CN206391736U - Whirlwind spray equipment - Google Patents
Whirlwind spray equipment Download PDFInfo
- Publication number
- CN206391736U CN206391736U CN201621476768.7U CN201621476768U CN206391736U CN 206391736 U CN206391736 U CN 206391736U CN 201621476768 U CN201621476768 U CN 201621476768U CN 206391736 U CN206391736 U CN 206391736U
- Authority
- CN
- China
- Prior art keywords
- whirlwind
- spray equipment
- absorption
- tank
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model is related to a kind of whirlwind spray equipment, and for the purification of waste gas, whirlwind spray equipment includes absorption tower, tank, whirlwind sleeve pipe, spray assemblies and water mist separator;Absorption tower is divided into the absorption chamber of bottom and the drain chamber on top, and absorption chamber is connected with air inlet pipe, and air inlet pipe is connected with the whirlwind sleeve pipe;Drain chamber includes airway tube, the bottom of airway tube self-discharging room outwards, extend downwardly setting;Whirlwind sleeve pipe is made up of some helix tubes, and helix tube winds airway tube setting from top to bottom;Spray assemblies include water pump, feed pipe and shower group.Above-mentioned whirlwind spray equipment carries out multistage absorption to waste gas by whirlwind sleeve pipe and spray assemblies; and multiple stop is carried out by filler and water mist separator; to increase the time of contact of waste gas and water; water is set to absorb toxic gas and flying dust in waste gas; dust removal and filtration effect is good; it can be recycled by tank reclaimed water, reduce waste, it is very environmentally friendly, simple in construction.
Description
Technical field
The utility model is related to dust-free workshop and installs improvement project field, more particularly to a kind of whirlwind spray equipment.
Background technology
Exhaust-gas treatment is primarily referred to as the industrial waste gas that produces for industrial site such as dust particle, flue gas flue dust, different
The work that taste gas, toxic and harmful gas are administered.Common exhaust-gas treatment has factory's fume and exhaust gas purifying, workshop dust to give up
Gas purification, organic waste-gas purification, the purification of waste gas peculiar smell, acid-base waste gas purifying, purification of chemical waste gas etc..Because waste gas is to air
Pollution is very serious, has formulated strict requirements for the exhaust-gas treatment environmental administration in chemical plant, it is desirable to which each factory processes are up to standard
After could be discharged.Conventional processing technique includes water absorption method, aeration type activated sludge deodorization method, multimedium catalysis oxidation work
Skill.In general plant produced, conventional processing method is to use chemical absorption method, and absorption process operation is difficult, expensive, easily to ring
Second of pollution is caused in border, influences health.Not yet there is preferable processing method at present.
Utility model content
Based on this, it is necessary to which there is provided a kind of whirlwind spray equipment, device behaviour for the problem of existing for current conventional art
Make simple, expense is low, reduction causes secondary pollution to environment.
In order to realize the purpose of this utility model, the utility model uses following technical scheme:
A kind of whirlwind spray equipment, for the purification of waste gas, the whirlwind spray equipment includes absorption tower, installed in described
Tank, the whirlwind sleeve pipe being installed in the absorption tower below absorption tower, the spray assemblies in the whirlwind sleeve pipe,
And the water mist separator above the spray assemblies;The absorption tower is divided into the absorption chamber of bottom and the discharge on top
Room, the absorption chamber is connected with air inlet pipe, and the air inlet pipe is connected with the whirlwind sleeve pipe;The drain chamber includes airway tube,
The airway tube from the bottom of the drain chamber outwards, extend downwardly setting;The whirlwind sleeve pipe is made up of some helix tubes,
The helix tube winds airway tube setting from top to bottom, and the one end of the helix tube is connected with the air inlet pipe, the spiral
The other end of pipe is connected with the bottom of the absorption chamber;The confession that the spray assemblies include water pump, are connected with the water pump
Water pipe and the shower group being connected with the feed pipe;The feed pipe winds the absorption chamber and set;The shower group
In the helix tube;The water mist separator includes the first layer separator of bottom and the second layer separator on top, institute
State first layer separator to be made up of the first Z-shaped plate of multilayer, the second layer separator is made up of the second Z-shaped plate of multilayer.
