CN206426909U - A kind of multizone pours the Operation Van that speedily carries out rescue work - Google Patents

A kind of multizone pours the Operation Van that speedily carries out rescue work Download PDF

Info

Publication number
CN206426909U
CN206426909U CN201621096356.0U CN201621096356U CN206426909U CN 206426909 U CN206426909 U CN 206426909U CN 201621096356 U CN201621096356 U CN 201621096356U CN 206426909 U CN206426909 U CN 206426909U
Authority
CN
China
Prior art keywords
equipment
compartment
region
rescue work
out rescue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621096356.0U
Other languages
Chinese (zh)
Inventor
提巧丽
李飞
唐珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing City Softbank Technology Development Co Ltd
Original Assignee
Beijing City Softbank Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing City Softbank Technology Development Co Ltd filed Critical Beijing City Softbank Technology Development Co Ltd
Priority to CN201621096356.0U priority Critical patent/CN206426909U/en
Application granted granted Critical
Publication of CN206426909U publication Critical patent/CN206426909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The utility model principally falls into special vehicle field, and in particular to a kind of multizone pours the Operation Van that speedily carries out rescue work.Including chassis vehicle and compartment, it is characterized in that, the inside in the compartment is provided with support and multiple equipment, the inside in compartment is divided into multiple regions by the support, the multiple region is divided into multiple left carriage areas and multiple right carriage areas according to compartment or so, the multiple left carriage area is according to being divided into multiple left front carriage areas and left back carriage area before and after compartment, the multiple right carriage area is according to being divided into multiple right front compartment regions and right trunk region before and after compartment, the multiple region is according to being divided into upper region and lower region above and below compartment;The multiple region, which is respectively fitted with, pours operation equipment of speedily carrying out rescue work, and is provided with the region for limiting above and below the equipment, the equipment locking mechanism of left and right and the movement of front and rear six direction;The equipment locking mechanism is set according to the shape for assembling the equipment;The all devices axle load distribution and center-of-mass coordinate meet the requirements.

