CN206414919U - Smelting exhaust gas dust pelletizing system - Google Patents

Smelting exhaust gas dust pelletizing system Download PDF

Info

Publication number
CN206414919U
CN206414919U CN201720001846.6U CN201720001846U CN206414919U CN 206414919 U CN206414919 U CN 206414919U CN 201720001846 U CN201720001846 U CN 201720001846U CN 206414919 U CN206414919 U CN 206414919U
Authority
CN
China
Prior art keywords
dust
chamber
radiating
group
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720001846.6U
Other languages
Chinese (zh)
Inventor
李建勋
李建汶
顾永惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN JIANXUN ENVIRONMENTAL RESOURCES AND TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
HUNAN JIANXUN ENVIRONMENTAL RESOURCES AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN JIANXUN ENVIRONMENTAL RESOURCES AND TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HUNAN JIANXUN ENVIRONMENTAL RESOURCES AND TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201720001846.6U priority Critical patent/CN206414919U/en
Application granted granted Critical
Publication of CN206414919U publication Critical patent/CN206414919U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

Smelting exhaust gas dust pelletizing system, dust chamber is connected with exhaust main by the blast pipe that gathers dust, and water inlet pipe is connected in dust chamber with water main, and one end of one group of branching pipe is connected with water main, and the other end closing of one group of branching pipe, every branching pipe installs one group of fountain head;One group of radiating bucket is on the top plate of dust chamber, and having to have on connection tracheae, the radiating bucket on the right on a radiating tube connection, the radiating bucket on the left side between two adjacent radiating buckets has inlet manifold;One group of filter chamber is arranged on the top plate of dust chamber, and each piece exhaust branch pipe in filter chamber is connected with exhaust main, and the bottom of filter chamber is inlet plenum, and each inlet plenum is connected through an air intake branch with being connected tracheae;The lower end of each radiating bucket and each inlet plenum, is connected through a dust outlet tube with dust chamber;One end of axle is stretched into dust outlet tube, and dust outlet tube door is welded on the axle in dust outlet tube, armshaft is connected on the axle outside dust outlet tube, pouring weight is hung on armshaft.