Above-mentioned whirlwind spray equipment, including absorption tower, the tank below absorption tower and the whirlwind in absorption tower
Sleeve pipe, the spray assemblies in whirlwind sleeve pipe and the water mist separator above spray assemblies.In use, opening
Dynamic exhaust blower and water pump, coating waste gas, dust-laden exhaust gas are extracted and entered in absorption chamber by air inlet pipe, via drawing for whirlwind sleeve pipe
Lead, spray assemblies spray water smoke and waste gas is filtered, and the water after filtering is flowed into tank.Waste gas and water smoke formation waste gas
Mist, waste gas mist is entered in drain chamber by airway tube, and carries out aqueous separation by water mist separator, waste liquid is flowed into tank, is obtained
Clean gas is discharged by outer discharge pipe after to dedusting.Above-mentioned whirlwind spray equipment is by whirlwind sleeve pipe and spray assemblies to useless
Gas carries out multistage absorption, and carries out multiple stop by filler and water mist separator, to increase the time of contact of waste gas and water, makes
Water absorbs the toxic gas and flying dust in waste gas, and dust removal and filtration effect is good, can be recycled by tank reclaimed water, reduce wave
Take, it is very environmentally friendly, simple in construction.
In one of the embodiments, the top of the first layer separator is in the high middle part low setting in both ends, and described the
The middle part of one layer of separator is provided with passway;Gas passage is formed between adjacent second Z-shaped plate, the gas passage coordinates
Circulated for the absorption tower interior air-flow passway.
In one of the embodiments, filler is filled with the helix tube, the filler is Pall ring filler.
In one of the embodiments, some spiral nozzles are installed in the shower group to coordinate the whirlwind sleeve pipe
Waste gas is absorbed.
In one of the embodiments, the airway tube is embedded in the absorption chamber and connected with the absorption chamber.
In one of the embodiments, the drain chamber also includes exhaust column, outer blast pipe and connects the exhaust column
And the exhaust blower of the outer blast pipe, the exhaust column connects with the top of the drain chamber, and the exhaust column is provided with regulation
Valve, the control valve is used for the regulation of the air quantity of exhaust blower;The outer blast pipe is provided with instrumentation and rain cover, institute
The bottom that instrumentation is located at the outer blast pipe is stated, the rain cover is located at the top of outer blast pipe.
In one of the embodiments, the control valve is operated pneumatic valve.
In one of the embodiments, the bottom of the absorption chamber sets in infundibulate and connected with the tank.
In one of the embodiments, the tank is made up of interconnected collecting tank and supply flume;The collecting tank
Lower section positioned at the absorption tower, the collecting tank is provided with screen pack, and the screen pack is located at the middle upper end of the collecting tank
Portion;The supply flume is located at the outside on the absorption tower, and the supply flume is provided with blowdown of the floss hole for tank.
In one of the embodiments, the tank also includes dividing plate, and the dividing plate is located at the collecting tank and the confession
The middle part of tank.
Brief description of the drawings
Fig. 1 is the schematic internal view of the whirlwind spray equipment of the preferred embodiment of the utility model one;
Fig. 2 is the top view of the whirlwind spray equipment shown in Fig. 1;
Fig. 3 is the enlarged diagram at the A shown in Fig. 2.
Embodiment
For the ease of understanding the utility model, the utility model is more fully retouched below with reference to relevant drawings
State.Preferred embodiment of the present utility model is given in accompanying drawing.But, the utility model can come real in many different forms
It is existing, however it is not limited to embodiment described herein.On the contrary, the purpose for providing these embodiments is made to public affairs of the present utility model
The understanding for opening content is more thorough comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element
Or can also have element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to
To another element or it may be simultaneously present centering elements.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model
The implication that the technical staff in domain is generally understood that is identical.It is herein to be in term used in the description of the present utility model
The purpose of description specific embodiment, it is not intended that in limitation the utility model.
Fig. 1 to Fig. 3 is referred to, is the whirlwind spray equipment 100 of a preferred embodiment of the present utility model, for waste gas
Purification, the whirlwind spray equipment 100 includes absorption tower 10, the tank 20 installed in the lower section of absorption tower 10, is installed on absorption tower 10
Interior whirlwind sleeve pipe 30, the spray assemblies 40 in whirlwind sleeve pipe 30 and the water smoke installed in the top of spray assemblies 40
Separator 50.Waste gas enters along whirlwind sleeve pipe 30, and is carried out by spray assemblies 40 to waste gas spray, can be to coating waste gas, dust-laden
Waste gas carries out prefiltration, and water mist separator 50 can again be filtered to waste gas, in wastewater sedimentation to tank 20, waited for
Next step processing.
The absorption tower 10 is used for the purification to waste gas.Absorption chamber 11 and the discharge on top of 10 points of the absorption tower for bottom
Room 12, absorption chamber 11 is connected with air inlet pipe 120, and air inlet pipe 120 is located at the upper end of absorption chamber 11, air inlet pipe 120 and whirlwind set
Pipe 30 is connected, so that waste gas enters in absorption tower 10 from whirlwind sleeve pipe 30.The bottom of absorption chamber 11 in infundibulate set and with
Tank 20 is connected, it is to avoid the bottom of waste gas from absorption chamber 11 gives out external environment condition.Drain chamber 12 includes airway tube 13, taken out
The exhaust blower 16 of airduct 14, outer blast pipe 15 and connection exhaust column 14 and outer blast pipe 15, the self-discharging room 12 of airway tube 13
Bottom is outside, extend downwardly setting, and airway tube 13 is embedded in absorption chamber 11 and connected with absorption chamber 11;Exhaust column 14 and row
The top connection of room 12 is put, exhaust column 14 is provided with control valve 140, and control valve 140 is used for the tune of the air quantity of exhaust blower 16
Section.In the present embodiment, control valve 140 is operated pneumatic valve.Outer blast pipe 15 is provided with instrumentation 150 and rain cover 151,
Instrumentation 150 is located at the bottom of outer blast pipe 15, and for the detection to discharge gas, rain cover 151 is located at outer blast pipe
15 top, to prevent rainwater from entering in pipe, blocks airduct.Exhaust blower 16 is used to extract the gas in absorption tower 10, so that gas
Body enters from absorption chamber 11, enters back into drain chamber 12, is then discharged by outer blast pipe 15.
The tank 20 is arranged on the lower section on absorption tower 10, for holding to the water after coating waste gas, dust-laden exhaust gas filtering.
The tank 20 is made up of interconnected collecting tank 21 and supply flume 22.Collecting tank 21 is located at the lower section on absorption tower 10, for receiving
Collect the waste water on absorption tower 10;Collecting tank 21 is provided with screen pack 210, and screen pack 210 is located at the middle upper end of collecting tank 21, uses
Impurity in filtered wastewater, to reclaim waste water.Supply flume 22 is located at the outside on absorption tower 10, and supply flume 22 is provided with floss hole
220 blowdown when being cleared up for tank 20.Tank 20 also includes dividing plate (figure is not indicated), and dividing plate is located at collecting tank 21 and supplies water
The middle part of groove 22, the cut-off of collecting tank 21 when being changed for screen pack 210 and supply flume 22, it is to avoid the stopping of adsorption tower absorption
Only, so that waste gas absorption being capable of non-stop run.
The whirlwind sleeve pipe 30 is made up of some helix tubes, and helix tube winds airway tube 13 and set from top to bottom, helix tube
One end connected with air inlet pipe 120, the other end of helix tube is connected with the bottom of absorption chamber 11, is filled with helix tube
Filler 31, filler 31 coordinates helix tube to increase flowing time of the waste gas in whirlwind sleeve pipe 30, so that waste gas is through excessive
The absorption of weight, to reach the effect of waste gas Adsorption.In the present embodiment, filler 31 is that Pall ring or Raschig ring etc. are filled out
Material, specifically, filler 31 are preferably Pall ring filler.
The spray assemblies 40 are arranged on the inner top of helix tube, for being sprayed and being absorbed to waste gas.Spray assemblies
40 include water pump 41, the feed pipe 42 being connected with water pump 41 and the shower group 43 being connected with feed pipe 42;Water pump 41 is latent
Liquid pump, water pump 41 is embedded in tank 20, the conveying for water.The winding absorption chamber 11 of feed pipe 42 is set, and is set on feed pipe 42
The cut-out for thering are some stop valves to supply water.Shower group 43 is provided with some spiral sprays in helix tube in shower group 43
Mouth is to coordinate whirlwind sleeve pipe 30 to absorb waste gas, and spiral nozzle can make the water smoke gushed out obtain projected area increase.
The water mist separator 50 is arranged on the middle part of drain chamber 12, for being blocked to waste water fog.Water smoke is separated
Device 50 includes the first layer separator 51 of bottom and the second layer separator 52 on top, and first layer separator 51 is by the first of multilayer
Z-shaped plate is constituted, and the top of first layer separator 51 is in the high middle part low setting in both ends, and the middle part of first layer separator 51 is provided with logical
Road junction, so that water flows down the bottom of drain chamber 12 from passway, prevents from being detained.Second layer separator 52 is second Z-shaped by multilayer
Plate is constituted, and gas passage is formed between the second adjacent Z-shaped plate, and gas passage coordinates passway for the interior air-flow of absorption tower 10
Circulation.Water smoke forms water droplet respectively through first layer separator 51, second layer separator 52, and final gas is from drain chamber 12
Upper end is discharged, and water is back in tank 20.
Above-mentioned whirlwind spray equipment 100, including absorption tower 10, the tank 20 installed in the lower section of absorption tower 10 and absorption
Whirlwind sleeve pipe 30 in tower 10, the spray assemblies 40 in whirlwind sleeve pipe 30 and installed in the top of spray assemblies 40
Water mist separator 50.In use, starting exhaust blower 16 and water pump 41, coating waste gas, dust-laden exhaust gas are extracted simultaneously by air inlet pipe 120
Into in absorption chamber 11, via the guiding of whirlwind sleeve pipe 30, spray assemblies 40 spray water smoke and waste gas are filtered, and will filtering
Water afterwards is flowed into tank 20.Waste gas is entered in drain chamber 12 with water smoke formation waste gas mist, waste gas mist by airway tube 13, and by water
Mist separator 50 carries out aqueous separation, waste liquid is flowed into tank 20, obtains gas clean after dedusting and discharged by outer discharge pipe.
Above-mentioned whirlwind spray equipment 100 carries out multistage absorption to waste gas by whirlwind sleeve pipe 30 and spray assemblies 40, and by filler
And water mist separator 50 carries out multiple stop, to increase the time of contact of waste gas and water, water is set to absorb the toxic gas in waste gas
And flying dust, dust removal and filtration effect is good, can be recycled by the reclaimed water of tank 20, reduce waste, very environmentally friendly, structure is simple
It is single.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
1. a kind of whirlwind spray equipment, the purification for waste gas, it is characterised in that the whirlwind spray equipment include absorption tower,
Tank below the absorption tower, the whirlwind sleeve pipe being installed in the absorption tower, in the whirlwind sleeve pipe
Spray assemblies and the water mist separator above the spray assemblies;The absorption tower is divided into the absorption chamber of bottom
And the drain chamber on top, the absorption chamber is connected with air inlet pipe, and the air inlet pipe is connected with the whirlwind sleeve pipe;The drain chamber
Including airway tube, the airway tube from the bottom of the drain chamber outwards, extend downwardly setting;The whirlwind sleeve pipe is by some
Helix tube is constituted, and the helix tube winds airway tube setting from top to bottom, and the one end of the helix tube connects with the air inlet pipe
Logical, the other end of the helix tube is connected with the bottom of the absorption chamber;The spray assemblies include water pump and the water
The feed pipe of pump connection and the shower group being connected with the feed pipe;The feed pipe winds the absorption chamber and set;Institute
Shower is stated to be mounted in the helix tube;The water mist separator includes the first layer separator of bottom and the second layer on top
Separator, the first layer separator is made up of the first Z-shaped plate of multilayer, and the second layer separator is second Z-shaped by multilayer
Plate is constituted.
2. whirlwind spray equipment according to claim 1, it is characterised in that the top of the first layer separator is in two ends
The high middle part low setting in portion, the middle part of the first layer separator is provided with passway;Gas is formed between adjacent second Z-shaped plate
Passage, the gas passage coordinates the passway so that the absorption tower interior air-flow circulates.
3. whirlwind spray equipment according to claim 1, it is characterised in that filler, institute are filled with the helix tube
Filler is stated for Pall ring filler.
4. whirlwind spray equipment according to claim 1, it is characterised in that be provided with some spirals in the shower group
Nozzle is to coordinate the whirlwind sleeve pipe to absorb waste gas.
5. whirlwind spray equipment according to claim 1, it is characterised in that the airway tube is embedded in the absorption chamber
And connected with the absorption chamber.
6. whirlwind spray equipment according to claim 1, it is characterised in that the drain chamber also includes exhaust column, outer row
Tracheae and the exhaust blower for connecting the exhaust column and the outer blast pipe, the exhaust column at the top of the drain chamber with connecting
Logical, the exhaust column is provided with control valve, and the control valve is used for the regulation of the air quantity of exhaust blower;On the outer blast pipe
Provided with instrumentation and rain cover, the instrumentation is located at the bottom of the outer blast pipe, and the rain cover is located at outer row
The top of tracheae.
7. whirlwind spray equipment according to claim 6, it is characterised in that the control valve is operated pneumatic valve.
8. whirlwind spray equipment according to claim 1, it is characterised in that the bottom of the absorption chamber is set in infundibulate
Put and connected with the tank.
9. whirlwind spray equipment according to claim 1, it is characterised in that the tank by interconnected collecting tank and
Supply flume is constituted;The collecting tank is located at the lower section on the absorption tower, and the collecting tank is provided with screen pack, and the screen pack is set
In the middle upper end of the collecting tank;The supply flume is located at the outside on the absorption tower, and the supply flume is provided with floss hole
For the blowdown of tank.
10. whirlwind spray equipment according to claim 9, it is characterised in that the tank also includes dividing plate, the dividing plate
Located at the middle part of the collecting tank and the supply flume.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621476768.7U CN206391736U (en) | 2016-12-29 | 2016-12-29 | Whirlwind spray equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621476768.7U CN206391736U (en) | 2016-12-29 | 2016-12-29 | Whirlwind spray equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206391736U true CN206391736U (en) | 2017-08-11 |
Family
ID=59516133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621476768.7U Expired - Fee Related CN206391736U (en) | 2016-12-29 | 2016-12-29 | Whirlwind spray equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206391736U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108380028A (en) * | 2018-04-04 | 2018-08-10 | 合肥工业大学 | A kind of equipment for treating industrial waste gas of U-shaped scrubbing tower |
CN108421348A (en) * | 2018-02-27 | 2018-08-21 | 山东禹王生态食业有限公司 | Solvent gas dregs of rice face Water filtration device for filtering |
CN109663488A (en) * | 2019-02-28 | 2019-04-23 | 张家港市欧微自动化研发有限公司 | A kind of waste gas treatment equipment and its processing method |
-
2016
- 2016-12-29 CN CN201621476768.7U patent/CN206391736U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108421348A (en) * | 2018-02-27 | 2018-08-21 | 山东禹王生态食业有限公司 | Solvent gas dregs of rice face Water filtration device for filtering |
CN108380028A (en) * | 2018-04-04 | 2018-08-10 | 合肥工业大学 | A kind of equipment for treating industrial waste gas of U-shaped scrubbing tower |
CN109663488A (en) * | 2019-02-28 | 2019-04-23 | 张家港市欧微自动化研发有限公司 | A kind of waste gas treatment equipment and its processing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205613230U (en) | Fountain air purification device | |
CN206350978U (en) | Water revolves waste gas water washing device | |
CN207401353U (en) | A kind of spray painting and drying tunnel waste gas treatment equipment | |
CN102172468B (en) | Three-pass dedusting devulcanizer | |
CN206391736U (en) | Whirlwind spray equipment | |
CN206566678U (en) | A kind of spray column | |
CN206435015U (en) | A kind of air-cooled desulphurization denitration dedusting deodorizing environmental protection device | |
CN208660820U (en) | A kind of lacquer spraying technique photocatalysis deodorizing device | |
CN105964124A (en) | Rotary spraying dust removal and desulfurization device | |
CN206613331U (en) | Industrial waste gas, floating outstanding particulate matter stage construction spraying intercept cleaning treatment system device | |
CN210356536U (en) | Gum dipping waste gas treatment device | |
CN206391789U (en) | Whirlwind spray equipment | |
CN206355767U (en) | Showering sanding apparatus | |
CN106512605A (en) | Waste incineration flue gas purification system | |
CN116764425B (en) | High-strength waste gas purification spray tower and application method thereof | |
CN206950959U (en) | Odor gas purification system | |
CN105771557A (en) | Gas treatment device | |
CN210332233U (en) | Novel high-efficient foul smell clean system | |
CN207872398U (en) | A kind of exhaust gas spray process system | |
CN104307334A (en) | Flue gas cleaning device | |
CN209076318U (en) | A kind of inflation film manufacturing machine emission-control equipment | |
CN116688689A (en) | A high-efficient dust removal spray column for exhaust-gas treatment | |
CN201799202U (en) | Combined waste gas treatment device of tornado tower | |
CN209138247U (en) | A kind of exhaust gas treating tower | |
CN206391810U (en) | Emission-control equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170811 Termination date: 20191229 |
|
CF01 | Termination of patent right due to non-payment of annual fee |