CN206428966U - Deformation joint template of shear wall structure - Google Patents

Deformation joint template of shear wall structure Download PDF

Info

Publication number
CN206428966U
CN206428966U CN201621399632.0U CN201621399632U CN206428966U CN 206428966 U CN206428966 U CN 206428966U CN 201621399632 U CN201621399632 U CN 201621399632U CN 206428966 U CN206428966 U CN 206428966U
Authority
CN
China
Prior art keywords
shaped
formwork
shear wall
pair
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621399632.0U
Other languages
Chinese (zh)
Inventor
杨佳佳
王艳国
刘瑞洲
董鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd
Original Assignee
SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd filed Critical SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd
Priority to CN201621399632.0U priority Critical patent/CN206428966U/en
Application granted granted Critical
Publication of CN206428966U publication Critical patent/CN206428966U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型具体为一种剪力墙结构变形缝模板,解决了现有剪力墙结构变形缝施工存在无法保证砼平整度、垂直度且影响结构安全性能的问题。包括定型模板和封头模板,两定型模板底端开有定位槽,每对定位槽内均穿有支撑套筒,支撑套筒内穿有横向支撑钢筋,两定型模板的内表面均固定有条状扁铁,条状扁铁之间设置有竖向支撑钢筋,竖向支撑钢筋顶端均设置有固定吊环,所有固定吊环内穿有一根贯通方木,定型模板之间穿有对拉螺杆;封头模板上设置有L型螺栓,每对L型螺栓的短边均插入条状扁铁和定型模板内,每对L型螺栓的长边上均拧有拉紧螺母。本实用新型有效提高了施工过程中的安全及质量问题,而且操作方便快捷,有效提高了施工效率。

The utility model is specifically a formwork for deformation joints of a shear wall structure, which solves the problems that the construction of the deformation joints of the existing shear wall structure cannot guarantee the flatness and verticality of concrete and affects the safety performance of the structure. Including the shaped formwork and the head formwork, the bottom of the two shaped formworks is provided with positioning grooves, and each pair of positioning grooves is equipped with a support sleeve, and the support sleeve is penetrated with a horizontal support steel bar. The inner surfaces of the two shaped formworks are fixed with strips Shaped flat iron, vertical support steel bars are arranged between strip flat irons, and fixed suspension rings are provided at the top of the vertical support steel bars, a through square wood is inserted in all the fixed suspension rings, and opposite-drawing screws are worn between the shaped templates; L-shaped bolts are arranged on the head template, and the short sides of each pair of L-shaped bolts are inserted into the strip flat iron and the shaped template, and tension nuts are screwed on the long sides of each pair of L-shaped bolts. The utility model effectively improves the safety and quality problems in the construction process, and the operation is convenient and fast, and the construction efficiency is effectively improved.

Description

剪力墙结构变形缝模板Shear wall structure deformation joint template

技术领域technical field

本实用新型涉及建筑结构主体施工模板,具体为一种剪力墙结构变形缝模板。The utility model relates to a construction template for a main body of a building structure, in particular to a deformation joint template for a shear wall structure.

背景技术Background technique

随着高层住宅成为城市建设中重要组成部分,变形缝的设计也在所难免。在施工变形缝模板安装过程中,特别是变形缝间距狭小时,常采用如下施工工艺:As high-rise residential buildings become an important part of urban construction, the design of deformation joints is inevitable. During the installation of formwork for construction deformation joints, especially when the distance between deformation joints is narrow, the following construction techniques are often used:

1、变形缝两侧剪力墙钢筋绑扎完毕后,在变形缝中间塞上与变形缝宽度一样的聚苯泡沫板,浇筑砼时,两侧剪力墙砼同时浇筑,由于泡沫板的密度小,整体垂直度不易控制,从而无法保证墙体垂直度,造价高,砼成型后竖向观感差。1. After the reinforcement of the shear walls on both sides of the deformation joint is bound, a polystyrene foam board with the same width as the deformation joint is inserted in the middle of the deformation joint. , the overall verticality is not easy to control, so that the verticality of the wall cannot be guaranteed, the cost is high, and the vertical perception after the concrete is formed is poor.

2、变形缝中间采用同变形缝宽度一样的木盒子,浇筑砼时,两侧剪力墙砼同时浇筑,木盒子无法拆除且成为刚性填充材料,影响变形缝功能,浪费材料。2. A wooden box with the same width as the deformation joint is used in the middle of the deformation joint. When pouring concrete, the shear wall concrete on both sides is poured at the same time. The wooden box cannot be removed and becomes a rigid filling material, which affects the function of the deformation joint and wastes materials.

传统的施工工艺比较繁杂,普遍无法保证剪力墙的构件尺寸、平整度、垂直度、剪力墙钢筋保护层厚度及砼密实度及观感质量,同时避免不了部分变形缝中钢筋裸露锈蚀,继而影响结构安全性能。The traditional construction technology is relatively complicated, and it is generally impossible to guarantee the component size, flatness, verticality, thickness of the protective layer of the shear wall reinforcement, concrete density and visual quality of the shear wall. At the same time, the exposed corrosion of the reinforcement in some deformation joints cannot be avoided. affect the safety performance of the structure.

发明内容Contents of the invention

本实用新型为了解决现有剪力墙结构变形缝施工存在无法保证砼平整度、垂直度且影响结构安全性能的问题,提供了一种剪力墙结构变形缝模板。The utility model provides a formwork for the deformation joint of the shear wall structure in order to solve the problem that the construction of the deformation joint of the existing shear wall structure cannot guarantee the flatness and verticality of the concrete and affect the safety performance of the structure.

本实用新型是采用如下技术方案实现的:剪力墙结构变形缝模板,包括设置在变形缝内且与左右两侧剪力墙墙体紧贴的定型模板和设置在变形缝前后两端的封头模板,两定型模板底端开有若干对左右对应且前后分布的定位槽,每对定位槽内均穿有与已浇筑砼楼面固定的支撑套筒,支撑套筒内穿有横向支撑钢筋,两定型模板的内表面均固定有若干块上下分布的条状扁铁,左右两侧的条状扁铁之间设置有若干与其紧贴且前后分布的竖向支撑钢筋,竖向支撑钢筋顶端均设置有固定吊环,所有固定吊环内穿有一根贯通方木,定型模板之间穿有若干两端均伸出剪力墙墙体的对拉螺杆;封头模板上设置有若干对与条状扁铁位置对应的L型螺栓,每对L型螺栓的短边均插入与其对应的条状扁铁和定型模板内,每对L型螺栓的长边上均拧有位于封头模板外侧的拉紧螺母。The utility model is realized by adopting the following technical scheme: the deformation joint formwork of the shear wall structure, including the shaping formwork arranged in the deformation joint and closely attached to the shear wall on the left and right sides, and the sealing heads arranged at the front and rear ends of the deformation joint Formwork, the bottom ends of the two shaped formworks are provided with several pairs of positioning grooves corresponding to the left and right and distributed front and rear, each pair of positioning grooves is pierced with a support sleeve fixed to the poured concrete floor, and the support sleeve is pierced with horizontal support steel bars, The inner surfaces of the two stereotyped templates are fixed with a number of strip-shaped flat irons distributed up and down. Between the strip-shaped flat irons on the left and right sides are arranged a number of vertical support bars that are close to them and distributed front and back. The tops of the vertical support bars are There are fixed lifting rings, all the fixing rings are pierced with a through square wood, and there are a number of pull screws with both ends extending out of the shear wall between the shaped templates; The L-shaped bolts corresponding to the iron position, the short sides of each pair of L-shaped bolts are inserted into the corresponding strip flat iron and the shaped template, and the long sides of each pair of L-shaped bolts are screwed with tensioning screws located outside the head template. nuts.

剪力墙结构变形缝中竖向支撑钢筋配合顶部的固定吊环及贯通方木使竖向支撑钢筋的刚性支撑整体统一,L型螺栓的设置防止变形缝内定位模板前后移动,从而保证了封口模板与定位模板的整体性能;进行模板拆除时,拆除对拉螺杆及L型螺栓后,将竖向支撑钢筋顶部的条状方木撤掉,然后再通过钢管穿入固定吊环旋转使其松动,接着用塔吊将竖向支撑钢筋和定型模板拆除并移走,定型模板拆除前,抽出加固用的螺杆并铲除相应的PVC套管抽出横向支撑钢筋并将支撑套筒铲除后,方可进行吊装,再把封头模板拆除,最后进行其它墙身模板的拆除,克服了现有剪力墙结构变形缝施工存在无法保证砼平整度、垂直度且影响结构安全性能的问题。In the deformation joint of the shear wall structure, the vertical supporting steel bar cooperates with the fixed suspension ring on the top and the through square wood to make the rigid support of the vertical supporting steel bar unified as a whole. The overall performance of the positioning formwork; when removing the formwork, after removing the pull screw and the L-shaped bolt, remove the strip-shaped square wood on the top of the vertical support reinforcement, and then pass the steel pipe through the fixed ring and rotate it to loosen it. Use a tower crane to remove and remove the vertical supporting steel bars and shaped formwork. Before removing the shaped formwork, pull out the reinforcing screw and remove the corresponding PVC casing. Pull out the horizontal supporting steel bars and remove the supporting sleeve before hoisting. The head formwork is removed, and finally the other wall formworks are removed, which overcomes the problem that the deformation joints of the existing shear wall structure cannot guarantee the flatness and verticality of the concrete and affect the safety performance of the structure.

定型模板是由左右分布的两层模板组成,每层模板是由前后分布的若干块模板本体组成,且两层模板本体的接缝处交错布置。The stereotyped formwork is composed of two layers of formwork distributed on the left and right, each layer of formwork is composed of several formwork bodies distributed front and back, and the joints of the two layers of formwork bodies are arranged alternately.

竖向支撑钢筋是由两根左右分布且固定的钢筋本体组成。The vertical supporting steel bar is composed of two fixed steel bar bodies distributed left and right.

本实用新型结构设计合理可靠,实现了变形缝两侧剪力墙模板整体同时支设的要求,进而保证了剪力墙的构件尺寸、平整度、垂直度、剪力墙钢筋保护层厚度及砼密实度,有效提高了施工过程中的安全及质量问题,而且操作方便快捷,有效提高了施工效率,具有结构简单、加工方便且成本低的优点。The structure design of the utility model is reasonable and reliable, and realizes the requirement that the shear wall formwork on both sides of the deformation joint is supported at the same time, thereby ensuring the component size, flatness, verticality, thickness of the protective layer of the shear wall reinforcement and concrete The compactness effectively improves the safety and quality problems in the construction process, and the operation is convenient and fast, which effectively improves the construction efficiency. It has the advantages of simple structure, convenient processing and low cost.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1的俯视示意图。FIG. 2 is a schematic top view of FIG. 1 .

图中:1-剪力墙墙体,2-定型模板,3-封头模板,4-已浇筑砼楼面,5-支撑套筒,6-横向支撑钢筋,7-条状扁铁,8-竖向支撑钢筋,9-固定吊环,10-贯通方木,11-对拉螺杆,12-L型螺栓,13-拉紧螺母。In the figure: 1-shear wall body, 2-shaped formwork, 3-head formwork, 4-concrete floor that has been poured, 5-support sleeve, 6-horizontal support reinforcement, 7-strip flat iron , 8 -Vertical supporting steel bar, 9-fixed ring, 10-through square timber, 11-tie screw, 12-L-shaped bolt, 13-tension nut.

具体实施方式detailed description

剪力墙结构变形缝模板,包括设置在变形缝内且与左右两侧剪力墙墙体1紧贴的定型模板2和设置在变形缝前后两端的封头模板3,两定型模板2底端开有若干对左右对应且前后分布的定位槽,每对定位槽内均穿有与已浇筑砼楼面4固定的支撑套筒5,支撑套筒5内穿有横向支撑钢筋6,两定型模板2的内表面均固定有若干块上下分布的条状扁铁7,左右两侧的条状扁铁7之间设置有若干与其紧贴且前后分布的竖向支撑钢筋8,竖向支撑钢筋8顶端均设置有固定吊环9,所有固定吊环9内穿有一根贯通方木10,定型模板2之间穿有若干两端均伸出剪力墙墙体1的对拉螺杆11;封头模板3上设置有若干对与条状扁铁7位置对应的L型螺栓12,每对L型螺栓12的短边均插入与其对应的条状扁铁7和定型模板2内,每对L型螺栓12的长边上均拧有位于封头模板3外侧的拉紧螺母13。The deformation joint formwork of the shear wall structure includes the shaping formwork 2 arranged in the deformation joint and closely attached to the left and right sides of the shear wall body 1 and the head formwork 3 arranged at the front and rear ends of the deformation joint, and the bottom ends of the two shaping forms 2 There are several pairs of positioning grooves corresponding to the left and right and distributed front and rear. Each pair of positioning grooves is pierced with a support sleeve 5 fixed to the poured concrete floor 4. The support sleeve 5 is pierced with a horizontal support steel bar 6. Two shaped templates The inner surface of 2 is fixed with several pieces of strip flat iron 7 distributed up and down, and between the strip flat iron 7 on the left and right sides is provided with some vertical support reinforcement bars 8 which are close to it and distributed front and back, and the vertical support reinforcement bars 8 The tops are all provided with fixed lifting rings 9, and all the fixed lifting rings 9 are pierced with a through square wood 10, and between the shaped templates 2 are pierced with a number of pull screws 11 with both ends protruding from the shear wall body 1; the head template 3 There are several pairs of L-shaped bolts 12 corresponding to the position of the strip-shaped flat iron 7, and the short sides of each pair of L-shaped bolts 12 are inserted into the corresponding strip-shaped flat iron 7 and the shaping template 2, and each pair of L-shaped bolts 12 All are screwed with the tension nut 13 that is positioned at the outer side of head template 3 on the long side.

定型模板2是由左右分布的两层模板组成,每层模板是由前后分布的若干块模板本体组成,且两层模板本体的接缝处交错布置;竖向支撑钢筋8是由两根左右分布且固定的钢筋本体组成。The stereotyped formwork 2 is composed of two layers of formwork distributed on the left and right, each layer of formwork is composed of several formwork bodies distributed in the front and back, and the joints of the two layers of formwork bodies are arranged in a staggered manner; the vertical support reinforcement bar 8 is composed of two And fixed steel body composition.

具体实施过程中,先绘制施工大样图,根据大样图预制定型模板2;条状扁铁7的尺寸为40mm*3mm,且间距为230mm;支撑套筒5采用直径为25mm的pvc管,pvc管两端露出墙身每边80mm,以免在浇筑时管内浇入砼而浪费材料。In the specific implementation process, first draw the large-scale construction drawing, and pre-formulate the formwork 2 according to the large-scale drawing; the size of the strip flat iron 7 is 40mm*3mm, and the spacing is 230mm; the support sleeve 5 adopts a PVC pipe with a diameter of 25mm, Both ends of the pvc pipe are exposed to 80mm on each side of the wall, so as to avoid wasting material by pouring concrete into the pipe during pouring.

Claims (3)

1.一种剪力墙结构变形缝模板,其特征在于:包括设置在变形缝内且与左右两侧剪力墙墙体(1)紧贴的定型模板(2)和设置在变形缝前后两端的封头模板(3),两定型模板(2)底端开有若干对左右对应且前后分布的定位槽,每对定位槽内均穿有与已浇筑砼楼面(4)固定的支撑套筒(5),支撑套筒(5)内穿有横向支撑钢筋(6),两定型模板(2)的内表面均固定有若干块上下分布的条状扁铁(7),左右两侧的条状扁铁(7)之间设置有若干与其紧贴且前后分布的竖向支撑钢筋(8),竖向支撑钢筋(8)顶端均设置有固定吊环(9),所有固定吊环(9)内穿有一根贯通方木(10),定型模板(2)之间穿有若干两端均伸出剪力墙墙体(1)的对拉螺杆(11);封头模板(3)上设置有若干对与条状扁铁(7)位置对应的L型螺栓(12),每对L型螺栓(12)的短边均插入与其对应的条状扁铁(7)和定型模板(2)内,每对L型螺栓(12)的长边上均拧有位于封头模板(3)外侧的拉紧螺母(13)。1. A formwork for deformation joints of a shear wall structure, characterized in that: it includes a shaping formwork (2) that is arranged in the deformation joint and is close to the shear wall walls (1) on the left and right sides and is arranged on the front and rear sides of the deformation joint. There are several pairs of positioning grooves corresponding to the left and right and distributed front and rear at the bottom of the two shaped formworks (2). Each pair of positioning grooves is equipped with a support sleeve fixed to the poured concrete floor (4). cylinder (5), the support sleeve (5) is pierced with horizontal support steel bars (6), and the inner surfaces of the two shaped formworks (2) are fixed with a number of strip-shaped flat irons (7) distributed up and down, and the left and right sides A number of vertical support bars (8) that are close to and distributed front and back are arranged between the strip flat irons (7). Fixed rings (9) are arranged on the top of the vertical support bars (8). All the fixed rings (9) There is a through square wood (10) inside, and a number of pull screws (11) with both ends protruding from the shear wall (1) are passed between the shaped templates (2); There are several pairs of L-shaped bolts (12) corresponding to the positions of the strip flat irons (7), and the short sides of each pair of L-shaped bolts (12) are inserted into the corresponding strip flat irons (7) and shaping templates (2) Inside, the long sides of each pair of L-shaped bolts (12) are screwed with tension nuts (13) located on the outside of the head template (3). 2.根据权利要求1所述的剪力墙结构变形缝模板,其特征在于:定型模板(2)是由左右分布的两层模板组成,每层模板是由前后分布的若干块模板本体组成,且两层模板本体的接缝处交错布置。2. The shear wall structure deformation joint formwork according to claim 1, characterized in that: the shaped formwork (2) is composed of two layers of formwork distributed left and right, and each layer of formwork is composed of several formwork bodies distributed front and back, And the seams of the two-layer formwork bodies are arranged in a staggered manner. 3.根据权利要求1或2所述的剪力墙结构变形缝模板,其特征在于:竖向支撑钢筋(8)是由两根左右分布且固定的钢筋本体组成。3. The formwork for deformation joints of shear wall structures according to claim 1 or 2, characterized in that: the vertical support reinforcement (8) is composed of two fixed reinforcement bars distributed left and right.
CN201621399632.0U 2016-12-20 2016-12-20 Deformation joint template of shear wall structure Expired - Fee Related CN206428966U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621399632.0U CN206428966U (en) 2016-12-20 2016-12-20 Deformation joint template of shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621399632.0U CN206428966U (en) 2016-12-20 2016-12-20 Deformation joint template of shear wall structure

