CN206401849U - The pre-buried structure of the electrical construction pre-buried pipe arrangement of main body - Google Patents
The pre-buried structure of the electrical construction pre-buried pipe arrangement of main body Download PDFInfo
- Publication number
- CN206401849U CN206401849U CN201621468243.9U CN201621468243U CN206401849U CN 206401849 U CN206401849 U CN 206401849U CN 201621468243 U CN201621468243 U CN 201621468243U CN 206401849 U CN206401849 U CN 206401849U
- Authority
- CN
- China
- Prior art keywords
- main body
- pipe arrangement
- buried
- electrical construction
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of pre-buried structure of electrical construction with the pre-buried pipe arrangement of main body, including main body pipe arrangement and be arranged on the main body match somebody with somebody tube hub hollow structure, the outer surface of the main body pipe arrangement is fixed on primary antibody pressure shell body, by being welded and fixed between the outer surface of the resistance to compression housing and the inner surface of multiple spacing rings, by being welded and fixed multiple steel support poles between the outer surface of multiple spacing rings, a cement matrix is condensed between the outer surface of the resistance to compression housing and the steel support pole, the outer surface of the cement matrix sets multiple bulge-structures.The utility model is simple in construction, can effectively strengthen the anti-pressure ability of main body pipe arrangement, prevents when constructing in the future, the destroyed probability of main body pipe arrangement.
Description
Technical field
The utility model is related to electrical construction technical field, and specially a kind of electrical construction is pre-buried with the pre-buried pipe arrangement of main body
Structure.
Background technology
At present, in terms of electrical construction, main body pipe arrangement has to pass through pre-buried processing in embedment, and general pre-buried processing
It is very simple, although to improve the efficiency of construction, but reduce anti-pressure ability of the main body pipe arrangement after embedment, its limitation
It is larger in terms of later maintenance.
The content of the invention
The purpose of this utility model is to provide a kind of pre-buried structure of the pre-buried pipe arrangement of electrical construction main body, with solution
State the problem of being proposed in background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of electrical construction pre-buried pipe arrangement of main body
Pre-buried structure, including main body pipe arrangement and be arranged on the main body match somebody with somebody tube hub hollow structure, the appearance of the main body pipe arrangement
Face is fixed on primary antibody pressure shell body, by being welded and fixed between the outer surface of the resistance to compression housing and the inner surface of multiple spacing rings,
By being welded and fixed multiple steel support poles, the outer surface of the resistance to compression housing and institute between the outer surface of multiple spacing rings
State and a cement matrix is condensed between steel support pole, the outer surface of the cement matrix sets multiple bulge-structures.
Preferably, the resistance to compression housing is the hollow pipe that steel and alloy is made.
Preferably, the spacing ring is bar construction.
Preferably, the distance between adjacent spacing ring of each two is identical.
Preferably, multiple steel support poles are evenly distributed on one week of the spacing ring outer surface.
Compared with prior art, the beneficial effects of the utility model are:The utility model is simple in construction, can effectively strengthen
The anti-pressure ability of main body pipe arrangement, is prevented when constructing in the future, the destroyed probability of main body pipe arrangement.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the pre-buried structure of the pre-buried pipe arrangement of electrical construction main body of the utility model;
Fig. 2 is the structural representation of spacing ring in a kind of pre-buried structure of the pre-buried pipe arrangement of electrical construction main body of the utility model
Figure;
In figure:1. cement matrix, 2. bulge-structures, 3. resistance to compression housings, 4. hollow structures, 5. main body pipe arrangements, 6. spacing rings,
7. steel support pole.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1 and Fig. 2, a kind of embodiment that the utility model is provided:A kind of electrical construction pre-buried pipe arrangement of main body
Pre-buried structure, including main body pipe arrangement 5 and be arranged on the hollow structure 4 at the center of main body pipe arrangement 5, the main body pipe arrangement 5
Outer surface is fixed on primary antibody pressure shell body 3, passes through weldering between the outer surface of the resistance to compression housing 3 and the inner surface of multiple spacing rings 6
Connect between fixation, the outer surface of multiple spacing rings 6 by being welded and fixed multiple steel support poles 7, the resistance to compression housing 3
A cement matrix 1 is condensed between outer surface and the steel support pole 7, the outer surface of the cement matrix 1 sets multiple projections
Structure 2.
The resistance to compression housing 3 is the hollow pipe that steel and alloy is made, and compression strength is big;The spacing ring 6 is reinforcing bar knot
Structure, the spacing ring 6 of the structure can play preferable stress effect;The distance between the adjacent spacing ring 6 of each two is identical, confrontation
Play a part of uniform stressed in the surface of pressure shell body 3;Multiple steel support poles 7 are evenly distributed on the outer surface of spacing ring 6
One week, play a part of 360 ° of uniform stresseds.
