CN206397452U - A kind of novel holing receives slag device - Google Patents
A kind of novel holing receives slag device Download PDFInfo
- Publication number
- CN206397452U CN206397452U CN201720058882.6U CN201720058882U CN206397452U CN 206397452 U CN206397452 U CN 206397452U CN 201720058882 U CN201720058882 U CN 201720058882U CN 206397452 U CN206397452 U CN 206397452U
- Authority
- CN
- China
- Prior art keywords
- reducer union
- collecting hood
- mud
- drilling rod
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002893 slag Substances 0.000 title claims abstract description 18
- 239000003638 chemical reducing agent Substances 0.000 claims abstract description 23
- 238000005553 drilling Methods 0.000 claims abstract description 16
- 239000000428 dust Substances 0.000 abstract description 10
- 239000000843 powder Substances 0.000 abstract description 5
- 239000002689 soil Substances 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 238000000151 deposition Methods 0.000 abstract description 3
- 238000001556 precipitation Methods 0.000 abstract description 3
- 238000004062 sedimentation Methods 0.000 abstract description 3
- 230000007613 environmental effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 238000004140 cleaning Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Landscapes
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The utility model belongs to the novel holing used in building machinery scope, especially base pit engineering and slope project and receives slag device.It is that collecting hood is installed in the aperture of centralizer, and collecting hood upper end is a bent-tube boiler reducer union, and reducer union side is provided with drilling rod hole.Clip is installed, slag pipeline is received in reducer union end mounting flange, flange connection in the reducer union.The utility model has an advantageous effect in that:1st, the utility model is simple in construction, easy to install.2nd, collecting hood press-in ground; collecting hood can cover drill bit and drilling rod; so as to the drilling of closed drilling rod; prevent dust and mud from leaking outside; soil, powder ash and mud by receive the collecting hood of slag device, reducer union guide functions; sedimentation basin is smoothly flowed into by receiving slag pipeline, the precipitation of depositing dust and mud is carried out, so as to play environmental protection and the healthy effect of protection operating personnel.
Description
Technical field
The utility model belongs to the drilling equipment used in building machinery scope, especially base pit engineering and slope project.
Background technology
Increased with the investment of economic development and infrastructure, base pit engineering and slope project are required for anchor pole, anchor cable work
Journey.Anchor pole, anchorage cable engineering need advance drilling, in boring procedure, can constantly produce many dust and mud, so can be to ring
Border and the healthy of operating personnel cause serious harm.
In order to solve the dust and the mud splashing diffusion that are produced in drill process, in the urgent need to a kind of novel device, use
The dust and mud produced in collection drill process.
The content of the invention
Problem to be solved in the utility model is not enough aiming at more than and the simple in construction, side of installing and using of open one kind
Just, the device of dust and mud can be collected in anchor pole, anchorage cable engineering boring procedure.Its technical scheme is as follows:
It is that collecting hood is installed in the aperture of centralizer, and collecting hood upper end is a bent-tube boiler reducer union, reducer union
Side is provided with drilling rod hole.
Clip is installed, slag pipeline is received in reducer union end mounting flange, flange connection in the reducer union.
Compared with prior art, the utility model has an advantageous effect in that:
1st, the utility model is simple in construction, easy to install.
2nd, collecting hood press-in ground, collecting hood can cover drill bit and drilling rod, so that closed drilling rod drills, prevent dust and
Mud leaks outside, soil, powder ash and mud by receive the collecting hood of slag device, reducer union guide functions, by receiving slag pipe
Road smoothly flows into sedimentation basin, carries out the precipitation of depositing dust and mud, so as to play environmental protection and protect operating personnel's body to be good for
The effect of health.
3rd, reducer union uses clamp connection, if reducer union is blocked, and quickly can unload clip, clears up reducing
The collection slag of joint, then be reinstalled, it is continuing with, saves the working time, accelerates duration progress.
Brief description of the drawings
Fig. 1, is the utility model structural representation;
Fig. 2, is the utility model use state figure.
Embodiment
Referring to Fig. 1, Fig. 2, the utility model is the installation collecting hood 1 in the aperture of centralizer 2, and the upper end of collecting hood 1 is one
Bent-tube boiler reducer union 3, the side of reducer union 3 is provided with drilling rod hole.
Clip 4 is installed, slag pipeline 9 is received in the end mounting flange 5 of reducer union 3, the connection of flange 5 in the reducer union 3.
