CN206398190U - A kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement - Google Patents
A kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement Download PDFInfo
- Publication number
- CN206398190U CN206398190U CN201720087048.XU CN201720087048U CN206398190U CN 206398190 U CN206398190 U CN 206398190U CN 201720087048 U CN201720087048 U CN 201720087048U CN 206398190 U CN206398190 U CN 206398190U
- Authority
- CN
- China
- Prior art keywords
- supporter
- chemical industry
- industry equipment
- fixed
- extract solution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The utility model discloses a kind of Hu shaddock ped extract solution preparation chemical industry equipment tube support arrangement of technical field of chemical, including supporter, the top of the supporter is connected with fixed anchor ear by fastening bolt, the top of the supporter and the bottom of fixed anchor ear offer pipeline circular groove, and the inwall of pipeline circular groove is provided with pipe protection pad, the bottom of the supporter offers two groups of adjustment holes, the inner chamber of the adjustment hole is plugged with screw rod, chemical industry equipment pipeline is stuck on supporter and is fixed by the utility model by fixed anchor ear, chemical industry equipment pipeline is fixed on the ground by fixed block, cement on fixed block pours groove injection cement, cement flows to ground by through hole, fixed block is linked together with ground, increase the earth-grasping force of fixed block by the setting of cylinder and circular cone tooth, more consolidate, it is adjusted by adjusting nut in screw rod, adjust the height of supporter.
Description
Technical field
The utility model is related to technical field of chemical, specially a kind of Hu shaddock ped extract solution preparation chemical industry equipment pipe
Road support meanss.
Background technology
At present, domestic and international result of study shows, there is that species is various, rich content flavone compound in Hu shaddock ped,
These flavone compounds are all industrially good dyestuff and antioxidant, in recent decades, it has been found that flavonoids
Compound has different physiological roles and larger medical value, in addition, aurantiamarin and aurantiin is also antiviral, resistance state is anti-
Cardiovascular system, anti-cancer and cancer-preventing, cholagogic, should be protected and acted on as a kind of novel sweetener etc., with very big exploitation and profit
With value, and with improving hair nursing, loose moisturizing, and Hu shaddock ped extract solution also there is moisturizing, it is whitening, anti-acne, rich
Chest and the antibacterial effect of anti-aging, need the process for concentrating, separate, purifying and drying in the preparation, are preparing the change of extract solution
Between each device of construction equipment, generally require to be attached with pipeline, for some of which pipeline, in practical work process
It is middle to be acted on by external force, and then it can be caused to produce vibration, and this vibration can not only directly result in the pipe of chemical industry equipment
Road working effect produces influence, or even also the pipeline for being chronically at vibrational state can be made to fracture when serious, so that significantly
The processing quality of chemical industry equipment is have impact on, and jeopardizes the Environmental security around chemical industry equipment, general tube support arrangement is fixed
Unstable, the later stage carries out height regulation relative difficulty, and based on this, the utility model devises a kind of Hu shaddock ped extract solution and prepares use
Chemical industry equipment tube support arrangement, to solve the above problems.
Utility model content
The purpose of this utility model is to provide a kind of Hu shaddock ped extract solution preparation chemical industry equipment tube support arrangement, with
The general tube support arrangement for solving to propose in above-mentioned background technology fixes unstable, and the later stage carries out height regulation relative difficulty
The problem of.
To achieve the above object, the utility model provides following technical scheme:A kind of Hu shaddock ped extract solution preparation chemical industry
Equipment pipe support meanss, including supporter, the top of the supporter are connected with fixed anchor ear, the branch by fastening bolt
The top of support body and the bottom of fixed anchor ear offer pipeline circular groove, and the inwall of pipeline circular groove is provided with pipe protection pad,
The bottom of the supporter offers two groups of adjustment holes, and the inner chamber of the adjustment hole is plugged with screw rod, the outer wall spiral shell of the screw rod
Adjusting nut is connected to, the adjusting nut is arranged on the bottom of supporter, and the bottom of the screw rod is provided with installing plate, the spiral shell
The bottom of bar is fixedly connected with installing plate, and the bottom of the installing plate is provided with fixed block, top of the fixed block or so two
Side offers cement and pours groove, and the intracavity bottom that the cement pours groove offers through hole.
It is preferred that, the bottom even of the fixed block is provided with cylinder, and the bottom of the cylinder is provided with circular cone tooth.
It is preferred that, the pipe protection pad includes plastic cement supporting layer, and rubber is provided with the top of the plastic cement supporting layer and is delayed
Rush and weather-proof lumarith is provided with the top of layer, the cushion rubber layer, be evenly arranged with the top of the weather-proof lumarith wear-resisting
Block rubber.
It is preferred that, backing plate is evenly arranged between the supporter and installing plate, and backing plate is arranged between two groups of screw rods.
Compared with prior art, the beneficial effects of the utility model are:The utility model is set chemical industry by fixed anchor ear
Standby pipeline, which is stuck on supporter, to be fixed, and is fixed on the ground chemical industry equipment pipeline by fixed block, the water on fixed block
Mud pours groove injection cement, and cement flows to ground by through hole, fixed block is linked together with ground, passes through cylinder and circular cone
The setting of tooth increases the earth-grasping force of fixed block, more consolidates, is adjusted by adjusting nut in screw rod, makes the height of supporter
Degree can be adjusted, and added the operating efficiency of Hu shaddock ped extract solution preparation, reduced preparation cost.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model pipe protection mat structure schematic diagram.
In figure:Anchor ear, 3 fastening bolts, 4 pipe protection pads, 41 plastic cement supporting layers, 42 abrasive rubbers are fixed in 1 supporter, 2
Block, 43 weather-proof lumariths, 44 cushion rubber layers, 5 adjustment holes, 6 screw rods, 7 adjusting nuts, 8 installing plates, 9 fixed blocks, 10 cement are poured
Fill groove, 11 through holes, 12 cylinders, 13 circular cone teeth, 14 backing plates.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of Hu shaddock ped extract solution preparation chemical industry equipment
Tube support arrangement, including supporter 1, the top of the supporter 1 are connected with fixed anchor ear 2, the branch by fastening bolt 3
The top of support body 1 and the bottom of fixed anchor ear 2 offer pipeline circular groove, and the inwall of pipeline circular groove is provided with pipe protection pad
4, the bottom of the supporter 1 offers two groups of adjustment holes 5, and the inner chamber of the adjustment hole 5 is plugged with screw rod 6, the screw rod 6
Outer wall is bolted with adjusting nut 7, and the adjusting nut 7 is arranged on the bottom of supporter 1, and the bottom of the screw rod 6 is provided with peace
Plate 8 is filled, the bottom of the screw rod 6 is fixedly connected with installing plate 8, and the bottom of the installing plate 8 is provided with fixed block 9, described solid
The top left and right sides for determining block 9 offers cement pouring groove 10, and the intracavity bottom that the cement pours groove 10 offers through hole
11。
Wherein, the bottom even of the fixed block 9 is provided with cylinder 12, and the bottom of the cylinder 12 is provided with circular cone tooth
13, cylinder 12 and circular cone tooth 13 insert ground, increase the earth-grasping force of fixed block 9, more consolidate, the pipe protection pad 4 is wrapped
Plastic cement supporting layer 41 is included, the top of the plastic cement supporting layer 41 is provided with cushion rubber layer 44, the top of the cushion rubber layer 44
Portion is provided with weather-proof lumarith 43, and the top of the weather-proof lumarith 43 is evenly arranged with abrasive rubber block 42, plastic cement supporting layer
The intensity of 41 increase pipe protection pads 4, cushion rubber layer 44 strengthens the crushing resistance of pipe protection pad 4, and weather-proof lumarith 43 makes
Pipe protection pad 4 is weather-proof corrosion-resistant, and abrasive rubber block 42 makes the increase of the wearability of pipe protection pad 4, the supporter 1 and installing plate
Backing plate 14 is evenly arranged between 8, and backing plate 14 is arranged between two groups of screw rods 6, backing plate 14 is supported to supporter 1, can
To carry out plus-minus quantity according to height, the load of screw rod 6 can be mitigated.
Operation principle:Chemical industry equipment pipeline is stuck on supporter 1 by fastening spiral shell by the utility model by fixed anchor ear 2
Bolt 3 is fixed, and is fixed on the ground chemical industry equipment pipeline by fixed block 9, and the cement on fixed block 9 is poured in groove 10 and noted
Enter cement, cement flows to the spud pile dug on ground by through hole 11, and fixed block 9 and spud pile are linked together, cylinder
12 and the insertion of circular cone tooth 13 ground, the earth-grasping force of fixed block 9 increase, it is more firm, by rotating adjusting nut 7 in screw rod 6
It is adjusted, screw rod 6 can carry out depth adjustment in adjustment hole 5, adjust the height of supporter 1, pipe protection pad 4
The intensity of the middle increase pipe protection of plastic cement supporting layer 41 pad 4, cushion rubber layer 44 strengthens the crushing resistance of pipe protection pad 4, resistance to
Waiting lumarith 43 makes pipe protection pad 4 weather-proof corrosion-resistant, and abrasive rubber block 42 makes the increase of the wearability of pipe protection pad 4, backing plate 14
Supporter 1 is supported, plus-minus quantity can be carried out according to height, the weight-bearing load of screw rod 6 can be mitigated.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement, including supporter(1), it is characterised in that:Institute
State supporter(1)Top pass through fastening bolt(3)It is connected with fixed anchor ear(2), the supporter(1)Top and fixed embrace
Hoop(2)Bottom offer pipeline circular groove, and the inwall of pipeline circular groove is provided with pipe protection pad(4), the supporter(1)
Bottom offer two groups of adjustment holes(5), the adjustment hole(5)Inner chamber be plugged with screw rod(6), the screw rod(6)Outer wall
It is bolted with adjusting nut(7), the adjusting nut(7)It is arranged on supporter(1)Bottom, the screw rod(6)Bottom set
There is installing plate(8), the screw rod(6)Bottom and installing plate(8)It is fixedly connected, the installing plate(8)Bottom be provided with it is solid
Determine block(9), the fixed block(9)The top left and right sides offer cement pour groove(10), the cement pouring groove(10)
Intracavity bottom offer through hole(11).
