CN206391810U CN201621476769.1U CN201621476769U CN206391810U CN 206391810 U CN206391810 U CN 206391810U CN 201621476769 U CN201621476769 U CN 201621476769U CN 206391810 U CN206391810 U CN 206391810U
Authority
CN
China
Prior art keywords
emission
control equipment
casing
barrier plate
absorption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621476769.1U
Other languages
Chinese (zh)
Inventor
凌新珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Yuxin Purification Engineering Co Ltd
Original Assignee
Dongguan Yuxin Purification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Yuxin Purification Engineering Co Ltd filed Critical Dongguan Yuxin Purification Engineering Co Ltd
Priority to CN201621476769.1U priority Critical patent/CN206391810U/en
Application granted granted Critical
Publication of CN206391810U publication Critical patent/CN206391810U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model is related to a kind of emission-control equipment, and for the purification of waste gas, emission-control equipment includes casing, some barrier plates, some spray assemblies, water mist separator and tank;Casing is divided into absorption chamber and drain chamber, and absorption chamber is provided with some air inlet pipe, and air inlet pipe is connected with absorption chamber;Barrier plate is provided with some through holes, and through hole is distributed in irregular alignment;Spray assemblies include feed pipe, water pump and shower group, and shower group is set in arranged distribution from top to bottom;Water mist separator is made up of some Z-shaped plates, and gas passage is formed between adjacent Z-shaped plate so that casing interior air-flow circulates.Absorption of the above-mentioned emission-control equipment by spray assemblies to waste gas; and multiple stop is carried out by barrier plate and water mist separator; to increase the time of contact of waste gas and water; water is set to absorb toxic gas and flying dust in waste gas; dust removal and filtration effect is good; it can be recycled by tank reclaimed water, reduce waste, it is very environmentally friendly, simple in construction.

