CN207608939U - A kind of bracing means of transmission line of electricity high voltage iron tower and basis - Google Patents

A kind of bracing means of transmission line of electricity high voltage iron tower and basis Download PDF

Info

Publication number
CN207608939U
CN207608939U CN201721504702.9U CN201721504702U CN207608939U CN 207608939 U CN207608939 U CN 207608939U CN 201721504702 U CN201721504702 U CN 201721504702U CN 207608939 U CN207608939 U CN 207608939U
Authority
CN
China
Prior art keywords
basis
steel tower
steel
high voltage
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721504702.9U
Other languages
Chinese (zh)
Inventor
韩立奎
赵书龙
王力
李俊江
冯博
柴璐
尚卓群
王羚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dezhou Huade Electric Power Survey And Design Co Ltd
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Dezhou Huade Electric Power Survey And Design Co Ltd
State Grid Corp of China SGCC
Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dezhou Huade Electric Power Survey And Design Co Ltd, State Grid Corp of China SGCC, Dezhou Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Dezhou Huade Electric Power Survey And Design Co Ltd
Priority to CN201721504702.9U priority Critical patent/CN207608939U/en
Application granted granted Critical
Publication of CN207608939U publication Critical patent/CN207608939U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses the bracing means of a kind of transmission line of electricity high voltage iron tower and basis, including bored concrete pile foundation, reinforced concrete coupling beams, steel strand wires and steel tower reinforce ironware, two bored concrete pile foundations are separately mounted to steel tower conducting wire and remove the original two basic both sides in side, two bored concrete pile foundations are attached by reinforced concrete coupling beams and existing two bases of steel tower, the steel tower is reinforced on the tower body that ironware is mounted on above the cable platform of steel tower, draw ring is installed on the reinforced concrete coupling beams, draw ring is reinforced ironware with steel tower by steel strand wires and is mutually fixedly connected;The utility model has the beneficial effects that:Side is removed in steel tower conducting wire to reinforce steel tower and basis by bracing means, to balance the broken string tension of the other side, is replaced steel tower compared to tradition and is beaten bracing wire reinforcing mode, avoids large area occupation of land, save track investment, shorten construction period.