Publications (1)

Publication Number Publication Date
CN206428966U true CN206428966U (en) 2017-08-22

Family

ID=59586563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621399632.0U Expired - Fee Related CN206428966U (en) 2016-12-20 2016-12-20 Deformation joint template of shear wall structure

Country Status (1)

Country Link
CN (1) CN206428966U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057056A (en) * 2018-08-09 2018-12-21 五冶集团上海有限公司 Filled and process plate fixing means between a kind of shear wall expansion joint
CN114277979A (en) * 2022-02-11 2022-04-05 中国十七冶集团有限公司 Construction device for settlement joint double-shear wall and construction method for double-shear wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057056A (en) * 2018-08-09 2018-12-21 五冶集团上海有限公司 Filled and process plate fixing means between a kind of shear wall expansion joint
CN114277979A (en) * 2022-02-11 2022-04-05 中国十七冶集团有限公司 Construction device for settlement joint double-shear wall and construction method for double-shear wall
CN114277979B (en) * 2022-02-11 2024-03-08 中国十七冶集团有限公司 Construction device for double shear wall with settlement joint and construction method for double shear wall

Similar Documents

Publication Publication Date Title
CN103114717B (en) A kind of both sides, shrinkage joint shear wall formwork system
CN204826619U (en) Mould is hung to superimposed sheet instrument formula
CN204703498U (en) Wall of High-building deformation joint template construction structure
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN204343459U (en) The parapet node structure of overlaid plate type concrete shear wall system
CN204590634U (en) For pouring into a mould the feed arrangement of constructional column
CN209228042U (en) A kind of corner constructional column erecting device
CN204781960U (en) High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system
CN206128631U (en) Inflatable post -cast strip side form props up establishes structure
CN206428966U (en) Deformation joint template of shear wall structure
CN203924102U (en) Building implements foundation bolt preformed hole construction mould
CN208430643U (en) A kind of wall hole plugging device
CN207314829U (en) A kind of wooden model early tears support device open
CN212002245U (en) A combined reinforcement device for aluminum formwork and wood formwork
CN206205429U (en) Easy-dismount aluminum alloy pattern plate support system in narrow movement joint
CN203716484U (en) Plastic-steel composite building engineering template
CN204186068U (en) Scissors wall building iron wood gang form
CN105275198B (en) A kind of shear-wall strengthening formwork structure and its construction method
CN204703499U (en) Wall of High-building deformation joint template
CN203097290U (en) Assembled type split bolt
CN107060173B (en) Construction Method of Early Formwork Removal in the Structural Hole of Fair-faced Concrete Waffle Slab
CN201276843Y (en) Internal corner adapter for wall beam template
CN203531244U (en) Steel wire mesh template for construction of post-cast strips or construction joints
CN205369906U (en) Cast -in -place slab band formwork support device
CN205591549U (en) Building structure floor plate preformed hole mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822

CF01 Termination of patent right due to non-payment of annual fee