Description

Emission-control equipment
Technical field
The utility model is related to dust-free workshop and installs improvement project field, more particularly to a kind of emission-control equipment.
Background technology
Exhaust-gas treatment is primarily referred to as the industrial waste gas that produces for industrial site such as dust particle, flue gas flue dust, different The work that taste gas, toxic and harmful gas are administered.Common exhaust-gas treatment has factory's fume and exhaust gas purifying, workshop dust to give up Gas purification, organic waste-gas purification, the purification of waste gas peculiar smell, acid-base waste gas purifying, purification of chemical waste gas etc..Because waste gas is to air Pollution is very serious, has formulated strict requirements for the exhaust-gas treatment environmental administration in chemical plant, it is desirable to which each factory processes are up to standard After could be discharged.Conventional processing technique includes water absorption method, aeration type activated sludge deodorization method, multimedium catalysis oxidation work Skill.In general plant produced, conventional processing method is to use chemical absorption method, and absorption process operation is difficult, expensive, easily to ring Second of pollution is caused in border, influences health.Not yet there is preferable processing method at present.
Utility model content
Based on this, it is necessary to which there is provided a kind of emission-control equipment, device behaviour for the problem of existing for current conventional art Make simple, expense is low, reduction causes secondary pollution to environment.
In order to realize the purpose of this utility model, the utility model uses following technical scheme:
A kind of emission-control equipment, for the purification of waste gas, the emission-control equipment includes casing, installed in the case Some barrier plates in vivo, some spray assemblies above the barrier plate, the water smoke point in the casing Tank from device and below the casing;The casing is divided into absorption chamber and drain chamber, and the absorption chamber is provided with Some air inlet pipe, the air inlet pipe is located on the side of the absorption chamber and connected with the absorption chamber;Set on the barrier plate There are some through holes, the through hole is distributed in irregular alignment;The spray assemblies include feed pipe, the peace being connected with the tank The shower group being connected with the water pump on the feed pipe and with the feed pipe is filled, the shower group is located at the resistance The top of baffle plate and in arranged distribution from top to bottom set;The water mist separator is arranged on the middle part of the drain chamber, described Water mist separator is made up of some Z-shaped plates, and gas passage is formed between the adjacent Z-shaped plate for the casing interior air-flow stream It is logical.
Above-mentioned emission-control equipment, including casing, some barrier plates in casing, above the barrier plate Some spray assemblies, the water mist separator in casing and the tank below casing.In use, application Waste gas, dust-laden exhaust gas enter in absorption chamber by air inlet pipe, and are guided by air inlet pipe, waste gas is flowed through by barrier plate, spray group Part sprays water smoke and waste gas is filtered, and the water after filtering is flowed into tank.Waste gas and water smoke formation waste gas mist, waste gas mist Guided and entered from outlet is absorbed in drain chamber by barrier plate group again, waste gas mist again passes by water mist separator, carries out aqueous point From, make waste liquid through stop flow into tank in, obtain gas clean after dedusting and discharged by outer discharge pipe.Above-mentioned exhaust-gas treatment dress The absorption to waste gas by spray assemblies is put, and multiple stop is carried out by barrier plate and water mist separator, to increase waste gas and water Time of contact, water is absorbed toxic gas and flying dust in waste gas, dust removal and filtration effect is good, can be circulated by tank reclaimed water Utilize, reduce waste, it is very environmentally friendly, simple in construction.
In one of the embodiments, the barrier plate from the extension of the bottom up of the absorption chamber and with the air inlet pipe It is oppositely arranged.
In one of the embodiments, the barrier plate is in evenly distributed and form barrier plate group, the barrier plate Group is in the low both ends high setting in middle part.
In one of the embodiments, some spiral nozzles are installed to coordinate the barrier plate pair in the shower group Waste gas is absorbed.
In one of the embodiments, absorption outlet is additionally provided with the absorption chamber and maintenance door is absorbed, it is described to absorb Mouth is located at the bottom of the absorption chamber, and the absorption outlet is connected with the drain chamber;The absorption maintenance door is arranged on institute State the one end of absorption chamber.
In one of the embodiments, the tank includes cleaning groove, and the cleaning groove is located at the end of the tank, institute State cleaning groove be provided with dividing plate, discharge outlet and tank maintenance door, the dividing plate from the bottom of gullet outwards, upwardly extend Set, the discharge outlet is located at the side of the cleaning groove.
In one of the embodiments, the drain chamber is provided with outer blast pipe and separator maintenance door, the outer exhaust Pipe is extended to outside the casing, outside of the separator maintenance door located at the top of the water mist separator.
Brief description of the drawings
Fig. 1 is the schematic internal view of the emission-control equipment of the preferred embodiment of the utility model one;
Fig. 2 is the top view of the emission-control equipment shown in Fig. 1;
Fig. 3 is the side view of the emission-control equipment shown in Fig. 1;
Fig. 4 is the enlarged diagram at the A shown in Fig. 3.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings State.Preferred embodiment of the present utility model is given in accompanying drawing.But, the utility model can come real in many different forms It is existing, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to public affairs of the present utility model The understanding for opening content is more thorough comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or can also have element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model The implication that the technical staff in domain is generally understood that is identical.It is herein to be in term used in the description of the present utility model The purpose of description specific embodiment, it is not intended that in limitation the utility model.
Fig. 1 to Fig. 4 is referred to, is the emission-control equipment 100 of a preferred embodiment of the present utility model, for waste gas Purification, the emission-control equipment 100 includes casing 10, some barrier plates 20 in casing 10, installed in barrier plate 20 Some spray assemblies 30 of top, the water mist separator 40 in casing 10 and the tank installed in the lower section of casing 10 50, spray assemblies 30 can carry out prefiltration to coating waste gas, dust-laden exhaust gas, and water mist separator 40 can be carried out again to waste gas Filtering, and be precipitated in tank 50, wait for next step processing.
The casing 10 is used for the installation and fixation of equipment.10 points of the casing is absorption chamber 11 and drain chamber 12, absorption chamber 11 provided with some air inlet pipe 110, absorb maintenance door and absorb outlet, air inlet pipe 110 be located at absorption chamber 11 side on and Connected with absorption chamber 11, the end semicircular in shape of air inlet pipe 110 is set, to guide waste gas to flow from the bottom up, increases waste gas stream Dynamic area.Absorb the one end that maintenance door is arranged on absorption chamber 11, cleaning and maintenance for absorption chamber 11.The bottom of absorption chamber 11 Portion is connected with tank 50, so that waste water energy is flowed into tank 50.Absorb outlet positioned at absorption chamber 11 bottom, absorb outlet with Drain chamber 12 is connected, so that waste gas height enters lower, increases the soak time of waste gas.Drain chamber 12 is provided with outer blast pipe 120, outside Blast pipe 120 is extended to outside casing 10, so that gas is discharged after absorption.
The barrier plate 20 is arranged in absorption chamber 11, for guiding waste gas to flow.The barrier plate 20 is rectangle setting, The bottom up of the self-absorption room 11 of barrier plate 20 extends and is oppositely arranged with air inlet pipe 110, and barrier plate 20 is in evenly distributed And 20 groups of barrier plate is formed to coordinate air inlet pipe 110 to guide waste gas, increase flowing time of the waste gas in absorption chamber 11 It is long.In the present embodiment, the barrier plate group is in the low both ends high setting in middle part.Barrier plate 20 is provided with some through holes 201, through hole 201 in irregular alignment distribution, to increase mobility of the waste gas in absorption chamber 11.
The spray assemblies 30 are arranged on the top of absorption chamber 11, for being sprayed and being absorbed to waste gas.Spray assemblies The spray that 30 feed pipes 31 for including be connected with tank 50, installation are connected with the water pump 32 on feed pipe 31 and with feed pipe 31 Shower pipe group 33, shower group 33 is located at the top of barrier plate 20 and set in arranged distribution from top to bottom, pacifies in shower group 33 Equipped with some spiral nozzles 330 to coordinate barrier plate 20 to absorb waste gas, spiral nozzle 330 can make the water smoke gushed out Obtain projected area increase.Water pump 32 is arranged on the side of tank 50, and the water in tank 50 is recycled.
The water mist separator 40 is arranged on the middle part of drain chamber 12, for being blocked to waste water fog.Water smoke is separated Device 40 is made up of some Z-shaped plates, gas passage is formed between adjacent Z-shaped plate so that the interior air-flow of casing 10 circulates, water smoke is by Z-shaped Plate shape is back in tank 50 into water droplet, and gas is discharged by outer blast pipe 120 after purification.Separator is additionally provided with drain chamber 12 Maintenance door, separator maintenance door is cleaned located at the outside on the top of water mist separator 40 to water mist separator 40.
The tank 50 is arranged on the lower section of casing 10, for holding to the water after coating waste gas, dust-laden exhaust gas filtering.Water Groove 50 includes cleaning groove, and cleaning groove is located at the end of tank 50, and cleaning groove is provided with dividing plate 51, discharge outlet 52 and tank inspection Repair door, dividing plate 51 from the bottom of tank 50 outwards, upwardly extend settings, make sediment in waste water through water flowing by dividing plate 51 every Open, and be trapped in cleaning groove, in order to clear up.Discharge outlet 52 is located at the side of cleaning groove, blowdown during for clearing up.
Above-mentioned emission-control equipment 100, including casing 10, some barrier plates 20 in casing 10, be arranged on Some spray assemblies 30 of the top of barrier plate 20, the water mist separator 40 in casing 10 and under casing 10 The tank 50 of side.In use, coating waste gas, dust-laden exhaust gas enter in absorption chamber 11 by air inlet pipe 110, and by air inlet pipe 110 Guiding, makes waste gas be flowed through by barrier plate 20, and spray assemblies 30 spray water smoke and waste gas is filtered, and the water after filtering is flowed into In tank 50.Waste gas and water smoke formation waste gas mist, waste gas mist by 20 groups of guiding of barrier plate and enter drain chamber from outlet is absorbed again In 12, waste gas mist again passes by water mist separator 40, carries out aqueous separation, waste liquid is flowed into through stopping in tank 50, is removed Clean gas is discharged by outer discharge pipe after dirt.Absorption of the above-mentioned emission-control equipment 100 by spray assemblies 30 to waste gas, And multiple stop is carried out by barrier plate 20 and water mist separator 40, to increase the time of contact of waste gas and water, water is absorbed waste gas In toxic gas and flying dust, dust removal and filtration effect is good, can be recycled by the reclaimed water of tank 50, reduce waste, very It is environmentally friendly, simple in construction.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (7)