Description

Smelting exhaust gas dust pelletizing system
Technical field
The utility model is related to smelting exhaust gas dust pelletizing system, belongs to smelting enterprise's waste gas dedusting field.
Background technology
At present, the waste gas that known smelting enterprise produces in production has dust and harmful sulfur-bearing, containing acid gas, because This, smelting enterprise first must carry out dedusting to waste gas, make exhaust gas conversion into after tail gas, then sulphur removal is carried out to tail gas, except acid treatment. And what waste gas dust-removal device used in existing smelting enterprise was designed so as to:The top of dust arrester is filter chamber, filtering There is equally distributed filter cloth bag interior, and the bottom of dust arrester is funnel, and plate, during work, waste gas are installed in the bottom of funnel Enter from funnel, after filter cloth bag is filtered, from filter chamber's discharge;The dust that filter cloth bag is filtered out, under fall on funnel Bottom;Per after a period of time, workman shifts dust stroller onto the lower section of funnel, the plate of extraction funnel bottom, leakage in work Dust in bucket is fallen into dust stroller.There are some shortcomings in aforesaid way:One is the plate for extracting funnel bottom out in workman, is received During collecting dust, portion overflows from funnel bottom, causes environment to be contaminated, and harm workman's body.Two be by It is dry in dust, during dust falls, part dust can be floated in air, equally cause environment by dirt Dye.Three be that the EGT come out from smelting furnace is very high, and high-temp waste gas damages fast, caused to the filter cloth bag in filter chamber The service life of filter cloth bag is short, and the production cost of enterprise is high.Four be that, because the service life of filter cloth bag is short, smelting furnace is in production one After short time, the filter cloth bag in filter chamber has lost filtration, and enterprise is to ensure that production is normally carried out, it is necessary at least built Two sets of dust arresters are made, is used, overhauled in turn by two sets of dust arresters, the purpose that production is normally carried out is reached, and at least built Two sets of dust arresters, add the production cost of enterprise.
The content of the invention
In order to overcome existing smelting enterprise in production, the disadvantages mentioned above of appearance, the utility model provides smelting exhaust gas Dust pelletizing system, using the smelting exhaust gas dust pelletizing system, reduces the production cost of enterprise.Meanwhile, during dust is collected, Waste gas is avoided also to overflow from funnel bottom, and part dust is floated in air, protects environment and workman's body.
In order to achieve the above object, the technical scheme that the utility model solves that its technical problem used is following design 's:
Dust chamber is built on the ground, has door on a face wall of dust chamber;Dust chamber is connected with exhaust main by the blast pipe that gathers dust It is logical, there is valve on the blast pipe that gathers dust;Water inlet pipe is connected in dust chamber with water main, and one end and the water main of one group of branching pipe connect Logical, the other end closing of one group of branching pipe, every branching pipe installs one group of fountain head.One group of radiating bucket is through radiating bucket edge, radiating The leg that struggles against is arranged on the top plate of dust chamber, has a radiating tube connection, the radiating bucket on the left side between two adjacent radiating buckets On have on connection tracheae, the radiating bucket on the right and have inlet manifold;One group of filter chamber is through filter chamber's leg, filter chamber along installed in receipts On the top plate of dirt room, there is one group of equally distributed filter cloth bag in each filter chamber, each piece exhaust branch pipe in filter chamber with Exhaust main is connected, and the bottom of filter chamber is inlet plenum, and each inlet plenum is connected through an air intake branch with being connected tracheae.Each The lower end of radiating bucket and each inlet plenum, is connected through a dust outlet tube with dust chamber;One end of axle is stretched into dust outlet tube, is located at Dust outlet tube door is welded on axle in dirt pipe, armshaft is connected on the axle outside dust outlet tube, pouring weight is hung on armshaft.
Described inlet plenum is funnel shaped, and this structure is conducive to the dust that the filter cloth bag in filter chamber is filtered out, Under fall in dust outlet tube.There is crossette on described door, this structure is conducive to being turned on and off door.Have recessed on described armshaft Groove, this structure is conducive to pouring weight to hang on armshaft.
The beneficial effects of the utility model are:1st, when collecting dust, the waste gas in smelting exhaust gas dust pelletizing system has been drained, Avoid after waste gas overflows and pollute environment.2nd, during the dust in cleaning dust chamber, because dust is moist, it is therefore prevented that Dust is floated in air, protects environment and workman's body.3rd, waste gas is before inlet plenum is entered, through one group of radiating bucket and one group Radiating tube has distributed amount of heat, and the EGT for reaching filter cloth bag is not high, reduces damage speed of the waste gas to filter cloth bag Degree, extends the useful life of filter cloth bag, within the unit interval, the filter cloth bag consumption of enterprise is few, high financial profit.4、 Long due to extending filter cloth bag service life, maintenance, the filter cloth bag changed in filter chamber are synchronous with smelting furnace stop production to overhaul Carry out;Therefore, enterprise must only build a set of dust arrester, reduce the production cost of enterprise.5th, the smelting exhaust gas dust pelletizing system Structure cylinder is single, easy to use.
Brief description of the drawings
The utility model is further illustrated with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is the front view of smelting exhaust gas dust pelletizing system.
Fig. 2 is Fig. 1 top view.
Fig. 3 is Fig. 1 A --- A views.
Fig. 4 is Fig. 1 B --- B views.
In figure
1st, filter chamber 2, filter chamber's leg 3, inlet manifold 4, radiating struggle against along 5, radiating bucket leg 6, axle 7, armshaft 8th, pouring weight 9, water inlet pipe 10, dust chamber 11, door 12, crossette 13, the blast pipe 14 that gathers dust, the dust outlet tube 16 of valve 15, dissipate Heat bucket 17, connection tracheae 18, inlet plenum 19, exhaust main 20, filter chamber along 21, radiating tube 22, exhaust branch pipe 23, Air intake branch 24, dust outlet tube door 25, water main 26, fountain head 27, branching pipe.
