CN204384132U - The upper cone of cement bin - Google Patents

The upper cone of cement bin Download PDF

Info

Publication number
CN204384132U
CN204384132U CN201420623496.3U CN201420623496U CN204384132U CN 204384132 U CN204384132 U CN 204384132U CN 201420623496 U CN201420623496 U CN 201420623496U CN 204384132 U CN204384132 U CN 204384132U
Authority
CN
China
Prior art keywords
upper cone
concatenation module
cone
cement bin
bar shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420623496.3U
Other languages
Chinese (zh)
Inventor
王玺铜
王永祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WEIFANG JINHE MACHINERY CO Ltd
Original Assignee
WEIFANG JINHE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WEIFANG JINHE MACHINERY CO Ltd filed Critical WEIFANG JINHE MACHINERY CO Ltd
Priority to CN201420623496.3U priority Critical patent/CN204384132U/en
Application granted granted Critical
Publication of CN204384132U publication Critical patent/CN204384132U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model proposes a kind of upper cone of cement bin, described upper cone comprises the identical upper cone concatenation module of several sizes, some described upper cone concatenation module assemblings form described upper cone, upper cone concatenation module described in each includes upper cone concatenation module body, the left and right sides of described upper cone concatenation module body is respectively equipped with by the one-body molded upper cone bar shaped flange be made of hydraulic compressor, the upper cone bar shaped flange of upper cone concatenation module described in adjacent two is installed together by fastener, the lower end of upper cone concatenation module body described in each is all welded with the upper cone arc flange for being fixed together with the middle cylinder upper end of cement bin.The utility model production cycle shortens greatly, and cost reduces greatly, and all warehouses are in the same size, can be mass, and achieve normalisation, convenient transportation, and can on-the-spot rapid-assembling.

Description

The upper cone of cement bin
Technical field
The utility model relates to mechanical field, refers to a kind of upper cone of cement bin especially.
Background technology
At present, cement bin capacity conventional is on the market general all about hundreds of ton, volume is larger, segmentation is needed to weld, be roughly divided into upper cone, middle cylinder and lower cone, three is formed by piece assembling, prior art is all generally surrounding flange being directly welded on silo piece, this connection mode needs a large amount of welders and solder, the very large and work under bad environment of the labour intensity of welder, and cause ambient contamination and the solder wasting of resources, in addition, owing to being human weld, inevitably deviation is there will be between silo piece, cause gap excessive after overall package and easily seep water, weld seam is more, whole feed bin occurs crooked, the feed bin production cycle of this mode is long, cost is high.Can be more outstanding if directly weld its above-mentioned shortcoming between the silo piece of upper cone, middle cylinder and lower cone.
Utility model content
The utility model proposes a kind of upper cone of cement bin, the production cycle shortens greatly, and cost reduces greatly, and all warehouses are in the same size, can be mass, and achieve normalisation, convenient transportation, and can on-the-spot rapid-assembling.
A kind of technical scheme of the present utility model is: the upper cone of cement bin, described upper cone comprises the identical upper cone concatenation module of several sizes, some described upper cone concatenation module assemblings form described upper cone, upper cone concatenation module described in each includes upper cone concatenation module body, the left and right sides of described upper cone concatenation module body is respectively equipped with by the one-body molded upper cone bar shaped flange be made of hydraulic compressor, the upper cone bar shaped flange of upper cone concatenation module described in adjacent two is installed together by fastener, the lower end of upper cone concatenation module body described in each is all welded with the upper cone arc flange for being fixed together with the middle cylinder upper end of cement bin.
Preferably, some brace panels by being welded are equipped with between two arc flanges of described upper cone concatenation module and upper cone concatenation module wall.
Preferably, packing seal is provided with between upper cone concatenation module described in adjacent two.
Have employed technique scheme, the beneficial effects of the utility model are: in the utility model, the left and right sides of upper cone concatenation module body is respectively equipped with by the one-body molded upper cone bar shaped flange be made of hydraulic compressor, upper cone bar shaped flange is directly stamped to form by hydraulic compressor, without the need to human weld, this operation eliminates a large amount of welders and solder, the environmental protection more of this processing mode, the working accuracy of upper cone and the quality of product and aesthetics are compared than human weld and are greatly improved, production cycle shortens greatly, cost reduces greatly, all warehouses are in the same size, can be mass, achieve normalisation, convenient transportation, and can on-the-spot rapid-assembling.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of upper cone concatenation module;
Wherein: 1, upper cone; 2, upper cone concatenation module; 3, upper cone concatenation module body; 4, upper cone bar shaped flange; 5, upper cone arc flange.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As Fig. 1 and Fig. 2 jointly shown in, the upper cone of cement bin, upper cone 1 comprises the identical upper cone concatenation module 2 of several sizes, some upper cone concatenation module 2 are assembled and are formed upper cone 1, each upper cone concatenation module 2 includes upper cone concatenation module body 3, the left and right sides of upper cone concatenation module body 3 is respectively equipped with by the one-body molded upper cone bar shaped flange 4 be made of hydraulic compressor, the upper cone bar shaped flange 4 of adjacent two upper cone concatenation module 2 is installed together by fastener, the lower end of each upper cone concatenation module body 3 is all welded with the upper cone arc flange 5 for being fixed together with middle cylinder (not marking in the figure) upper end of cement bin.
In order to strengthen structural strength, between two arc flanges of upper cone concatenation module 2 and upper cone concatenation module 2 wall, be equipped with some brace panels (not marking in figure) by being welded.
In order to increase leak tightness, described in adjacent two, between upper cone concatenation module 2, be provided with packing seal (not marking in figure).
Fastener in the present embodiment is bolt.
In the present invention, the left and right sides of upper cone concatenation module body 3 is respectively equipped with by the one-body molded upper cone bar shaped flange 4 be made of hydraulic compressor, upper cone bar shaped flange 4 is directly stamped to form by hydraulic compressor, without the need to human weld, this operation eliminates a large amount of welders and solder, the environmental protection more of this processing mode, the working accuracy of upper cone 1 and the quality of product and aesthetics are compared than human weld and are greatly improved, production cycle shortens greatly, cost reduces greatly, all warehouses are in the same size, can be mass, achieve normalisation, convenient transportation, and can on-the-spot rapid-assembling.
The applicant researches and develops for many years in field, large-scale cement storehouse, creationaryly obtain integral type butt flange by punching press, the environmental protection more of this processing mode, the working accuracy of warehouse and the quality of product and aesthetics are compared than human weld and are greatly improved, production cycle shortens greatly, and cost reduces greatly.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (3)