Description

A kind of bracing means of transmission line of electricity high voltage iron tower and basis
Technical field
The utility model is related to power maintenance technology field, the reinforcing of specifically a kind of transmission line of electricity high voltage iron tower and basis Device.
Background technology
With the continuous development of urban construction, part circuit changes because mismatching to need partly to move with urban planning.Wherein exist Circuit moves when changing, and often faces that steel tower side is removed and the other side retains, and steel tower force unbalance can only be replaced under normal circumstances Steel tower, or bracing wire is played to keep stress balance.But replace steel tower investment greatly, long construction period;It plays 45 ° of bracing wires and reinforces and take up an area Area is too big, is not suitable in city.There is an urgent need for designing a kind of bracing means, under the premise of meeting safe and reliable, effectively reduce Track investment, while can keep reliably being connected with the front and back side of whole circuit.
Utility model content
The purpose of this utility model is to provide the bracing means of a kind of transmission line of electricity high voltage iron tower and basis, in solution State the problem of being proposed in background technology.
To achieve the above object, the utility model provides the following technical solutions:
A kind of bracing means of transmission line of electricity high voltage iron tower and basis, including bored concrete pile foundation, reinforced concrete coupling beams, steel Twisted wire and steel tower reinforce ironware, and two bored concrete pile foundations are separately mounted to steel tower conducting wire, and to remove original two of side basic Both sides, two bored concrete pile foundations are attached by reinforced concrete coupling beams and existing two bases of steel tower, and formation one is whole Body completes the reinforcing on basis, and the steel tower is reinforced on the tower body that ironware is mounted on above the cable platform of steel tower, the reinforcing bar Draw ring is installed, draw ring is reinforced ironware with steel tower by steel strand wires and is mutually fixedly connected, reinforced to steel tower on concrete connecting-beam.
As further program of the utility model:The steel strand wires are galvanized strand wires GJ-150.
As the utility model further scheme:The bored concrete pile foundation includes outer stirrup and interior stirrup.
As the utility model further scheme:The outer stirrup internal diameter is φ 880mm, and interior stirrup internal diameter is φ 816mm。
As the utility model further scheme:The original basis top mark that the bored concrete pile foundation top is higher by steel tower is high 600mm。
As the utility model further scheme:The perfusion depth of the bored concrete pile foundation is 6200mm.
As the utility model further scheme:Original basis of the bored concrete pile foundation and steel tower is located at same On straight line, and the spacing on original basis of adjacent bored concrete pile foundation and steel tower is 4000mm.
As the utility model further scheme:The thickness of the reinforced concrete coupling beams is 1000mm.
Compared with prior art, the utility model has the beneficial effects that:Side, which is removed, in steel tower conducting wire passes through bracing means pair Steel tower and basis are reinforced, and to balance the broken string tension of the other side, are replaced steel tower compared to tradition and are beaten bracing wire reinforcing mode, keep away Exempt from large area occupation of land, saved track investment, shortens construction period.
Description of the drawings
Fig. 1 is the schematic front view of a kind of transmission line of electricity high voltage iron tower and the bracing means on basis;
Fig. 2 is the left view schematic diagram of the transmission line of electricity high voltage iron tower and the bracing means on basis described in Fig. 1;
Fig. 3 is the schematic diagram of the transmission line of electricity high voltage iron tower and bored concrete pile foundation in the bracing means on basis described in Fig. 1;
Fig. 4 is the schematic diagram of the transmission line of electricity high voltage iron tower and steel tower reinforcing ironware in the bracing means on basis described in Fig. 1.
Specific implementation mode
The technical solution of this patent is described in more detail With reference to embodiment.
Please refer to Fig.1-4, a kind of bracing means of transmission line of electricity high voltage iron tower and basis, including bored concrete pile foundation, reinforcing bar Concrete connecting-beam, steel strand wires and steel tower reinforce ironware, and two bored concrete pile foundations are separately mounted to steel tower conducting wire and remove side original Two basic both sides having, two bored concrete pile foundations are connected by reinforced concrete coupling beams and existing two bases of steel tower It connects, forms an entirety, complete the reinforcing on basis, the steel tower reinforces the tower that ironware is mounted on above the cable platform of steel tower With, draw ring is installed, draw ring is reinforced ironware with steel tower by steel strand wires and is mutually fixedly connected, right on the reinforced concrete coupling beams Steel tower is reinforced.
The steel strand wires are galvanized strand wires GJ-150.
The bored concrete pile foundation includes outer stirrup and interior stirrup.
The outer stirrup internal diameter is φ 880mm, and interior stirrup internal diameter is φ 816mm.
The bored concrete pile foundation top is higher by the high 600mm of original basis top mark of steel tower.
The perfusion depth of the bored concrete pile foundation is 6200mm.
Original basis of the bored concrete pile foundation and steel tower is located along the same line, and adjacent bored concrete pile foundation and iron The spacing on original basis of tower is 4000mm.
The thickness of the reinforced concrete coupling beams is 1000mm.
Operation principle:Side is removed in steel tower conducting wire to reinforce steel tower and basis by bracing means, it is another to balance The broken string tension of side removes side group plinth both sides in steel tower conducting wire and adds a bored concrete pile foundation respectively, passes through reinforced concrete coupling beams Original old iron tower foundation is attached with two bored concrete pile foundations, while ironware being installed on tower body, is twisted using galvanized steel Line GJ-150 is attached with reinforced concrete coupling beams, complete steel tower with basis integral reinforcing, compared to tradition replace steel tower and Bracing wire reinforcing mode is beaten, large area occupation of land is avoided, saves track investment, shorten construction period.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is set Set ", " connected " and " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or one Ground connects;It can be directly connected, can also can be indirectly connected through an intermediary the connection inside two elements.It is right For those skilled in the art, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein, and should not any reference numeral in claim be considered as limitation Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (9)

1. the bracing means of a kind of transmission line of electricity high voltage iron tower and basis, which is characterized in that including bored concrete pile foundation, reinforced concrete Native coupling beam, steel strand wires and steel tower reinforce ironware, and it is original that two bored concrete pile foundations are separately mounted to steel tower conducting wire dismounting side Two basic both sides, two bored concrete pile foundations are attached by reinforced concrete coupling beams and existing two bases of steel tower, The steel tower is reinforced on the tower body that ironware is mounted on above the cable platform of steel tower, and drawing is equipped on the reinforced concrete coupling beams Ring, draw ring are reinforced ironware with steel tower by steel strand wires and are mutually fixedly connected.
2. the bracing means of transmission line of electricity high voltage iron tower according to claim 1 and basis, which is characterized in that the steel twists Line is galvanized strand wires GJ-150.
3. the bracing means of transmission line of electricity high voltage iron tower according to claim 1 and basis, which is characterized in that the perfusion Pile foundation includes outer stirrup and interior stirrup.
4. the bracing means of transmission line of electricity high voltage iron tower according to claim 3 and basis, which is characterized in that the outer hoop Muscle internal diameter is φ 880mm, and interior stirrup internal diameter is φ 816mm.
5. the bracing means of transmission line of electricity high voltage iron tower according to claim 3 and basis, which is characterized in that the perfusion Pile foundation top is higher by the high 600mm of original basis top mark of steel tower.
6. the bracing means of transmission line of electricity high voltage iron tower according to claim 1 and basis, which is characterized in that the perfusion The perfusion depth of pile foundation is 6200mm.
7. the bracing means of transmission line of electricity high voltage iron tower according to claim 1 and basis, which is characterized in that the perfusion Original basis of pile foundation and steel tower is located along the same line.
8. the bracing means of transmission line of electricity high voltage iron tower according to claim 7 and basis, which is characterized in that adjacent institute The spacing for stating original basis of bored concrete pile foundation and steel tower is 4000mm.
9. the bracing means of transmission line of electricity high voltage iron tower according to claim 1 and basis, which is characterized in that the reinforcing bar The thickness of concrete connecting-beam is 1000mm.
CN201721504702.9U 2017-11-13 2017-11-13 A kind of bracing means of transmission line of electricity high voltage iron tower and basis Expired - Fee Related CN207608939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721504702.9U CN207608939U (en) 2017-11-13 2017-11-13 A kind of bracing means of transmission line of electricity high voltage iron tower and basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721504702.9U CN207608939U (en) 2017-11-13 2017-11-13 A kind of bracing means of transmission line of electricity high voltage iron tower and basis

Publications (1)

Publication Number Publication Date
CN207608939U true CN207608939U (en) 2018-07-13

Family

ID=62795258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721504702.9U Expired - Fee Related CN207608939U (en) 2017-11-13 2017-11-13 A kind of bracing means of transmission line of electricity high voltage iron tower and basis

Country Status (1)

Country Link
CN (1) CN207608939U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106930A (en) * 2019-06-03 2019-08-09 国核电力规划设计研究院重庆有限公司 A kind of novel iron tower foundation method for reinforcing and protecting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106930A (en) * 2019-06-03 2019-08-09 国核电力规划设计研究院重庆有限公司 A kind of novel iron tower foundation method for reinforcing and protecting
CN110106930B (en) * 2019-06-03 2021-07-16 国核电力规划设计研究院重庆有限公司 Iron tower foundation reinforcement protection method

Similar Documents

Publication Publication Date Title
CN105735113A (en) Pier pile transition connection structure for concrete-filled steel tube bridge and construction method of pier pile transition connection structure
CN205741882U (en) Pier stake transition connecting construction for concrete filled steel tube bridge
CN207608939U (en) A kind of bracing means of transmission line of electricity high voltage iron tower and basis
CN109537929A (en) Demolishing columns bracing means and reinforcement means
CN107675737A (en) A kind of transmission line of electricity high voltage iron tower and the bracing means on basis
CN208455907U (en) A kind of prefabricated laminated floor slab
CN206554592U (en) 220kV single loop wine glass-shapeds strain insulator, which is bored, gets over tower
CN209369826U (en) A kind of shield duct piece ruggedized construction
CN102776955B (en) Connecting node for connecting newly added reinforced concrete earthquake resistant wall and sleeve reinforced beam
CN205152981U (en) Disease treatment structure is kept off to existing of light -duty flexibility
CN106087881B (en) A kind of precast concrete box-structure and cast-in-place concrete convolution Sluice Pier structure and its construction technology
CN104153630A (en) Transition connection method of hybrid wind power towers
CN209669855U (en) It is a kind of to lengthen steel reinforcement cage for the construction of low headroom pile foundation
CN207245718U (en) A kind of special section of jurisdiction of shield receiving terminal
CN207646562U (en) A kind of crack on road fixing device
CN208501950U (en) A kind of standard buckling restrained brace node embedded part
CN205421313U (en) Steel structure foundation ring on resistance to plucking, anti mountain region aerogenerator basis of inclining
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN206844057U (en) A kind of hydraulic engineering slope protection net
CN206309051U (en) A kind of tension bar planting structure
CN208122861U (en) A kind of elliptic cross-section hollow steel tube concrete support component that bending resistance is strengthened
CN206386139U (en) A kind of fiber reinforcement type grouted anchor bar body of rod
CN103669312A (en) Jacket platform of offshore wind turbine
CN204982927U (en) Hollow earth anchor cage basis
CN108756006A (en) A kind of standard buckling restrained brace node embedded part and its casting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180713

Termination date: 20201113

CF01 Termination of patent right due to non-payment of annual fee