CN206397523U - Adaptive suspension device for tunnel - Google Patents
Adaptive suspension device for tunnel Download PDFInfo
- Publication number
- CN206397523U CN206397523U CN201720038590.6U CN201720038590U CN206397523U CN 206397523 U CN206397523 U CN 206397523U CN 201720038590 U CN201720038590 U CN 201720038590U CN 206397523 U CN206397523 U CN 206397523U
- Authority
- CN
- China
- Prior art keywords
- support column
- hydraulically extensible
- anchor pole
- tunnel
- extensible bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a kind of adaptive suspension device for tunnel, including top plate, bottom plate, support column and some anchor poles, anchor pole and support column are both connected between top plate and bottom plate, support column is connected in the middle of top plate and bottom plate, anchor pole is connected to support column surrounding, support column is the hydraulically extensible structure for filling hydraulic oil, first hydraulically extensible bar of the one end of support column connecting bottom board provided with some connection support columns, first hydraulically extensible bar is tilted towards the ground, and first hydraulically extensible bar be located between adjacent anchor pole, the junction of first hydraulically extensible bar and support column is provided with pressure valve;Anchor pole interlude is reinforcing bar energy-absorbing section.The utility model is simple in construction, gives staff's warning function while convenient and practical when running into emergency situations, and escape space is provided to staff.
Description
Technical field
The utility model is related to civil engineering protective equipment field.
Background technology
With developing rapidly for Geotechnical Engineering, to supporting in the construction of the domain engineerings such as tunnel, water conservancy, mine working
The demand of device is increasing.Tunnel early stage protection almost all be using timber as tunnel and the backing material of working face,
With the appearance of reinforcing bar silicon, start to turn in one's mind the support forms such as block using concrete or armored concrete, these traditional supportings expend big
Amount timber and adopted depth and Lithologic Effects are serious.With the development evolvement of tunnel support technology, traditional supporting can be summarized as
The serial support technology of mode, metallic support support pattern, anchor pole and compound payment technology.
Above-mentioned support pattern respectively has advantage, and there is also a common drawback:When roof fall, stone slump occurs in tunnel or encloses
During the phenomenons such as rock deformation, device damage can be directly resulted in if support apparatus intensity is not enough and staff's life is seriously threatened
Safety.All it is to belong to the emergency situations without sign because falling rocks or surrouding rock deformation occurs in tunnel, and existing protector
Effective reaction and enabling capabilities can not be made to dangerous phenomenon, staff is not made a response quickly, it is impossible to having
Warning is made for staff and escape space is provided in the effect time.
Utility model content
The utility model is intended to provide a kind of adaptive suspension device for tunnel, is existed with solving existing suspension device
During emergency situations, it is impossible to effective reaction and enabling capabilities are made to dangerous phenomenon, staff can not be quickly made instead
Should, it is impossible to the problem of making warning for staff within effective time and escape space is provided.
Base case:The adaptive suspension device for tunnel in this programme, if including top plate, bottom plate, support column and
Dry anchor pole, anchor pole and support column are both connected between top plate and bottom plate, and support column is connected in the middle of top plate and bottom plate, anchor pole connection
In support column surrounding, support column is the hydraulically extensible structure for filling hydraulic oil, if one end of support column connecting bottom board is provided with involvement
First hydraulically extensible bar of logical support column, the first hydraulically extensible bar is tilted towards the ground, and the first hydraulically extensible bar is located at adjacent anchor
Between bar, the junction of the first hydraulically extensible bar and support column is provided with pressure valve;Anchor pole interlude is reinforcing bar energy-absorbing section.
The principle of above-mentioned technical proposal is:This programme is arranged in the tunnel for needing to carry out support action, according to tunnel
Height, inject different amounts of hydraulic oil, support column is adapted to the tunnel of different height, then workman carries out tunnel work
Industry, when running into emergency situations, rock burst, rubble or when caving in, after support column is pressurized, be located at the first hydraulically extensible bar and
The pressure valve of support column junction is suppressed opening, and the first hydraulically extensible bar is propped up, whole suspension device bottom just many one
Pillar is enclosed, now the reinforcing bar energy-absorbing section in anchor pole produces deformation absorption energy while being pressurized, and adapts to the deformation of surrounding.
The effect of above-mentioned technical proposal is:
1st, the support column of hydraulically extensible structure is adapted to the tunnel of different height and used, and flexibility ratio is high, user
Just.
When the 2nd, being suppressed, pressure valve can just be opened, and hydraulic oil enters the first hydraulically extensible bar, promotes the first hydraulically extensible bar
Stretching is supported on ground, and the protection of many weights is provided for the present apparatus, staff's warning function is also given, is provided to staff
Escape space.
3rd, when running into rock burst or when side slope produces large deformation, anchor pole can absorb energy by the deformation of itself,
The deformation of adaptive country rock, the support capacity of effective guarantee anchor pole.To common ground supporting, slope retaining, tunnel rock burst etc.
Burst fire-disaster can play effective buffering and governance role.
Preferred scheme one, as the further optimization to base case, the support column and bottom plate are threaded connection.Support
Post and bottom plate are that threaded connection can be conveniently that hydraulic oil is changed in support column, have ensured the service life of support column.
Preferred scheme two, as the further optimization to preferred scheme one, one end of the support column connection top plate is provided with
With the symmetrical second hydraulically extensible bar of the first hydraulically extensible bar.The present apparatus that is set to of second hydraulically extensible bar provides many weights
Supporting role, be staff safely provide it is many one weight guarantees.
Preferred scheme three, as the further optimization to base case, the quantity of the anchor pole is at least 5.Anchor pole number
Amount at least 5 can be the validity of this suspension device strengthening supporting.
Preferred scheme four, as the further optimization to preferred scheme three, the first hydraulically extensible bar, the second hydraulic pressure are stretched
Contracting bar is corresponding with the quantity of anchor pole.Because the first hydraulically extensible bar and the second hydraulically extensible bar are located at space correspondence between anchor pole
On the support column at place, so quantity is equal, the supporting role of equity is provided for this supporting construction, it is not pressurised generation inclined
Move.
Preferred scheme five, as the further optimization to base case, the reinforcing bar energy-absorbing section is externally provided with outer sleeve, overcoat
Cylinder inwall is provided with screw thread.The setting of outer sleeve can be when anchor pole energy-absorbing section be pulled off, and the inner thread of outer sleeve can connect
Anchor pole reinforcing bar is connect, continues to ensure the validity of suspension roof support by the snap-in force between bush whorl and anchor pole screw thread steel.
Brief description of the drawings
Fig. 1 is the sectional view of the utility model embodiment.
Embodiment
The utility model is described in further detail below by embodiment:
Reference in Figure of description includes:Top plate 1, bottom plate 2, support column 3, anchor pole 4, the first hydraulically extensible bar 5,
The 6, second hydraulically extensible bar 7 of reinforcing bar energy-absorbing section, outer sleeve 8.
Embodiment is substantially as shown in Figure 1:For the adaptive suspension device in tunnel, top plate 1, branch are set gradually from top to bottom
Dagger 3, bottom plate 2 and some anchor poles 4, anchor pole 4 and support column 3 are both connected between top plate 1 and bottom plate 2, and support column 3 is connected to top
In the middle of plate 1 and bottom plate 2, support column 3 is the hydraulically extensible structure for filling hydraulic oil, and support column 3 and bottom plate 2 are threaded connection, side
Just to change hydraulic oil in support column 3, the service life of support column 3 has been ensured.
Anchor pole 4 is connected to around support column 3, around support column 3, is linked up in a ring, and the one of the connecting bottom board 2 of support column 3
First hydraulically extensible bar 5 of the end provided with some connection support columns 3, the first hydraulically extensible bar 5 is tilted towards the ground, and support column 3 is connected
One end of top plate 1 is provided with and the symmetrical second hydraulically extensible bar 7 of the first hydraulically extensible bar 5, the first hydraulically extensible bar 5 and the second liquid
Pressure expansion link 7 is each provided on the support column 3 of the space corresponding position between adjacent anchor pole 4, the first hydraulically extensible bar 5, the second hydraulic pressure
The junction of expansion link 7 and support column 3 is equipped with pressure valve;First hydraulically extensible bar 5, the second hydraulically extensible bar 7 and anchor pole 4
Quantity is 5, and the interlude of anchor pole 4 is reinforcing bar energy-absorbing section 6, and reinforcing bar energy-absorbing section 6 is externally provided with outer sleeve 8, and the inwall of outer sleeve 8 is provided with
Screw thread, reinforcing bar energy-absorbing section 6 is the helical structure with elasticity.
This programme is arranged in the tunnel for needing to carry out support action, according to the height in tunnel, different amounts of liquid is injected
Force feed, makes support column 3 be adapted to the tunnel of different height, and then workman carries out tunneling operation, when running into emergency situations, rock
Quick-fried, rubble or when caving in, after support column 3 is pressurized, is located at the first hydraulically extensible bar 5, the second hydraulically extensible bar 7 and branch
The pressure valve of the junction of dagger 3 is suppressed opening, the first hydraulically extensible bar 5 and the second hydraulically extensible bar 7 is overhanged, whole supporting
The just many circle pillars in bottom of device and top, now, anchor pole 4 can absorb energy by the deformation of itself, adaptively enclose
The deformation of rock, the support capacity of effective guarantee anchor pole 4.To burst fire-disasters such as common ground supporting, slope retaining, tunnel rock bursts
Effective buffering and governance role can be played, when the energy-absorbing of anchor pole 4 section is pulled off, the inner thread of outer sleeve 8 can be connected
The reinforcing bar of anchor pole 4, continues to ensure the validity of the supporting of anchor pole 4 by the snap-in force between bush whorl and the screw thread steel of anchor pole 4.
Above-described is only that the known general knowledge such as concrete structure and characteristic is herein in embodiment of the present utility model, scheme
Excessive description is not made.It should be pointed out that for those skilled in the art, not departing from the premise of the utility model structure
Under, several modifications and improvements can also be made, these should also be considered as protection domain of the present utility model, and these are all without influence
Effect and practical applicability that the utility model is implemented.This application claims protection domain should be with the content of its claim
It is defined, embodiment in specification etc. records the content that can be used for explaining claim.
Claims (6)
1. the adaptive suspension device for tunnel, it is characterised in that including top plate(1), bottom plate(2), support column(3)With it is some
Anchor pole(4), anchor pole(4)And support column(3)It is both connected to top plate(1)And bottom plate(2)Between, support column(3)It is connected to top plate(1)
And bottom plate(2)Centre, anchor pole(4)It is connected to support column(3)Around, support column(3)To fill the hydraulically extensible structure of hydraulic oil,
Support column(3)Connecting bottom board(2)One end be provided with some connection support columns(3)The first hydraulically extensible bar(5), the first hydraulic pressure stretches
Contracting bar(5)It is tilted towards the ground, and the first hydraulically extensible bar(5)It is located at adjacent anchor pole(4)Between, the first hydraulically extensible bar(5)With
Support column(3)Junction be provided with pressure valve;Anchor pole(4)Interlude is reinforcing bar energy-absorbing section(6).
2. the adaptive suspension device according to claim 1 for tunnel, it is characterised in that the support column(3)With
Bottom plate(2)For threaded connection.
3. the adaptive suspension device according to claim 2 for tunnel, it is characterised in that the support column(3)Even
Connect top plate(1)One end be provided with and the first hydraulically extensible bar(5)Symmetrical second hydraulically extensible bar(7).
4. the adaptive suspension device according to claim 1 for tunnel, it is characterised in that the anchor pole(4)Number
Amount is at least 5.
5. the adaptive suspension device according to claim 4 for tunnel, it is characterised in that first hydraulically extensible
Bar(5), the second hydraulically extensible bar(7)And anchor pole(4)Quantity it is corresponding.
6. the adaptive suspension device according to claim 1 for tunnel, it is characterised in that the reinforcing bar energy-absorbing section
(6)It is externally provided with outer sleeve(8), outer sleeve(8)Inwall is provided with screw thread.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720038590.6U CN206397523U (en) | 2017-01-13 | 2017-01-13 | Adaptive suspension device for tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720038590.6U CN206397523U (en) | 2017-01-13 | 2017-01-13 | Adaptive suspension device for tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206397523U true CN206397523U (en) | 2017-08-11 |
Family
ID=59514233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720038590.6U Expired - Fee Related CN206397523U (en) | 2017-01-13 | 2017-01-13 | Adaptive suspension device for tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206397523U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503763A (en) * | 2017-09-29 | 2017-12-22 | 绵阳头坝科技有限公司 | Mine bracing means is used in one kind mining |
CN113250705A (en) * | 2021-06-28 | 2021-08-13 | 重庆工程职业技术学院 | Multi-arch tunnel construction method |
CN113622946A (en) * | 2021-09-17 | 2021-11-09 | 浙江省交通运输科学研究院 | Buffering energy-absorbing support composite structure |
-
2017
- 2017-01-13 CN CN201720038590.6U patent/CN206397523U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503763A (en) * | 2017-09-29 | 2017-12-22 | 绵阳头坝科技有限公司 | Mine bracing means is used in one kind mining |
CN113250705A (en) * | 2021-06-28 | 2021-08-13 | 重庆工程职业技术学院 | Multi-arch tunnel construction method |
CN113250705B (en) * | 2021-06-28 | 2023-10-20 | 重庆工程职业技术学院 | Multi-arch tunnel construction method |
CN113622946A (en) * | 2021-09-17 | 2021-11-09 | 浙江省交通运输科学研究院 | Buffering energy-absorbing support composite structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206397523U (en) | Adaptive suspension device for tunnel | |
JP7477710B2 (en) | Tertiary preventive control method for mountain jump tunnels | |
CN110318761B (en) | Construction method for controlling roadway deformation | |
CN102418538B (en) | High-speed energy absorption anti-impact retreat hydraulic support for coal mine | |
Wang et al. | Failure mechanism and control technology of longwall coalface in large-cutting-height mining method | |
CN103643979A (en) | Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support | |
CN201687496U (en) | Four-column straight-guidebar wall retaining type filling hydraulic bracket | |
CN106677804B (en) | A kind of gob side entry retaining roadside support system and its construction method | |
CN107939427A (en) | A kind of energy-absorbing anti-seismic anchor rod | |
CN206800424U (en) | A kind of slope of highway securing device | |
CN103758529A (en) | Coal mine gob-side entry retaining side supporting method | |
CN102720498A (en) | Gob-side entry retaining mining process for coal face | |
CN206129285U (en) | Deep soft rock roadway under high stress crossover point supporting construction | |
CN207229125U (en) | A kind of thrust device for being exclusively used in concrete filled steel tube pier stud | |
CN103424045A (en) | Supporting method for blasting preventive facility of deep-foundation-pit lithosphere | |
CN208153054U (en) | A kind of filling bag body and supporting packed column | |
CN206129286U (en) | Deep soft rock roadway under high stress high strength support | |
CN205778957U (en) | A kind of delayed section of support system of workings subject to dy namic pressure | |
CN103306697A (en) | Three-column paste body filling hydraulic bracket for underground thin coal seam and four-step paste body filling process | |
CN206129303U (en) | Great mining height rib wall caving reinforcing apparatus | |
CN205297608U (en) | Novel recoverable stock of hydraulic pressure inflation formula | |
CN208950614U (en) | Breaking surrounding rock suspension device | |
CN208749373U (en) | A kind of Tunnel Gushing disposal plant | |
CN208201773U (en) | A kind of Novel tailing filling fabricform damming device | |
CN214423297U (en) | Protective structure of hydraulic and hydroelectric engineering side slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20190113 |