CN206429247U - Waterproof tunnel lining segment structure capable of being prefabricated - Google Patents

Waterproof tunnel lining segment structure capable of being prefabricated Download PDF

Info

Publication number
CN206429247U
CN206429247U CN201621057680.1U CN201621057680U CN206429247U CN 206429247 U CN206429247 U CN 206429247U CN 201621057680 U CN201621057680 U CN 201621057680U CN 206429247 U CN206429247 U CN 206429247U
Authority
CN
China
Prior art keywords
lining
lining cutting
jurisdiction
prefabricated
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621057680.1U
Other languages
Chinese (zh)
Inventor
苏玉宝
郭立军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201621057680.1U priority Critical patent/CN206429247U/en
Application granted granted Critical
Publication of CN206429247U publication Critical patent/CN206429247U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a prefabricated waterproof tunnel lining segment structure, which comprises a plurality of spliced lining splicing units, wherein each lining splicing unit consists of two I-shaped segments and two L-shaped segments, the two L-shaped segments are arranged at two sides in a mutually opposite state, and the two I-shaped segments are spliced between the two L-shaped segments, so that the whole lining splicing unit is in an arch square bar shape; the front side of lining cutting concatenation unit is equipped with curved arch, and the rear side of lining cutting concatenation unit is equipped with the bellied recess of matching, be equipped with the slip casting hole that is used for pouring into concrete slurry into on the recess, realize the concatenation through pouring into concrete slurry into toward the slip casting hole between two lining cutting concatenation units. The utility model discloses a prefabricated tunnel lining section of jurisdiction can reduce tunnel lining's construction cycle, because the lining cutting major structure all adopts prefabrication in the field, consequently has avoidd because the concrete strength durability consequence such as not up to standard that the abominable construction environment in scene leads to, has improved construction quality greatly, has practiced thrift manpower and equipment resource in a large number simultaneously, has embodied the development direction of national green construction, has good application prospect in tunnel engineering.

Description

A kind of waterproof tunnel lining segment structure that can be prefabricated
Technical field
The utility model is related to a kind of supporting construction in tunnel construction field, refer specifically to it is a kind of can be prefabricated Waterproof tunnel lining segment structure.
Background technology
At present, drilling and blasting method is still the main method excavated in China's constructing tunnel at present, with applicable geological conditions is wide, tunnel The advantages of road excavates part expense bottom.But, problems can be but brought during subsequent lining construction.The lining of drilling and blasting method The method that construction often uses cast in situs is built, because of the particularity of concrete structure, its intensity profile has larger in terms of the time It is required that, and construction environment tends not to meet the humidity and temperature needed for casting concrete in tunnel, causes concrete lining Intensity and durability after shaping are extremely difficult to requirement, and another aspect poured in place concrete needs substantial amounts of manpower and early stage branch Equipment is protected, and the operating environment at scene is unstable, and serious potential safety hazard, the above are brought to workmen and construction equipment It is a variety of to cause the consequences such as constructing tunnel cycle length, high cost.
Therefore, drilling and blasting method lining cutting site operation efficiency and construction quality are improved, construction cost is reduced, is to bore quick-fried at present One of Main way of method constructing tunnel development.
Utility model content
The utility model is in order to solve the above-mentioned deficiency of prior art, it is proposed that a kind of waterproof tunnel-liner pipe that can be prefabricated Chip architecture, is particularly suitable for use in the lining construction excavated with drilling and blasting method.
In order to solve the above-mentioned technical problem, the utility model uses following technical scheme:A kind of anti-water tunnel that can be prefabricated Lining segment structure, includes the lining cutting concatenation unit of multiple phases splicing, the lining cutting concatenation unit is by two panels I-tube piece and L-type Section of jurisdiction is constituted, wherein, two panels L-type section of jurisdiction is arranged on both sides in opposed state, and two panels I-tube piece splices in two panels L-type pipe Between piece so that whole lining cutting concatenation unit is in arcuation square bar;The front side of the lining cutting concatenation unit is provided with the projection of arc, The rear side of lining cutting concatenation unit is provided with the slip casting for being used for injecting concrete slurry provided with the raised groove of matching, the groove Spliced between hole, two lining cutting concatenation units by being realized toward injection concrete slurry in injected hole.
Preferably, the splicing of the I-tube piece and L-type section of jurisdiction, which is prolonged, is designed with male projection and female groove, the I on side All it is mutually to be spliced with female groove using male projection between type section of jurisdiction and L-type section of jurisdiction, between I-tube piece and I-tube piece.
Preferably, the male projection is ramp-like in dipping down, and the bottom of the female groove is provided with osculum, described lining The drainpipe of the osculum leak is accepted provided with matching in the back side for building concatenation unit.
Preferably, raised and female groove the joint of the male is provided with for bolt lock-bit and vertically runs through two panels The prepared screw-bolt hole on side is prolonged in the splicing of section of jurisdiction.
Preferably, the lining cutting concatenation unit is extended transversely through provided with the zip hole for being used for bolt to drawing fixation.
Preferably, the both sides of the lining cutting concatenation unit correspond to the both sides tunnel side cushion cap for being fixed on tunnel base respectively On.
Compared with prior art, prefabricated tunnel lining segment of the present utility model, it is possible to reduce the construction week of tunnel-liner Phase, because lining cutting agent structure uses prefabricated in field, therefore the coagulation caused by live severe construction environment is evaded The consequence such as native strength durable is not up to standard, substantially increases construction quality, while substantial amounts of saved manpower and device resource, body The developing direction of national green construction is showed, has been had a good application prospect in Tunnel Engineering.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is the sectional view at I-I of the present utility model.
Embodiment
Utility model is described in detail with reference to the accompanying drawings and examples.
As shown in Figure 1,2 and 3, the utility model proposes waterproof tunnel lining segment structure that can be prefabricated, it is including multiple The lining cutting concatenation unit mutually spliced, lining cutting concatenation unit is made up of two panels I-tube piece 2 and L-type section of jurisdiction 4, and two panels L-type section of jurisdiction is in phase The state of opposition is arranged on both sides, and two panels I-tube piece splices between two panels L-type section of jurisdiction so that entirely lining cutting concatenation unit is in Arcuation square bar.Specific connecting method is referring to Fig. 2.
The front side of lining cutting concatenation unit is provided with the projection 8 of arc, and the rear side of lining cutting concatenation unit is provided with the recessed of matching projection 8 Groove 9, that is, I-tube piece 2 and L-type section of jurisdiction 4 are designed with projection 8 in prolonging for front side on side, and I-tube piece 2 and L-type section of jurisdiction 4 Rear side prolongs side and is designed with groove 9, can thus keep the uniformity of the raised setting with groove of lining cutting concatenation unit.
Groove 9 is provided between the injected hole 1 for being used for injecting concrete slurry, two lining cutting concatenation units by past slip casting Injection concrete slurry realizes splicing in hole 1.
The splicing of I-tube piece and L-type section of jurisdiction, which is prolonged, is designed with male projection 12 and female groove 13, I-tube piece and L-type on side All it is mutually to be spliced with female groove 13 using male projection 12 between section of jurisdiction, between I-tube piece and I-tube piece.
Male projection 12 is ramp-like in dipping down, and the bottom of female groove 13 is provided with osculum 11, and described lining cutting splicing is single The drainpipe 6 of the leak of osculum 11 is accepted provided with matching in the back side of member.
The joint of male projection 12 and female groove 13 is provided with for bolt lock-bit and vertically through two panels section of jurisdiction The prepared screw-bolt hole 10 on side is prolonged in splicing.
Lining cutting concatenation unit is extended transversely through provided with the zip hole 7 for being used for bolt to drawing fixation.The both sides of lining cutting concatenation unit Correspond to respectively and be fixed on tunnel base(5)Both sides tunnel side cushion cap on.
In the utility model, each prefabricated lining cutting of circle is spliced, respectively two panels I-tube piece 2 by four sections of jurisdiction With two panels L-type section of jurisdiction 4, construction period sets up tunnel base 5 first, then in its sidepiece splicing L-type section of jurisdiction 4, finally completes I types Section of jurisdiction and the splicing of L-type section of jurisdiction.Section of jurisdiction splicing construction splicing between section of jurisdiction as shown in Figure 3, sets recessed between two panels section of jurisdiction Groove 13 and projection 12, and setting is tilted down, and osculum 11 is set in the end of groove 12, osculum is connected to drainpipe 6, filled Dividing prevents tunnel because of ponding caused by lining cutting leak.After the completion of the tentatively splicing of section of jurisdiction, connecting bolt is attached to reserved bolt Among hole 10, water-proofing treatment then is carried out to bolt hole bottom.
Complete one to enclose after the assembly of lining cutting, along constructing tunnel direction, by this circle lining cutting female groove 9, with previous lining cutting public affairs The splicing of head projection 8 is integrated, and injects few to the gap between groove 9 and projection 8 followed by the reserved injected hole 1 on lining cutting top Concrete slurry is measured, prestressing force arrangement is carried out finally by reserved reinforcing bar or zip hole 7, tunnel-liner is connected as a single entity.
In summary, in prefabricated tunnel lining segment provided by the present invention, because all parts in its structure are all Prefabricated components, tunnel construction site progress assembly is transported to after precasting yard completes, then by all parts, therefore tunnel is applied Gib such as scaffold, template etc. are not needed during work, so as to substantially improve construction condition and construction content, is had Effect reduces the constructing tunnel duration, while largely saving labour cost;Additionally, due to each component can batch production it is prefabricated, because This can ensure architecture quality, such as intensity, durability, anti-corrosion and waterproof performance, so as to improve the integral construction matter in tunnel Amount.
Above-described embodiment only expresses several embodiments of the present utility model, and it describes more specific and detailed, but simultaneously Can not be therefore understands that being the limitation to the utility model the scope of the claims.It should be pointed out that for the ordinary skill people of this area For member, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this reality With new protection domain.Therefore, the utility model patent and protection domain should be defined by appended claims.