1. the upper cone of cement bin, it is characterized in that, described upper cone comprises the identical upper cone concatenation module of several sizes, some described upper cone concatenation module assemblings form described upper cone, upper cone concatenation module described in each includes upper cone concatenation module body, the left and right sides of described upper cone concatenation module body is respectively equipped with by the one-body molded upper cone bar shaped flange be made of hydraulic compressor, the upper cone bar shaped flange of upper cone concatenation module described in adjacent two is installed together by fastener, the lower end of upper cone concatenation module body described in each is all welded with the upper cone arc flange for being fixed together with the middle cylinder upper end of cement bin.
2. the upper cone of cement bin as claimed in claim 1, is characterized in that, being equipped with some brace panels by being welded between two arc flanges of described upper cone concatenation module and upper cone concatenation module wall.
3. the upper cone of cement bin as claimed in claim 2, is characterized in that, be provided with packing seal described in adjacent two between upper cone concatenation module.
CN201420623496.3U 2014-10-24 2014-10-24 The upper cone of cement bin Active CN204384132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420623496.3U CN204384132U (en) 2014-10-24 2014-10-24 The upper cone of cement bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420623496.3U CN204384132U (en) 2014-10-24 2014-10-24 The upper cone of cement bin

Publications (1)

Publication Number Publication Date
CN204384132U true CN204384132U (en) 2015-06-10

Family

ID=53356870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420623496.3U Active CN204384132U (en) 2014-10-24 2014-10-24 The upper cone of cement bin

Country Status (1)

Country Link
CN (1) CN204384132U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104370009A (en) * 2014-10-24 2015-02-25 潍坊金河机械有限公司 Upper cone body of cerement bin and manufacturing process of upper cone body
CN106347889A (en) * 2016-11-10 2017-01-25 长沙爱达环保科技有限公司 Splitting powder material tank

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104370009A (en) * 2014-10-24 2015-02-25 潍坊金河机械有限公司 Upper cone body of cerement bin and manufacturing process of upper cone body
CN106347889A (en) * 2016-11-10 2017-01-25 长沙爱达环保科技有限公司 Splitting powder material tank
CN106347889B (en) * 2016-11-10 2018-07-27 长沙爱达环保科技有限公司 A kind of assembled powder pot

Similar Documents

Publication Publication Date Title
CN204223528U (en) Cement bin
CN104401604A (en) Cement bin and manufacturing process thereof
CN102730351B (en) Storage silo and silo manufacturing method of storage silo
CN204384132U (en) The upper cone of cement bin
CN205369206U (en) Geogrid convenient to fixed equipment
HRP20140144T1 (en) Flexible package for liquid products
CN204223552U (en) The lower cone of cement bin
CN104370012A (en) Lower cone body of cerement bin and manufacturing process of lower cone body
CN204940270U (en) A kind of square pile pile cover structure
CN204195081U (en) With the melt-through weld structure of liner plate
CN206382218U (en) Bridging arrangement between straight line shaker dust cap
CN204040273U (en) The hermetically-sealed construction of a kind of steel bar truss floor support plate and beam junction
CN104370009A (en) Upper cone body of cerement bin and manufacturing process of upper cone body
CN204448074U (en) The double-deck column of the special many seamed edges of a kind of laboratory table
CN206633445U (en) Plastic products weld strength detection support
CN207348224U (en) A kind of integrated shaped steel and its live splicing construction
CN207390121U (en) Ton bucket strengthening frame
CN202687202U (en) Storage bin
CN207810215U (en) Multidirectional V-type clamping structure on platform supporting rack
CN203175126U (en) Assembled steel plate bin wall node connecting structure
CN204627291U (en) Window covering
CN204343455U (en) A kind of novel plugging steel construction piece
CN204040272U (en) The hermetically-sealed construction of a kind of steel bar truss floor support plate and beam junction
CN205153316U (en) A steel case roof beam that is used for space curved surface rack crooked
CN202687201U (en) Bin body of material storage bin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant