CN206382218U - Bridging arrangement between straight line shaker dust cap - Google Patents

Bridging arrangement between straight line shaker dust cap Download PDF

Info

Publication number
CN206382218U
CN206382218U CN201621331971.5U CN201621331971U CN206382218U CN 206382218 U CN206382218 U CN 206382218U CN 201621331971 U CN201621331971 U CN 201621331971U CN 206382218 U CN206382218 U CN 206382218U
Authority
CN
China
Prior art keywords
dust cap
right angle
converted
another
interior right
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621331971.5U
Other languages
Chinese (zh)
Inventor
卢恩同
秦英
孟保亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxiang Zhenying Machinery Equipment Co Ltd
Original Assignee
Xinxiang Zhenying Machinery Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxiang Zhenying Machinery Equipment Co Ltd filed Critical Xinxiang Zhenying Machinery Equipment Co Ltd
Priority to CN201621331971.5U priority Critical patent/CN206382218U/en
Application granted granted Critical
Publication of CN206382218U publication Critical patent/CN206382218U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses the bridging arrangement between straight line shaker dust cap, embedded above two interior right angles of dust cap to be overlapped with another dust cap, the middle that dust cap and another dust cap are overlapped is put into sealing skin.Dust cap and another dust cap are to make embedded connection using steel plate, one end of the dust cap be converted into downwards behind outer right angle it is outwards parallel be converted into the extension of interior right angle upwards again in the extension of interior right angle, one end of another dust cap, which is converted into downwards outer right angle and is inwardly converted into after interior right angle extension centre above two interior right angles of embedded dust cap and seals skin, to be sealed.The shape of dust cap is such as " Z " font, and the shape of another dust cap is in " Z " font.The technical program improves the quality of product without punching, simple installation, saving labour.

Description

Bridging arrangement between straight line shaker dust cap
Technical field
The utility model is related to a kind of bridging arrangement, is particularly suitable for use in using during overlap joint between straight line shaker dust cap.
Background technology
Existing straight line shaker dust cap, because area is huge, the breadth of steel plate can not be met, it is necessary to use two steel plates, very It could be realized to needing to be spliced with plurality of steel plates sometimes, the method for use is that angle bar is welded on steel plate, and bolt hole is equipped with angle bar, With sealing skin and being bolted together between two angle bar, the shortcoming of this connected mode is, complicated, in-convenience in use, Installation and removal are time-consuming to take a lot of work, therefore increase labour cost.
The content of the invention
Task of the present utility model is to propose that one kind is simple in construction, between a kind of straight line shaker dust cap for saving labour Bridging arrangement.
Task of the present utility model, which is done in such a way that, is characterized in that:It is embedded above two interior right angles of dust cap Another dust cap is overlapped with, the middle that dust cap and another dust cap are overlapped is put into sealing skin.Dust cap and another Dust cap is to make embedded connection using steel plate, and it is in interior straight that one end of the dust cap, which is converted into downwards behind outer right angle outwards parallel, Angle extension is converted into interior right angle extension upwards again, and one end of another dust cap is converted into downwards outer right angle and is inwardly converted into interior right angle It is middle above two interior right angles of embedded dust cap after extension to be sealed with sealing skin.The shape of dust cap is such as " Z " font, institute The shape of another dust cap is stated in " Z " font.
The utility model has the following effects that the technical program is carried without punching, simple installation, saving labour The quality of high product.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Drawing explanation:1st, dust cap, 2, sealing skin, 3, another dust cap.
Embodiment
Embodiment is described in detail with reference to the figures above, dust cap 1 and another dust cap 3 are to make embedded using steel plate Connection, one end of the dust cap is converted into downwards behind outer right angle outwards parallel to be converted into interior right angle in the extension of interior right angle and prolongs upwards again Stretch, shape such as " Z " font, one end of another dust cap be converted into downwards outer right angle be inwardly converted into it is embedding after interior right angle extension Enter centre sealing skin 2 above two interior right angles of dust cap to seal, the shape of another dust cap is in " Z " word Type.
Now, embedded above two interior right angles of dust cap 1 to be overlapped with another dust cap, dust cap is prevented with another The middle of dirt lid overlap joint is put into sealing skin.
Dust cap need to only overlap the insertion of two dust caps when installing, and skin be sealed on intermediate pressure, two dust-proof The embedded lap-joint of lid is all to use bending technique, and intensity is good, does not weld and punches, elegant in appearance, installs simple, saves work Power, improves product quality.

Claims (3)

1. the bridging arrangement between straight line shaker dust cap, it is characterised in that:Embedded overlap joint above two interior right angles of dust cap There is another dust cap, the middle that dust cap and another dust cap are overlapped is put into sealing skin.
2. the bridging arrangement between straight line shaker dust cap as claimed in claim 1, it is characterised in that:Dust cap is prevented with another Dirt lid is to make embedded connection using steel plate, and it is in interior right angle that one end of the dust cap, which is converted into downwards behind outer right angle outwards parallel, Extension is converted into the extension of interior right angle upwards again, and one end of another dust cap, which is converted into downwards outer right angle and is inwardly converted into interior right angle, prolongs Sealing skin sealing in centre above two interior right angles of embedded dust cap after stretching.
3. the bridging arrangement between straight line shaker dust cap as claimed in claim 1, it is characterised in that:The shape of dust cap as " Z " font, the shape of another dust cap is in " Z " font.
CN201621331971.5U 2016-12-07 2016-12-07 Bridging arrangement between straight line shaker dust cap Expired - Fee Related CN206382218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621331971.5U CN206382218U (en) 2016-12-07 2016-12-07 Bridging arrangement between straight line shaker dust cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621331971.5U CN206382218U (en) 2016-12-07 2016-12-07 Bridging arrangement between straight line shaker dust cap

Publications (1)

Publication Number Publication Date
CN206382218U true CN206382218U (en) 2017-08-08

Family

ID=59488333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621331971.5U Expired - Fee Related CN206382218U (en) 2016-12-07 2016-12-07 Bridging arrangement between straight line shaker dust cap

Country Status (1)

Country Link
CN (1) CN206382218U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106694360A (en) * 2016-12-07 2017-05-24 新乡市振英机械设备有限公司 Lap joint structure used between linear sieve dust covers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106694360A (en) * 2016-12-07 2017-05-24 新乡市振英机械设备有限公司 Lap joint structure used between linear sieve dust covers

Similar Documents

Publication Publication Date Title
CN206753587U (en) A kind of fast detachable shield tail brush
CN206382218U (en) Bridging arrangement between straight line shaker dust cap
CN103147764A (en) Sizing end mould plate for second lining of tunnel arch wall
CN104401604A (en) Cement bin and manufacturing process thereof
CN206780641U (en) A kind of omnipotent machine frame for prefabricated component production and application
CN204185853U (en) A kind of overhead kick piecing devices connected fast for prestressed concrete pipe pile
CN204311444U (en) For the cottor pin linkage that prestressed concrete pipe pile connects fast
CN103331518B (en) A kind of method for laser welding of lithium battery
CN106694360A (en) Lap joint structure used between linear sieve dust covers
CN204384132U (en) The upper cone of cement bin
CN204775986U (en) Airborne flap subassembly and have its aircraft
CN206591901U (en) The titanium steel inner cylinder that can be connected with flange
CN203767024U (en) Simple manhole guardrail
CN203701702U (en) Splicing type dustproof shed
CN204040273U (en) The hermetically-sealed construction of a kind of steel bar truss floor support plate and beam junction
CN104370012A (en) Lower cone body of cerement bin and manufacturing process of lower cone body
CN204223552U (en) The lower cone of cement bin
CN103801934B (en) Steel ball reducing fixture beaten by a kind of bent axle
CN203936600U (en) A kind of pipe joint ecto-entad crimp connection fixture
CN204809008U (en) Transformer tank's new -type case along structure
CN203811019U (en) Impermeable anti-leakage cooling tower side plate
CN204024070U (en) A kind of auxiliary frame structure and there is its concrete mixer
CN204966768U (en) Double -purpose power converter E utmost point plug bush
CN204435861U (en) For building the formwork structure of circular concrete column
CN204523869U (en) Forcing press

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170808

Termination date: 20211207