As shown in Figure 1 and Figure 2, (former righting is replaced in use, centralizer 2 is directly installed on the travelling arm of jumbolter
Device), travelling arm is adjusted, design punch position can be reached;Drilling rod hole at the insertion reducer union of drilling rod 8.Rig is adjusted, will be received
Collection cover 1 is pressed into ground, and collecting hood 1 can cover drill bit and drilling rod, so that closed drilling rod drills, prevents dust and mud from leaking outside.
Air compressor machine pipeline 6 connects air compressor machine during work, and inputs to Roofbolt drill rod 8 air of certain air pressure, air by anchor pole inside
Air vent, into band impactor drill bit 11, makes impactor work, is drilled, while air pressure is grey by the soil for the cutting that drills, powder
And mud is brought into the outer wall of drilling rod and the hole on ground.Because air compressor machine gas is constantly inputted, soil, powder ash and mud
Slurry will be impacted inside receipts slag device, by receive the collecting hood of slag device, reducer union guide functions, soil, powder ash with
And mud smoothly flows into sedimentation basin 10 by the receipts slag pipeline 9 being connected with flange 5, carries out the precipitation of depositing dust and mud.Reducing
Joint 3 is connected using clip 4, if reducer union is blocked, quickly can be unloaded clip 4, the collection at cleaning reducer union
Slag, then be reinstalled, it is continuing with.
7 be drill rod connector in figure.
Claims (2)
1. a kind of novel holing receives slag device, it is characterized in that installing collecting hood (1), collecting hood (1) in the aperture of centralizer (2)
Upper end is a bent-tube boiler reducer union (3), and reducer union (3) side is provided with drilling rod hole.
2. novel holing receives slag device according to claim 1, it is characterized in that installing clip (4), reducing in reducer union (3)
Slag pipeline (9) is received in joint (3) end mounting flange (5), flange (5) connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720058882.6U CN206397452U (en) | 2017-01-17 | 2017-01-17 | A kind of novel holing receives slag device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720058882.6U CN206397452U (en) | 2017-01-17 | 2017-01-17 | A kind of novel holing receives slag device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206397452U true CN206397452U (en) | 2017-08-11 |
Family
ID=59519702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720058882.6U Expired - Fee Related CN206397452U (en) | 2017-01-17 | 2017-01-17 | A kind of novel holing receives slag device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206397452U (en) |
-
2017
- 2017-01-17 CN CN201720058882.6U patent/CN206397452U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101446178B (en) | Wind pressure air drilling equipment in downhole soft outbursting coal bed and process matched therewith | |
CN102147033B (en) | Non-excavation directional traversing construction method for thermal power pipeline | |
CN104481580B (en) | A kind of down-hole coal bed mash gas pumping drilling restorative procedure and the device of use thereof | |
CN103147708A (en) | Through type down hole hammer reverse circulation drilling dust collection device | |
CN200949476Y (en) | Gas drainage drilling slag removal dust removal device | |
CN107542093B (en) | Bottom cleaning method for punched cast-in-place pile | |
CN108150109A (en) | A kind of dust protected adopts mining-drilling machine | |
CN201560795U (en) | Apparatus for controlling dust with wind as medium during boring construction for gas drainage | |
CN108180313A (en) | 360 ° of full circle swinging Circular Shaft pipe-rocking machines and construction | |
CN203296725U (en) | Through type DTH hammer reverse circulation drilling dust collecting device | |
CN206438526U (en) | Deep basal pit tube well dewatering equipment | |
CN206753527U (en) | A kind of comprehensive coal dust collection device of coal mine drilling | |
CN201137152Y (en) | Sealed multi-tube strata precipitation device | |
CN206397452U (en) | A kind of novel holing receives slag device | |
CN106623388A (en) | Novel extraction dropping pipe applied to multiphase extraction device and control method of novel extraction dropping pipe | |
CN204402406U (en) | A kind of down-hole coal bed mash gas pumping drilling prosthetic device | |
CN206917623U (en) | A kind of Luoyang Spade inspecting hole sediment outflow equipment | |
CN208203184U (en) | A kind of hole pumping and mining dust-extraction unit | |
CN102966376B (en) | Vacuum negative pressure quick unwatering method for ore body | |
CN210858621U (en) | Orifice dust collecting device | |
CN209780950U (en) | Automatic integrated device that discharges of coal seam gas drainage and drilling ponding | |
CN201771432U (en) | Bore hole cleaner | |
CN207634047U (en) | A kind of anti-float anchor rod receipts slag device for reducing dust | |
CN213331173U (en) | Drilling orifice gas drainage cross | |
CN205858252U (en) | A kind of coring boring blowout prevention aperture apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 |
|
CF01 | Termination of patent right due to non-payment of annual fee |