CN206417763U - Construction elevator cage - Google Patents

Construction elevator cage Download PDF

Info

Publication number
CN206417763U
CN206417763U CN201621476532.3U CN201621476532U CN206417763U CN 206417763 U CN206417763 U CN 206417763U CN 201621476532 U CN201621476532 U CN 201621476532U CN 206417763 U CN206417763 U CN 206417763U
Authority
CN
China
Prior art keywords
handle
handrail
arc
cage body
bib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621476532.3U
Other languages
Chinese (zh)
Inventor
汪琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Chong Jun Electronic Technology Co Ltd
Original Assignee
Chongqing Chong Jun Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Chong Jun Electronic Technology Co Ltd filed Critical Chongqing Chong Jun Electronic Technology Co Ltd
Priority to CN201621476532.3U priority Critical patent/CN206417763U/en
Application granted granted Critical
Publication of CN206417763U publication Critical patent/CN206417763U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses construction elevator cage, including cage body, multiple protectors and multiple tool box;Multiple protectors and tool box are arranged in cage body;Protector includes support column, arc bib, handrail and handle;Support column is vertically fixed on the bottom surface of cage body;Arc bib is fixed on the top of support column;Support column is connected with the center of arc bib;Handrail is connected to the two ends of arc bib;Handle is fixed on the bottom of the one end of handrail away from arc bib;Tool box is fixed on the bottom surface of cage body.The utility model can avoid personnel when cage body rapid decrease or jerk from falling down, safe.

Description

Construction elevator cage
Technical field
The utility model is related to building machinery, more particularly to a kind of construction elevator cage.
Background technology
During high-building construction, in order to transport personnel and construction tool, it is necessary to use building hoist.Construction rises Drop machine transports personnel and instrument goods and materials by cage.At present, building hoist all possesses safety protection structure, can be disconnected in hanger rope Split or avoid cage from falling during power-unit failure.When hanger rope fracture or power-unit failure, cage can fall one section at a high speed Distance, then safety protection structure act on and carry out brake hard.During cage high speed whereabouts and brake hard, in cage Personnel easily fall down.And because cage is typically that personnel and construction tool are loaded in mixture, fall down personnel easily with angular , there is great potential safety hazard in various construction tool collisions.
Utility model content
The purpose of this utility model is to overcome the above mentioned problem of prior art there is provided a kind of construction elevator cage.
The purpose of this utility model is achieved through the following technical solutions:
Construction elevator cage, including cage body, multiple protectors and multiple tool box;
The multiple protectors and the tool box are arranged in the cage body;
The protector includes support column, arc bib, handrail and handle;The support column is vertically fixed on described On the bottom surface of cage body;The arc bib is fixed on the top of the support column;In the support column and the arc bib The heart is connected;The handrail is connected to the two ends of the arc bib;The handle is fixed on the handrail away from the arc protective The bottom of one end of gear;
The tool box is fixed on the bottom surface of the cage body.
Operation principle of the present utility model is as follows:
Staff enters after cage body, in construction tool inserter frame, will realize putting in order for construction tool.Then Staff enters protection and placed, i.e., into arc protective confining into region in, lean against arc bib, both hands buttress handrail or Catch handle.Then building hoist drives cage body to rise.If hanger rope is broken or power-unit failure, cage body drops at high speeds Or during jerk, arc bib and handrail can play a supportive role to staff, prevent staff from falling down.When staff grabs Firmly during handle, during cage body declines at a high speed, the arm of staff will be close to the bottom of handrail, contribute to the people that works Member is maintained on cage body bottom surface, it is to avoid because weightlessness causes staff's disequilibrium during cage body high speed decline, further carried High security.Handle is arranged on handrail bottom, staff's trunk can be avoided during failure, which to rock, causes staff and handle Hand produces collision, further improves security.
Further, the bottom of the one end of the handrail away from the arc bib offers holding tank;The handle can The bottom of the one end of the handrail away from the arc bib is rotatably arranged at, with the into and out holding tank.
Holding tank is set, when the grip is not used, handle can be made to enter in holding tank with swing handle, so as to avoid protrusion Handle and human body collide, further increase security.
Further, it is provided with horizontally disposed rotary shaft in the holding tank;The handle can turn with the rotary shaft Connect dynamicly;Torsion spring is arranged with the rotary shaft;One end of the torsion spring and the handle, the other end of the torsion spring and institute State the wall connection of holding tank.
Further, the cage body possess door and with door just to metope;Just to institute at the opening of the arc bib State metope;
The tool box is arranged between the protector and the door.
Just metope and tool box are arranged between protector and door at the opening of arc bib, in this way, even existing When staff falls down, staff will not also jump on tool box, it is to avoid staff with angular various construction tools Collision, improves security.
Further, the rubber blanket just to the protector is provided with the metope.
Rubber blanket is set, and when staff falls down forward, rubber blanket can avoid staff and metope direct collision, Improve security.
The utility model has the advantages that:
1. when staff catches handle, during cage body declines at a high speed, the arm of staff, which will be close to, to be helped The bottom of hand, helps staff being maintained on cage body bottom surface, it is to avoid because weightlessness causes work during cage body high speed decline Make personnel's disequilibrium, further improve security.Handle is arranged on handrail bottom, staff's body when can avoid failure Dry rock causes staff to produce collision with handle, further improves security.
2. setting holding tank, when the grip is not used, handle can be made to enter in holding tank with swing handle, so as to avoid convex The handle gone out is collided with human body, further increases security.
3. just metope and tool box are arranged between protector and door at the opening of arc bib, in this way, even When staff falls down, staff will not also jump on tool box, it is to avoid staff with angular various construction works Tool collision, improves security.
4. setting rubber blanket, when staff falls down forward, rubber blanket can avoid staff from directly being touched with metope Hit, improve security.
Brief description of the drawings
, below will be to needed for description the utility model embodiment in order to illustrate more clearly of embodiment of the present utility model The accompanying drawing to be used is briefly described.It will be apparent that drawings in the following description are only described in the utility model Some embodiments, for a person skilled in the art, without creative efforts, can also be according to following Accompanying drawing, obtain other accompanying drawings.
Fig. 1 is inside top figure of the present utility model;
Fig. 2 is inner side elevational view of the present utility model;
Wherein, the corresponding parts title of reference is as follows:
10- cage bodies, 11-, 12- metopes, 20- support columns, 30- arc bibs, 40- handrails, 41- holding tanks, 42- is rotated Axle, 50- tool box, 60- rubber blankets, 70- handles.
Embodiment
In order that those skilled in the art more fully understands the utility model, below in conjunction with the utility model embodiment In accompanying drawing clear, complete description is carried out to the technical scheme in the utility model embodiment.It will be apparent that described below Embodiment be only a part in the utility model embodiment, rather than all.The implementation recorded based on the utility model Example, other all embodiments that those skilled in the art obtain without creative efforts are new in this practicality In the range of type protection.
Embodiment 1
As depicted in figs. 1 and 2, construction elevator cage, including cage body 10, multiple protectors and multiple tool box 50;
The multiple protectors and the tool box 50 are arranged in the cage body 10;
The protector includes support column 20, arc bib 30, handrail 40 and handle 70;The support column 20 is vertically On the bottom surface for being fixed on the cage body 10;The arc bib 30 is fixed on the top of the support column 20;The support column 20 It is connected with the center of the arc bib 30;The handrail 40 is connected to the two ends of the arc bib 30;The handle 70 is consolidated It is scheduled on the bottom of the one end of the handrail 40 away from the arc bib 30;
The tool box 50 is fixed on the bottom surface of the cage body 10.
Operation principle of the present utility model is as follows:
Staff enters after cage body 10, in construction tool inserter frame 50, will realize putting in order for construction tool. Then staff enters protection and placed, i.e., in the region surrounded into arc bib 30, lean against arc bib 30, both hands are buttressed Handrail 40 catches handle 70.Then building hoist drives cage body 10 to rise.If hanger rope is broken or power-unit failure, Cage body 10 drops or during jerk at high speeds, and arc bib 30 and handrail 40 can play a supportive role to staff, prevent work Personnel fall down.When staff catches handle 70, during cage body 10 declines at a high speed, the arm of staff will be close to The bottom of handrail 40, helps staff being maintained on the bottom surface of cage body 10, it is to avoid cage body 10 decline at a high speed during because lose Cause staff's disequilibrium again, further improve security.Handle 70 is arranged on the bottom of handrail 40, failure can be avoided When staff's trunk rock and cause staff and handle 70 to produce collision, further improve security.
Further, as depicted in figs. 1 and 2, in wherein a kind of embodiment, the handrail 40 is away from the arc protective The bottom of one end of gear 30 offers holding tank 41;The handle 70 is rotatably arranged in the handrail 40 away from the arc The bottom of one end of bib 30, with the into and out holding tank 41.
Holding tank 41 is set, when without using handle 70, handle 70 can be made to enter in holding tank 41 with swing handle 70, from And avoid the handle 70 of protrusion and human body from colliding, further increase security.
Further, as depicted in figs. 1 and 2, in wherein a kind of embodiment, level is provided with the holding tank 41 The rotary shaft 42 of arrangement;The handle 70 is rotatably coupled with the rotary shaft 42;Torsion spring is arranged with the rotary shaft 42; One end of the torsion spring and the handle 70, the other end of the torsion spring are connected with the wall of the holding tank 41.
Further, as depicted in figs. 1 and 2, in wherein a kind of embodiment, the cage body 10 possess door 11 and with Door 11 just to metope 12;Just to the metope 12 at the opening of the arc bib 30;
The tool box 50 is arranged between the protector and the door 11.
Just metope 12 and tool box 50 are arranged between protector and door 11 at the opening of arc bib 30, in this way, Even when staff falls down, staff will not also jump on tool box 50, it is to avoid staff with angular each Construction tool collision is planted, security is improved.
Further, as depicted in figs. 1 and 2, in wherein a kind of embodiment, it is provided with the metope 12 just to institute State the rubber blanket 60 of protector.
Rubber blanket 60 is set, and when staff falls down forward, rubber blanket 60 can avoid staff and metope 12 straight Collision is connect, security is improved.
Above content is to combine the further description that specific preferred embodiment is made to the utility model, it is impossible to recognized Fixed embodiment of the present utility model is confined to these explanations.For the common skill of the utility model art For art personnel, the other embodiment drawn in the case where not departing from the technical solution of the utility model should be included in this practicality In new protection domain.

Claims (5)

1. construction elevator cage, it is characterised in that:Including cage body(10), multiple protectors and multiple tool box(50);
The multiple protectors and the tool box(50)It is arranged on the cage body(10)In;
The protector includes support column(20), arc bib(30), handrail(40)And handle(70);The support column(20) Vertically it is fixed on the cage body(10)Bottom surface on;The arc bib(30)It is fixed on the support column(20)Top; The support column(20)With the arc bib(30)Center connection;The handrail(40)It is connected to the arc bib(30) Two ends;The handle(70)It is fixed on the handrail(40)Away from the arc bib(30)One end bottom;
The tool box(50)It is fixed on the cage body(10)Bottom surface on.
2. construction elevator cage according to claim 1, it is characterised in that:The handrail(40)Away from the arc protective Gear(30)The bottom of one end offer holding tank(41);The handle(70)It is rotatably arranged in the handrail(40)It is remote The arc bib(30)One end bottom, with the into and out holding tank(41).
3. construction elevator cage according to claim 2, it is characterised in that:The holding tank(41)Inside it is provided with level The rotary shaft of arrangement(42);The handle(70)With the rotary shaft(42)It is rotatably coupled;The rotary shaft(42)Upper set Provided with torsion spring;One end of the torsion spring and the handle(70), the other end of the torsion spring and the holding tank(41)Wall Connection.
4. construction elevator cage according to claim 1, it is characterised in that:The cage body(10)Possesses door(11)And With door(11)Just to metope(12);The arc bib(30)Opening at just to the metope(12);The tool box (50)It is arranged on the protector and the door(11)Between.
5. construction elevator cage according to claim 4, it is characterised in that:The metope(12)On be provided with just to institute State the rubber blanket of protector(60).
CN201621476532.3U 2016-12-29 2016-12-29 Construction elevator cage Expired - Fee Related CN206417763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621476532.3U CN206417763U (en) 2016-12-29 2016-12-29 Construction elevator cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621476532.3U CN206417763U (en) 2016-12-29 2016-12-29 Construction elevator cage

Publications (1)

Publication Number Publication Date
CN206417763U true CN206417763U (en) 2017-08-18

Family

ID=59574390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621476532.3U Expired - Fee Related CN206417763U (en) 2016-12-29 2016-12-29 Construction elevator cage

Country Status (1)

Country Link
CN (1) CN206417763U (en)

Similar Documents

Publication Publication Date Title
CN207920039U (en) A kind of building hanging basket with buffer protection function
CN206417763U (en) Construction elevator cage
CN206502489U (en) A kind of lift
CN206172726U (en) Safety elevator with rock protection device
CN201943406U (en) Safe and fallproof device for car-carrying board
CN206367966U (en) A kind of safe cage
CN205367562U (en) Coaster slowly falls in electric line heavy object
CN205041085U (en) Safe anti -climb rail
CN205076600U (en) Anti -falling protection device of elevator
CN206811175U (en) A kind of electric drill with safeguard function
CN206599363U (en) Vertical transferring apparatus
CN203684635U (en) Safety protection hanging basket for building
CN207090724U (en) A kind of safety cage for housing construction
CN203158041U (en) Handcart switch transfer trolley switch-falling prevention device
CN202843504U (en) Robot for cleaning windows
CN209443817U (en) A kind of aerial suspension device for building construction
CN204282847U (en) A kind of building protective screening
CN207632336U (en) A kind of single-beam crane buffer
CN206446646U (en) A kind of electronic loading climbing machine
CN207226722U (en) A kind of elevator with protective device
CN205971085U (en) Transport vechicle afterbody protection climbing device
CN214985476U (en) Space-saving stop lever limiting mechanism
CN205169567U (en) Take springiness cushioning's roller device that pulls
CN104494604A (en) Steel wire rope slipping-back preventing device for aerial passenger device
CN205652953U (en) High -speed landing protection device of elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818

Termination date: 20171229

CF01 Termination of patent right due to non-payment of annual fee