CN206397179U - A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting - Google Patents

A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting Download PDF

Info

Publication number
CN206397179U
CN206397179U CN201720004668.2U CN201720004668U CN206397179U CN 206397179 U CN206397179 U CN 206397179U CN 201720004668 U CN201720004668 U CN 201720004668U CN 206397179 U CN206397179 U CN 206397179U
Authority
CN
China
Prior art keywords
steel
base
correcting
support beam
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720004668.2U
Other languages
Chinese (zh)
Inventor
唐明金
魏虎明
陈海龙
郭平俊
徐志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Power Water Conservancy Project Machinery Co Ltd In Gansu
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Water Power Water Conservancy Project Machinery Co Ltd In Gansu
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Water Power Water Conservancy Project Machinery Co Ltd In Gansu, Sinohydro Engineering Bureau 4 Co Ltd filed Critical Water Power Water Conservancy Project Machinery Co Ltd In Gansu
Priority to CN201720004668.2U priority Critical patent/CN206397179U/en
Application granted granted Critical
Publication of CN206397179U publication Critical patent/CN206397179U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting;It include base, the hydraulic jack being arranged in the middle part of base, be arranged on hydraulic jack piston rod top support beam, be symmetricly set on hydraulic jack both sides and the auxiliary height-regulating device being connected simultaneously with support beam and base;It is described auxiliary height-regulating device include be fixedly installed on base short column, be adapted with short column and be movably connected in the auxiliary conditioning unit in support beam;The auxiliary conditioning unit includes the inner screw sheath being fixedly connected with support beam, the regulating sleeve coordinated with inner screw sheath screw thread, and the regulating sleeve is adapted with the short column;The top of the regulating sleeve is provided with the steel pad that can be circumferentially rotated with respect to its axle center, the excircle of regulating sleeve and is provided with adjustment hole;The utility model reasonable in design, easy to use, simple operation can realize the quick corrective operations of steel structure column, can improve operating efficiency, save fund input.

