CN206386560U - Small-bore jacking construction method concrete duct grouting device - Google Patents
Small-bore jacking construction method concrete duct grouting device Download PDFInfo
- Publication number
- CN206386560U CN206386560U CN201621494614.0U CN201621494614U CN206386560U CN 206386560 U CN206386560 U CN 206386560U CN 201621494614 U CN201621494614 U CN 201621494614U CN 206386560 U CN206386560 U CN 206386560U
- Authority
- CN
- China
- Prior art keywords
- plasma discharge
- welded
- discharge hole
- plate
- steel cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model is related to a kind of small-bore jacking construction method concrete duct grouting device, it is mainly used in small-bore pipeline when non-excavated jacking construction method is installed, lubricated slurry is evenly supplied to by the device of the periphery of push pipe road four, it is by top surface annulus (1), socket steel ring (2), transition rings (3), slab steel cylinder (4) with plasma discharge hole, backplate (5), reinforcing plate (6), the auxiliary plate of plasma discharge (7), stiffener plate one (8), stiffener plate two (9), backing plate (10) bellmouth steel ring (11), stress surface annulus (12) is constituted, small-bore pipeline can preferably be solved when non-excavated jacking construction method is installed, lubricated slurry can not be evenly supplied to by the problem of the periphery of push pipe road four, improve the installation effectiveness of pipeline, the installation quality of pipeline is ensured.
Description
Technical field:
The utility model is related to a kind of small-bore jacking construction method concrete duct grouting device, is mainly used in small-bore
Lubricated slurry is evenly supplied to by the device of the periphery of push pipe road four by pipeline when non-excavated jacking construction method is installed.
Background technology:
Passed through at present in pipe of concrete pipeline installation construction frequently with two kinds of mounting means, one kind is that the installation of trench excavation formula is applied
Work, another is no-dig technique pipe jacking method.Trench excavation formula installation is used in meagrely-populated place more, but in city
Then more using the construction of non-excavated jacking method inside city, non-excavated jacking construction beats vertical shaft from ground without destroying surface structures
Lower progress Durchgangshohle installation, convenient and swift cost is low.
When carrying out non-excavated jacking construction, because soil has drag effects pipeline jacking installation, needed when often constructing
Pipeline surrounding row note mud is lubricated, so as to overcome soil resistance.In general large diameter pipeline itself is with note
Hole is starched, is directly connected Grouting Pipe with injected hole, it is possible to realizes that plasma discharge lubricates, is removed after the completion of construction.But for small
Because itself internal diameter size is small for caliber pipe, after the segment distance of jacking one, operating personnel is difficult to enter into internal by slip casting
The equipment such as pipe are disassembled, therefore result in domestic small-bore pipeline almost not having using jacking construction method installation, substantially
Using excavation installation form.But with being gradually improved for Process of Urbanization Construction, old cell drainage system transformation is just inevitable
The problem of having suffered from such awkward, original pipe diameter is small and blocks and serious needs to change, it is impossible to removes and determines again
Can not be by the way of installation be excavated.
The content of the invention:
The purpose of this utility model is:Design one kind is exclusively used in small-bore jacking construction method concrete duct slip casting dress
Put, disclosure satisfy that small-bore pipeline, when non-excavated jacking construction method is installed, lubricated slurry is evenly supplied to by push pipe road four
Periphery, so as to ensure effective progress of construction.
Based on this purpose, by design and research repeatedly, we develop small-bore jacking construction method pipe of concrete
Road grouting device, its general principle is that design one saves steel pipe, and plasma discharge hole is provided with steel pipe, lead slurry pipe can directly and its
Connection, is squeezed into lubricated slurry by press device, and mud is discharged from plasma discharge hole, so that the surrounding formation wettable layer outside pipeline,
Play a part of lubrication.
