CN206419562U - Steel pipe clamp - Google Patents

Steel pipe clamp Download PDF

Info

Publication number
CN206419562U
CN206419562U CN201621463892.XU CN201621463892U CN206419562U CN 206419562 U CN206419562 U CN 206419562U CN 201621463892 U CN201621463892 U CN 201621463892U CN 206419562 U CN206419562 U CN 206419562U
Authority
CN
China
Prior art keywords
support arm
steel pipe
pipe clamp
mounting hole
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621463892.XU
Other languages
Chinese (zh)
Inventor
高明臣
刘宏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Foton Daimler Automobile Co Ltd
Original Assignee
Beijing Foton Daimler Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Foton Daimler Automobile Co Ltd filed Critical Beijing Foton Daimler Automobile Co Ltd
Priority to CN201621463892.XU priority Critical patent/CN206419562U/en
Application granted granted Critical
Publication of CN206419562U publication Critical patent/CN206419562U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a kind of steel pipe clamp.The steel pipe strap attached bag is included:First support arm, penstock installation portion and the second support arm being sequentially connected, the penstock installation portion is connected to before the first support arm and the second support arm, first support arm mounting hole is provided with the first support arm, second support arm mounting hole is provided with the second support arm, the first support arm mounting hole is corresponding with the second support arm mounting hole, and the distance between the first support arm and described second support arm are in increase trend from the one end being connected with the penstock installation portion to the other end.According to the steel pipe clamp of the utility model embodiment, by changing physical dimension, open-cellular form and the first support arm of steel pipe clamp and the original state of second support arm, solve steel pipe clamp and be difficult the problem of assembling is held tightly and influences productive temp.

Description

Steel pipe clamp
Technical field
The utility model is related to automotive field, in particular to a kind of steel pipe clamp.
Background technology
Steel pipe clamp is a kind of technique Assembly part commonly used in truck pipeline, and production steel pipe clamp used is main at present For car gage part, it is stamped to form by sheet metal.Conventional steel pipe clamp is encircled by being stamped and formed out open type Structure, and hold steel pipe tightly after being fastened by bolts.But these steel pipe clamps due to bolt fastening point apart from clamp ring heart compared with Far, and part plate is partially thin, Tightening moment can not efficiently be transferred to the contact surface with steel pipe, cause to be difficult the enclasping force of steel pipe Control, and during steel pipe vibrations, easily there is sliding phenomenon in bolt.
In addition, two stationary planes of these steel pipe clamps are in closure state in supply of material state, workman needs hand before assembly It is dynamic to be pushed aside, then fastened after embedded steel pipe, this process influence productive temp, and the process pushed aside manually is also highly vulnerable to breakage Original design structure, causes influence fastening enclasping force.
Utility model content
The utility model is intended at least solve one of above-mentioned technical problem of the prior art to a certain extent.Therefore, The purpose of this utility model is to propose a kind of steel pipe clamp, by change the physical dimension of steel pipe clamp, open-cellular form and The original state of two stationary planes, solves steel pipe clamp and is difficult the problem of assembling is held tightly and influences productive temp.
Included according to the steel pipe strap attached bag of the utility model embodiment:The first support arm that is sequentially connected, penstock installation portion and Two support arms, the penstock installation portion is connected between the first support arm and the second support arm, is set in the first support arm Have and second support arm mounting hole be provided with first support arm mounting hole, the second support arm, the first support arm mounting hole with it is described Second support arm mounting hole correspondence, the distance between the first support arm and the second support arm are connected from the penstock installation portion One end to the other end be in increase trend.
According to the steel pipe clamp of the utility model embodiment, by the way that first support arm and second support arm are adjusted into open-like shape State, effectively reduces the man-hour of embedded steel pipe during assembly manipulation, improves the fixed efficiency of steel pipe.
In addition, can also have technical characteristic additional as follows according to the steel pipe clamp of the utility model above-described embodiment:
According to some embodiments of the present utility model, the penstock installation portion is arc linking arm.
According to some embodiments of the present utility model, weakening structure is provided with the arc linking arm.
According to some embodiments of the present utility model, the weakening structure is reduction groove.
According to some embodiments of the present utility model, thickness thinning area, the thickness are formed with the arc linking arm Thinning area constitutes the weakening structure.
According to some embodiments of the present utility model, circumferencial direction extension of the reduction groove along the arc linking arm.
According to some embodiments of the present utility model, the reduction groove is centrally arranged on the arc linking arm.
According to some embodiments of the present utility model, the first support arm, the second support arm and the arc linking arm It is integrally formed.
According to some embodiments of the present utility model, the first support arm mounting hole is circular port, the second support arm peace Dress hole is Long Circle hole.
According to some embodiments of the present utility model, the Long Circle hole includes the first arc section and second being oppositely arranged Arc section and the flat segments being connected between first arc section and second arc section, first arc section and institute State the free end of second support arm distance be less than second arc section and the second support arm free end distance, described the The circle centre position of the center of circle of one arc section and the circular port is on the same line.
Brief description of the drawings
Fig. 1 is the front view of the steel pipe clamp according to the utility model embodiment;
Fig. 2 is the top view of the steel pipe clamp according to the utility model embodiment.
Reference:
Steel pipe clamp 10, first support arm 1, first support arm mounting hole 11, penstock installation portion 2, reduction groove 21, second support arm 3, Second support arm mounting hole 31, the first arc section 311, the second arc section 312, flat segments 313.
Embodiment
Embodiment of the present utility model is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning Same or similar element or element with same or like function are represented to same or similar label eventually.Below by ginseng The embodiment for examining accompanying drawing description is exemplary, it is intended to for explaining the utility model, and it is not intended that to the utility model Limitation.
In description of the present utility model, it is to be understood that term " first ", " second " are only used for describing purpose, and It is not intended that indicating or implying relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, define One or more this feature can be expressed or be implicitly included to the feature of " first ", " second ".Of the present utility model In description, " multiple " are meant that at least two, such as two, three etc., unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be Be joined directly together, can also be indirectly connected to by intermediary, can be two element internals connection or two elements it is mutual Interactively.For the ordinary skill in the art, it can understand that above-mentioned term is new in this practicality as the case may be Concrete meaning in type.
The steel pipe clamp 10 according to the utility model embodiment is described in detail with reference to Fig. 1-Fig. 2.
Shown in reference picture 1, can include being sequentially connected according to the steel pipe clamp 10 of the utility model embodiment first Arm 1, penstock installation portion 2 and second support arm 3.
In other words, penstock installation portion 2 is connected between first support arm 1 and second support arm 3.
With reference to shown in Fig. 2, it is provided with first support arm 1 in first support arm mounting hole 11, second support arm 3 and is provided with second Arm mounting hole 31, first support arm mounting hole 11 is corresponding with second support arm mounting hole 31, and first support arm mounting hole is worn by bolt 11 with second support arm mounting hole 31, make first support arm 1 and second support arm 3 close proximity in first support arm 1 and second support arm 3 Under drive, penstock installation portion 2 is by banding steel pipe, so as to complete the fixation of steel pipe.
The distance between first support arm 1 and second support arm 3 are from the one end being connected with penstock installation portion 2 to the other end in increase Trend, as shown in Figure 1.So, under initial supply of material state, first support arm 1 and second support arm 3 are into open state, assembling process In directly steel pipe can be embedded in the holding circle of steel pipe clamp 10, be not required to workman and carry out pushing first support arm 1 and second support arm 3 aside Operation, so as to be embedded in the man-hour of steel pipe during effectively reducing assembly manipulation, improves the efficiency of assembling of steel pipe.
According to the steel pipe clamp 10 of the utility model embodiment, by the way that first support arm 1 and second support arm 3 are adjusted into open State, effectively reduces the man-hour of embedded steel pipe during assembly manipulation, improves the fixed efficiency of steel pipe.
Penstock installation portion 2 is arc linking arm 2, when first support arm 1 and the clamping of second support arm 3, the half of arc linking arm 2 Footpath will be reduced, until the inner surface of arc linking arm 2 is contacted with outer surface of steel tube, so as to hold steel pipe tightly, steel pipe is fixed.
Weakening structure can be provided with arc linking arm 2, weakening structure can effectively reduce the strong of arc linking arm 2 Degree, so when first support arm 1 and second support arm 3 are clamped, arc linking arm 2 is easier to deform, it is possible thereby to make arc The enclasping force that shape linking arm 2 is applied to steel pipe increases rapidly, so that quick banding steel pipe.
In certain embodiments, weakening structure can be reduction groove 21.
In further embodiments, thickness thinning area is formed with arc linking arm 2, thickness thinning area constitutes reduction knot Structure, the material of thickness thinning area is relatively thin, thus weakens the intensity of arc linking arm 2, arc linking arm 2 is easily become Shape, so as to hold steel pipe tightly.
Weaken groove 21 arcuately linking arm 2 circumferencial direction extension.Preferably, reduction groove 21 is occupied on arc linking arm 2 Middle arrangement, but arrangement form not limited to this of the reduction groove 21 on arc linking arm 2, for example, can also be two reduction grooves 21, It is arranged in the both sides of arc linking arm 2.In addition, in a particular embodiment, reduction groove 21 can also be square groove, triangle The structure types such as groove, circular trough, the number of reduction groove 21 can also be multiple.
In some preferred embodiments, first support arm 1, second support arm 3 and arc linking arm 2 are integrally formed, and so may be used To simplify the manufacturing process of steel pipe clamp 10, manufacturing cost is advantageously reduced.Further, steel pipe clamp 10 can be metal plate Golden part, sheet metal component has certain rigidity, thus the fixation of steel pipe can be made relatively reliable.
First support arm mounting hole 11 is circular port, and second support arm mounting hole 31 is Long Circle hole.Long Circle hole is bolt Position adjustment provides surplus, so, and assembler can be made to be easy to carry out, and bolt is top-down penetrates operation, improves steel The efficiency of assembling of pipe clamp 10.
Further, shown in reference picture 2, Long Circle hole includes the first arc section 311 and the second arc section being oppositely arranged 312 and the flat segments 313 that are connected between the first arc section 311 and the second arc section 312, the first arc section 311 and second The distance of the free end of support arm 3 is less than the second arc section 312 and the distance of the free end of second support arm 3.Preferably, the first circular arc Section 311 the center of circle and circular port circle centre position on the same line, thus when bolt by first support arm 1, second support arm 3 fasten with When making the holding steel pipe of arc linking arm 2, bolt can only be to steel in the second support arm mounting hole 31 (Long Circle hole) of steel pipe clamp 10 Direction play where pipe, so that can only continue to zoom out the internal diameter of tightening up of steel pipe clamp 10, steel pipe and steel pipe clamp 10 after assembling Between be not in looseness phenomenon.
In the utility model, first support arm mounting hole 11, second support arm mounting hole 31 can be set close to penstock installation portion 2 Put, so just shorten the distance of the ring heart in bolt fastener and penstock installation portion 2, when using bolt fastening first support arm 1, the During two support arms 3, steel pipe clamp 10 can be made bigger to the enclasping force of steel pipe, the fixation to steel pipe is also relatively reliable.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means to combine specific features, structure, material or the feature that the embodiment or example are described It is contained at least one embodiment of the present utility model or example.In this manual, to the schematic representation of above-mentioned term Necessarily it is directed to identical embodiment or example.Moreover, specific features, structure, material or the feature of description can be Combined in an appropriate manner in any one or more embodiments or example.In addition, those skilled in the art can be by this Not be the same as Example or example described in specification are engaged and combined.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is Exemplary, it is impossible to it is interpreted as to limitation of the present utility model, one of ordinary skill in the art is in scope of the present utility model It is interior above-described embodiment to be changed, changed, replaced and modification.

Claims (10)

1. a kind of steel pipe clamp, it is characterised in that including:
First support arm, penstock installation portion and the second support arm being sequentially connected, the penstock installation portion is connected to the first support arm Between the second support arm, it is provided with the first support arm in first support arm mounting hole, the second support arm and is provided with Two support arm mounting holes, the first support arm mounting hole is corresponding with the second support arm mounting hole, the first support arm and described the The distance between two support arms are in increase trend from the one end being connected with the penstock installation portion to the other end.
2. steel pipe clamp according to claim 1, it is characterised in that the penstock installation portion is arc linking arm.
3. steel pipe clamp according to claim 2, it is characterised in that be provided with weakening structure on the arc linking arm.
4. steel pipe clamp according to claim 3, it is characterised in that the weakening structure is reduction groove.
5. steel pipe clamp according to claim 3, it is characterised in that thickness is formed with the arc linking arm and is thinned Area, the thickness thinning area constitutes the weakening structure.
6. steel pipe clamp according to claim 4, it is characterised in that circumference of the reduction groove along the arc linking arm Direction extends.
7. steel pipe clamp according to claim 4, it is characterised in that the reduction groove is placed in the middle on the arc linking arm Arrangement.
8. steel pipe clamp according to claim 2, it is characterised in that the first support arm, the second support arm and described Arc linking arm is integrally formed.
9. steel pipe clamp according to claim 1, it is characterised in that the first support arm mounting hole is circular port, described Second support arm mounting hole is Long Circle hole.
10. steel pipe clamp according to claim 9, it is characterised in that the Long Circle hole includes first be oppositely arranged Arc section and the second arc section and the flat segments being connected between first arc section and second arc section, described One arc section and the distance of the free end of the second support arm are less than second arc section and the free end of the second support arm Distance, the center of circle of first arc section and the circle centre position of the circular port are on the same line.
CN201621463892.XU 2016-12-28 2016-12-28 Steel pipe clamp Expired - Fee Related CN206419562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621463892.XU CN206419562U (en) 2016-12-28 2016-12-28 Steel pipe clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621463892.XU CN206419562U (en) 2016-12-28 2016-12-28 Steel pipe clamp

Publications (1)

Publication Number Publication Date
CN206419562U true CN206419562U (en) 2017-08-18

Family

ID=59573214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621463892.XU Expired - Fee Related CN206419562U (en) 2016-12-28 2016-12-28 Steel pipe clamp

Country Status (1)

Country Link
CN (1) CN206419562U (en)

Similar Documents

Publication Publication Date Title
CN203131259U (en) Irregular clamp with pre-positioner
KR101820993B1 (en) A strap-band type connecting device
CN108700236A (en) Shaping jig
CN107498303A (en) A kind of oscillating bearing assembling guide-localization riveting device and assembly method
CN105090215A (en) Rivet nut unit and mounting method thereof
CN104514935A (en) Nut, hose nipple and hose connector for fluid hose
CN107743563A (en) Fixture with clamping band and pre-determined bit part
JP4797857B2 (en) Clamp with mounting element
CN206419562U (en) Steel pipe clamp
SG178648A1 (en) Releasable nut-free c-clip secured pipe fitting
CN208663161U (en) A kind of positioning clamping device for thin-walled inner ring body part
CN206702920U (en) The frock tool of automobile engine belt installation
US20110268531A1 (en) Segmented thread and connecting arrangement
CN104075031A (en) Wire harness binding device
CN105570266A (en) Fastening apparatus for vehicle sheet component
CN205571587U (en) Saw bit fastener
US8790057B2 (en) Threaded fastener
CN205977930U (en) Fastening staple bolt structure
CN205521207U (en) A quick assembly disassembly fastener for mould equipment
CN207298171U (en) A kind of novel hose yoke configurations
CN106944968A (en) Frock tool and its application method that a kind of automobile engine belt is installed
KR101247587B1 (en) Connecting structure between braket and end fitting for brake hose of a car
CN204099372U (en) The fastening piece of the mold pressing instruction collar and this mold pressing of use instruction collar
CN106460900A (en) Method for connecting ball to first component in formfitting manner, and component connection system
CN205554558U (en) A unmanned aerial vehicle that is used for clamping device of horn and has it

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818

Termination date: 20201228