CN206425462U - Aluminium wheels forge die paint finishing - Google Patents
Aluminium wheels forge die paint finishing Download PDFInfo
- Publication number
- CN206425462U CN206425462U CN201621203465.8U CN201621203465U CN206425462U CN 206425462 U CN206425462 U CN 206425462U CN 201621203465 U CN201621203465 U CN 201621203465U CN 206425462 U CN206425462 U CN 206425462U
- Authority
- CN
- China
- Prior art keywords
- wheel hub
- lifting
- graphite
- conveying roller
- fixedly mounted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forging (AREA)
Abstract
The utility model is related to a kind of aluminium wheels forge die paint finishing, lifting system is cooled down including liquid graphite holding vessel, liquid graphite high-pressure delivery unit, rotary spraying machine, manipulator and wheel hub, liquid graphite holding vessel connects rotary spraying machine by liquid graphite high-pressure delivery unit, manipulator picks up rotary spraying machine from the rack on forging press column, wheel hub upper/lower die is sprayed, then put back on rack.In the side installation wheel hub cooling lifting system of forging press, the side for cooling down lifting system in wheel hub installs conveying roller, wheel hub is conveyed on conveying roller.This paint finishing realizes die surface orientation, quantitative atomizing spraying, die surface formation is uniformly sprayed film, it is to avoid die surface sticks together during forging and stamping and is damaged with thermometal.Complete wheel hub quenching.
Description
Technical field
The utility model belongs to forging and stamping demoulding field, is related to aluminium wheels, especially a kind of aluminium wheels forge die spray
System.
Background technology
The effect of releasing agent is exactly to form a kind of diaphragm between mould and hot forging pressed compact material, it is to avoid in forging and stamping process
In, directly contacted between thermometal and mould, so as to avoid forging and stamping metal from occurring bond vitrified phenomenon with mould, cause mould weight
Multiple utilization rate reduction, so as to improve production cost.
In the selection of releasing agent, because crystalline flake graphite has a layer structure in itself, graphite burning-point it is higher (700 DEG C with
On), heat conductivility is very good.In addition, graphite also has an Incoercibility in itself, the graphite linings of suitable particle size can make thermometal with
Isolation is produced between mould, heat energy cross conduction does not stick together, thus enables mould Reusability, so as to reduce production
Cost.
The mould of current wheel hub forging forming production is circle, and preceding profile is than larger, if sprayed with fixed nozzle,
It is not only poor to circular surface coverage, coating uneven distribution, and also quantity for spray control is extremely difficult, using rotary spraying side
Formula, can overcome foregoing problems, it is ensured that spraying film thickness is uniform, and film thickness can very well be controlled by rotary speed.
Utility model content
Orientation can be achieved there is provided one kind in place of being to overcome the deficiencies in the prior art in the purpose of this utility model, it is quantitative and
Releasing agent is equably covered in the aluminium wheels forge die paint finishing of mould die joint.
The utility model solves the technical scheme that is used of technical problem:
A kind of aluminium wheels forge die paint finishing, including liquid graphite holding vessel, liquid graphite high-pressure delivery unit, rotation
Turn flush coater, manipulator and wheel hub cooling lifting system, liquid graphite holding vessel is connected by liquid graphite high-pressure delivery unit
Rotary spraying machine, manipulator picks up rotary spraying machine from the rack on forging press column, to wheel hub upper/lower die
Sprayed, then put back on rack, in the side installation wheel hub cooling lifting system of forging press, in wheel hub cooling lifting system
Conveying roller is installed on the side of system, and wheel hub is conveyed on conveying roller.
Moreover, set agitator in described liquid graphite holding vessel, agitator is arranged on the lid of tank body, using motor and
Reductor drives.
Moreover, the upper lid in liquid graphite holding vessel installs ultrasonic liquid level sensor.
Moreover, described liquid graphite high-pressure delivery unit by 2 high-pressure graphite pump groups into 1 is standby with 1.
Moreover, being equipped with barostat in high-pressure graphite pump, pressure switch is installed in high-pressure graphite pump discharge.
Moreover, described rotary spraying machine includes shell, swivel joint, spray pipe, the shell is cylindrical shape, in shell
External annulus be formed with above and below two annular slots, upper annular slot and the rack activity clamp being packed on column, lower annular
Neck and manipulator activity clamp, are provided with swivel joint in shell, are sprayed in the top connection cooling atomization of swivel joint
Tu Guan, the upper spray pipe of graphite atomization and upper scavenging conduit, spray pipe, graphite atomization under the bottom connection cooling atomization of swivel joint
Lower spray pipe and lower scavenging conduit, the bottom surface uniform intervals of top surface, lower spray pipe in upper spray pipe are formed with multiple nozzles, in rotation
Side wall connection high-pressure graphite delivery pipe, cooling water delivery pipe and the blowpipe of joint, the connection of high-pressure graphite delivery pipe
The upper spray pipe of graphite atomization and the lower spray pipe of graphite atomization;The cooling water delivery pipe upper spray pipe of connection cooling atomization and cooling atomization
Lower spray pipe;The upper scavenging conduit of blowpipe connection and lower scavenging conduit.
Moreover, described wheel hub cooling lifting system includes support frame, lifting cylinder, lifts basket, lifts guide plate and traversing
Device, in the side of the wheel hub conveying roller pond for installing a strip parallel with conveying roller, in pond and the top of conveying roller horizontal stroke
Across installing a support frame, the bottom inside of support frame is packed in pond, and outside is packed on the ground on the outside of wheel hub conveying roller,
Traverse displacement unit is installed at the top of the support frame above conveying roller, the support frame two side Parallel Symmetric in pond side is fixedly mounted with two liftings
Guide plate, two lifting guide plates are vertical with pond, bottom is immersed in pond, and two guiding are formed with vertically on each lifting guide plate
Hole, two pilot hole parallel intervals, what it is close to conveying roller is the first pilot hole, is the second pilot hole, second away from conveying roller
The pilot hole mirror image pair on the extension of the arc to the first pilot hole lateral bend, two lifting guide plates is formed with the top of pilot hole
Claim, be slidably installed a lifting basket between two lifting guide plates in pilot hole, wheel hub is placed in lifting basket, in the both sides pair of lifting basket
Answer the first pilot hole to be fixedly mounted with the first sliding axle, the second pilot hole of correspondence and be fixedly mounted with the second sliding axle, be fixedly mounted with and carry between two sliding axles
Lifting shaft, is all connected with the top of a lifting cylinder in each lift shaft, and the cylinder body of two lifting cylinders, which is tilted, is packed in support frame
Top, top the first sliding axle of correspondence in the lateral surface pond of lifting guide plate installs the first alignment pin, the second sliding axle of correspondence
Second alignment pin is installed, the 3rd alignment pin, the 3rd positioning sliding axle of finger setting first are installed between two alignment pins.
Moreover, described the first alignment pin and the second locating pin structure is identical, including dibit alignment pin, rotary cylinder and
Support, support is fixedly mounted with the side wall of lifting guide plate, and rotary cylinder is fixedly mounted with support, and the output shaft connection dibit of rotary cylinder is determined
One end of position pin, the arc groove for holding sliding axle is formed with the other end of dibit alignment pin, and rotary cylinder drives dibit
Alignment pin, the arc groove of dibit alignment pin makes lifting basket sliding axle out of service.
Moreover, the 3rd described alignment pin includes positioning cylinder, swing shaft support and rotating shaft, it is fixedly mounted with and turns on lifting guide plate
Axle, is set with the middle part of swing shaft support in rotating shaft, and one end of swing shaft support and the top of positioning cylinder are fixedly mounted with connection, the other end and
First sliding axle coordinates, the rotation under the promotion of positioning cylinder by axle of rotating shaft of swing shaft support.
Moreover, described traverse displacement unit includes leading screw, spindle motor, screw slider, wheel hub lancet and lancet lifting cylinder,
Support top of support above wheel hub conveying roller is parallel with conveying roller to be fixedly mounted with a leading screw, one end connection spindle motor of the leading screw,
Engagement connection screw slider, a transverse slat is fixedly mounted with the bottom surface of screw slider on leading screw, and inserting one vertically at the middle part of transverse slat carries
Hook lifting cylinder, lancet lifting cylinder bottom top connection one section be L-shaped lancet, the both sides of lancet lifting cylinder,
Symmetrically two auxiliary vertical rods are fixedly mounted between lancet and transverse slat.
Advantage of the present utility model and good effect are:
1st, this paint finishing realizes die surface orientation, quantitative atomizing spraying, die surface is formed uniform spray
Film, it is to avoid die surface sticks together during forging and stamping and is damaged with thermometal.
2nd, the coating film thin and thick of the spraying process spray-coating surface completed by rotary spraying machine is uniform, is particularly suitable for use in needing circle
The coating film on shape surface is formed.Suitable for forging industry, metallurgy industry, automobile manufacture industry, the different in nature forging industry of various metals
Deng.
3rd, wheel hub cooling cooperation of the lifting system by three alignment pins and two sliding axles, completes from water surface lifting, falls
Water, the overall process for overturning, being laterally moved to conveying roller, scientific structure design rationally, coordinate perfect.
Brief description of the drawings
Fig. 1 is the structure chart of the system;
Fig. 2 is the connection diagram of manipulator, rotary spraying machine and rack;
Fig. 3 is the structural representation (removing outside lifting guide plate) that wheel hub cools down lifting system;
Fig. 4 is the structural representation that wheel hub cools down lifting system;
Fig. 5 is the structure chart of cooling three alignment pins of lifting system;
Fig. 6 is the cooling step working state schematic representation of lifting system the 3rd;
Fig. 7 is the cooling step working state schematic representation of lifting system the 4th;
Fig. 8 is the cooling step working state schematic representation of lifting system the 5th;
Fig. 9 is the cooling step working state schematic representation of lifting system the 6th;
Figure 10 is the process chart of the system.
Embodiment
Below in conjunction with the accompanying drawings and the utility model is described in further detail by specific embodiment, following examples are to retouch
The property stated, be not limited, it is impossible to limit protection domain of the present utility model with this.
A kind of aluminium wheels forge die paint finishing, including liquid graphite holding vessel 2, liquid graphite high-pressure delivery unit 1,
Rotary spraying machine 7, manipulator 6 and cooling lifting system 9, liquid graphite holding vessel are connected by liquid graphite high-pressure delivery unit
Rotary spraying machine, described rotary spraying machine is movably arranged on the column 3 of forging press by rack 8, and manipulator is from installation
Rack on forging press column picks up rotary spraying machine, and wheel hub upper/lower die is sprayed, rack is then put back to
On, cooling lifting system is installed on the side of forging press, conveying roller 10 is installed on the side of cooling lifting system, on conveying roller
Convey wheel hub.
Agitator is set in described liquid graphite holding vessel, agitator is arranged on the lid of tank body, using complete motor/subtract
Fast machine driving.Lid installs a set of ultrasonic sensor on tank body, and the sensor launches ultrasonic wave to graphite liquid level, and by liquid
Position height conversion is that analog electrical energy is transferred on the spot and distal displayed instrument and controller.Display instrument can intuitively show liquid level number
Word.Ultrasonic sensor, controller and display instrument have very high reliability, in order to ensure the authenticity of indicant position,
Sensor mount position takes in design, is unlikely to that probe is polluted and reported by mistake.
Described liquid graphite high-pressure delivery unit by 2 high-pressure graphite pump groups into, 1 with 1 standby (can also act) simultaneously,
Devote oneself to work, can automatically switch in turn.The unit has the characteristics that:
(a) flow of system high pressure pump is exportable required releasing agent under 2.5L/min, operating pressure.
(b) barostat is housed, in spraying process, makes the control of nozzle exit pressure fluctuation range in the scope of very little, subtracts simultaneously
The low initiation culture of high pressure pump group, extends the service life of pump group.
(c) pressure switch is installed in pump discharge, once the pressure of certain high pressure pump outlet is less than the pressure that relay is set
Force value, you can provide signal, by electric control system, the pump is stopped, and provides signal in main operation room platform.
Described rotary spraying machine is as shown in Fig. 2 including shell 7-6, swivel joint, spray pipe, the shell is cylinder
Shape, two annular slots above and below the external annulus of shell are formed with, upper annular slot and the rack active card being packed on column
Dress, lower annular slot and manipulator activity clamp, in use, manipulator removes rotary spraying machine from rack, are put into forging
Between the mold 5 of press, lower mould 4, not used time, rotary spraying machine is placed on rack by manipulator.Installed in shell
Have swivel joint, swivel joint top connection cooling atomization on spray pipe 7-2, graphite atomization on spray pipe 7-4 and on blow
Pipe 7-5 is swept, spray pipe and lower scavenging conduit under spray pipe, graphite are atomized under the bottom connection cooling atomization of swivel joint, upper
The top surface of spray pipe, the bottom surface uniform intervals of lower spray pipe are formed with multiple nozzle 7-1.In the side wall connection high pressure stone of swivel joint
Black delivery pipe, cooling water delivery pipe and blowpipe.The high-pressure graphite delivery pipe upper spray pipe of connection graphite atomization and stone
Spray pipe under ink mist;The cooling water delivery pipe upper spray pipe of connection cooling atomization and the lower spray pipe of cooling atomization;Compressed air is defeated
The upper scavenging conduit of pipe connection and lower scavenging conduit are sent, encasement tube covers 7-3 outside three delivery pipes.
When the finished product of die cast is put into bosh support by manipulator, above and below rotary spraying machine is advanced to by manipulator
Atomization cooling water sprinkling 3s is carried out in the middle of mould to its upper/lower die, cooling water is closed, releasing agent spraying 3s, spraying is then turned on
Machine removes mould area, matched moulds, then flush coater is put into the middle of mould, opens purging 3s, turns off purging, and flush coater removes mould
Tool, is put into the spraying frame of press support column;Flush coater removes mould, gives host computer signal, is cast, forging operation.
The entrance of manipulator completion rotary spraying machine, cooling, spraying, matched moulds purge and exited 5 actions.Wherein nozzle is moved
Enter 5s (adjustable 3-99s) in the middle of upper/lower die, mould rotation cooling, spraying and purging 9s (adjustable 3-99s), then remove 5s (can
Adjust 3-99s), 19s (adjustable 3-99s) completes a graphite coating cycle altogether.
The quantity for spray of upper/lower die, using the nozzle exit pressure and the aperture adjustment of nozzle of nozzle up and down, then passes through PLC controls
Spray time, reaches optimal spraying effect.
Wheel hub semi-finished product take out by manipulator and are put on cooling frame, cooling 30-40s or so.By cooling down lifting system
System is put on rollgang, is sent to subsequent processing;
Described cooling lifting system as shown in Figure 3, Figure 4, including support frame 15, lifting cylinder 31, lifting basket 24, lifting
Guide plate 30 and traverse displacement unit, in the side of the conveying roller pond 29 for installing a strip parallel with conveying roller, in pond and conveying
The top of roller is cuboid framework across a support frame, support frame as described above is installed, and the bottom inside of support frame is packed in pond,
Outside is packed on the ground on the outside of wheel hub conveying roller.Traverse displacement unit is installed at the top of the support frame above conveying roller, in pond
The support frame two side Parallel Symmetric of side is fixedly mounted with two lifting guide plates, and two lifting guide plates are vertical with pond, bottom is immersed in pond,
Two pilot holes are formed with each lifting guide plate vertically, two pilot hole parallel intervals are oriented to close to conveying roller for first
Hole 27, is that the arc to the first pilot hole lateral bend is formed with the top of the second pilot hole 28, the second pilot hole away from conveying roller
Extension 28-1.Pilot hole specular on two lifting guide plates.It is slidably installed in pilot hole and one carries between two lifting guide plates
Basket is risen, wheel hub 26 is placed in lifting basket.The first sliding axle 22, correspondence the are fixedly mounted with both sides the first pilot hole of correspondence of lifting basket
Two pilot holes are fixedly mounted with the second sliding axle 23, and lift shaft 25 is fixedly mounted between two sliding axles, and being all connected with one in each lift shaft carries
The top of cylinder is risen, the cylinder body of two lifting cylinders tilts the top for being packed in support frame.In the lateral surface pond of lifting guide plate
Top the first sliding axle of correspondence installs the first alignment pin 19, and the second sliding axle of correspondence installs the second alignment pin 21, in two alignment pins
Between install the 3rd alignment pin 20, the 3rd positioning the sliding axle of finger setting first.
Described the first alignment pin and the second locating pin structure is identical, as shown in figure 5, include dibit alignment pin 21-1,
Rotary cylinder 21-2 and support 21-3, is fixedly mounted with support in the side wall of lifting guide plate, rotary cylinder, rotary cylinder is fixedly mounted with support
Output shaft connect one end of dibit alignment pin, be formed with the other end of dibit alignment pin recessed for the arc of holding sliding axle
Groove, rotary cylinder drives dibit alignment pin, and the arc groove of dibit alignment pin makes lifting basket sliding axle out of service.
Described the 3rd alignment pin as shown in figure 5, including positioning cylinder 20-1, swing shaft support 20-3 and rotating shaft 20-2,
Rotating shaft is fixedly mounted with lifting guide plate, the middle part of swing shaft support, one end of swing shaft support and the top of positioning cylinder are set with rotating shaft
Connection is fixedly mounted with, the other end and the first sliding axle coordinate.The rotation under the promotion of positioning cylinder by axle of rotating shaft of swing shaft support.
Described traverse displacement unit includes leading screw 13, spindle motor 14, screw slider 12, wheel hub lancet 18 and lancet lifting gas
Cylinder 11, support top of support above wheel hub conveying roller is parallel with conveying roller to be fixedly mounted with a leading screw, one end connection leading screw of the leading screw
Motor, engagement connection screw slider, a slide plate 16 is fixedly mounted with the bottom surface of screw slider, is inserted vertically at the middle part of slide plate on leading screw
A lancet lifting cylinder is filled, bottom top one section of connection of lancet lifting cylinder is the lancet of L-shaped, in lancet lifting cylinder
Symmetrically two auxiliary vertical rods 17 are fixedly mounted between both sides, lancet and slide plate.Lancet by lancet lifting cylinder it is vertically movable, pass through sliding block
Transverse shifting.
Cooling down lifting system includes following five steps:
1st, wheel hub is put into process in pond;
2nd, wheel hub lifting process;
3rd, wheel hub mouth down tilting procedure;
4th, wheel hub mouth placement process upward;
5th, wheel hub is traversing and moves down placement rollgang process.
Idiographic flow is:
The first step:Wheel hub is put into lifting basket by manipulator;
Second step:Lifting cylinder is moved down, and is put wheel hub lifting and is entered in the key in pond, signal is provided in place, (as shown in Figure 4);
3rd step:Cool time terminates, and provides signal, and lifting cylinder is moved up, and puts wheel hub lifting basket and goes out the water surface, reaches and only stop
Position, (as shown in Figure 6);
4th step:The first alignment pin is opened, lifting cylinder rises, lifting basket is rotated by the center of circle of the second alignment pin to wheel hub
Turn forward 15 ° and pinned to the 3rd alignment pin, (as shown in Figure 7);
5th step:Then, using the 3rd alignment pin as pivot, the second alignment pin is opened, wheel hub lifting basket reversion will be put
105 ° are returned, wheel hub bottom downwards, provides signal, (as shown in Figure 8);
6th step:The traversing insertion wheel hub bottom of signal lancet is connected to, is lifted, traversing to (being lifted above rollgang simultaneously
Basket, which is returned to, connects hub positions), then traversing lancet is displaced downwardly to below rollgang, and wheel hub is put on rollgang, and wheel hub is removed.
Lancet, which rises to, takes hub positions.Cooling cycle terminates.Next process is waited to start, (as shown in Figure 9).
Lift basket return course:Lifting cylinder is moved downward to the first alignment pin position, provides signal, and lifting cylinder stops
Mobile, the 3rd alignment pin is opened, and in place, lifting cylinder is displaced downwardly to the second alignment pin position to the first alignment pin again, and lifting cylinder stops
Only run, open the first alignment pin and the second alignment pin, lifting cylinder, which is restarted to be displaced downwardly to, connects hub positions, prepare to host computer
Good signal.Next cooling cycle is waited to start.
Whole process is automatically controlled by PLC, is reached unattended, it is ensured that wheel hub quenches quality.In addition, each cooling procedure
Time adjustment can all be carried out.Reach optimum state.
Above-described is only preferred embodiment of the present utility model, it is noted that for the ordinary skill of this area
For personnel, on the premise of utility model design is not departed from, various modifications and improvements can be made, these belong to this reality
With new protection domain.
Claims (10)
1. a kind of aluminium wheels forge die paint finishing, it is characterised in that:It is defeated including liquid graphite holding vessel, liquid graphite high pressure
Unit, rotary spraying machine, manipulator and wheel hub cooling lifting system are sent, liquid graphite holding vessel passes through liquid graphite high-pressure delivery
Unit connects rotary spraying machine, and manipulator picks up rotary spraying machine from the rack on forging press column, to wheel hub
Upper/lower die is sprayed, and is then put back on rack, and lifting system is cooled down in the side installation wheel hub of forging press, cold in wheel hub
But conveying roller is installed on the side of lifting system, and wheel hub is conveyed on conveying roller.
2. aluminium wheels forge die paint finishing according to claim 1, it is characterised in that:Described liquid graphite storage
Agitator is set in tank, agitator is arranged on the lid of tank body, driven using motor and reductor.
3. aluminium wheels forge die paint finishing according to claim 1, it is characterised in that:In liquid graphite holding vessel
Upper lid installs ultrasonic liquid level sensor.
4. aluminium wheels forge die paint finishing according to claim 1, it is characterised in that:Described liquid graphite high pressure
Supply unit is by 2 high-pressure graphite pump groups into 1 is standby with 1.
5. aluminium wheels forge die paint finishing according to claim 4, it is characterised in that:In high-pressure graphite pump equipped with perseverance
Depressor, pressure switch is installed in high-pressure graphite pump discharge.
6. aluminium wheels forge die paint finishing according to claim 1, it is characterised in that:Described rotary spraying machine bag
Include shell, swivel joint, spray pipe, the shell is cylindrical shape, two annular slots above and below the external annulus of shell are formed with, on
Annular slot and the rack activity clamp being packed on column, lower annular slot and manipulator activity clamp, pacify in shell
Equipped with swivel joint, spray pipe, graphite are atomized spray pipe and upper scavenging conduit in the top connection cooling atomization of swivel joint,
Spray pipe and lower scavenging conduit under spray pipe, graphite are atomized under the bottom connection cooling atomization of swivel joint, in upper spray pipe
Top surface, the bottom surface uniform intervals of lower spray pipe are formed with multiple nozzles, side wall connection high-pressure graphite delivery pipe in swivel joint, cold
But water delivery pipe and blowpipe, are sprayed under the high-pressure graphite delivery pipe upper spray pipe of connection graphite atomization and graphite atomization
Pipe;The cooling water delivery pipe upper spray pipe of connection cooling atomization and the lower spray pipe of cooling atomization;Blown in blowpipe connection
Sweep pipe and lower scavenging conduit.
7. aluminium wheels forge die paint finishing according to claim 1, it is characterised in that:Described wheel hub cooling lifting
System includes support frame, lifting cylinder, lifting basket, lifting guide plate and traverse displacement unit, in the side of wheel hub conveying roller and conveying roller
The parallel pond for installing a strip, in pond and the top of conveying roller across installing a support frame, the bottom inside of support frame
It is packed in pond, outside is packed on the ground on the outside of wheel hub conveying roller, installs horizontal at the top of the support frame above conveying roller
Moving device, the support frame two side Parallel Symmetric in pond side is fixedly mounted with two lifting guide plates, and two lifting guide plates are vertical with pond, bottom
Immerse in pond, be formed with two pilot holes, two pilot hole parallel intervals, close to conveying roller vertically on each lifting guide plate
For the first pilot hole, away from conveying roller for the second pilot hole, be formed with the top of the second pilot hole to the first pilot hole lateral bending
Pilot hole specular on the extension of bent arc, two lifting guide plates, is slidably installed between two lifting guide plates in pilot hole
One lifting basket, wheel hub is placed in lifting basket, and the first sliding axle, correspondence the are fixedly mounted with both sides the first pilot hole of correspondence of lifting basket
Two pilot holes are fixedly mounted with the second sliding axle, and lift shaft is fixedly mounted between two sliding axles, and a lifting gas is all connected with each lift shaft
The top of cylinder, the cylinder body of two lifting cylinders tilts the top for being packed in support frame, the top in the lateral surface pond of lifting guide plate
The first sliding axle of correspondence installs the first alignment pin, and the second sliding axle of correspondence is installed the second alignment pin, installed between two alignment pins
3rd alignment pin, the 3rd positioning sliding axle of finger setting first.
8. aluminium wheels forge die paint finishing according to claim 7, it is characterised in that:Described the first alignment pin and
Second locating pin structure is identical, including dibit alignment pin, rotary cylinder and support, and support is fixedly mounted with the side wall of lifting guide plate,
Rotary cylinder is fixedly mounted with support, the output shaft of rotary cylinder connects one end of dibit alignment pin, in the another of dibit alignment pin
End is formed with the arc groove for holding sliding axle.
9. aluminium wheels forge die paint finishing according to claim 7, it is characterised in that:The 3rd described alignment pin bag
Positioning cylinder, swing shaft support and rotating shaft are included, rotating shaft is fixedly mounted with lifting guide plate, the middle part of swing shaft support, pendulum are set with rotating shaft
One end of rotating shaft support and the top of positioning cylinder are fixedly mounted with connection, and the other end and the first sliding axle coordinate, swing shaft support using rotating shaft as
Axle rotation under the promotion of positioning cylinder.
10. aluminium wheels forge die paint finishing according to claim 7, it is characterised in that:Described traverse displacement unit bag
Leading screw, spindle motor, screw slider, wheel hub lancet and lancet lifting cylinder are included, the support top of support above wheel hub conveying roller
It is parallel with conveying roller to be fixedly mounted with a leading screw, one end connection spindle motor of the leading screw, the engagement connection screw slider on leading screw, in silk
The bottom surface of thick stick sliding block is fixedly mounted with a transverse slat, and a lancet lifting cylinder, the bottom of lancet lifting cylinder are inserted vertically at the middle part of transverse slat
Top one section of connection is the lancet of L-shaped, and symmetrical two auxiliary that are fixedly mounted with are stood between the both sides of lancet lifting cylinder, lancet and transverse slat
Bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621203465.8U CN206425462U (en) | 2016-11-08 | 2016-11-08 | Aluminium wheels forge die paint finishing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621203465.8U CN206425462U (en) | 2016-11-08 | 2016-11-08 | Aluminium wheels forge die paint finishing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206425462U true CN206425462U (en) | 2017-08-22 |
Family
ID=59588312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621203465.8U Active CN206425462U (en) | 2016-11-08 | 2016-11-08 | Aluminium wheels forge die paint finishing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206425462U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106391957A (en) * | 2016-11-08 | 2017-02-15 | 天津昭阳科技有限公司 | Aluminum wheel hub forging and pressing mould spraying system |
-
2016
- 2016-11-08 CN CN201621203465.8U patent/CN206425462U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106391957A (en) * | 2016-11-08 | 2017-02-15 | 天津昭阳科技有限公司 | Aluminum wheel hub forging and pressing mould spraying system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106391957B (en) | Aluminum wheel hub forging and pressing mould spraying system | |
CN106362896B (en) | Spraying system for automobile axle forging and pressing die | |
CN206425462U (en) | Aluminium wheels forge die paint finishing | |
CN214077406U (en) | Release agent spraying device for forging die | |
CN207126729U (en) | A kind of bottle automatic spraying system | |
CN106001502A (en) | Flat-top low-pressure casting machine | |
CN210754904U (en) | Mould spraying system | |
CN205833441U (en) | A kind of self-interacting type spraying equipment carrier platform | |
CN205904415U (en) | Flat top formula low pressure casting machine | |
CN111822176A (en) | Brake block spraying device | |
CN206169301U (en) | Rotatory lift is traded packing and is put and atomizing and pulverizing equipment of constituteing thereof | |
CN112337704A (en) | Spraying device is used in robot production | |
CN205518338U (en) | A release agent paint finishing for wheel hub forging mould | |
CN206215428U (en) | Automotive axle forge die paint finishing | |
CN208991082U (en) | A kind of cylindrical part Special spray coating case | |
CN214517464U (en) | Automatic purging and mold release agent spraying device | |
CN106319171B (en) | One kind forging and stamping liquid aluminium wheels cooling lifting system | |
CN205974643U (en) | Large castings heat is spouted zinc and is spouted zinc equipment with novel automatic mariages heat | |
CN206127361U (en) | Forge and press liquid aluminium wheel hub cooling lift system | |
CN212550111U (en) | Brake block spraying device | |
CN212822651U (en) | Tundish with good heat dissipation effect for continuous casting process | |
CN210585530U (en) | Tool device for spraying or drying large casting shell | |
CN209715478U (en) | A kind of autosteerer of paint spraying apparatus | |
CN205966323U (en) | Quartz crucible spraying box and spray gun thereof | |
CN202079005U (en) | Cylinder inner wall spray-coating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |