CN206397536U - A kind of high intensity tunnel ventilation pipeline - Google Patents

A kind of high intensity tunnel ventilation pipeline Download PDF

Info

Publication number
CN206397536U
CN206397536U CN201720061939.8U CN201720061939U CN206397536U CN 206397536 U CN206397536 U CN 206397536U CN 201720061939 U CN201720061939 U CN 201720061939U CN 206397536 U CN206397536 U CN 206397536U
Authority
CN
China
Prior art keywords
layer pipe
horizontal support
support bar
outer layer
inner layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720061939.8U
Other languages
Chinese (zh)
Inventor
王金喜
崔汉涛
马家亮
杨珍
曲学峰
孟志强
石志祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Engineering
Original Assignee
Hebei University of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Engineering filed Critical Hebei University of Engineering
Priority to CN201720061939.8U priority Critical patent/CN206397536U/en
Application granted granted Critical
Publication of CN206397536U publication Critical patent/CN206397536U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a kind of high intensity tunnel ventilation pipeline, including inner layer pipe(1)And outer layer pipe(2), inner layer pipe(1)Socket and outer layer pipe(2)It is interior, inner layer pipe(1)Outer wall and outer layer pipe(2)Inwall between be provided with gap(3);It is characterized in that:The inner layer pipe(1)For concrete prefabricated pipe, the outer layer pipe(2)For four prism type, the gap(3)Inside be provided with some support components, the two ends of support component respectively with inner layer pipe(1)Outer wall and outer layer pipe(2)Inwall be fixedly connected.The drawbacks of overcoming prior art the utility model has the advantage of it, reasonable in design is novel.