Small-bore jacking construction method is with the basic structure of concrete duct grouting device by top surface annulus (1), socket steel ring
(2), transition rings (3), the slab steel cylinder (4) with plasma discharge hole, backplate ring (5), reinforcement arc plate (6), the auxiliary plate of plasma discharge (7), reinforcement
Plate one (8), stiffener plate two (9), backing plate (10) bellmouth steel ring (11), stress surface annulus (12) composition, top surface annulus (1) welding
It is integrally formed on socket steel ring (2) top, forms top power face, socket steel ring (2) is welded on transition rings (3) one end, band row
The slab steel cylinder (4) in slurry hole is welded on transition rings (3) other end, and stiffener plate one (8) and stiffener plate two (9) are welded in respectively
Slab steel cylinder (4) two ends with plasma discharge hole, particular location is itself plasma discharge hole of slab steel cylinder (4) with plasma discharge hole or so 50cm's
Distance, strengthens arc plate (6) one end and welds together with stiffener plate one (8), other end is welded into one with transition rings (3)
Body, bellmouth steel ring (11) is welded in stiffener plate two (9), and stress surface annulus (13) one end is welded on the thick plate steel with plasma discharge hole
On cylinder (4), other end welds together with bellmouth steel ring (11), forms an entirety, can be held by stress surface annulus (12)
Power is pushed up by construction, backplate ring (5) is welded on the outside of the slab steel cylinder (4) with plasma discharge hole away from transition rings (3) one end and and transition rings
(3) it is welded into one, distance of backplate ring (5) total length away from itself plasma discharge hole 25cm on the slab steel cylinder (4) with plasma discharge hole,
Backing plate (10) is welded on the place away from itself plasma discharge hole 50cm on the slab steel cylinder (4) with plasma discharge hole close to stress surface annulus (12)
Direction, in addition, the thickness of backing plate (10) is 1/2nd of backplate ring (5) thickness, the auxiliary plate of plasma discharge (7) is welded on backing plate (10)
On, and other end is welded into one with backplate ring (5).
The utility model can preferably solve small-bore pipeline when non-excavated jacking construction method is installed, it is impossible to will lubricate
Mud slurry uniform is transported to by the problem of the periphery of push pipe road four, improves the installation effectiveness of pipeline, has ensured the installation quality of pipeline.
Brief description of the drawings:
Accompanying drawing 1 is the utility model structural representation, is arranged by top surface annulus (1), socket steel ring (2), transition rings (3), band
The slab steel cylinder (4) in slurry hole, backplate ring (5), reinforcement arc plate (6), the auxiliary plate of plasma discharge (7), stiffener plate one (8), stiffener plate two
(9), backing plate (10), bellmouth steel ring (11), stress surface annulus (12) composition.
Accompanying drawing 2 is the utility model structure rearview, by the auxiliary plate of plasma discharge (7), backing plate (10), bellmouth steel ring (11), stress
Face annulus (12) is constituted.
Embodiment:
In actual use, first by small-bore jacking construction method concrete duct grouting device socket steel ring
(2) installed with jacking machine head, it is ensured that top surface annulus (1) and jacking machine stress surface are sturdy, then will be inserted by push pipe road
Mouth carries out abutting joint with small-bore jacking construction method with concrete duct grouting device bellmouth steel ring (11), it is ensured that socket end
Face and stress surface annulus (12) are sturdy, bear construction top power with intact, then will lead slurry pipe and the slab steel cylinder (4) with plasma discharge hole
Interior plasma discharge hole is attached, and jacking construction is carried out after the completion of connection, by press device by lubricated slurry in work progress
Discharged by leading slurry pipe from the plasma discharge hole in the slab steel cylinder (4) with plasma discharge hole, mud can be from the auxiliary plate of plasma discharge (7) and backplate ring
(5) the space uniform outflow between backing plate (10) so that small-bore jacking construction method is with four outside concrete duct grouting device
All uniform moistenings, reduce the frictional resistance of soil, and because small-bore jacking construction method with concrete duct grouting device is
Steel construction, can effectively prevent and treat rubble cut draw, be conducive to the jacking and protection of pipeline after one's death, after pipeline pass through mounting distance after will
Lead slurry pipe to separate with the plasma discharge hole in the slab steel cylinder (4) with plasma discharge hole, jacking machine head is unloaded, by small-bore jacking construction method
Separated with concrete duct grouting device and pipeline and complete Pipe installing.
