CN206410538U - A kind of Kang Sidi preheats the petticoat pipe of resistance to material - Google Patents

A kind of Kang Sidi preheats the petticoat pipe of resistance to material Download PDF

Info

Publication number
CN206410538U
CN206410538U CN201621447996.1U CN201621447996U CN206410538U CN 206410538 U CN206410538 U CN 206410538U CN 201621447996 U CN201621447996 U CN 201621447996U CN 206410538 U CN206410538 U CN 206410538U
Authority
CN
China
Prior art keywords
grades
alumina brick
alumina
brick
aluminum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621447996.1U
Other languages
Chinese (zh)
Inventor
黄海平
马登德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Special Steel Co Ltd Of Zhen Shi Group
Original Assignee
East Special Steel Co Ltd Of Zhen Shi Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Special Steel Co Ltd Of Zhen Shi Group filed Critical East Special Steel Co Ltd Of Zhen Shi Group
Priority to CN201621447996.1U priority Critical patent/CN206410538U/en
Application granted granted Critical
Publication of CN206410538U publication Critical patent/CN206410538U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model provides a kind of Kang Sidi preheatings petticoat pipe of resistance to material, improves service life, the production efficiency of electric furnace, reduces production cost.Aluminum-spinel base is made of aluminum-spinel;The bottom of two two grades of high-alumina brick cover walls is separately fixed on two aluminum-spinel bases;Two grades of high-alumina brick cover walls are formed with two grades of high alumina brick masonries;Two grades of high-alumina brick vaults are arch, and its two side bottom is separately fixed at the top of two two grades of high-alumina brick cover walls;Two grades of high-alumina brick vaults are formed with two grades of high alumina brick masonries;The bottom of two grades of high-alumina brick cases is fixed on the top of two grades of high-alumina brick vaults;Two grades of high-alumina brick cases are formed with two grades of high alumina brick masonries;Space between two grades of high-alumina brick cases and two grades of high-alumina brick vaults is consolidated with high alumina castable layer filling, and high alumina castable layer is made of high alumina castable;Aluminum-spinel base, two grades of high-alumina brick cover walls, two grades of high-alumina brick vault threes surround cross section for inverted U-shaped high-temperature smoke passage.

Description

A kind of Kang Sidi preheats the petticoat pipe of resistance to material
Technical field
The utility model is related to a kind of Kang Sidi preheatings petticoat pipe of resistance to material, applied in Kang Sidi electric furnaces.
Background technology
Kang Sidi electric furnaces are the energy saving and environment friendly electric furnaces that the applicant introduces from Italian get Xing companies.By Intel The Consteel techniques of company's exploitation, i.e. electric furnace continuous steelmaking process is a kind of electric furnace steel making new technology.It is special that the technique passes through Online transporter to electric furnace continuous charging, meanwhile, the steel scrap transporter is the flue of dust pelletizing system again, and steel scrap is by preheating resistance to material Petticoat pipe is heated by the high-temperature flue gas of reverse flow, improves steel scrap charging temperature, with efficient, quick smelting cycle production steel Water, easily coordinates with continuous casting, and melting electric consumption is low, and molten steel recovery rate is high, keeps negative pressure in smelting process in stove, and molten bath is steady, makes an uproar Sound is low, working environment cleaning.
At present, more than 10 platforms have been introduced in the whole nation.According to investigation, the preheating petticoat pipe of resistance to material of Kang Sidi electric furnaces is typically brick using clay Build, the life-span, such as Wuxi Xue Feng, Shandong stone was horizontal at 1 year or so, some units also leave unused unused because often damaging.Annual overhaul Once, take time nearly one month.The maintenance of the Kang Sidi preheatings petticoat pipe of resistance to material is larger to Influence of production.
Utility model content
The purpose of this utility model is to overcome above shortcomings in the prior art, and provides a kind of structure design and close The Kang Sidi preheatings petticoat pipe of resistance to material of reason, improves service life, the production efficiency of electric furnace, reduces production cost.
The technical scheme in the invention for solving the above technical problem is:A kind of Kang Sidi preheats the petticoat pipe of resistance to material, and it is special Levy and be:Including aluminum-spinel base, two grades of high-alumina brick cover walls, two grades of high-alumina brick vaults, two grades of high-alumina brick cases and high alumina Matter pours into a mould the bed of material;Aluminum-spinel base is two, and left and right is arranged side by side;Aluminum-spinel base is made of aluminum-spinel; Two grades of high-alumina brick cover walls are two, and left and right is arranged side by side, and the bottom of two two grades of high-alumina brick cover walls is separately fixed at two magnaliums On spinelle base;Two grades of high-alumina brick cover walls are formed with two grades of high alumina brick masonries;Two grades of high-alumina brick vaults are arch, its both sides bottom Portion is separately fixed at the top of two two grades of high-alumina brick cover walls;Two grades of high-alumina brick vaults are formed with two grades of high alumina brick masonries;Two grades The bottom of high-alumina brick case is fixed on the top of two grades of high-alumina brick vaults;Two grades of high-alumina brick cases are with two grades of high alumina brick masonries Into;Space between two grades of high-alumina brick cases and two grades of high-alumina brick vaults is consolidated with high alumina castable layer filling, and High-Alumina is poured Material feeding layer is made of high alumina castable;Aluminum-spinel base, two grades of high-alumina brick cover walls, two grades of high-alumina brick vault threes surround Cross section is inverted U-shaped high-temperature smoke passage.
The outer top surface and inner top surface of two grades of high-alumina brick vaults described in the utility model are arc.
Two grades of high-alumina brick cases described in the utility model are arc.
Aluminum-spinel substructure height described in the utility model is 50cm.
The utility model compared with prior art, with advantages below and effect:Magnalium matter spinelle refractory degree is high, and lotus is soft Up to 1650 DEG C of point, alkali resistance flue dust immersion performance is strong;Two grades of High-Alumina bricks belong to neutral resistance to material, do soda acid flue dust immersion performance tool Good, 1450 DEG C of lotus soft spots tackles 1100 DEG C of high-temperature smokes more than sufficient;It can be seen that, magnalium matter spinelle and two grades of High-Alumina bricks are resistance to Fiery degree is much higher than Theoretical Design temperature, can greatly prolong service life, dramatically saves on production cost.
It is now that the utility model and prior art use cost and Economic Efficiency is as follows(Prior art can only use 1 Year, the utility model can at least be used 8 years):
A. use cost compares
Prior art:100 tons × 1100 yuan/ton=110,000 yuan yuan/year of ÷ 1 year=110,000 of clay brick;
The utility model:Aluminum-spinel:20 tons × 2100 yuan/ton=4.2 ten thousand yuan yuan/year of ÷ 8 years=0.525 ten thousand;High alumina 80 tons × 1500 yuan/ton=120,000 yuan yuan/year of ÷ 8 years=1.5 ten thousand of brick;It is total 2.025 ten thousand yuan.
B. economic benefit
The utility model is pressed to be calculated using 8 years, use cost saving=(11-2.025) ten thousand yuan/year × 8 year=71.8 ten thousand yuan.
The annual overhaul of prior art once, takes one month, loses 60,000 tons of stainless steel output, is got profit by stainless steel per ton 500 yuan of meters, economic benefit=60,000 ton/year × 500 yuan/ton × 8 year=240,000,000 yuan the utility model by based on using 8 years, + 24,000 ten thousand yuan=24071.8 ten thousand yuan of economic benefit=71.8 ten thousand yuan can be produced.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment.
Embodiment
Below in conjunction with the accompanying drawings and the utility model is described in further detail by embodiment, following examples are pair It is of the present utility model explanation and the utility model is not limited to following examples.
Referring to Fig. 1, the present embodiment include aluminum-spinel base 1, two grades of high-alumina brick cover walls 2, two grades of high-alumina brick vaults 3, Two grades of high-alumina brick cases 4 and high alumina castable layer 5.
Aluminum-spinel base 1 is two, and left and right is arranged side by side.Aluminum-spinel base 1 is made of aluminum-spinel.
Two grades of high-alumina brick cover walls 2 are two, and left and right is arranged side by side, and the bottom of two two grades of high-alumina brick cover walls 2 is fixed respectively On two aluminum-spinel bases 1.Two grades of high-alumina brick cover walls 2 are formed with two grades of high alumina brick masonries.
Two grades of high-alumina brick vaults 3 are arch, and its two side bottom is separately fixed at the top of two two grades of high-alumina brick cover walls 2. Two grades of high-alumina brick vaults 3 are formed with two grades of high alumina brick masonries.The outer top surface and inner top surface of two grades of high-alumina brick vaults 3 are arc, Insulation and air flow effect are good.
The bottom of two grades of high-alumina brick cases 4 is fixed on the top of two grades of high-alumina brick vaults 3.Two grades of high-alumina brick cases 4 use two Level high alumina brick masonry is formed.Two grades of high-alumina brick cases 4 are arc, high insulating effect.
Space between two grades of high-alumina brick cases 4 and two grades of high-alumina brick vaults 3 is consolidated with the filling of high alumina castable layer 5, High alumina castable layer 5 is made of high alumina castable.
Aluminum-spinel base 1, two grades of high-alumina brick cover walls 2, two grades of threes of high-alumina brick vault 3 surround cross section to be inverted U-shaped High-temperature smoke passage 6, this high-temperature smoke passage 6 is also Kang Sidi electric furnace smelting raw materials(Iron, steel, lime etc.)Preheating Flue gas in room, electric arc furnaces is inversely constantly preheated by high-temperature smoke passage 6 to furnace charge, and so, electric arc furnaces can be direct Molten steel is heated, by the direct melting waste steel of molten steel, makes smooth operation, the impact to prime power network is small, transformer capacity, section is reduced The about energy.
Above content described in this specification is only to the utility model structure example explanation;Moreover, The title that the utility model each several part is taken can also be different, all constructions according to described in the utility model inventional idea, feature and In the equivalent or simple change that principle is done, the protection domain for being included in the utility model patent.