Embodiment
In the embodiment shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, dust chamber 10 is built on the ground, a face wall of dust chamber 10 On have door 11;Dust chamber 10 is connected with exhaust main 19 by the blast pipe 13 that gathers dust, and has valve 14 on the blast pipe 13 that gathers dust;Water inlet pipe 9 are connected with water main 25 in the dust chamber 10, and one end of one group of branching pipe 27 is connected with water main 25, one group of branching pipe 27 it is another One end is closed, and every branching pipe 27 installs one group of fountain head 26.One group of radiating bucket 16 is installed through radiating bucket along 4, radiating bucket leg 5 On the top plate of dust chamber 10, there is a radiating tube 21 to connect between two adjacent radiating buckets 16, on the radiating bucket 16 on the left side Having on connection tracheae 17, the radiating bucket 16 on the right has inlet manifold 3;One group of filter chamber 1 is through filter chamber's leg 2, filter chamber along 20 On the top plate of dust chamber 10, there is one group of equally distributed filter cloth bag in each filter chamber 1, each filter chamber 1 is through one Root exhaust branch pipe 22 is connected with exhaust main 19, and the bottom of filter chamber 1 is inlet plenum 18, and each inlet plenum 18 is through an air inlet branch Pipe 23 is connected with being connected tracheae 17.The lower end of each radiating bucket 16 and each inlet plenum 18, through a dust outlet tube 15 and dust chamber 10 connections;One end of axle 6 is stretched into dust outlet tube 15, dust outlet tube door 24 is welded on the axle 6 in dust outlet tube 15, positioned at dust outlet tube Armshaft 7 is connected on axle 6 outside 15, pouring weight 8 is hung on armshaft 7.
Described inlet plenum 18 is funnel shaped, and this structure is conducive to the dirt that the filter cloth bag in filter chamber 1 is filtered out Angstrom, under fall in dust outlet tube 15.There is crossette 12 on described door 11, this structure is conducive to being turned on and off door 11.Described Fluted on armshaft 7, this structure is conducive to pouring weight 8 to hang on armshaft 7.
Before use, inlet manifold 3 is connected with air blower, smelting furnace waste gas outlet with tracheae, it is with offgas duct that exhaust is total Pipe 19 is connected with air exhauster, exhaust gas processing device;Water inlet pipe 9 is connected with water flowing time switch, water tower with water pipe again.
During work, the valve 14 gathered dust on blast pipe 13 is closed, air blower, air exhauster, water flowing time switch is started, smelted The waste gas that stove is produced is through smelting furnace waste gas outlet, tracheae, inlet manifold 3, radiating bucket 16, radiating tube 21, connection tracheae 17, air inlet Branch pipe 23, inlet plenum 18 reach the filter cloth bag in filter chamber 1, then turn into tail gas after being filtered through filter cloth bag, and tail gas is through exhaust Branch pipe 22, exhaust main 19, offgas duct enter exhaust gas processing device.
During waste gas flows through one group of radiating bucket 16, one group of radiating tube 21, in waste gas under part dust effect of inertia, Fall in dust outlet tube 15.Meanwhile, the heat in waste gas is come out by one group of radiating bucket 16, one group of radiating tube 21, and waste gas is reached During filter cloth bag in filter chamber 1, the temperature of waste gas is not high, reduces damage of the high-temperature gas to filter cloth bag, extended The useful life of filter cloth bag.In inlet plenum 18, the dust that filter cloth bag is filtered out under gravity, falls on dust outlet tube 15 It is interior.
When the dust in dust outlet tube 15 reaches a certain amount of, under the Action of Gravity Field of dust, dust promotion dust outlet tube door 24, Axle 6 is rotated, and is fallen under the dust in dust outlet tube 15 in dust chamber 10;Fall behind under dust in dust outlet tube 15, pouring weight 8 is through armshaft 7 band moving axis 6, dust outlet tube door 24 are rotated backward, and dust outlet tube door 24 closes dust outlet tube 15.
In dust chamber 10, water reaches fountain head 26 through water flowing time switch, water inlet pipe 9, water main 25, branching pipe 27, Under the effect of water flowing time switch, the intermittent water spray of fountain head 26 causes to fall and break to after the dust humidity in dust chamber 10, is deposited on Dust chamber 10 inner bottom part, it is to avoid dust swims in aerial in dust chamber 10.
The filter cloth bag service life that can be collected due to dust chamber 10 in a large amount of dust and filter chamber 1 is long, therefore, is smelting Stove production period is not required to clear up the filter cloth bag in the dust of dust chamber 10 and maintenance, replacing filter chamber 1, and clears up dust chamber 10 Dust and maintenance, change filter chamber 1 in filter cloth bag, be it is synchronous with smelting furnace stop production to overhaul progress.
When smelting furnace stop production to overhaul, first pouring weight 8 is removed from armshaft 7, armshaft 7 is rotated up, makes dust outlet tube door 24 Open, after being fallen under the dust whole in dust outlet tube 15 in dust chamber 10, put down armshaft 7, pouring weight 8 is hung over into armshaft 7 again On.Because now smelting furnace has stopped production, the gas entered from inlet manifold 3 is air, in the effect of air exhauster, air blower Under, after a period of time, the whole emptyings of waste gas in smelting exhaust gas dust pelletizing system.At the same time, acted in the water spray of fountain head 26 Under, the dust in dust chamber 10 all soaks, and is deposited on the inner bottom part of dust chamber 10.Then, water flowing time switch is closed, stops spray The water spray of head 26, Open valve 14, and about half an hour is waited, in the presence of air exhauster, air pressure is less than in dust chamber 10 Atmospheric pressure, then, door 11 is opened through crossette 12(Due to air pressure subatmospheric in dust chamber 10, when opening door 11, dust chamber 10 Interior waste gas will not overflow, but air enters in dust chamber 10 through door 11), in the presence of air exhauster, then during by one section Between, the whole emptyings of waste gas in dust chamber 10.Then, the dust closed in air blower, air exhauster, cleaning dust chamber 10, maintenance, Change the filter cloth bag in filter chamber 1.

Claims (7)

1. smelting exhaust gas dust pelletizing system, it is characterized in that:Dust chamber(10)A face wall on have door(11), dust chamber(10)With exhaust House steward(19)By the blast pipe that gathers dust(13)Connection, water inlet pipe(9)In dust chamber(10)Interior and water main(25)Connection, one group of Zhi Shui Pipe(27)One end and water main(25)Connection, one group of branching pipe(27)The other end closing, every branching pipe(27)Install one Group fountain head(26);Two adjacent radiating buckets(16)Between have a radiating tube(21)Connection, the radiating bucket on the left side(16)On There is connection tracheae(17), the radiating bucket on the right(16)On have inlet manifold(3);Each filter chamber(1)Inside there is one group to be uniformly distributed Filter cloth bag, each filter chamber(1)Through an exhaust branch pipe(22)With exhaust main(19)Connection, filter chamber(1)Bottom It is inlet plenum(18), each inlet plenum(18)Through an air intake branch(23)With being connected tracheae(17)Connection;Each radiating bucket (16)And each inlet plenum(18)Lower end, through a dust outlet tube(15)With dust chamber(10)Connection;Axle(6)One end stretch into out Dirt pipe(15)It is interior, the axle in dust outlet tube 15(6)Upper welding dust outlet tube door(24), positioned at dust outlet tube(15)Outer axle(6)On Connect armshaft(7), pouring weight(8)Hang over armshaft(7)On.
2. smelting exhaust gas dust pelletizing system according to claim 1, it is characterized in that:One group of radiating bucket(16)Through radiating bucket edge (4), radiating bucket leg(5)Installed in dust chamber(10)Top plate on.
3. smelting exhaust gas dust pelletizing system according to claim 1, it is characterized in that:One group of filter chamber(1)Through filter chamber's leg (2), filter chamber edge(20)Installed in dust chamber(10)Top plate on.
4. smelting exhaust gas dust pelletizing system according to claim 1, it is characterized in that:Gather dust blast pipe(13)On have valve (14).
5. smelting exhaust gas dust pelletizing system according to claim 1, it is characterized in that:Inlet plenum(18)It is funnel shaped.
6. smelting exhaust gas dust pelletizing system according to claim 2, it is characterized in that:Door(11)On have crossette 12.
7. smelting exhaust gas dust pelletizing system according to claim 1, it is characterized in that:Armshaft(7)It is upper fluted.
CN201720001846.6U 2017-01-03 2017-01-03 Smelting exhaust gas dust pelletizing system Withdrawn - After Issue CN206414919U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720001846.6U CN206414919U (en) 2017-01-03 2017-01-03 Smelting exhaust gas dust pelletizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720001846.6U CN206414919U (en) 2017-01-03 2017-01-03 Smelting exhaust gas dust pelletizing system