Description

A kind of multizone pours the Operation Van that speedily carries out rescue work
Technical field
The utility model principally falls into special vehicle field, and in particular to one kind is multi-functional to pour the Operation Van that speedily carries out rescue work.
Background technology
At present, the emergency disposal of the accident such as China's disaster, accident relies primarily on army and participates in progress.Similar In the disposal process of accident, the function of life rescue is essential.
Rescue task mainly considers that collection to personnel and personnel are stranded the local forcible entry in region and shore operation, with true Protect on the premise of additional injury is not caused to trapped personnel, it is succoured within the most short time, while taking into account waterborne Rescue function.The demand of life rescue is as follows:(1)Concrete structure forcible entry, crushing operation;(2)Small space concrete is pre- Support, the supporting of product prevent secondary cave in;(3)The wounded carry;(4)Water life-saving.Need to coordinate other coagulations of army simultaneously Soil pours vehicle and carries out concreting operation.
It is army when performing emergency repair rush construction and life rescue action task to pour the Operation Van that speedily carries out rescue work, and is followed large-scale mixed Solidifying soil machinery, which is together marched into the arena, carries out concrete vehicle repairing, while emergency dealing operation, the synthesis of life rescue function can be provided Operation Van.General concrete mechanical equipment includes concrete mixing and transporting car, cement transporter, concrete pump, injection Machinery, casting equipment, material distributing machine, concrete pump truck etc..The need for for concrete mechanical equipment field repair, operation of speedily carrying out rescue work is poured In-vehicle device should meet following demand:(1)Function is rushed to repair to concrete mechanical equipment;(2)To concrete equipment vehicle motor Fault detect and maintenance;(3)Concrete equipment vehicle line fault is detected with repairing;(4)To concrete equipment vehicle liquid The fault detect of line ball road and maintenance;(5)To concrete equipment operational maintenance and fault detect and maintenance.
Therefore, according to the actual requirements, it is necessary to transport the repairing of a large amount of emergency dealings to engineer machinery operation with setting spare vehicles Place.Use existing vehicle, on the one hand, device category is more, it is impossible to by device class, searched when using inconvenient;On the other hand, Road is jolted, equipment is not fixed, fragile equipment.
Utility model content
In view of the above-mentioned problems, the utility model, which provides a kind of multizone, pours the Operation Van that speedily carries out rescue work, subregion assembling is all kinds of to be poured Speedily carry out rescue work operation equipment, it is easy-to-look-up, and equipment locking mechanism is set, it is to avoid the damage in transportation.
The utility model is achieved through the following technical solutions:
One kind is multi-functional to pour the Operation Van that speedily carries out rescue work, including chassis vehicle and compartment, and the inside in the compartment is provided with support and many The inside in compartment is divided into multiple regions by individual equipment, the support, according to the multiple region in 4 directions in front, rear, left and right point For front compartment region, the left front carriage area, a left side behind left front carriage area, left back carriage area, right front compartment region and the right side Respectively include at least one battery limits behind trunk region, right front compartment region and the right side in the region in front compartment region from top to bottom Domain;The equipment region, which is respectively fitted with, pours operation equipment of speedily carrying out rescue work, and is provided with the region for limiting the equipment Up and down, the equipment locking mechanism of left and right and the movement of front and rear six direction;The equipment locking mechanism is according to the assembling equipment Shape is set;The all devices axle load distribution and center-of-mass coordinate meet the requirements.
Further, the equipment of the assembly area assembling in the left front carriage area and left back carriage area is robbed to pour Dangerous operation dismounting, detection device or pour speedily carries out rescue work operation with repairing facility;The right front compartment region and right trunk region The equipment of interior assembly area assembling is pours operation of speedily carrying out rescue work with repairing facility or pour speedily carry out rescue work operation dismounting, detection device; It is lighter that the left front carriage area and the equipment of the right front compartment region assembling pour operation weight of equipment of speedily carrying out rescue work for described in Equipment;The left back carriage area and the equipment of the right trunk region assembling pour operation equipment weight of speedily carrying out rescue work to be described The heavier equipment of amount;The weight of equipment that the equipment region is assembled from top to bottom increases successively;
The region also includes being not provided with equipment in trough, the trough.
Further, the multiple equipment also includes power-supply device;The power-supply device includes vehicle-mounted cable drum, distribution Case and generator.
Further, it is described to pour operation of speedily carrying out rescue work with repairing facility including but not limited to:Generator, electric welding machine, air compressor machine, And conventional repair outfit;It is described pour operation dismounting of speedily carrying out rescue work, detection device includes but is not limited to:Diesel vehicle failure diagnostic apparatus vapour Car fault locator, motor stethoscope, hydraulic test instrument, high-frequency discharge device and conventional detection instrument.
Further, the locking mechanism of generator includes pressing plate, location key seat and L shaped plate, and the pressing plate is arranged on generating The front end of machine placement location, the location key seat are arranged on the rear end of generator, and the L shaped plate is placed on the both sides of generator.
Further, the locking mechanism of hydraulic power station is included in two L shaped plates of the relative welding in rear end, in the left and right sides Two pairs of L shaped plates being oppositely arranged, retaining mechanism and tensioning mechanism in front end;Two pairs of L shaped plates that the left and right sides is oppositely arranged Length is inconsistent.
Further, the Operation Van that speedily carries out rescue work that pours also includes subframe, the subframe and the chassis vehicle Main car frame is connected using resilient support.
Further, the carriage body uses the big plank frame of interlayer, and the surface of the carriage body and gusset material are aluminium alloy Plate, the core material of the carriage body is polyurethane thick 40 mm.
Further, the top of the carriage body is provided with front side of lift floodlight, carriage body provided with two searchlights.
Further, have the compartment is each side provided with three fans door, and the rear portion in compartment is provided with Yishanmen;The car The door of the left and right sides in railway carriage or compartment and the door at the rear portion in compartment is lift door or on the door.
Advantageous effects of the present utility model:
(1)It is rational in infrastructure
The utility model uses modular concept, the design of equipment goods shelf combinationization, Hydraulic Pressure Trail Plank and carriage body arrangement, makes sample car With good profile and globality.
(2)Function is strong
The utility model possess steel part derusting, cutting, welding, bore, mill etc. function, be equipped with electric welding machine, generator, lifting shine Bright lamp and a variety of special repairing equipments, meet the repairing demand for pushing away the repairing scope for digging dress motor vehicles and machines.
(3)It is simple to operate, easy to maintenance
The utility model vehicle has taken into full account the rapidity and security of individual soldier's operation, reduces maloperation and work is strong Degree.Equipment locking mechanism is succinct reliable, safe and practical.
(4)Selected device steady quality is reliable
For ensure selected device wartime can reliable and stable its effect of performance, we are selected to possess advanced skill both at home and abroad The equipment of the well-known manufacturer production of art, makes it have the unification of advance, reliability, applicability, while we focus on supplying factory The qualification and scale of business, with ensure equipment usually and wartime maintenance service and spares provisioning.
In a word, the design outward appearance of the program and railway carriage or compartment are artistically decorated novelty, and apolegamy equipment operation is simple, use safety, work Efficiency high, army's strong applicability, disclosure satisfy that the demand dug and fill the Operation Van that speedily carries out rescue work.
Brief description of the drawings
Fig. 1 is the left carriage area of the utility model and its facilities schematic diagram;
Fig. 2 is the right carriage area of the utility model and its facilities schematic diagram;
Fig. 3 is the utility model carriage area and its facilities schematic top plan view;
Fig. 4 is generator fixed mechanism schematic diagram;
Fig. 5 is hydraulic power station fixed mechanism schematic diagram;
In figure, the rubber boat 5. of 1. chassis vehicle, 2. searchlight, the 3. compartment 4. rescue rescue stretcher of tripod 6. The pump 7. the luminous life line 12. of the creeper 10. of 8. automotive service set of tent 9. electric welding unit set 11. vibrates 13. the air compressor machine of 18. acetylene cylinder of abrasive machine 14. cutting machine, 15. oil drum, 16. vibration board, 17. generator 19. 20. the sander 25. of 23. jetting machine of pneumatic 22. hydraulic power station of charging machine of folding ladder 21. 24. pulls calabash Reed 26. draws the tensioning mechanism post of 30. pressing plate of horse 27. air drill, 28. L shaped plate, 29. location key seat 31. 32. the butt welding L shaped plate of retaining mechanism 33..
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is explained in further detail.It should be appreciated that specific embodiment described herein is used only for explaining The utility model, is not used to limit the utility model.
On the contrary, the utility model cover it is any be defined by the claims do in spirit and scope of the present utility model Replacement, modification, equivalent method and scheme.Further, it is right below in order that the public has a better understanding to the utility model It is detailed to describe some specific detail sections in detailed description of the present utility model.Do not have for a person skilled in the art The description of these detail sections can also understand the utility model completely.
Embodiment one:
One kind is multi-functional to pour the Operation Van that speedily carries out rescue work, including chassis vehicle and compartment, and the inside in the compartment is provided with support and many The inside in compartment is divided into multiple regions by individual equipment, the support, according to the multiple region in 4 directions in front, rear, left and right point For front compartment region, the left front carriage area, a left side behind left front carriage area, left back carriage area, right front compartment region and the right side Respectively include at least one battery limits behind trunk region, right front compartment region and the right side in the region in front compartment region from top to bottom Domain;The equipment region, which is respectively fitted with, pours operation equipment of speedily carrying out rescue work, and is provided with the region for limiting the equipment Up and down, the equipment locking mechanism of left and right and the movement of front and rear six direction;The equipment locking mechanism is according to the assembling equipment Shape is set;The all devices axle load distribution and center-of-mass coordinate meet the requirements.
The equipment of assembly area assembling in the left front carriage area and left back carriage area is used to pour operation of speedily carrying out rescue work Dismounting, detection device or pour speedily carry out rescue work operation with repairing facility;Assembling in the right front compartment region and right trunk region Region assembling equipment for pour speedily carry out rescue work operation with repair facility or pour speedily carry out rescue work operation dismounting, detection device;
Equipment is placed according to functionalization subregion, the centralized arrangement of repairing facility of function and job requirement approximately, combination Within a unit, different repairing operating mode and object are directed to facilitate, different classes of repair facility is concentrated use in;
The left front carriage area and the equipment of the right front compartment region assembling pour operation equipment of speedily carrying out rescue work to be described The equipment of lighter in weight;The left back carriage area and the equipment of the right trunk region assembling pour operation of speedily carrying out rescue work to be described With the heavier equipment of weight of equipment;The weight of equipment that the equipment region is assembled from top to bottom increases successively.Consider the axle of vehicle Heavier repairing facility is arranged in the afterbody of vehicle by the security that lotus is distributed and travelled, the utility model as far as possible.
The region also includes being not provided with equipment in trough, the trough, is easy to placement.
Further, the multiple equipment also includes power-supply device;The power-supply device includes vehicle-mounted cable drum, distribution Case and generator.The utility model pours the power supply of repairing facility for operation of speedily carrying out rescue work from two aspects:External electric and vehicle-mounted hair Motor.
Extraneous power supply need to be connected by being repaired facility due to electric welding machine and air compressor machine in vehicle-mounted repair facility etc., so must examine How worry provides reliable power supply for it.
In the preferable building site of condition, the vehicle-mounted cable drum expansion of the Operation Van that speedily carries out rescue work can will be poured, civil power is connected, not outer In the case of connecing power supply, the equipment is furnished with generator, and spontaneous electrical function can be achieved.Guarantee enables part electrical equipment while working Under specified nominal power parameter, operating efficiency is farthest improved.
Further, it is described to pour operation of speedily carrying out rescue work with repairing facility including but not limited to:Generator, electric welding machine, air compressor machine, And conventional repair outfit;It is described pour operation dismounting of speedily carrying out rescue work, detection device includes but is not limited to:Diesel vehicle failure diagnostic apparatus vapour Car fault locator, motor stethoscope, hydraulic test instrument, high-frequency discharge device and conventional detection instrument.
Further, as shown in figure 3, the locking mechanism of generator includes pressing plate, location key seat and L shaped plate, the pressing plate The rear end that the front end of generator placement location, the location key seat are arranged on generator is arranged on, the L shaped plate is placed on generating The both sides of machine.
Further, as shown in figure 4, the locking mechanism of hydraulic power station be included in the relative welding in rear end two L shaped plates, Two pairs of L shaped plates being oppositely arranged in the left and right sides, retaining mechanism and tensioning mechanism in front end;The left and right sides be oppositely arranged two Length to L shaped plate is inconsistent.
Equipment locking mechanism, for fixing in-vehicle device, it is ensured that equipment occurs without sliding, loosening when vehicle is travelled.Locking Mechanism limits the movement of equipment six direction, while ensure that locking and the reliability and maintenanceability disengaged.
Further, the Operation Van that speedily carries out rescue work that pours also includes subframe, the subframe and the chassis vehicle Main car frame is connected using resilient support.Spacing fixed form can be combined using connecting bracket and U-shaped clamp stud, main car can be improved Frame stress carrying situation, it is to avoid concentrfated load and mitigate by torsional moment.
Further, the top of the carriage body is provided with front side of lift floodlight, carriage body provided with two searchlights.
The utility model chassis vehicle is that east wind EQ1118 chassis, compartment appearance and size are:4500×2100×2460mm(L ×W×H).
Carriage body both sides are three and lift door greatly, and carriage body rear end has opened up a pair of clamshell doors.Whole carriage body is board-like greatly using interlayer Structure, surface and gusset material are aluminium alloy plate, and core material is the thick polyurethanes of 40 mm, is ensureing the situation of carriage body intensity Under, alleviate the weight of carriage body.
Extinguisher fixing device is provided with the inside of compartment tail gate.
Refer to, from headstock to tailstock direction, up and down refer to from compartment bottom to carriage top direction before and after described.
Left front carriage area and left back carriage area are referred to as left carriage area;Right front compartment region and right trunk region It is referred to as right carriage area;Left front carriage area and left front carriage area are referred to as front compartment region;Left back carriage area and the right side Trunk region is referred to as right region.
As shown in Figure 1, Figure 2 and Figure 3, Fig. 1 is the left carriage area of the utility model and its equipment for the specific setting of each equipment Equipment schematic diagram, Fig. 2 is the right carriage area of the utility model and its facilities schematic diagram.Fig. 3 is the utility model compartment area Domain and its facilities schematic top plan view.Multizone emergency dealing breakdown van, including chassis vehicle and compartment, the inside in the compartment Provided with support, the inside in compartment is divided into multiple regions by the support, and multiple regions are respectively fitted with emergency dealing repairing with setting It is standby.
The equipment of the left carriage area assembling is used to pour operation dismounting of speedily carrying out rescue work, detection device or pouring operation of speedily carrying out rescue work Repair facility;The equipment of the right carriage area assembling speedily carries out rescue work operation with tearing open to pour operation of speedily carrying out rescue work with repairing facility or pour Unload, detection device;Pour speedily carry out rescue work operation with repair facility as luminous life line 11, the pump 12 that vibrates, abrasive machine 13, generator 17, Electric welding unit set 10, air compressor machine 19 etc. are arranged on the left region in compartment;Pour speedily carry out rescue work operation dismounting, detection device hydraulic power station 22nd, jetting machine 23, sander 24, chain block 25, drawing horse 26, air drill 27 etc. are arranged on the right region in compartment.
The quality such as generator 17, acetylene cylinder 18, air compressor machine 19, folding ladder 20, pneumatic charging machine 21, hydraulic power station 22 compared with The equipment of weight is placed on the rear region in compartment;Luminous life line 11, the pump 12 that vibrates, abrasive machine 13, chain block 25, draw horse 26, The equipment of the lighter weights such as air drill 27 etc. is placed on the forefoot area in compartment.
Equipment locking mechanism is provided with region, each equipment locking mechanism is set according to the shape of region place apparatus, such as Shown in Fig. 4 and Fig. 5.