1. a kind of emission-control equipment, the purification for waste gas, it is characterised in that the emission-control equipment includes casing, peace Some barrier plates in the casing, some spray assemblies above the barrier plate, installed in the casing Interior water mist separator and the tank below the casing;The casing is divided into absorption chamber and drain chamber, the suction Receive room and be provided with some air inlet pipe, the air inlet pipe is located on the side of the absorption chamber and connected with the absorption chamber;It is described Barrier plate is provided with some through holes, and the through hole is distributed in irregular alignment;The spray assemblies include being connected with the tank Feed pipe, the shower group that is connected with the water pump on the feed pipe and with the feed pipe of installation, the shower group Set positioned at the top of the barrier plate and in arranged distribution from top to bottom;The water mist separator is arranged on the drain chamber Middle part, the water mist separator is made up of some Z-shaped plates, and gas passage is formed between the adjacent Z-shaped plate for the casing Interior air-flow circulates.
2. emission-control equipment according to claim 1, it is characterised in that the barrier plate is from the bottom of the absorption chamber Upwardly extend and be oppositely arranged with the air inlet pipe.
3. emission-control equipment according to claim 2, it is characterised in that the barrier plate is in evenly distributed and shape Into barrier plate group, the barrier plate group is in the low both ends high setting in middle part.
4. emission-control equipment according to any one of claim 1 to 3, it is characterised in that pacify in the shower group Equipped with some spiral nozzles to coordinate the barrier plate to absorb waste gas.
5. emission-control equipment according to claim 1, it is characterised in that be additionally provided with the absorption chamber absorption outlet and Maintenance door is absorbed, the absorption outlet is connected positioned at the bottom of the absorption chamber, the absorption outlet with the drain chamber;Institute State and absorb the one end that maintenance door is arranged on the absorption chamber.
6. emission-control equipment according to claim 1, it is characterised in that the tank includes cleaning groove, the cleaning Groove is located at the end of the tank, and the cleaning groove is provided with dividing plate, discharge outlet and tank maintenance door, and the dividing plate is from institute State bottom of gullet outwards, upwardly extend settings, the discharge outlet is located at the side for clearing up groove.
7. emission-control equipment according to claim 1, it is characterised in that the drain chamber is provided with outer blast pipe and divides From device maintenance door, the outer blast pipe is extended to outside the casing, and the separator maintenance door is located at the water mist separator The outside on top.
CN201621476769.1U 2016-12-29 2016-12-29 Emission-control equipment Expired - Fee Related CN206391810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621476769.1U CN206391810U (en) 2016-12-29 2016-12-29 Emission-control equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621476769.1U CN206391810U (en) 2016-12-29 2016-12-29 Emission-control equipment