Description

A kind of high intensity tunnel ventilation pipeline
Technical field
The utility model is related to a kind of high intensity tunnel ventilation pipeline, belongs to tunnel ventilation field.
Background technology
In tunnel, the vehicle of traveling can constantly discharge harmful exhaust and flue dust, when the harmful exhaust and flue dust of discharge are dense Degree will bring harm to driver and conductor when exceeding certain value, influence to keep good in healthy and traffic safety, therefore tunnel Air condition is the necessary condition of traffic safety, and the purpose divulged information is that pernicious gas in tunnel or pollutant are reduced to permission Below concentration, to ensure the security and comfortableness of running car, this is a major criterion of tunnel service level.
In existing technology, the ventilation shaft in tunnel typically using set up in advance Steel bar rack carry out concreting or Scene is transported to using prefabricated integrated piping to be spliced.Use the method for setting up Steel bar rack progress concreting in advance Although so that the intensity of ventilation shaft is higher, construction is complicated, long in time limit;Scene is transported to using prefabricated integrated piping to enter Although row splicing construction procedure is less, the duration is shorter, and prefabricated pipeline bulk strength enters not as setting up Steel bar rack in advance The ventilation shaft of the method manufacture of row concreting.
Utility model content
For in the prior art " although carrying out the method for concreting so that ventilation shaft with Steel bar rack is set up in advance Intensity it is higher, but construction is complicated, long in time limit;Although being transported to scene using prefabricated integrated piping is spliced construction step Rapid less, the duration is shorter, but prefabricated pipeline bulk strength is not so good as to set up the side that Steel bar rack carries out concreting in advance The deficiency of the ventilation shaft of method manufacture ", the utility model provides a kind of high intensity tunnel ventilation pipeline.
In order to solve the above technical problems, the utility model is adopted the technical scheme that, a kind of high intensity tunnel ventilation pipeline, Including inner layer pipe and outer layer pipe, inner layer pipe socket with outer layer pipe, the outer wall of inner layer pipe and outer layer pipe it is interior Gap is provided between wall;The inner layer pipe is concrete prefabricated pipe, and the outer layer pipe is four prism type, outer layer pipe Including 4 pieces of rectangle prefabricated boards I, 4 pieces of rectangle prefabricated boards I constitute four prism type;Some support components are provided with the gap, are propped up The two ends of support component are fixedly connected with the outer wall of inner layer pipe and the inwall of outer layer pipe respectively.
Because prefabricated pipeline bulk strength is not so good as to set up the method manufacture of Steel bar rack progress concreting in advance Ventilation shaft, the technical scheme of the application sets outer layer pipe outside inner layer pipe, such to be set equal to concrete prefabricated One layer of anti-impacting layer is added outside pipe, the relatively low defect of the inner layer pipe intensity that is made up of concrete prefabricated pipe is compensate for.
And the form for being set to be combined by 4 pieces of rectangle prefabricated boards by outer layer pipe, so can be by prefabricated board with being sent to Spliced behind scene, splicing is convenient, reduces construction period.And due to prefabricated board relative to prefabricated pipeline its single volume Smaller, same transport vehicles drive quantity is more, and transport facilitates efficiency high.
Support group is added in order to fix in the relative position of inner layer pipe and outer layer pipe, the technical scheme of the application Part.
Optimize, above-mentioned high intensity tunnel ventilation pipeline, layer of sand is filled with the gap.
After outer layer pipe is impacted, layer of sand can play the work of the pressure between inner buffer layer pipeline and outer layer pipe With.
Optimization, above-mentioned high intensity tunnel ventilation pipeline, the support component includes supporting plate I and supporting plate II, support Plate I is fixedly connected with inner layer pipe outer wall, and supporting plate II is fixedly connected with the inwall of outer layer pipe;The supporting plate I and support Horizontal support bar I and horizontal support bar II are provided between plate II, one end and the horizontal support bar II of horizontal support bar I are hinged, horizontal support bar I The other end be fixedly connected with supporting plate I;One end of the horizontal support bar II is hinged with horizontal support bar I, horizontal support bar II it is another One end is fixedly connected with supporting plate II.
Optimization, above-mentioned high intensity tunnel ventilation pipeline, the angle of the horizontal support bar I and horizontal support bar II is more than 90 degree Less than 180 degree.
Optimization, above-mentioned high intensity tunnel ventilation pipeline, the support component also includes an elastic metallic bar, elasticity gold The two ends of category bar are fixedly connected with the middle part of horizontal support bar I and the middle part of horizontal support bar II respectively.
By elastic metallic bar supporting role, the relative position of fixed outer layer pipeline and inner layer pipe.
By the elastic deformation of elastic metallic bar, it can absorb outer layer pipe after failure by rupture occurs for outer layer pipe and apply Plus the pressure of inner layer pipeline, prevent inner layer pipe from further rupturing.
Optimization, above-mentioned high intensity tunnel ventilation pipeline, the elastic metallic bar is curved metal bar.
Optimize, above-mentioned high intensity tunnel ventilation pipeline, spacer bar is preset with the rectangle prefabricated board I.
Spacer bar serves the effect of the intensity of increase rectangle prefabricated board I.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is internal structure schematic diagram of the present utility model.
Embodiment
Technical characterstic of the present utility model is expanded on further with specific embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, the utility model is a kind of high intensity tunnel ventilation pipeline, including inner layer pipe 1 and outer layer pipe 2, the socket of inner layer pipe 1 is with outer layer pipe 2, gap 3 is provided between the outer wall of inner layer pipe 1 and the inwall of outer layer pipe 2; The inner layer pipe 1 is concrete prefabricated pipe, and the outer layer pipe 2 is four prism type, and it is pre- that outer layer pipe 2 includes 4 pieces of rectangles I 4,4 pieces of composition four prism types of rectangle prefabricated board I 4 of making sheet;Some support components, the two of support component are provided with the gap 3 End is fixedly connected with the outer wall of inner layer pipe 1 and the inwall of outer layer pipe 2 respectively.
Because prefabricated pipeline bulk strength is not so good as to set up the method manufacture of Steel bar rack progress concreting in advance Ventilation shaft, the technical scheme of the application sets outer layer pipe 2 inner layer pipe 1 is outer, it is such be set equal to it is pre- in concrete One layer of anti-impacting layer is added outside rounding pipe, compensate for that the intensity of inner layer pipe 1 that is made up of concrete prefabricated pipe is relatively low to be lacked Fall into.
And the form for being set to be combined by 4 pieces of rectangle prefabricated boards by outer layer pipe 2, so can be by prefabricated board with being sent to Spliced behind scene, splicing is convenient, reduces construction period.And due to prefabricated board relative to prefabricated pipeline its single volume Smaller, same transport vehicles drive quantity is more, and transport facilitates efficiency high.
Support group is added in order to fix in the relative position of inner layer pipe 1 and outer layer pipe 2, the technical scheme of the application Part.
Layer of sand is filled with the gap 3.After outer layer pipe 2 is impacted, layer of sand can play inner buffer layer pipeline 1 The effect of pressure between outer layer pipe 2.
The support component includes supporting plate I 5 and supporting plate II 6, and supporting plate I 5 is fixedly connected with the outer wall of inner layer pipe 1, Supporting plate II 6 is fixedly connected with the inwall of outer layer pipe 2;Horizontal support bar I is provided between the supporting plate I 5 and supporting plate II 6 7 and horizontal support bar II 8, one end and the horizontal support bar II 8 of horizontal support bar I 7 are hinged, the other end and the supporting plate I 5 of horizontal support bar I 7 It is fixedly connected;One end of the horizontal support bar II 8 is hinged with horizontal support bar I 7, the other end and the supporting plate II 6 of horizontal support bar II 8 It is fixedly connected.
The angle of the horizontal support bar I 7 and horizontal support bar II 8 is more than 90 degree and is less than 180 degree.The support component also includes A piece elastic metallic bar 9, the two ends of elastic metallic bar 9 are consolidated with the middle part of horizontal support bar I 7 and the middle part of horizontal support bar II 8 respectively Fixed connection.
By the supporting role of elastic metallic bar 9, the relative position of fixed outer layer pipeline 2 and inner layer pipe 1.
By the elastic deformation of elastic metallic bar 9, outer layer pipe 2 can be absorbed after failure by rupture occurs for outer layer pipe 2 Apply the pressure of inner layer pipeline 1, prevent the further rupture of inner layer pipe 1.
The elastic metallic bar 9 is curved metal bar.Spacer bar is preset with the rectangle prefabricated board I 4.
Spacer bar serves the effect of the intensity of increase rectangle prefabricated board I.
Certainly, described above is not that, to limitation of the present utility model, the utility model is also not limited to the example above, this The those of ordinary skill of technical field, in essential scope of the present utility model, the variations, modifications, additions or substitutions made, all Protection domain of the present utility model should be belonged to.

Claims (7)

1. a kind of high intensity tunnel ventilation pipeline, including inner layer pipe(1)And outer layer pipe(2), inner layer pipe(1)It is socketed and outer Layer pipeline(2)It is interior, inner layer pipe(1)Outer wall and outer layer pipe(2)Inwall between be provided with gap(3);It is characterized in that: The inner layer pipe(1)For concrete prefabricated pipe, the outer layer pipe(2)For four prism type, outer layer pipe(2)Including 4 pieces Rectangle prefabricated board I(4), 4 pieces of rectangle prefabricated boards I(4)Constitute four prism type;The gap(3)Some support components are inside provided with, The two ends of support component respectively with inner layer pipe(1)Outer wall and outer layer pipe(2)Inwall be fixedly connected.
2. high intensity tunnel ventilation pipeline according to claim 1, it is characterised in that:The gap(3)It is interior to be filled with sand Layer.
3. high intensity tunnel ventilation pipeline according to claim 1, it is characterised in that:The support component includes supporting plate Ⅰ(5)With supporting plate II(6), supporting plate I(5)With inner layer pipe(1)Outer wall is fixedly connected, supporting plate II(6)With outer layer pipe (2)Inwall be fixedly connected;The supporting plate I(5)With supporting plate II(6)Between be provided with horizontal support bar I(7)And horizontal support bar Ⅱ(8), horizontal support bar I(7)One end and horizontal support bar II(8)It is hinged, horizontal support bar I(7)The other end and supporting plate I(5) It is fixedly connected;The horizontal support bar II(8)One end and horizontal support bar I(7)It is hinged, horizontal support bar II(8)The other end and branch Fagging II(6)It is fixedly connected.
4. high intensity tunnel ventilation pipeline according to claim 3, it is characterised in that:The horizontal support bar I(7)And support Straight-bar II(8)Angle be more than 90 degree less than 180 degree.
5. high intensity tunnel ventilation pipeline according to claim 4, it is characterised in that:The support component also includes one Elastic metallic bar(9), elastic metallic bar(9)Two ends respectively with horizontal support bar I(7)Middle part and horizontal support bar II(8)In Portion is fixedly connected.
6. high intensity tunnel ventilation pipeline according to claim 5, it is characterised in that:The elastic metallic bar(9)For arc Shape metallic rod.
7. high intensity tunnel ventilation pipeline according to claim 1, it is characterised in that:The rectangle prefabricated board I(4)It is interior pre- Provided with spacer bar.
CN201720061939.8U 2017-01-19 2017-01-19 A kind of high intensity tunnel ventilation pipeline Withdrawn - After Issue CN206397536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720061939.8U CN206397536U (en) 2017-01-19 2017-01-19 A kind of high intensity tunnel ventilation pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720061939.8U CN206397536U (en) 2017-01-19 2017-01-19 A kind of high intensity tunnel ventilation pipeline

Publications (1)

Publication Number Publication Date
CN206397536U true CN206397536U (en) 2017-08-11

Family

ID=59518969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720061939.8U Withdrawn - After Issue CN206397536U (en) 2017-01-19 2017-01-19 A kind of high intensity tunnel ventilation pipeline

Country Status (1)

Country Link
CN (1) CN206397536U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545354A (en) * 2017-01-19 2017-03-29 河北工程大学 A kind of high intensity tunnel ventilation pipeline
CN109248505A (en) * 2018-11-02 2019-01-22 宁波大发化纤有限公司 A kind of regeneration chemical fibre circular blow system off gas circulation emission reduction device and its technique

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545354A (en) * 2017-01-19 2017-03-29 河北工程大学 A kind of high intensity tunnel ventilation pipeline
CN106545354B (en) * 2017-01-19 2018-12-25 河北工程大学 A kind of high intensity tunnel ventilation pipeline
CN109248505A (en) * 2018-11-02 2019-01-22 宁波大发化纤有限公司 A kind of regeneration chemical fibre circular blow system off gas circulation emission reduction device and its technique

Similar Documents

Publication Publication Date Title
CN206397536U (en) A kind of high intensity tunnel ventilation pipeline
CN208279951U (en) A kind of track double-round clad steel spring vibration-isolator
CN103046490A (en) Totally closed sound barrier
CN202946180U (en) Tunnel ventilation system suitable for underground public transit system
CN108194098A (en) A kind of shield tunnel anti-collision energy absorption section of jurisdiction device
WO2022241750A1 (en) Large-area dismantling device for wall body structure of subway station and process therefor
CN207813625U (en) A kind of shield tunnel anti-collision energy absorption section of jurisdiction device
CN108639071A (en) Long range large-diameter, sealed tube road system
CN106545354B (en) A kind of high intensity tunnel ventilation pipeline
CN201842140U (en) Frame of frame-type storage battery tour bus
CN207030805U (en) Purlin car is moved in portable maintenance for sack cleaner
CN206800084U (en) The briquetting component of shield machine track
CN105253157A (en) Mounting method for air duct external flange of rail vehicle
CN202294836U (en) Air conditioner platform on car roof
CN202954266U (en) Novel rail transit vibration isolation floating ballast bed precast slab
CN110406548A (en) A kind of pipeline transportation tool line system
CN107916936A (en) A kind of major diameter one-tunnel two-tracks subway tunnel and its construction method
CN207435823U (en) Empty iron commutation switch mechanism
CN207405422U (en) One kind is for the hundred meters long rail transport fixing device of subway route
CN108756903A (en) A kind of shield machine crosses the construction method of well
CN209493863U (en) It is a kind of to use stable and rail traffic sound barrier easy for installation
CN205149875U (en) Rail vehicle wind channel outward flange structure
CN107655134A (en) The aeration structure and its design method of a kind of Urban Rail Transit Stations
CN214577047U (en) Steel structure trolley supporting system for station rail top air duct construction
CN105235699B (en) Air ducts of railway vehicle outward flange structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170811

Effective date of abandoning: 20181225

AV01 Patent right actively abandoned