Claims (4)

1. a kind of Kang Sidi preheats the petticoat pipe of resistance to material, it is characterised in that:Including aluminum-spinel base, two grades of high-alumina brick cover walls, two Level high-alumina brick vault, two grades of high-alumina brick cases and high alumina castable layer;Aluminum-spinel base is two, and left and right is set side by side Put;Aluminum-spinel base is made of aluminum-spinel;Two grades of high-alumina brick cover walls are two, and left and right is arranged side by side, two two grades The bottom of high-alumina brick cover wall is separately fixed on two aluminum-spinel bases;Two grades of high-alumina brick cover walls are with two grades of high alumina brick masonries Form;Two grades of high-alumina brick vaults are arch, and its two side bottom is separately fixed at the top of two two grades of high-alumina brick cover walls;It is two grades high The very useful two grades of high alumina brick masonries of aluminium brick arch are formed;The bottom of two grades of high-alumina brick cases is fixed on the top of two grades of high-alumina brick vaults; Two grades of high-alumina brick cases are formed with two grades of high alumina brick masonries;Use in space between two grades of high-alumina brick cases and two grades of high-alumina brick vaults High alumina castable layer filling tamping, high alumina castable layer is made of high alumina castable;It is aluminum-spinel base, two grades high Aluminium brick cover wall, two grades of high-alumina brick vault threes surround cross section for inverted U-shaped high-temperature smoke passage.
2. Kang Sidi according to claim 1 preheats the petticoat pipe of resistance to material, it is characterised in that:Two grades of described high-alumina brick vaults Outer top surface and inner top surface are arc.
3. Kang Sidi according to claim 1 preheats the petticoat pipe of resistance to material, it is characterised in that:Two grades of described high-alumina brick cases are Arc.
4. Kang Sidi according to claim 1 preheats the petticoat pipe of resistance to material, it is characterised in that:Described aluminum-spinel base is high Spend for 50cm.
CN201621447996.1U 2016-12-27 2016-12-27 A kind of Kang Sidi preheats the petticoat pipe of resistance to material Expired - Fee Related CN206410538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621447996.1U CN206410538U (en) 2016-12-27 2016-12-27 A kind of Kang Sidi preheats the petticoat pipe of resistance to material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621447996.1U CN206410538U (en) 2016-12-27 2016-12-27 A kind of Kang Sidi preheats the petticoat pipe of resistance to material

Publications (1)

Publication Number Publication Date
CN206410538U true CN206410538U (en) 2017-08-15

Family

ID=59551532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621447996.1U Expired - Fee Related CN206410538U (en) 2016-12-27 2016-12-27 A kind of Kang Sidi preheats the petticoat pipe of resistance to material

Country Status (1)

Country Link
CN (1) CN206410538U (en)

Similar Documents

Publication Publication Date Title
CN102851518B (en) Fubang oxygen-enriched side-blown bath copper smelting furnace and operation method thereof
CN103509566A (en) Overhaul construction method of double chute position of dry quenching furnace
CN101440417A (en) Tube furnace-high furnace duplex coal-based smelting reduction ironmaking method
CN112880409B (en) Method for prolonging service life of refractory material at bottom of ferronickel electric furnace and bottom of ferronickel electric furnace
CN206410538U (en) A kind of Kang Sidi preheats the petticoat pipe of resistance to material
CN202182615U (en) Combined furnace cover of electric arc furnace
CN203065550U (en) Oxygen enrichment side-blown molten-pool copper smelting furnace
CN111271974A (en) Movable carbon slag smelting furnace
CN105293494B (en) Close calcium carbide method of smelting in oxygen Electricity Federation
CN204718409U (en) A kind of can the anode furnace of hot replacing redox mouth brick
CN102213545A (en) Combined arc furnace cover
CN111560486A (en) Blast furnace bottom building method for guiding furnace bottom to be in shape of boiler bottom
CN106546098A (en) A kind of vanadium-nitrogen alloy sintering kiln
CN206799457U (en) A kind of casting material prefabricated brick of dry coke quenching slope air course supporting part
CN211645352U (en) Front bed with inverted arch bottom
CN207570343U (en) It is molten to divide stove
CN206553599U (en) Reviver saves Shuangzi smelting furnace
CN2495966Y (en) Ore-smelting electric furnace built with cold-pounding mud
CN206768167U (en) A kind of masonry construction of RH refining furnaces lower channel
CN107162432B (en) A kind of device of liquid blast furnace production mineral wool
CN204555684U (en) A kind of siccative oven inner liner
CN209840744U (en) Novel preheating smoke hood based on Consisti electric arc furnace
CN202836208U (en) Molten pool smelting furnace with double reverse arcs
CN104911633B (en) A kind of electrolgtic aluminium carbon anode twin furnace pre-heating system and application method
CN202511630U (en) Side-embedded fire resistant combination brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170815

Termination date: 20191227

CF01 Termination of patent right due to non-payment of annual fee