Publications (1)

Publication Number Publication Date
CN206391810U true CN206391810U (en) 2017-08-11

Family

ID=59517084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621476769.1U Expired - Fee Related CN206391810U (en) 2016-12-29 2016-12-29 Emission-control equipment

Country Status (1)

Country Link
CN (1) CN206391810U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112500258A (en) * 2020-12-31 2021-03-16 安徽华塑股份有限公司 Slag discharging mechanism special for recycling acetylene in dry acetylene carbide slag

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112500258A (en) * 2020-12-31 2021-03-16 安徽华塑股份有限公司 Slag discharging mechanism special for recycling acetylene in dry acetylene carbide slag
CN112500258B (en) * 2020-12-31 2023-08-15 安徽华塑股份有限公司 Slag discharging mechanism special for recovering acetylene from dry acetylene carbide slag

Similar Documents

Publication Publication Date Title
CN205613230U (en) Fountain air purification device
CN203971651U (en) A kind of rinsing type exhaust gas treating tower
CN206350978U (en) Water revolves waste gas water washing device
CN208660820U (en) A kind of lacquer spraying technique photocatalysis deodorizing device
CN206391736U (en) Whirlwind spray equipment
CN107998789A (en) A kind of combustion tail gas fuel gas and dust processing equipment
CN206355767U (en) Showering sanding apparatus
CN206391810U (en) Emission-control equipment
KR101611538B1 (en) A Scrubber for Collecting Contaminator from Gas with Swirl Generating Structure
CN205867984U (en) Flue gas minimum discharge absorption tower device
CN206391789U (en) Whirlwind spray equipment
CN205825180U (en) Combined type oil smoke of catering industry purifier
CN210874581U (en) Water-saving water curtain dust removal recovery system
CN110038372B (en) Wet purification and dust removal device capable of realizing ultralow emission of particulate matters
CN109519999B (en) Water tank spray type range hood
CN209809809U (en) High-efficient oil smoke treatment facility
CN103438490A (en) Lampblack purifying machine for kitchen
CN208389661U (en) A kind of Tower for purifying waste gas
CN105944547A (en) Absorption tower device with ultralow emission of flue gas and application
CN106268142B (en) A kind of compound efficient wet scrubber and its dust collecting process
CN207307511U (en) Fiberglass stuffing washing tower
CN214715317U (en) High-efficient purification adsorbs to wash deposits filtration cascade cabinet
CN205435276U (en) Flue dust purification device
CN108619841A (en) A kind of second-hand flue gas circulating purifying device in interior
CN2376989Y (en) Combined smoke-eliminating dust-collecting purifying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170811

Termination date: 20191229