Claims (6)

1. a kind of waterproof tunnel lining segment structure that can be prefabricated, it is characterised in that:Splice single including the lining cutting that multiple phases are spliced Member, the lining cutting concatenation unit is by two panels I-tube piece(2)With L-type section of jurisdiction(4)Composition, wherein, two panels L-type section of jurisdiction is in opposed State be arranged on both sides, two panels I-tube piece splices between two panels L-type section of jurisdiction so that whole lining cutting concatenation unit is in arcuation Square bar;The front side of the lining cutting concatenation unit is provided with the projection of arc(8), the rear side of lining cutting concatenation unit is provided with matching projection (8)Groove(9), the groove(9)It is provided with the injected hole for being used for injecting concrete slurry(1), two lining cutting concatenation units Between pass through toward injected hole(1)Interior injection concrete slurry realizes splicing.
2. waterproof tunnel lining segment structure that as claimed in claim 1 can be prefabricated, it is characterised in that:The I-tube piece and L The splicing of type section of jurisdiction, which is prolonged, is designed with male projection on side(12)With female groove(13), between the I-tube piece and L-type section of jurisdiction, I All it is raised using male between type section of jurisdiction and I-tube piece(12)With female groove(13)Mutually splice.
3. waterproof tunnel lining segment structure that as claimed in claim 2 can be prefabricated, it is characterised in that:The male is raised (12)It is ramp-like in dipping down, the female groove(13)Bottom be provided with osculum(11), the back of the body of described lining cutting concatenation unit The osculum is accepted provided with matching in face(11)The drainpipe of leak(6).
4. waterproof tunnel lining segment structure that as claimed in claim 2 can be prefabricated, it is characterised in that:The male is raised (12)With female groove(13)Joint be provided with for bolt lock-bit and vertically prolong the pre- of side through the splicing of two panels section of jurisdiction Stay bolt hole(10).
5. waterproof tunnel lining segment structure that as claimed in claim 1 can be prefabricated, it is characterised in that:The lining cutting splicing is single Member is extended transversely through provided with the zip hole for being used for bolt to drawing fixation(7).
6. waterproof tunnel lining segment structure that as claimed in claim 1 can be prefabricated, it is characterised in that:The lining cutting splicing is single The both sides of member correspond to be fixed on tunnel base respectively(5)Both sides tunnel side cushion cap on.
CN201621057680.1U 2016-09-18 2016-09-18 Waterproof tunnel lining segment structure capable of being prefabricated Expired - Fee Related CN206429247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621057680.1U CN206429247U (en) 2016-09-18 2016-09-18 Waterproof tunnel lining segment structure capable of being prefabricated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621057680.1U CN206429247U (en) 2016-09-18 2016-09-18 Waterproof tunnel lining segment structure capable of being prefabricated