Specifically used mode:In utility model works, the groove hole for being used on placement is first dug, then by cement matrix 1
It is placed into groove hole, then passes through cable in the hollow structure 4 inside main body pipe arrangement 5, you can, after setting, due to this
The entire compression ability of device is good, can keep out the effect of certain external force.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Claims (5)
1. a kind of electrical construction pre-buried structure of the pre-buried pipe arrangement of main body, including main body pipe arrangement(5)Match somebody with somebody with the main body is arranged on
Pipe(5)The hollow structure at center(4), it is characterised in that:The main body pipe arrangement(5)Outer surface be fixed on primary antibody pressure shell body(3),
The resistance to compression housing(3)Outer surface and multiple spacing rings(6)Inner surface between by being welded and fixed, multiple spacing rings
(6)Outer surface between by being welded and fixed multiple steel support poles(7), the resistance to compression housing(3)Outer surface and the steel
Muscle support bar(7)Between condense a cement matrix(1), the cement matrix(1)Outer surface multiple bulge-structures are set(2).
2. a kind of pre-buried structure of electrical construction pre-buried pipe arrangement of main body according to claim 1, it is characterised in that:It is described
Resistance to compression housing(3)The hollow pipe being made for steel and alloy.
3. a kind of pre-buried structure of electrical construction pre-buried pipe arrangement of main body according to claim 1, it is characterised in that:It is described
Spacing ring(6)For bar construction.
4. a kind of pre-buried structure of electrical construction pre-buried pipe arrangement of main body according to claim 1, it is characterised in that:Every two
Individual adjacent spacing ring(6)The distance between it is identical.
5. a kind of pre-buried structure of electrical construction pre-buried pipe arrangement of main body according to claim 1, it is characterised in that:It is multiple
Steel support pole(7)It is evenly distributed on the spacing ring(6)One week of outer surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621468243.9U CN206401849U (en) | 2016-12-30 | 2016-12-30 | The pre-buried structure of the electrical construction pre-buried pipe arrangement of main body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621468243.9U CN206401849U (en) | 2016-12-30 | 2016-12-30 | The pre-buried structure of the electrical construction pre-buried pipe arrangement of main body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206401849U true CN206401849U (en) | 2017-08-11 |
Family
ID=59516037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621468243.9U Expired - Fee Related CN206401849U (en) | 2016-12-30 | 2016-12-30 | The pre-buried structure of the electrical construction pre-buried pipe arrangement of main body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206401849U (en) |
-
2016
- 2016-12-30 CN CN201621468243.9U patent/CN206401849U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206401849U (en) | The pre-buried structure of the electrical construction pre-buried pipe arrangement of main body | |
CN205822900U (en) | A kind of wire basket in cement electric pole | |
CN204781361U (en) | Alternately open last quarter node fastener of string truss structure | |
CN206457955U (en) | A kind of oblique close rib composite wall board structure | |
CN204959967U (en) | Hoop reinforcing concrete filled steel tube | |
CN207988632U (en) | A kind of novel groove flexible flange structure | |
GU et al. | Preseismic, Coseismic and Postseismic Horizontal Crustal Movements of the Mw9. 0 Tohoku Earthquake in Japan, 2011 | |
CN203742241U (en) | Rust-proof reinforced concrete pole | |
CN206052960U (en) | A kind of reinforcing bar xoncrete structure | |
CN207110239U (en) | A kind of strong supporting & stablizing type corner post | |
CN207700819U (en) | Compound electric pole support device | |
CN207608939U (en) | A kind of bracing means of transmission line of electricity high voltage iron tower and basis | |
CN206975302U (en) | A kind of small Fracture Force Strain clamp for optical cable of small span | |
CN206337484U (en) | Many annular pedalines | |
CN205637330U (en) | Buckling restrained brace pole | |
CN204502350U (en) | A kind ofly can mutually change the nunchakus of use with two-section cudgel | |
CN107514509A (en) | A kind of new reinforced pipe | |
CN204590412U (en) | A kind of novel C-type reinforcing bar concrete composite beam | |
CN206617397U (en) | A kind of complete anchor ear | |
CN203285142U (en) | Foundation pit guardrail for building construction | |
CN207879009U (en) | A kind of prestressing combination method antidetonation angle connector | |
CN204059215U (en) | Passive protection net column column cap connecting structure | |
CN207739400U (en) | A kind of assembled architecture link sleeve | |
CN203790503U (en) | Parallelly-arranged spring type power twister | |
CN207944587U (en) | Novel shear wall building structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20201230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |