CN206408992U - A kind of experiment porch of wind electric converter - Google Patents
A kind of experiment porch of wind electric converter Download PDFInfo
- Publication number
- CN206408992U CN206408992U CN201621461784.9U CN201621461784U CN206408992U CN 206408992 U CN206408992 U CN 206408992U CN 201621461784 U CN201621461784 U CN 201621461784U CN 206408992 U CN206408992 U CN 206408992U
- Authority
- CN
- China
- Prior art keywords
- cable
- electric converter
- experimental facilities
- wind electric
- experiment porch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
Abstract
The utility model discloses a kind of wind electric converter experiment porch, including multiple experimental facilities and cable, in addition to cable testing bridge and multiple support brackets, the bottom of support bracket is provided with multiple rollers, and support bracket can arbitrarily be moved by the roller of bottom;Cable testing bridge is distributed in the area of isolation of laboratory in " matrix ", and " matrix " mouth is relative with gate;Experimental facilities is laid along the direction that cable is built bridge and is laid in the inner side of cable testing bridge;Each experimental facilities is arranged on a support bracket;It is connected with each other between each experimental facilities by cable, and each two realizes that the cable between equipment is arranged on cable testing bridge;The experiment porch of the wind electric converter is when carrying out experimental facilities maintenance or changing, connected cable need to be only taken off, pulls moveable support bracket to come experimental facilities from fixed position hauling-out, it is easy to operate, in addition to this it is possible to be effectively prevented from the safety problem in experimentation.
Description
Technical field
The utility model belongs to technical field of wind power generation, more particularly to a kind of experiment porch of wind electric converter.
Background technology
At present, the selection in the experiment of wind electric converter to laboratory is more random, and the construction period in laboratory is longer
And cost is higher, in addition, the equipment of progress wind electric converter experiment, which is put, not to be planned, experimental facilities and each experiment of connection
The cable of equipment is directly put on the ground mostly, and experimental implementation environment seems abnormal mixed and disorderly, at the same time, when needs are carried out in fact
Operation extremely inconvenience is, it is necessary to which many individuals make a concerted effort to complete when testing equipment replacement.
The content of the invention
The purpose of this utility model is to provide a kind of experiment porch of wind electric converter.
Therefore, technical solutions of the utility model are as follows:
A kind of wind electric converter experiment porch, including multiple experimental facilities and cable, described wind electric converter experiment are flat
Platform is arranged on multiple area of isolation and can accommodated in the laboratory of multiple wind electric converter experiment porch, each area of isolation
It is equipped with a gate;The wind electric converter experiment porch also includes cable testing bridge and multiple support brackets, the bottom of support bracket
Portion is provided with multiple rollers, and support bracket can arbitrarily be moved by the roller of bottom;Cable testing bridge is in the area of isolation of laboratory
It is distributed in " matrix ", and " matrix " mouth is relative with gate;Experimental facilities is laid and is laid in along the direction that cable is built bridge
The inner side of cable testing bridge;Each experimental facilities is arranged on a support bracket;Pass through cable phase between each experimental facilities
Connect, and the cable between each two experimental facilities is arranged on cable testing bridge.
Described cable testing bridge is double-decker.
Described laboratory is built using chromatic steel sandwich plate, and gypsum rock wool is lined with the inside of chromatic steel sandwich plate
Plate.
Cooling fan is installed at the top of described laboratory, will be tested by cooling fan in wind electric converter experimentation
The heat that equipment is produced is discharged out of laboratory.
Lighting apparatus and smoke alarm are installed at the top of described laboratory.
The top of the area of isolation in described laboratory is diagonally mounted on camera, realizes and the panorama in laboratory is supervised
Control.
Compared with prior art, the experiment porch of the wind electric converter is when carrying out experimental facilities maintenance or changing, only
Connected cable need to be taken off, pulls moveable support bracket to come experimental facilities from fixed position hauling-out, it is easy to operate,
In addition to this it is possible to be effectively prevented from the safety problem in experimentation.
Brief description of the drawings
The structural representation of the experiment porch for the wind electric converter that Fig. 1 provides for the utility model.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described further to the utility model, but following embodiments are right absolutely not
The utility model has any limitation.
As shown in figure 1, a kind of wind electric converter experiment porch, including multiple experimental facilities 1 and cable, described wind-powered electricity generation change
Stream device experiment porch is arranged on multiple area of isolation and can accommodated in the laboratory of multiple wind electric converter experiment porch, often
Individual area of isolation is equipped with a gate;The wind electric converter experiment porch also includes cable testing bridge 2 and multiple support brackets, holds
The bottom of weight support is provided with multiple rollers, and support bracket can arbitrarily be moved by the roller of bottom;Cable testing bridge 2 is in laboratory
In " matrix " distribution in area of isolation, and " matrix " mouth is relative with gate;Direction of the experimental facilities 1 along cable bridge formation 2 is carried out
Lay and be laid in the inner side of cable testing bridge 2;Each experimental facilities 1 is arranged on a support bracket;Each experimental facilities
Between be connected with each other by cable, and the cable between each two experimental facilities 1 is arranged on cable testing bridge 2.
Described cable testing bridge 2 is double-decker.
Described laboratory is built using chromatic steel sandwich plate, and gypsum rock wool is lined with the inside of chromatic steel sandwich plate
Plate.
Cooling fan is installed at the top of described laboratory, will be tested by cooling fan in wind electric converter experimentation
The heat that equipment 1 is produced is discharged out of laboratory.
Lighting apparatus and smoke alarm are installed at the top of described laboratory.
The top of the area of isolation in described laboratory is diagonally mounted on camera, realizes and the panorama in laboratory is supervised
Control.
The embodiment for the wind electric converter experiment porch that the utility model is provided is as follows:
Embodiment one:First, built using the high chromatic steel sandwich plate of fire rating used in the wind electric converter experiment porch
Laboratory, the laboratory cost is low, and construction speed is fast;Laboratory is divided into using the dividing plate of phase same material in laboratory
Multiple area of isolation, each area of isolation can set a wind electric converter experiment porch, each wind electric converter experiment
Different current transformer experimental implementations can be implemented separately in platform, and unaffected each other;Then it is right in area of isolation
The wind electric converter experiment porch is built, and each area of isolation is equipped with a gate, and cable is built in area of isolation
Crane span structure 2, makes cable testing bridge 2 be distributed in area of isolation in " matrix ", and gate of " matrix " mouth just to area of isolation, and then
Each experimental facilities 1 is placed on a support bracket using oily electrical forklift, support bracket bottom is passed through according to requirement of experiment
The roller that portion is set lays experimental facilities 1 in the inner side of cable testing bridge 2 along cable testing bridge 2, then passes through according to requirement of experiment
Cable connects each experimental facilities 1, and the cable between each two experimental facilities 1 is arranged on cable testing bridge 2, is kept away
Exempt from cable and be directly placed on ground caused safety problem.
Embodiment two:When experimental facilities 1 is damaged or needs to change experimental facilities 1 according to requirement of experiment, by it
Before be connected to cable on experimental facilities 1 to be replaced and remove, then manually promote the load-bearing branch of the lower section of experimental facilities 1 to be replaced
Frame, experimental facilities 1 to be replaced is removed from original position, at the same time, is placed new experimental facilities 1 using oily electrical forklift
Onto a support bracket, promote the support bracket that new experimental facilities 1 is moved into the original position of experimental facilities 1 to be replaced
Put, and connected new experimental facilities 1 with other experimental facilities 1 by cable, then can carry out wind electric converter
Experiment.
Claims (6)
1. a kind of wind electric converter experiment porch, including multiple experimental facilities (1) and cable, it is characterised in that described wind-powered electricity generation
Current transformer experiment porch is arranged on multiple area of isolation and can accommodated in the laboratory of multiple wind electric converter experiment porch,
Each area of isolation is equipped with a gate;The wind electric converter experiment porch also includes cable testing bridge (2) and multiple load-bearing branch
Frame, the bottom of support bracket is provided with multiple rollers;Cable testing bridge (2) is distributed in the area of isolation of laboratory in " matrix ", and " recessed
Type " mouth is relative with gate;Laid and be laid in cable testing bridge (2) in direction of the experimental facilities (1) along cable testing bridge (2)
Inner side;Each experimental facilities (1) is arranged on a support bracket;Mutually interconnected by cable between each experimental facilities (1)
Connect, and the cable between each two experimental facilities (1) is arranged on cable testing bridge (2).
2. wind electric converter experiment porch according to claim 1, it is characterised in that described cable testing bridge (2) is double
Rotating fields.
3. wind electric converter experiment porch according to claim 1, it is characterised in that described laboratory is using color steel clamp
Core plate is built, and gypsum rock cotton board is lined with the inside of chromatic steel sandwich plate.
4. wind electric converter experiment porch according to claim 1, it is characterised in that be provided with the top of described laboratory
Cooling fan, is arranged the heat that experimental facilities (1) in wind electric converter experimentation is produced by cooling fan out of laboratory
Go out.
5. wind electric converter experiment porch according to claim 1, it is characterised in that install and shine at the top of described laboratory
Bright equipment and smoke alarm.
6. wind electric converter experiment porch according to claim 1, it is characterised in that the area of isolation in described laboratory
Top be diagonally mounted on camera, realize the overall view monitoring to laboratory.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621461784.9U CN206408992U (en) | 2016-12-29 | 2016-12-29 | A kind of experiment porch of wind electric converter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621461784.9U CN206408992U (en) | 2016-12-29 | 2016-12-29 | A kind of experiment porch of wind electric converter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206408992U true CN206408992U (en) | 2017-08-15 |
Family
ID=59552567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621461784.9U Expired - Fee Related CN206408992U (en) | 2016-12-29 | 2016-12-29 | A kind of experiment porch of wind electric converter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206408992U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106593033A (en) * | 2016-12-29 | 2017-04-26 | 天津瑞能电气有限公司 | Experiment platform of wind power converter |
-
2016
- 2016-12-29 CN CN201621461784.9U patent/CN206408992U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106593033A (en) * | 2016-12-29 | 2017-04-26 | 天津瑞能电气有限公司 | Experiment platform of wind power converter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107591895B (en) | Enhanced transformer substation dispatching system | |
CN205138552U (en) | Extra -high voltage engineering group tower is embraced a pole and is acted as go -between atress and observe and control and alarm system | |
WO2017008717A1 (en) | Bridge crane suspension device and method for valve tower | |
CN104320006B (en) | A kind of marine flexible direct-current transmission system converter station | |
CN206408992U (en) | A kind of experiment porch of wind electric converter | |
CN107039933A (en) | A kind of cable testing bridge of perfect heat-dissipating | |
CN205070369U (en) | 330kV crosslinked cable trench structure | |
CN106593033A (en) | Experiment platform of wind power converter | |
CN204376311U (en) | The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device | |
CN109713600B (en) | Replacement construction method for rectifier unit of subway power supply system | |
CN206299205U (en) | A kind of single-pipe tower | |
CN104393524B (en) | Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method | |
CN205381879U (en) | A lift by crane instrument for 35 -110kV isolator overhauls | |
CN204627391U (en) | A kind of portable cat ladder | |
CN209748088U (en) | Wheel type bracket for bypass flexible cable of power distribution network | |
CN208368318U (en) | Main transformer of transformer substation oil sump cover board | |
CN203123415U (en) | Area networking control device among fire-fighting controllers | |
CN104600623A (en) | High-altitude crossover releasing device for lifting type heavy power cable | |
CN107650979B (en) | A kind of cable auxiliary conveying device | |
CN207566233U (en) | A kind of feed feeds intake mouth protecting device | |
CN206775047U (en) | A kind of fiber optic cables crane span structure | |
CN201512370U (en) | Switch blade hoisting frame | |
CN206655697U (en) | A kind of tunnel shaft and shaft bottom conveying arrangement | |
CN201932843U (en) | Self-balancing insulation spreader for grid maintenance | |
CN205944749U (en) | Transformer substation exchanges circuit direct current ice -melt bus structure that is qualified for next round of competitions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170815 Termination date: 20211229 |