2. prepared by a kind of Hu shaddock ped extract solution according to claim 1 use chemical industry equipment tube support arrangement, its feature exists
In:The fixed block(9)Bottom even be provided with cylinder(12), the cylinder(12)Bottom be provided with circular cone tooth(13).
3. prepared by a kind of Hu shaddock ped extract solution according to claim 1 use chemical industry equipment tube support arrangement, its feature exists
In:The pipe protection pad(4)Including plastic cement supporting layer(41), the plastic cement supporting layer(41)Top be provided with rubber buffer
Layer(44), the cushion rubber layer(44)Top be provided with weather-proof lumarith(43), the weather-proof lumarith(43)Top
It is evenly arranged with abrasive rubber block(42).
4. prepared by a kind of Hu shaddock ped extract solution according to claim 1 use chemical industry equipment tube support arrangement, its feature exists
In:The supporter(1)And installing plate(8)Between be evenly arranged with backing plate(14), and backing plate(14)It is arranged on two groups of screw rods(6)
Between.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720087048.XU CN206398190U (en) | 2017-01-23 | 2017-01-23 | A kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720087048.XU CN206398190U (en) | 2017-01-23 | 2017-01-23 | A kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206398190U true CN206398190U (en) | 2017-08-11 |
Family
ID=59515377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720087048.XU Expired - Fee Related CN206398190U (en) | 2017-01-23 | 2017-01-23 | A kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206398190U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109114358A (en) * | 2018-09-18 | 2019-01-01 | 青岛奥德贝商贸有限公司 | A kind of hydraulic engineering pipe joint protective device |
-
2017
- 2017-01-23 CN CN201720087048.XU patent/CN206398190U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109114358A (en) * | 2018-09-18 | 2019-01-01 | 青岛奥德贝商贸有限公司 | A kind of hydraulic engineering pipe joint protective device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206398190U (en) | A kind of Hu shaddock ped extract solution prepares and uses chemical industry equipment tube support arrangement | |
CN107926474A (en) | A kind of sand prevention planting unit for being used for environmental protection | |
CN201214768Y (en) | Pier stud through type coping template support | |
CN105773809B (en) | A kind of prefabricated components shaping fixed type multifunctional upset Working mould table | |
CN202299144U (en) | Concrete cover cushion block | |
CN205777116U (en) | The light reinforced fixture of shear wall construction is built in room | |
CN205976538U (en) | Can have enough to meet need stirrup device | |
CN209482338U (en) | A kind of plug-in type prefabricated pile basis | |
CN204278207U (en) | Concrete tubular pile material filling system | |
CN201155208Y (en) | Concrete edged formwork reinforcement device | |
CN206070404U (en) | Oblique formwork support structure at the section haunch of box culvert top | |
CN206143796U (en) | Rim of a cup basis box steel column and mounting adjustment fixing device | |
CN107460879A (en) | A kind of fixed structure of flare template | |
CN201167818Y (en) | Movable device for hanging boxing sandbag in residence | |
CN208792785U (en) | A kind of regularization concrete ground pump pump line bracing means | |
CN207420029U (en) | A kind of building structural post formwork fastener | |
CN206605614U (en) | A kind of concrete prefabricated element mould with water seepage function | |
CN103866865B (en) | The pre-buried fixing means of a diameter of 48mm foundation bolt | |
CN201934353U (en) | Novel support structure of small submersible sewage pump | |
CN106731089A (en) | A kind of supporting construction of sewage filter net | |
CN208702012U (en) | A kind of PC member reinforcing steel bar connector | |
CN206859446U (en) | A kind of damping building structure | |
CN207362805U (en) | The support device of aqueduct construction process | |
CN206570707U (en) | A kind of bridge stiffening device | |
CN206396887U (en) | Pit structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20220123 |
|
CF01 | Termination of patent right due to non-payment of annual fee |