Description

A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting
Technical field
The utility model belongs to the apparatus for correcting in steel lattice column construction in the realm of building construction, and in particular to Yi Zhonggang Structure workshop pre-buried steel structure column apparatus for correcting.
Background technology
, it is necessary to lift steel lattice column in steel-structure factory building work progress, when steel structure column is lifted using pre-buried mode Need that the absolute altitude and perpendicularity of steel structure column is adjusted, to meet code requirement;Existing mode of operation is large-scale Four ox pin are welded on steel structure column, four jack are placed between ox pin and cement ground, by adjusting four jack To realize the absolute altitude of steel structure column and the regulation of perpendicularity, absolute altitude and perpendicularity meet poured concrete after specification, treat concrete Intensity removes jack again after reaching more than 70%;But problems with is primarily present in actual mechanical process:1st, steel structure column Quantity of constructing is more, it will uses substantial amounts of jack, adds fund input;2nd, four jack have four regulation thick sticks Bar, it is operated during adjusting wastes time and energy, inefficiency;3rd, the jack positioned at the same side can not realize synchronous adjustment, The side steel structure verticality of stand column is easily influenceed, it is necessary to repetition measurement is adjusted again, influences construction speed.
Utility model content
The purpose of this utility model be for problems of the prior art there is provided a kind of reasonable in design, use Steel-structure factory building pre-buried steel structure column apparatus for correcting simple and convenient, that operating efficiency can be improved.
The technical solution adopted in the utility model is to achieve the above object:
A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting, including base, the hydraulic jack that is arranged in the middle part of base Push up, be arranged on the support beam on the piston rod top of hydraulic jack, be symmetricly set on hydraulic jack both sides and simultaneously with support The auxiliary height-regulating device that beam is connected with base;
Further, the auxiliary height-regulating device includes being fixedly installed on base short column, be adapted with short column and It is movably connected in the auxiliary conditioning unit in support beam;
Further, the auxiliary conditioning unit includes the inner screw sheath being fixedly connected with support beam and inner screw sheath screw thread The regulating sleeve of cooperation, the regulating sleeve is adapted with the short column;
Further, the top of the regulating sleeve is provided with the steel pad that can be circumferentially rotated with respect to its axle center, regulating sleeve Adjustment hole is provided with excircle;
Further, the locking device of fixed hydraulic jack is provided with the middle part of the base;
Further, the locking device includes the arc protection walls being fixedly installed on base and the top being disposed thereon Silk.
In the utility model, inner screw sheath and short column can be arranged to can opposing hydraulic jack draw close and remote Structure, to meet the spacing between ox pin;Its concrete structure can be:The two ends of support beam set the first slideway, internal thread Set is clamped in the first slideway and can slid along;Short column bottom sets and sets the second slideway on slide, base, and slide can Slid on slideway, the jackscrew that can be positioned to slide is provided with the second slideway.
The beneficial effects of the utility model are:
1st, the utility model is acted in support beam by hydraulic jack, and support beam is by regulating sleeve by steel structure column On ox pin jack-up;It is the synchronous adjustment that two ox pin of homonymy can be achieved by a jack, jack usage amount can be saved, Saving fund, meanwhile, its effect being adjusted in synchronism reduces operation regulation difficulty, improves operating efficiency;
2nd, the cooperation of regulating sleeve and inner screw sheath realizes the regulation at single ox placement of foot, is adjusted beneficial to perpendicularity Operation;
3rd, the cooperation of short column and regulating sleeve can slow down active force of the steel structure column to support beam, and it is by short column By correcting the path implementation of regulating sleeve, it can so increase the security that the device is used.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is Fig. 1 side structure schematic view;
Fig. 3 removes the structural representation after hydraulic jack for A-A directions in Fig. 1.
Wherein:1- bases;2- hydraulic jacks;3- support beams;The short columns of 4-;5- inner screw sheaths;6- regulating sleeves;7- steel Pad;8- adjustment holes;9- arc protection walls;10- jackscrews.
Embodiment
The utility model preferred embodiment is illustrated below in conjunction with accompanying drawing:
As shown in Figures 1 to 3, a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting, including base 1, it is arranged on base 1 The hydraulic jack 2 at middle part, be arranged on hydraulic jack 2 piston rod top support beam 3, be symmetricly set on hydraulic jack 2 both sides and the auxiliary height-regulating device being connected simultaneously with support beam 3 and base 1;The auxiliary height-regulating device includes being fixedly installed Short column 4 on base 1, the auxiliary conditioning unit for being adapted and being movably connected in support beam 3 with short column 4;It is described auxiliary Adjusting means is helped to include the inner screw sheath 5 being fixedly connected with support beam 3, the regulating sleeve 6 coordinated with the screw thread of inner screw sheath 5, institute Regulating sleeve 6 is stated to be adapted with the short column 4;The top of the regulating sleeve 6, which is provided with, to be circumferentially rotated with respect to its axle center Steel pad 7, be provided with adjustment hole 8 on the excircle of regulating sleeve 6;The middle part of base 1 is provided with fixed hydraulic jack 2 Locking device;The locking device includes the arc protection walls 9 being fixedly installed on base 1 and the jackscrew 10 being disposed thereon.
Operating instruction and principle:The manual hand manipulation of hydraulic jack 2, it is up that hydraulic jack 2 holds support beam 3, position Regulating sleeve 6 in the two ends of support beam 3 can hold two ox pin of the steel structure column side by steel pad 7;Inserted and adjusted by lever Rotation in knothole 8 can drive regulating sleeve 6 to be moved up and down with respect to inner screw sheath 5, and then realize that single ox pin holds the height of side Degree regulation;Wherein steel pad 7 and the contact surface coefficient of friction of regulating sleeve 6 is small, the regulation of conveniently adjusted sleeve 6 operation, also can be Reasoning ball bearing is added between steel pad 7 and regulating sleeve 6 to set rub resistance and the small pad of coefficient of friction also or smear Lubricant grease;The short rectifiable moving track of regulating sleeve 6 of column, reduction steel structure column are applied in support beam 3 by ox pin Active force;Locking device can realize the locking of hydraulic jack 2, fix and position effect increase safety in utilization, be easy to simultaneously Transport.
The utility model actual operation method:Two are placed at the rim of a cup of cement ground for needing pre-buried steel structure column The individual device, is intended to first that the steel pad 7 on the top of regulating sleeve 6 is levelling, and outside is passed through after the ox pin contact steel pad 7 of steel structure column Survey tool detects absolute altitude and perpendicularity, realizes that correction is adjusted by the corresponding operating of the lever in hydraulic jack 2 and adjustment hole 8 Section;The adjustable operation of adjustment hole 8 preferentially is realized in regulation correcting process, so follow-up associative operation can pass through hydraulic jack Push up 2 quick and synchronous realizations, it is laborsaving it is time saving, operating efficiency, reduction operation difficulty can be improved.
Base 1 and support beam 3 can be using square steel and the junction steel plate for being connected to square steel support in the utility model Constitute, it would however also be possible to employ other specific body structures.
Finally it should be noted that:The preferred embodiment of utility model is the foregoing is only, practicality is not limited to It is new, although utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art, its The technical scheme described in foregoing embodiments can still be modified, or which part technical characteristic is equal Replace.All spirit in utility model is with principle, and any modification, equivalent substitution and improvements made etc. should be included in reality Within new protection domain.

Claims (6)

1. a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting, it is characterised in that:Including base (1), it is arranged on base (1) The hydraulic jack (2) at middle part, be arranged on hydraulic jack (2) piston rod top support beam (3), be symmetricly set on hydraulic pressure Jack (2) both sides and the auxiliary height-regulating device being connected simultaneously with support beam (3) and base (1).
2. a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting as claimed in claim 1, it is characterised in that:The auxiliary Height-regulating device include be fixedly installed on base (1) short column (4), be adapted with short column (4) and be movably connected in support Auxiliary conditioning unit on beam (3).
3. a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting as claimed in claim 2, it is characterised in that:The auxiliary Adjusting means includes the inner screw sheath (5) being fixedly connected with support beam (3), the regulating sleeve coordinated with inner screw sheath (5) screw thread (6), the regulating sleeve (6) is adapted with the short column (4).
4. a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting as claimed in claim 3, it is characterised in that:The regulation The top of sleeve (6) is provided with the steel pad (7) that can be circumferentially rotated with respect to its axle center, the excircle of regulating sleeve (6) and is provided with Adjustment hole (8).
5. a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting as described in any one of Claims 1-4, its feature exists In:The locking device of fixed hydraulic jack (2) is provided with the middle part of the base (1).
6. a kind of steel-structure factory building pre-buried steel structure column apparatus for correcting as claimed in claim 5, it is characterised in that:The locking Device includes the arc protection walls (9) being fixedly installed on base (1) and the jackscrew (10) being disposed thereon.
CN201720004668.2U 2017-01-04 2017-01-04 A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting Expired - Fee Related CN206397179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720004668.2U CN206397179U (en) 2017-01-04 2017-01-04 A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720004668.2U CN206397179U (en) 2017-01-04 2017-01-04 A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting

Publications (1)

Publication Number Publication Date
CN206397179U true CN206397179U (en) 2017-08-11

Family

ID=59516839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720004668.2U Expired - Fee Related CN206397179U (en) 2017-01-04 2017-01-04 A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting

Country Status (1)

Country Link
CN (1) CN206397179U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107339578A (en) * 2017-08-29 2017-11-10 辽宁鑫丰矿业(集团)有限公司 Height-adjustable door frame and Coal Transport equipment
CN108678396A (en) * 2018-05-31 2018-10-19 湖北沛函建设有限公司 The base construction of lift-on/lift-off type building-supporting device
CN111673003A (en) * 2020-04-27 2020-09-18 河北省送变电有限公司 Adjustable pipe corrector suitable for multiple section wires

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107339578A (en) * 2017-08-29 2017-11-10 辽宁鑫丰矿业(集团)有限公司 Height-adjustable door frame and Coal Transport equipment
CN108678396A (en) * 2018-05-31 2018-10-19 湖北沛函建设有限公司 The base construction of lift-on/lift-off type building-supporting device
CN108678396B (en) * 2018-05-31 2021-03-26 湖北绿筑装配科技有限公司 Base structure of hoisting type building supporting device
CN111673003A (en) * 2020-04-27 2020-09-18 河北省送变电有限公司 Adjustable pipe corrector suitable for multiple section wires

Similar Documents

Publication Publication Date Title
CN206397179U (en) A kind of steel-structure factory building pre-buried steel structure column apparatus for correcting
CN205590250U (en) Movable support for construction
CN203793390U (en) Mobile car for mounting guide rail rack
CN107309363A (en) A kind of civil engineering steel bar bending apparatus of angle adjustable
CN205114934U (en) Jacking device for civil engineering
CN106287105B (en) A kind of large-scale pipeline internal installation device
CN106121216B (en) The lower support device that hand wheel type on-line continuous for hydraulic climbing die block system is adjusted
CN203592268U (en) Large pipe welding platform
CN205152804U (en) Jacking device for civil engineering
CN202829453U (en) Lift used for arch camber of motor-driven center pivot sprinkling machine
CN207086611U (en) Head mobile hydraulic straightener
CN208284917U (en) A kind of fast power-saving cable laying auxiliary device
CN207724285U (en) The integral marking tooling of piston rod
CN212077657U (en) Walking pushing device
CN115749368A (en) Wall body supporting device with adjustable
CN211058378U (en) Strutting arrangement for building
CN203008940U (en) Hydraulic support capable of adjusting height of operating valve
CN208280657U (en) support frame for building
CN207618713U (en) A kind of film roll shifting material seat
CN207010040U (en) High-tension switch cabinet implement
CN219991052U (en) Building construction bears device
CN206722418U (en) A kind of transportable trowelling machine
CN204782057U (en) Convenient constructional steel that removes constructs lift strutting arrangement
CN220591390U (en) Steel bar bending machine
CN105252041A (en) Portable assistance supporting frame suitable for overhead operation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811

Termination date: 20200104

CF01 Termination of patent right due to non-payment of annual fee