Claims (1)
1. small-bore jacking construction method concrete duct grouting device, it is characterised in that:By top surface annulus (1), socket steel ring
(2), transition rings (3), the slab steel cylinder (4) with plasma discharge hole, backplate (5), reinforcing plate (6), the auxiliary plate of plasma discharge (7), stiffener plate one
(8), stiffener plate two (9), backing plate (10) bellmouth steel ring (11), stress surface annulus (12) composition, top surface annulus (1) is welded on slotting
Mouth steel ring (2) top is integrally formed, and forms top power face, and socket steel ring (2) is welded on transition rings (3) one end, band plasma discharge hole
Slab steel cylinder (4) be welded on transition rings (3) other end, stiffener plate one (8) and stiffener plate two (9) are welded in band row respectively
Starch slab steel cylinder (4) two ends in hole, particular location be itself plasma discharge hole of slab steel cylinder (4) with plasma discharge hole or so 50cm away from
From reinforcing plate (6) one end welds together with stiffener plate one (8), and other end is welded into one with transition rings (3), holds
Mouth steel ring (11) is welded in stiffener plate two (9), and stress surface annulus (12) one end is welded on the slab steel cylinder (4) with plasma discharge hole
On, other end welds together with bellmouth steel ring (11), forms an entirety, and construction can be born by stress surface annulus (12)
Power is pushed up, backplate (5) is welded on the outside of the slab steel cylinder (4) with plasma discharge hole away from transition rings (3) one end and is welded into transition rings (3)
It is integrated, distance of backplate (5) total length away from itself plasma discharge hole 25cm on the slab steel cylinder (4) with plasma discharge hole, backing plate (10) weldering
The place away from itself plasma discharge hole 50cm on the slab steel cylinder (4) with plasma discharge hole is connected on close to stress surface annulus (12) direction, in addition,
The thickness of backing plate (10) is 1/2nd of backplate (5) thickness, and the auxiliary plate of plasma discharge (7) is welded on backing plate (10), and other one
End is welded into one with backplate (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621494614.0U CN206386560U (en) | 2016-12-30 | 2016-12-30 | Small-bore jacking construction method concrete duct grouting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621494614.0U CN206386560U (en) | 2016-12-30 | 2016-12-30 | Small-bore jacking construction method concrete duct grouting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206386560U true CN206386560U (en) | 2017-08-08 |
Family
ID=59491867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621494614.0U Active CN206386560U (en) | 2016-12-30 | 2016-12-30 | Small-bore jacking construction method concrete duct grouting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206386560U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110145322A (en) * | 2018-07-09 | 2019-08-20 | 中国水利水电第七工程局有限公司 | Slip casting tail sleeve and small-bore mire water equilibrium tube equipment |
-
2016
- 2016-12-30 CN CN201621494614.0U patent/CN206386560U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110145322A (en) * | 2018-07-09 | 2019-08-20 | 中国水利水电第七工程局有限公司 | Slip casting tail sleeve and small-bore mire water equilibrium tube equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207598254U (en) | A kind of shield radial direction stratum bracing means | |
CN105297807B (en) | A kind of integrated pipe canal open cut development machine with automatic backfill function | |
CN205225271U (en) | Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid | |
CN206386560U (en) | Small-bore jacking construction method concrete duct grouting device | |
CN102345287B (en) | Construction method of large-diameter cast-in-situ thin-wall concrete composite pile forming device | |
CN201826302U (en) | Boring device for large-diameter cast-in-situ thin-walled concrete composite pile | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN105040743A (en) | Detachable support replacing method for underground structure post-cast strip and structure | |
CN103486349B (en) | The preparation method of spheroidal graphite cast iron push pipe | |
CN201292529Y (en) | Mixing anchor rod | |
CN108638317A (en) | A kind of spheroidal graphite cast-iron push pipe is with pouring tooling and its working method | |
CN102434718B (en) | Method for reinforcing originating end of push bench | |
CN103938619A (en) | Construction process of tubular pile and special hole opener of construction process | |
CN202969440U (en) | Excavator bucket | |
CN206034525U (en) | Quartering hammer device for breaker | |
CN204424850U (en) | Cable laying RC pipejacking | |
CN212297912U (en) | Reinforcing structure for outlet of pipe jacking receiving well | |
CN208309750U (en) | A kind of fashioned iron adds the rectangle vertical shaft reacting wall of steel plate structure | |
KR102187757B1 (en) | Method And Apparatus For Removing Reinforced Concrete Pile | |
CN202945681U (en) | Automatic baffle for foundation trench | |
CN205735444U (en) | A kind of slip casting casement for offering injected hole to propulsion tube | |
CN204898737U (en) | Structure is propped to detachable trading in underground structure post -cast strip | |
CN204532384U (en) | Bar gate type quick acting locking device | |
CN205369356U (en) | Configuration optimization's lower liner cover on hydraulic crushing hammer | |
CN203891006U (en) | Protection plate for joint of underground continuous walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |