in inner chamber and the thawing room of performance detection body are avenged, and Thaw performance detection is originally The upper part of the inner chamber of body also sets up a longeron;
The ice hockey forming room is set to include refrigerating plant, motor, rotating shaft, guide rail, upper mould and lower mould, institute State that refrigerating plant is corresponding to be arranged on the left and right wall of the inner chamber of the ice hockey forming room, the motor is arranged at the snow melt On the top cover of performance detection body, and the output shaft of the motor is set to connect above and below one end of the rotating shaft, the rotating shaft Two parts set oppositely oriented external screw thread, and the bottom split-phase of the rotating shaft, which coordinates, is arranged a sliding block, and the left and right two of the rotating shaft Side is corresponding to be vertically arranged the guide rail, and the guide rail is fixed on the rear wall of the inner chamber of the ice hockey forming room, it is described on into Pattern tool by movable block be slideably positioned in the upper part of the rotating shaft with set on the guide rail, and on this on mould into The mouth of a river and delivery port, the upper mould are engaged with the structure of the lower mould, and the upper mould and institute Lower mould is stated homogeneously to be correspondingly arranged between two groups of left and right, upper mould described in two groups of left and right by inverted U pipe connection, The lower mould is articulated with the longeron by a supporting plate, and the lower surface of the supporting plate is hinged a push rod, institute The other end for stating push rod is articulated with the sliding block;
The thawing room is set to include left reaction tube, right reaction tube and U-tube, the left reaction tube and the right reaction tube point The not corresponding lower section for being arranged at lower mould described in two groups of left and right, the bottom of the left reaction tube and the right reaction tube leads to The U-tube connection is crossed, and the left reaction tube is respectively provided with a weight sensor, the left reaction with the right reaction tube bottom The top of cylinder, which is set up separately, puts an inlet, a centrally disposed control valve for the U-tube.
2. the equipment of detection Snow Agent performance according to claim 1, it is characterised in that:The corrosive nature detection part It is set to include corrosive nature detection body, the first reaction tube, the second reaction tube, water replanishing device and lowering or hoisting gear, the corrosion The inner chamber of performance detection body is disposed adjacent first reaction tube and second reaction tube of same size, and the corrosivity It can detect that the inner chamber of body is horizontally disposed with an installing plate, first reaction tube is respectively provided with the moisturizing with second reaction tube Device, the water replanishing device is arranged on the rear wall of the inner chamber of the corrosive nature detection body, and the lowering or hoisting gear is worn vertically The installing plate is crossed, and the lower end of the lowering or hoisting gear sets test agent.
3. the equipment of detection Snow Agent performance according to claim 2, it is characterised in that:The water replanishing device is set to bag Water supply tank, siphon pipe and pressure sensor are included, the water supply tank is arranged at the rear wall of the inner chamber of the corrosive nature detection body On, and the lower end of the water supply tank sets a water inlet, and the water supply tank is inserted in one end of the siphon pipe, and the siphon pipe is another One end is inserted in first reaction tube or second reaction tube, and the pressure sensor is arranged at the bottom wall of the water supply tank On.
4. the equipment of detection Snow Agent performance according to claim 2, it is characterised in that:The lowering or hoisting gear is set to bag Electromagnetic adsorption seat, support bar, spring, magnetic element and springlock are included, the electromagnetic adsorption seat is arranged at the corrosive nature inspection On the top cover for surveying body, and the underface of electromagnetic adsorption seat is vertically arranged coaxial line set on the support bar, the support bar If the spring, the top center of the support bar sets the magnetic element, and the bottom of the support bar is connected by cotton rope A row bayonet socket is also set up on the test agent, and the support bar, the springlock is arranged at the upper surface of the installing plate, and should Springlock is arranged on the support bar.
5. the equipment of detection Snow Agent performance according to claim 1, it is characterised in that:The lower part of the rotating shaft is also set Put a retaining mechanism.
6. the equipment of detection Snow Agent performance according to claim 1, it is characterised in that:The following table of the upper mould Face sets an annular protrusion, and the upper surface of the lower mould is corresponding to set an annular groove, the annular protrusion and institute The structure for stating annular groove is engaged, and a sealing ring, the sealing ring and the annular protrusion are also set up in the annular groove Interference fit.
7. the equipment of detection Snow Agent performance according to claim 1, it is characterised in that:The inner chamber of the ice hockey forming room A heat-insulation layer is respectively provided with wall.
CN201720128435.3U 2017-02-13 2017-02-13 A kind of equipment for detecting Snow Agent performance Expired - Fee Related CN206431003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720128435.3U CN206431003U (en) 2017-02-13 2017-02-13 A kind of equipment for detecting Snow Agent performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720128435.3U CN206431003U (en) 2017-02-13 2017-02-13 A kind of equipment for detecting Snow Agent performance

Publications (1)

Publication Number Publication Date
CN206431003U true CN206431003U (en) 2017-08-22

Family

ID=59591652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720128435.3U Expired - Fee Related CN206431003U (en) 2017-02-13 2017-02-13 A kind of equipment for detecting Snow Agent performance

Country Status (1)

Country Link
CN (1) CN206431003U (en)

Similar Documents

Publication Publication Date Title
CN103969407B (en) Device for evaluating foaming property of air-soluble surface active agent and application of device
CN103018152A (en) Indoor grouting testing device under simulation of complex stress effect and testing method thereof
CN202956329U (en) Indoor grouting test device under action of simulated complex stress
CN107589146B (en) High-temperature mine obturation accumulation of heat heat release experimental simulation device and method
CN106644385B (en) Surface water and underground water subsurface flow exchange self-circulation test device and use method
CN106706697A (en) Model test device for simulating pre-cooling freezing method construction under flowing effect of underground water
CN105092578B (en) Moisture transition process follow-up mechanism and its experimental method in a kind of frozen soil
CN107191159A (en) Oil well tube rod moving tube bridge sewage collection system and oil well tube rod moving tube bridge dirt collection system
CN206114446U (en) Pavement base material antiscour capability test device
CN107288608A (en) A kind of mixing device with pressure for oil field compression fracture
CN106223877A (en) The automatic well washing apparatus of coal bed gas well
CN206431003U (en) A kind of equipment for detecting Snow Agent performance
CN208857807U (en) It is a kind of to fill sluicing and water charging system for large scale ship
CN203117135U (en) Concrete freezing and thawing tester
CN208270255U (en) A kind of differential ground water fixed depth acquisition device
CN211006632U (en) Freezing decontamination device with variable diameter and length
CN108817051B (en) System and method for ex-situ remediation of contaminated soil based on natural cold energy
CN208075951U (en) A kind of weir flow manual measurement container
CN203616225U (en) Device for identifying foaming performance of shield residue soil improving foaming agent
CN205686379U (en) A kind of carwash pool structure for cold district job site
CN204041055U (en) The direct metering device of a kind of single-well crude oil oil and gas production
CN112304846A (en) Engineering building material waterproof detection device and monitoring method thereof
CN103335864B (en) A kind of crude oil sample sampler for tracer technique between oil well
CN221405661U (en) Hydrologic test instrument
CN103076433B (en) Experimental device for testing foaming sol adsorbing dusts

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822