Publications (1)

Publication Number Publication Date
CN206429247U true CN206429247U (en) 2017-08-22

Family

ID=59588080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621057680.1U Expired - Fee Related CN206429247U (en) 2016-09-18 2016-09-18 Waterproof tunnel lining segment structure capable of being prefabricated

Country Status (1)

Country Link
CN (1) CN206429247U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184736A (en) * 2018-09-30 2019-01-11 山东建筑大学 One kind can apply prestressed tunnel constraint packed type pipe-plate lining structure and technique
CN109505624A (en) * 2018-09-27 2019-03-22 中铁隧道局集团有限公司 A kind of section of jurisdiction mortise and tenon formula shield tunnel construction
CN109915151A (en) * 2019-04-09 2019-06-21 范安安 Synchronous shield machine is drive in a kind of pair of filling boldly
CN110332011A (en) * 2019-08-12 2019-10-15 中铁第四勘察设计院集团有限公司 A kind of tunnel segment structure and tunnel-liner based on seam sluicing decompression

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505624A (en) * 2018-09-27 2019-03-22 中铁隧道局集团有限公司 A kind of section of jurisdiction mortise and tenon formula shield tunnel construction
CN109184736A (en) * 2018-09-30 2019-01-11 山东建筑大学 One kind can apply prestressed tunnel constraint packed type pipe-plate lining structure and technique
CN109184736B (en) * 2018-09-30 2023-09-26 山东建筑大学 Construction process of tunnel constraint filling type duct piece lining structure capable of applying prestress
CN109915151A (en) * 2019-04-09 2019-06-21 范安安 Synchronous shield machine is drive in a kind of pair of filling boldly
CN110332011A (en) * 2019-08-12 2019-10-15 中铁第四勘察设计院集团有限公司 A kind of tunnel segment structure and tunnel-liner based on seam sluicing decompression
CN110332011B (en) * 2019-08-12 2024-03-26 中铁第四勘察设计院集团有限公司 Segment structure based on joint drainage and depressurization and tunnel lining

Similar Documents

Publication Publication Date Title
CN206429247U (en) Waterproof tunnel lining segment structure capable of being prefabricated
AU2019303060B2 (en) Prefabricated wall and assembly structure for prefabricated building, and construction method therefor
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN202391019U (en) End part thickened grouting connector of steel bar
CN203669880U (en) Assembly type tunnel lining segment
CN105134009B (en) Sill coping concrete structure of frame structure infilled wall and construction method
CN106836479A (en) A kind of prefabricated PC concrete frame structure
CN105862990B (en) A kind of prefabrication and assembly construction shaft wall structure and its construction method
CN110005441B (en) Segment lining grouting system and method based on externally embedded channel and stretchable bag
CN103643966A (en) Prefabricated tunnel lining segment
CN203948108U (en) A kind of concreting moulding form of the tunnel with withe and dividing plate
CN204826429U (en) Cast member reinforcing bar grout connecting piece
CN110700439B (en) Prefabricated assembly type shear wall rapid formwork erecting connection construction method
CN109707052A (en) Assembled beam and plate connecting node
CN109914589B (en) Vertical connecting structure of prestressed reinforced concrete precast column and construction method thereof
CN104032850B (en) Precast shear wall dry type vertical connection nodes and construction method
CN107882050A (en) The manufacture method of the side plate of cap mold and cap mold
CN110107319A (en) A method of utilizing embedding arch shotcrete composite structure Strengthening Tunnel lining cutting
CN214301846U (en) Upper and lower block-divided open-cut tunnel prefabricated lining prestress connecting structure
CN106087881A (en) A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and construction technology thereof
CN210440048U (en) Die carrier suitable for curved well wall construction of multiple arch tunnel is used
CN110284705B (en) Sectional type formwork system for reinforcing concrete cylinder
CN209799982U (en) Assembled inverted arch structure suitable for drilling and blasting method tunnel
CN212507346U (en) Concrete splicing formwork for road and bridge construction
CN206189456U (en) Three cabin piping lanes

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822

Termination date: 20180918

CF01 Termination of patent right due to non-payment of annual fee