Claims (6)

1. one kind is multi-functional to pour the Operation Van that speedily carries out rescue work, including chassis vehicle and compartment, it is characterised in that the inside in the compartment is provided with The inside in compartment is divided into multiple regions by support and multiple equipment, the support, many according to the direction of front, rear, left and right 4 Individual region is divided into front compartment region, the left front compartment behind left front carriage area, left back carriage area, right front compartment region and the right side Respectively include at least one from top to bottom in the region in front compartment region behind region, left back carriage area, right front compartment region and the right side Equipment region;The equipment region, which is respectively fitted with, pours operation equipment of speedily carrying out rescue work, and is provided with the region for limiting institute State above and below equipment, left and right and front and rear six direction movement equipment locking mechanism;The top of the carriage body in the compartment is provided with lifting Provided with two searchlights on front side of formula floodlight, carriage body.
2. pour the Operation Van that speedily carries out rescue work as claimed in claim 1, it is characterised in that the left front carriage area and left back carriage area Operation that the equipment of interior assembly area assembling is dismantled to pour operation of speedily carrying out rescue work, detection device or pour is speedily carried out rescue work is with repairing facility; The equipment of assembly area assembling in the right front compartment region and right trunk region is pours operation of speedily carrying out rescue work with repairing facility Or pour speedily carry out rescue work operation dismounting, detection device;The left front carriage area and the equipment of the right front compartment region assembling are It is described to pour the lighter equipment of operation weight of equipment of speedily carrying out rescue work;What the left back carriage area and the right trunk region were assembled Equipment pours the heavier equipment of operation weight of equipment of speedily carrying out rescue work to be described;The weight of equipment that the equipment region is assembled from top to bottom Increase successively.
3. pour the Operation Van that speedily carries out rescue work as claimed in claim 1, it is characterised in that the multiple equipment also includes power-supply device;Institute Stating power-supply device includes vehicle-mounted cable drum, distribution box and generator.
4. pour the Operation Van that speedily carries out rescue work as claimed in claim 2, it is characterised in that it is described pour speedily carry out rescue work operation with repair facility including But it is not limited to:Generator, electric welding machine, air compressor machine and conventional repair outfit;It is described to pour speedily carry out rescue work operation dismounting, detection device Including but not limited to:Diesel vehicle failure diagnostic apparatus vehicle failure detection instrument, motor stethoscope, hydraulic test instrument, high-frequency discharge Device and conventional detection instrument.
5. pour the Operation Van that speedily carries out rescue work as described in claim 1-4 is any, it is characterised in that the carriage body in the compartment is big using interlayer Plank frame, the surface of the carriage body and gusset material are aluminium alloy plate, and the core material of the carriage body is poly- ammonia thick 40 mm Fat.
6. pour the Operation Van that speedily carries out rescue work as described in claim 1-4 is any, it is characterised in that have each side opening for the compartment There is three fans door, the rear portion in compartment is provided with Yishanmen;The door of the left and right sides in the compartment and the door at the rear portion in compartment for lift door or On the door.
CN201621096356.0U 2016-09-29 2016-09-29 A kind of multizone pours the Operation Van that speedily carries out rescue work Active CN206426909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621096356.0U CN206426909U (en) 2016-09-29 2016-09-29 A kind of multizone pours the Operation Van that speedily carries out rescue work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621096356.0U CN206426909U (en) 2016-09-29 2016-09-29 A kind of multizone pours the Operation Van that speedily carries out rescue work

Publications (1)

Publication Number Publication Date
CN206426909U true CN206426909U (en) 2017-08-22

Family

ID=59588247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621096356.0U Active CN206426909U (en) 2016-09-29 2016-09-29 A kind of multizone pours the Operation Van that speedily carries out rescue work

Country Status (1)

Country Link
CN (1) CN206426909U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110854732A (en) * 2019-10-28 2020-02-28 中国人民解放军96782部队 Covering operation low-voltage numerical control power supply guarantee platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110854732A (en) * 2019-10-28 2020-02-28 中国人民解放军96782部队 Covering operation low-voltage numerical control power supply guarantee platform

Similar Documents

Publication Publication Date Title
CN106698207B (en) The construction method of shield machine is disassembled in hole
CN108756909B (en) A kind of construction method of small space shield machine dismantling
FI121769B (en) A method of operating a mine vehicle, an arrangement at a mine, and a rock drilling machine
CN102030076A (en) Cabin entry process for main diesel generating set of 50,000-ton semi-submerged ship
CN110407097A (en) The construction method of the novel phase modifier of lifting based on portal frame and Lao Xinge device
CN103832508B (en) There is the helicopter trailer of landing, security function
CN206426909U (en) A kind of multizone pours the Operation Van that speedily carries out rescue work
CN103879336A (en) Multifunctional hydraulic slippage overlapped full-closed engineering emergency car
CN204340820U (en) A kind of blowout prevention service rig special vehicle
CN205248885U (en) It is alert with synthesizing breakdown van
CN206426907U (en) A kind of multizone emergency dealing breakdown van
CN103171911B (en) Ship loader installation technology
CN206426908U (en) A kind of multizone digs dress and speedily carried out rescue work Operation Van
RU160399U1 (en) REPAIR AND EVACUATION MACHINE
CN104709154B (en) Movable engineering vehicle for motor vehicle service and maintenance
CN205704131U (en) A kind of electric power overhaul tool car
RU177821U1 (en) MOBILE REPAIR AND EVACUATION COMPLEX
CN202878162U (en) Rear nitrogen cylinder overhauling device
CN105458643A (en) Scrapped car engine fine dismounting worktable
CN210554421U (en) Special carriage for pipeline construction
CN206662686U (en) Railway vehicle coupler supporting plate nut dismounting device
CN207363618U (en) A kind of novel separated module tourist bus
CN207389020U (en) A kind of engineering construction emergency car with lifting platform
CN205790137U (en) A kind of fixed structure of on-vehicle battery
CN207313637U (en) A kind of more changing device of material distribution chute on furnace top of blast furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant