CN206419049U - A kind of Large Span Underground space structure - Google Patents

A kind of Large Span Underground space structure Download PDF

Info

Publication number
CN206419049U
CN206419049U CN201720065503.6U CN201720065503U CN206419049U CN 206419049 U CN206419049 U CN 206419049U CN 201720065503 U CN201720065503 U CN 201720065503U CN 206419049 U CN206419049 U CN 206419049U
Authority
CN
China
Prior art keywords
tunnel
underground
underground space
space structure
pipe curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720065503.6U
Other languages
Chinese (zh)
Inventor
高毅
苏明浩
于少辉
李洋
程鹏
罗雨田
王宁
李鹏
李明芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201720065503.6U priority Critical patent/CN206419049U/en
Application granted granted Critical
Publication of CN206419049U publication Critical patent/CN206419049U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to underground project dug underground technical field, particularly relate to a kind of Large Span Underground space structure, primarily to providing a kind of to the less underground tunneling space structure of social environment influence and its construction method, it is effective to solve the big technical problem of underground space structure engineering construction difficulty, there is provided a kind of Large Span Underground space structure, the underground space structure is mainly made up of underground tunnel structure and buried pipe curtain structure, and the wherein main leading tunnel in multiple longitudinal directions by being excavated using shield machine or push-bench of underground tunnel structure is constituted;The horizontal buried pipe curtain structure being made up of multiple bodys is provided between the adjacent leading tunnel in longitudinal direction, its middle tube body is set using linear or domes, the driving and slag discharge efficiency of heading equipment not only greatly improved in it, and underground construction machineryization construction degree greatly improved, improve efficiency of construction, it is ensured that the safety of underground engineering construction.

Description

A kind of Large Span Underground space structure
Technical field
The utility model belongs to underground project dug underground technical field;Particularly relate to a kind of Large Span Underground space knot Structure.
Background technology
Reform and opening-up and the urban construction of modernization with China, the construction of the underground space is using increasingly by country Attention;And in the continuation progradation of Urbanization in China, the quick concentration of urban population, land resource becomes outstanding To be rare, entire society also protrudes the demand of underground space development further;But common underground engineering construction, way It is the form of construction work being combined using supporting and open cut, but the maximum puzzlement that this traditional mode is brought is exactly to need over the ground Face carries out overall excavation, not only influences surrounding enviroment, and seriously blocks the traffic, to social public transport and ambient influnence compared with Greatly;And with the increase of structure buried depth, supporting expense is also greatly improved, if open cut is carried out in the ripe region in city, to society The potential loss that can be brought is even more to despise;And there is also many deficiencies, efficiency and the more difficult control of quality for current tunneling technology System;In terms of shield, pipe-jacking technology also can only preferably be used in tunnel, for large-scale underground space structure there is no preferably, Architectonical, different geological conditions can be tackled, the construction method of difference in functionality demand;Therefore, how do not influence ground environment, On the premise of traffic, social life, it is particularly important to complete complex geological condition, the construction of the underground engineering of sophisticated functions demand And problem urgently to be resolved hurrily.
The content of the invention
Goal of the invention of the present utility model:
Primarily to providing a kind of to the less underground tunneling space structure of social environment influence and its construction method, have The efficiency of construction for solving the big technical problem of underground space structure engineering construction difficulty, improving enterprise of effect, reduces the labor of workman Fatigue resistance, improves the implementation quality of underground large-span space structure, improves the security and mechanization degree of underground engineering.
The technical solution of the utility model is:
There is provided a kind of Large Span Underground space structure, the underground space structure is main by underground tunnel structure and buried pipe Curtain structure is constituted, wherein the main leading tunnel group in multiple longitudinal directions by being excavated using shield machine or push-bench of underground tunnel structure Into;The horizontal buried pipe curtain structure being made up of multiple bodys is provided between the adjacent leading tunnel in longitudinal direction, its middle tube body is adopted Set with linear or domes, linear body is excavated using rectilinear tubes curtain machine and set, and arch body is using curve pipe curtain Machine, which is excavated, to be set.
Transverse pipe curtain and its leading tunnel in longitudinal direction of bridging can carry out the plane of the underground space as basic structural unit Direction and the sequential combination of depth direction, the repeated combination in same depth plane constitute large-scale multispan underground space knot Structure, large-scale multi-layer underground space structure is constituted in the repeated combination of depth direction.
The leading tunnel in described longitudinal direction can use rectangle or class rectangle tunnel, circular tunnel and horse-shoe tunnel.
The span of buried pipe curtain structure between the described leading tunnel in adjacent longitudinal direction is 8m~30m.
Described buried pipe curtain structure is shaped as semi-circular, round, door type or openning type.
The beneficial effects of the utility model are:
The underground space structure of the structure setting forms the vertical of economic and reliable by the combination of longitudinal tunnel and pipe curtain structure Horizontal structural system;The system unit can flexible arrangement, can not only be combined to form many span spatial structures in plane, can also In depth direction combination, the underground space structure of multilayer is formed, so as to realize the function needs of complicated underground space building;It is not But the driving and slag discharge efficiency of heading equipment greatly improved, and underground construction machineryization construction degree greatly improved, carries High efficiency of construction, it is ensured that the safety of underground engineering construction, shortens the duration, reduces construction cost, and effectively avoid Influence to ground environment, reduces influence of the underground space development to social synthesis's benefit.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention;
Fig. 2 is overlooking the structure diagram of the invention;
Fig. 3 is one of construction method structural representation of embodiments of the invention one;
Fig. 4 is the two of the construction method structural representation of embodiments of the invention one;
Fig. 5 is the three of the construction method structural representation of embodiments of the invention one;
Fig. 6 is the four of the construction method structural representation of embodiments of the invention one;
Fig. 7 is one of implementation structural representation of embodiments of the invention two;
Fig. 8 is the two of the implementation structural representation of embodiments of the invention two;
Fig. 9 is the three of the implementation structural representation of embodiments of the invention two;
Figure 10 is the four of the implementation structural representation of embodiments of the invention two;
Figure 11 is one of implementation structural representation of embodiments of the invention three;
Figure 12 is the two of the implementation structural representation of embodiments of the invention three;
Figure 13 is the three of the implementation structural representation of embodiments of the invention three;
Figure 14 is the four of the implementation structural representation of embodiments of the invention three;
In figure;1 is the leading tunnel in longitudinal direction;2 be body;3 be horizontal buried pipe curtain.
Embodiment
The embodiment of the present invention is described in detail below in conjunction with accompanying drawing.
There is provided a kind of Large Span Underground space structure as shown in Fig. 1~2, the underground space structure is main by underground tunnel Road structure and buried pipe curtain structure composition, wherein underground tunnel structure are main by being indulged using shield machine or the multiple of push-bench excavation Constituted to leading tunnel 1;The horizontal buried pipe curtain 3 being made up of multiple bodys 2 is provided between the adjacent leading tunnel in longitudinal direction Structure, its middle tube body is set using linear or domes, and linear body is excavated using rectilinear tubes curtain machine and set, arch tube Body is excavated using curve pipe curtain machine and set.
Transverse pipe curtain and its leading tunnel in longitudinal direction of bridging can carry out the plane of the underground space as basic structural unit Direction and the sequential combination of depth direction, the repeated combination in same depth plane constitute large-scale multispan underground space knot Structure, large-scale multi-layer underground space structure is constituted in the repeated combination of depth direction.
The leading tunnel in described longitudinal direction can use rectangle or class rectangle tunnel, circular tunnel and horse-shoe tunnel.
The span of buried pipe curtain structure between the described leading tunnel in adjacent longitudinal direction is 8m~30m.
Described buried pipe curtain structure is shaped as semi-circular, round, door type or openning type.
The construction method step of Large Span Underground space structure in accordance with the above is:
(1), utilize shield machine, push-bench to excavate to complete the leading tunnel in longitudinal direction;Longitudinal direction is parallel to each other between leading tunnel.
(2), between the leading tunnel in longitudinal direction using pipe curtain machine carry out pipe curtain structure and excavate to perform, form linear or arch And its buried pipe curtain structure in the multiple span directions being combined, and in pipe curtain structure two ends setting bearing, pipe curtain steel pipe is relied on Fore shaft is connected, and injects water-stop or mortar at fore shaft, forms sealed antipriming pipe curtain, and then form horizontal span space Excavation supporting structure.
(3), the region that encloses that is constituted to the leading tunnel in longitudinal direction and transverse pipe curtain structure using excavating machinery carry out the earthwork Excavate.
(4), repeat the above steps(1)~(3), complete multiple knots being made up of the leading tunnel in longitudinal direction and transverse pipe curtain structure Structure unit;It is finally constituted multilayer or the underground space structure main body of multi-span.
(5), carry out the mechanical and electric equipment installation of underground space building, plumbing installation, furred ceiling and wall decoration, lighting apparatus Install etc..
Embodiment one:The form of construction work that the plane aspect with regard to the Large Span Underground space structure of the structure setting is combined below It is described in detail;As illustrated in figures 3-6:
Step one:Longitudinal tunnel machineization construction;Two parallel tunnels are first performed using shield machine, push-bench;In advance Tunnel is as the longitudinal load-bearing structure of space structure unit, and its cross sectional shape can use rectangle or class rectangle tunnel, circular tunnel Or horse-shoe tunnel.
Step 2:Transverse pipe curtain mechanized construction;Pipe curtain is carried out using pipe curtain machine to perform, and forms the structure in span direction; Pipe curtain machine is originated from a tunnel, and another tunnel is received, and pipe curtain pours bearing after being formed in the pipe curtain termination in two tunnels, Gu Fixed tube curtain two ends;Stratum residing for structure is aqueous more at most using the pipe curtain structure of belt lock catch form and with sleeve pipe curtain machine, utilizes lock Detain and injecting treatment;Pipe curtain irrigates plain concrete or configuration reinforcement or insertion shaped steel according to structural load situation inside pipeline.
Step 3:Earth excavation;Under the supporting of leading tunnel and pipe curtain, the region enclosed to tunnel and pipe curtain, along elder generation Row tunnel bearing of trend carries out earth excavation.
Step 4:The Parallel Tunnel of a longitudinal direction is performed again, and repeat step two, step 3 complete construction unit in plane Simple repeated combination, realize multispan underground space structure;Repeat step one, two, three, repeats, combines the structure of tunnel+pipe curtain Unit, forms the agent structure of complicated underground space building;
Step 5:Tunnel-side is abolished, leading tunnel and large span space is connected, and carry out equipment installation, decorations Deng ending operation.
Embodiment two:The form of construction work that the depth direction of the Large Span Underground space structure of the structure setting is combined below It is described in detail;As shown in Fig. 7~10:
Step one:Longitudinal tunnel machineization construction;Two parallel tunnels are first performed using shield machine, push-bench;In advance Tunnel is as the longitudinal load-bearing structure of space structure unit, and its cross sectional shape can use rectangle or class rectangle tunnel, circular tunnel Or horse-shoe tunnel.
Step 2:Transverse pipe curtain mechanized construction;Pipe curtain is carried out using pipe curtain machine to perform, and forms the structure in span direction; Pipe curtain machine is originated from a tunnel, and another tunnel is received, and pipe curtain pours bearing after being formed in the pipe curtain termination in two tunnels, Gu Fixed tube curtain two ends;Stratum residing for structure is aqueous more at most using the pipe curtain structure of belt lock catch form and with sleeve pipe curtain machine, utilizes lock Detain and injecting treatment;Pipe curtain irrigates plain concrete or configuration reinforcement or insertion shaped steel according to structural load situation inside pipeline.
Step 3:Earth excavation;Under the supporting of leading tunnel and pipe curtain, the region enclosed to tunnel and pipe curtain, along elder generation Row tunnel bearing of trend carries out earth excavation.
Step 4:Second of Parallel Tunnel is performed in depth direction, repeat step two, step 3 complete structural units and existed The repeated combination of depth direction, realizes multi-layer underground space structure.
Step 5:Tunnel-side is abolished, leading tunnel and large span space is connected, and carry out equipment installation, decorations Deng ending operation.
Embodiment three:Below with regard to applying that the domes pipe curtain of the Large Span Underground space structure of the structure setting is combined Work mode is described in detail;As shown in Figure 11~14:
Step one:Longitudinal tunnel machineization construction;Two parallel tunnels are first performed using shield machine, push-bench;In advance Tunnel is as the longitudinal load-bearing structure of space structure unit, and its cross sectional shape can use rectangle or class rectangle tunnel, circular tunnel Or horse-shoe tunnel.
Step 2:The curtain mechanized construction of horizontal curve pipe;Pipe curtain is carried out using curve pipe curtain machine to perform, and forms span direction Structure;Pipe curtain machine is originated from a tunnel, and another tunnel is received, and pipe curtain is poured after being formed in the pipe curtain termination in two tunnels Bearing, fixing pipe curtain two ends;Stratum residing for structure is aqueous more at most using the pipe curtain structure of belt lock catch form and with sleeve pipe curtain machine, Utilize lock and injecting treatment;Pipe curtain irrigates plain concrete or configuration reinforcement or inserted inside pipeline according to structural load situation Enter shaped steel.
Step 3:Earth excavation;Under the supporting of leading tunnel and pipe curtain, the region enclosed to tunnel and pipe curtain, along elder generation Row tunnel bearing of trend carries out earth excavation.
Step 4:The Parallel Tunnel of a longitudinal direction is performed again, and repeat step two, step 3 complete construction unit in plane Simple repeated combination, realize the underground space structure of multispan arcading;
Step 5:Tunnel-side is abolished, leading tunnel and large span space is connected, and carry out equipment installation, decorations Deng ending operation.
Described above is only the preferred embodiment of the present invention, it is noted that to those skilled in the art, not On the premise of departing from the invention design, some similar changes or remodeling can also be made, these also should be regarded as the present invention Protection domain within.

Claims (5)

1. a kind of Large Span Underground space structure, it is characterised in that:The underground space structure is main by underground tunnel structure and ground Down tube curtain structure is constituted, wherein the main leading tunnel in multiple longitudinal directions by being excavated using shield machine or push-bench of underground tunnel structure Composition;The horizontal buried pipe curtain structure being made up of multiple bodys, its middle tube body are provided between the adjacent leading tunnel in longitudinal direction Set using linear or domes, linear body is excavated using rectilinear tubes curtain machine and set, and arch body uses curve pipe Curtain machine, which is excavated, to be set.
2. a kind of Large Span Underground space structure according to claim 1, it is characterised in that:Transverse pipe curtain and its bridging The leading tunnel in longitudinal direction the in-plane of the underground space and the sequential combination of depth direction can be carried out as basic structural unit, Repeated combination in same depth plane constitutes large-scale multispan underground space structure, is constituted in the repeated combination of depth direction big The multi-layer underground space structure of type.
3. a kind of Large Span Underground space structure according to claim 1, it is characterised in that:The leading tunnel in described longitudinal direction Rectangle or class rectangle tunnel, circular tunnel and horse-shoe tunnel can be used.
4. a kind of Large Span Underground space structure according to claim 1, it is characterised in that:Described adjacent longitudinal direction is first The span of buried pipe curtain structure between row tunnel is 8m~30m.
5. a kind of Large Span Underground space structure according to claim 1, it is characterised in that:Described buried pipe curtain structure Be shaped as semi-circular, round, door type or openning type.
CN201720065503.6U 2017-01-19 2017-01-19 A kind of Large Span Underground space structure Active CN206419049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720065503.6U CN206419049U (en) 2017-01-19 2017-01-19 A kind of Large Span Underground space structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720065503.6U CN206419049U (en) 2017-01-19 2017-01-19 A kind of Large Span Underground space structure

Publications (1)

Publication Number Publication Date
CN206419049U true CN206419049U (en) 2017-08-18

Family

ID=59572212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720065503.6U Active CN206419049U (en) 2017-01-19 2017-01-19 A kind of Large Span Underground space structure

Country Status (1)

Country Link
CN (1) CN206419049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640155A (en) * 2017-01-19 2017-05-10 中铁工程装备集团有限公司 Large-span underground space structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640155A (en) * 2017-01-19 2017-05-10 中铁工程装备集团有限公司 Large-span underground space structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN102373930A (en) Rapid construction method of weak surrounding rock large-section multi-arc tunnel
CN102305077A (en) Rapid construction method of large-section multi-arc tunnel
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN104775817A (en) All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN107060771A (en) Middle short tunnel is unidirectionally appeared excavation method
CN104632235A (en) Method for expanding excavation of large-diameter shield tunnel for subway station construction through pile arch wall support
CN106640155A (en) Large-span underground space structure and construction method thereof
CN102654055A (en) Construction method for compound construction of large-scale underground space structure by holes, groove and piles
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN104165056A (en) Construction method for excavating water-rich shallow underground excavation tunnel
CN204457792U (en) A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building
CN103362513A (en) Transformation and construction method for existing cavity in underground excavation region
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN107178370A (en) It is not take up the method for construction of constructing road subway station weak soil
CN104314578A (en) Construction method for continuous construction by using shield construction machine and matched station thereof
CN109372520A (en) One kind passing through Debris Flow Deposition area tunnel support structure and its construction method
CN104612696A (en) Construction method for large-section underground excavation subway station to pass through viaduct in fine sand layer by using column hole method
CN104632245A (en) Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN104653188A (en) Method for arranging large-diameter shield receiving and originating well in underground-excavated air duct
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method