Publications (1)

Publication Number Publication Date
CN206414919U true CN206414919U (en) 2017-08-18

Family

ID=59574159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720001846.6U Withdrawn - After Issue CN206414919U (en) 2017-01-03 2017-01-03 Smelting exhaust gas dust pelletizing system

Country Status (1)

Country Link
CN (1) CN206414919U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106512631A (en) * 2017-01-03 2017-03-22 湖南建勋环保资源科技发展有限公司 Dust removing system for smelting waste gas

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106512631A (en) * 2017-01-03 2017-03-22 湖南建勋环保资源科技发展有限公司 Dust removing system for smelting waste gas
CN106512631B (en) * 2017-01-03 2018-10-09 湖南建勋环保资源科技发展有限公司 Smelting exhaust gas dust pelletizing system

Similar Documents

Publication Publication Date Title
CN102078730A (en) Stage blowback dust-cleaning method and equipment of air box blowback bag type dust collector
CN106512631B (en) Smelting exhaust gas dust pelletizing system
CN108636042A (en) A kind of environment-friendly type building construction dust-extraction unit
CN205164327U (en) Bag -type dust remover
CN206414919U (en) Smelting exhaust gas dust pelletizing system
CN204901803U (en) Production boiler
CN207244069U (en) A kind of dedusting removal of impurities carding machine
CN204147689U (en) A kind of filter drum type precipitator
CN204973345U (en) Prevent that waste gas from spilling over and overhauing safe waste gas dust collector
CN205235668U (en) Dedusting device
CN204709989U (en) Saving low pulse dust collector
CN205683741U (en) A kind of device preventing wet waste gas blocking dirt pocket inner filtration cloth bag
CN205598867U (en) Take belt cleaning device's filter bag formula air cleaner
CN206119151U (en) Wind energy cyclic utilization device of roast machine of tobacco leaf
CN205925237U (en) Low pressure pulsed jet cloth filter
CN209271031U (en) A kind of energy conservation coal mine negative pressure dust removing device
CN208365615U (en) A kind of environmental project single flow fume extractor
CN208927805U (en) A kind of anti-blocking deduster
CN202173851U (en) Dewing-preventing pulse bag type dust remover for copper smelting
CN207169969U (en) A kind of high-efficiency pulse humidifies dedusting grinder
CN202105544U (en) High-temperature resistant dust remover
CN207356837U (en) A kind of deduster for carrying two trace gather apparatus for ash
CN207087458U (en) Diamond saw blade sharpening machine dust arrester installation
CN205435353U (en) Industrial dust collecting equipment
CN204710034U (en) A kind of whirlwind spray mixed dust collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170818

Effective date of abandoning: 20181009

AV01 Patent right actively abandoned