CN206378374U - A kind of high hose pressure experimental rig of operating efficiency - Google Patents

A kind of high hose pressure experimental rig of operating efficiency Download PDF

Info

Publication number
CN206378374U
CN206378374U CN201720093301.2U CN201720093301U CN206378374U CN 206378374 U CN206378374 U CN 206378374U CN 201720093301 U CN201720093301 U CN 201720093301U CN 206378374 U CN206378374 U CN 206378374U
Authority
CN
China
Prior art keywords
support member
connecting tube
backup pad
upper backup
test gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720093301.2U
Other languages
Chinese (zh)
Inventor
廖恒易
吴杰
茹高艺
张有华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGXI HUATE ELECTRONIC CHEMICAL CO., LTD.
Original Assignee
Jiangxi Huate Electronic Chemical Co Ltd
Jiangxi Huadong Special Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Huate Electronic Chemical Co Ltd, Jiangxi Huadong Special Gas Co Ltd filed Critical Jiangxi Huate Electronic Chemical Co Ltd
Priority to CN201720093301.2U priority Critical patent/CN206378374U/en
Application granted granted Critical
Publication of CN206378374U publication Critical patent/CN206378374U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

A kind of high hose pressure experimental rig of operating efficiency, including support frame, the first connecting tube, the second connecting tube, fastening device of hose, test gas pipe, exhaust-valve, pressure gauge and test gas source;Support frame includes upper backup pad and end supporting part, and the quantity of end supporting part is two, and is respectively arranged on the two ends of upper backup pad;Supporting part is held to include the first support member, the second support member and the 3rd support member, the first support member, the second support member and the 3rd support member constitute the end supporting part of triangle;First connecting tube and the second connecting tube are located at upper backup pad;One end of first connecting tube is cased with fastening device of hose, and the other end of the first connecting tube is connected with pressure gauge;One end of second connecting tube is cased with fastening device of hose, and the other end of the second connecting tube is connected to one end of test gas pipe, and the other end of test gas pipe is connected to test gas source.The utility model reliability is high, and operating efficiency is high, and pressure that can be quickly to flexible pipe is tested.

Description

A kind of high hose pressure experimental rig of operating efficiency
Technical field
The utility model is related to hose test device field, more particularly to a kind of high hose pressure experiment dress of operating efficiency Put.
Background technology
Flexible pipe is broadly divided into by purposes:Threading flexible pipe, scupper hose, vent hose, hose for shower head, wire harness pipe;By material It is broadly divided into:Stainless steel flexible hose, metal hose, corrugated flexible hose, rubber hose, plastic flexible pipe.Flexible pipe has the characteristics that:Pitch Between flexibly;There is preferable retractility, it is clog-free and stiff;Lightweight, bore uniformity is good;Flexibility, repeated flex, scratch Property is good;Corrosion resistance, heat-resisting quantity are good;It is mouse bite preventing, wear-resistant good, prevent internal wire to be worn;Resistant to bending, pull resistance Energy, lateral pressure resistant are strong;It is a softer and smoother touch, be easy to threading install positioning.
Normal pressures flexible pipe is because using frequently, deformation is larger, there is certain potential safety hazard after long-term use, it is necessary to fixed Phase carries out pressure-resistant, the air-tight test of flexible pipe, pinpoints the problems in time, it is ensured that the safety of operating personnel in use.
But, the existing central pressure test to flexible pipe is the other end connection flexible pipe one end on tank car Pressure source, like this, carries out testing cumbersome, inefficiency.
Utility model content
The purpose of this utility model is the hose pressure experimental rig for proposing that a kind of operating efficiency is high, and its reliability is high, Operating efficiency is high, and pressure that can be quickly to flexible pipe is tested.
For up to this purpose, the utility model uses following technical scheme:
A kind of high hose pressure experimental rig of operating efficiency, including it is support frame, the first connecting tube, the second connecting tube, soft Pipe locking device, test gas pipe, exhaust-valve, pressure gauge and test gas source;
Support frame as described above includes upper backup pad and end supporting part, and the quantity of the end supporting part is two, and is respectively arranged on institute State the two ends of upper backup pad;
The end supporting part includes the first support member, the second support member and the 3rd support member, the one of second support member End and one end of the 3rd support member are respectively arranged at first support member, the other end of second support member and the 3rd support The other end of part is respectively arranged at the both sides of the end of the upper backup pad, first support member, the second support member and the 3rd Support member constitutes the end supporting part of triangle;
First connecting tube and the second connecting tube are located at the upper backup pad;
One end of first connecting tube is cased with the fastening device of hose, and the other end of first connecting tube is connected with The pressure gauge;
One end of second connecting tube is cased with the fastening device of hose, and the other end of second connecting tube is connected to One end of the test gas pipe, the other end of the test gas pipe is connected to the test gas source, and the exhaust-valve is set In the test gas pipe.
Further, one end of second support member and one end of the 3rd support member are respectively welded in first support member Upper surface, the other end of second support member and the other end of the 3rd support member are respectively welded in the end of the upper backup pad The both sides in portion.
Further, first connecting tube and the second connecting tube are curved pipe;
One end of first connecting tube and one end of the second connecting tube are respectively facing the outer of the two ends of the upper backup pad The lower surface of side, the other end of first connecting tube and the other end of the second connecting tube from the upper backup pad is through thereon Surface, and it is welded in the upper backup pad.
Further, the exhaust-valve is vertical at the side of the test gas pipe.
Further, the upper backup pad also includes two pieces of connecting plates, and two pieces of connecting plates are respectively perpendicular on described The both sides of supporting plate.
Further, the structure of first support member, the second support member and the 3rd support member is identical;
First support member includes the first supporting plate and the second supporting plate;
First supporting plate is vertically installed in the side of second supporting plate.
Further, the hose pressure experimental rig also includes multiple universal wheels, and the universal wheel is respectively arranged on described the The two ends of the bottom of one support member, the universal wheel is provided with brake gear.
Further, the hose pressure experimental rig also includes solar panel, battery and LED, is respectively arranged on The upper surface of the upper backup pad, the LED and solar panel are connected with the storage battery respectively.
The utility model proposes a kind of high hose pressure experimental rig of operating efficiency, its reliability according to the above Height, operating efficiency is high, and pressure that can be quickly to flexible pipe is tested.
During work, the two ends of the flexible pipe are connected with one end of first connecting tube and one end of the second connecting tube respectively Connect, then the two ends of the flexible pipe are locked at by one end of first connecting tube and second by the fastening device of hose and connect On one end of pipe, can so increase it is follow-up to it is described it is soft test when functional reliability, it is to avoid the experiment of the flexible pipe When come off and cause test failure;
Then, the flexible pipe just can form the loop of a detection, now, start the test gas source, described in Test gas pipe is passed through test gas, and the test gas used in the present embodiment is nitrogen, another due to second connecting tube End is connected to one end of the test gas pipe, connects so the nitrogen is directly passed through to described second from the test gas pipe Adapter, then be passed through from second connecting tube to the inside hose, then the nitrogen is again from the another of first connecting tube One end leads to the pressure gauge, then observes and record the numerical value on the pressure gauge, just can quickly learn whether the flexible pipe reaches To related pressure index, rapidly and efficiently, efficiency high, reliability is high for whole process of the test.
Also, the pressure of the nitrogen of the test gas source output according to actual situation, can be adjusted, to meet not Same test requirements document.After the completion of experiment, by opening the exhaust-valve, by the nitrogen discharge.
The quantity of the end supporting part is two, and is respectively arranged on the two ends of the upper backup pad so that the upper backup pad It is more uniformly stressed, so as to increase the service life of the upper backup pad;By first support member, the second support member and the 3rd The support force of the end supporting part of the triangle of support member composition is stronger, the other end of second support member and the 3rd support The other end of part is respectively arranged at the both sides of the end of the upper backup pad, can farthest support the upper backup pad, Improve the stability of support frame as described above.
Brief description of the drawings
Fig. 1 is the structural representation of the one of embodiment of the utility model.
Fig. 2 is the structural representation of the one of embodiment of the utility model.
Wherein:Support frame 1, upper backup pad 11, connecting plate 111, end supporting part 12, the first support member 121, the first supporting plate 1211st, the second supporting plate 1212, the second support member 122, the 3rd support member 123, the first connecting tube 21, the second connecting tube 22, soft Pipe locking device 3, test gas pipe 4, exhaust-valve 5, pressure gauge 6.
Embodiment
Further illustrate the technical solution of the utility model below in conjunction with the accompanying drawings and by embodiment.
A kind of high hose pressure experimental rig of operating efficiency, including support frame 1, the first connecting tube 21, the second connecting tube 22nd, fastening device of hose 3, test gas pipe 4, exhaust-valve 5, pressure gauge 6 and test gas source;
Support frame as described above 1 includes upper backup pad 11 and end supporting part 12, and the quantity of the end supporting part 12 is two, and respectively Located at the two ends of the upper backup pad 11;
The end supporting part 12 includes the first support member 121, the second support member 122 and the 3rd support member 123, described second One end of support member 122 and one end of the 3rd support member 123 are respectively arranged at first support member 121, second support The other end of the other end of part 122 and the 3rd support member 123 is respectively arranged at the both sides of the end of the upper backup pad 11, described First support member 121, the second support member 122 and the 3rd support member 123 constitute the end supporting part 12 of triangle;
The connecting tube 22 of first connecting tube 21 and second is located at the upper backup pad 11;
One end of first connecting tube 21 is cased with the fastening device of hose 3, the other end of first connecting tube 21 It is connected with the pressure gauge 6;
One end of second connecting tube 22 is cased with the fastening device of hose 3, the other end of second connecting tube 22 One end of the test gas pipe 4 is connected to, the other end of the test gas pipe 4 is connected to the test gas source, described Exhaust-valve 5 is located at the test gas pipe 4.
(fastening device of hose 3 is not drawn into Fig. 2) as depicted in figs. 1 and 2, the hose pressure examination of the present embodiment Experiment device can rapidly measure flexible pipe whether reach correlation pressure index, during work, by the two ends of the flexible pipe respectively with One end of first connecting tube 21 and the connection of one end of the second connecting tube 22, then will be described by the fastening device of hose 3 The two ends of flexible pipe are locked on one end of one end of first connecting tube 21 and the second connecting tube 22, can so increase follow-up To it is described it is soft test when functional reliability, it is to avoid come off during the experiment of the flexible pipe and cause test failure;
Then, the flexible pipe just can form the loop of a detection, now, start the test gas source, described in Test gas pipe 4 is passed through test gas, and the test gas used in the present embodiment is nitrogen, another due to second connecting tube 22 One end is connected to one end of the test gas pipe 4, so the nitrogen is directly passed through to described the from the test gas pipe 4 Two connecting tubes 22, then be passed through from second connecting tube 22 to the inside hose, then the nitrogen is again from the described first company The other end of adapter 21 leads to the pressure gauge 6, then observes and record the numerical value on the pressure gauge 6, just can quickly learn institute The pressure index whether flexible pipe reaches correlation is stated, rapidly and efficiently, efficiency high, reliability is high for whole process of the test.
Also, the pressure of the nitrogen of the test gas source output according to actual situation, can be adjusted, to meet not Same test requirements document.After the completion of experiment, by opening the exhaust-valve 5, by the nitrogen discharge.
The quantity of the end supporting part 12 is two, and is respectively arranged on the two ends of the upper backup pad 11 so that the upper branch Fagging 11 is more uniformly stressed, so as to increase the service life of the upper backup pad 11;By first support member 121, second The support force of the end supporting part 12 of the triangle of the support member 123 of support member 122 and the 3rd composition is stronger, second support The other end of the other end of part 122 and the 3rd support member 123 is respectively arranged at the both sides of the end of the upper backup pad 11, can The upper backup pad 11 is farthest supported, the stability of support frame as described above 1 is improved.
Further, one end of second support member 122 and one end of the 3rd support member 123 are respectively welded in described first The upper surface of support member 121, the other end of second support member 122 and the other end of the 3rd support member 123 be respectively welded in The both sides of the end of the upper backup pad 11.
By way of welding so that one end of second support member 122 and one end of the 3rd support member 123 directly connect The upper surface of first support member 121 is connected to, the seal of connection is better, and structural strength is bigger, is used so as to increase it Life-span;The other end of second support member 122 and the other end of the 3rd support member 123 are respectively welded in the upper backup pad 11 End both sides, so more facilitate the weldering of the other end of second support member 122 and the other end of the 3rd support member 123 Connect, when increasing the other end of second support member 122 and the other end of the 3rd support member 123 with the upper backup pad 11 welding Contact area, so as to weld more steady.
Further, the connecting tube 22 of the first connecting tube 21 and second is curved pipe;
One end of first connecting tube 21 and one end of the second connecting tube 22 are respectively facing the two of the upper backup pad 11 The other end of the outside at end, the other end of first connecting tube 21 and the second connecting tube 22 is under the upper backup pad 11 Surface passes through its upper surface, and is welded in the upper backup pad 11.
The connecting tube 22 of first connecting tube 21 and second is curved pipe, can reduce by first connecting tube 21 and The space that two connecting tubes 22 take so that the structure of the hose pressure experimental rig is compacter.First connecting tube 21 One end and the second connecting tube 22 one end be respectively facing the upper backup pad 11 two ends outside, more facilitate the flexible pipe Two ends be attached to;The other end of first connecting tube 21 and the other end of the second connecting tube 22 are from the upper support The lower surface of plate 11 passes through its upper surface, and like this, the pressure gauge 6 and test gas pipe 4 just can be located at the upper support The top of the upper surface of plate 11, conveniently observes the numerical value of the pressure gauge 6 and is connected to the other end of the test gas pipe 4 The test gas source.By way of welding so that the connecting tube 22 of the first connecting tube 21 and second is more stably set In the upper backup pad 11.
Further, the exhaust-valve 5 is vertical at the side of the test gas pipe 4.
Like this, staff more easily can be operated to discharge the nitrogen to the exhaust-valve 5.
Further, the upper backup pad 11 also includes two pieces of connecting plates 111, and two pieces of connecting plates 111 are respectively perpendicular and set In the both sides of the upper backup pad 11.
On the one hand two pieces of connecting plates 111 increase the structural strength of the upper backup pad 11, so that increasing it uses the longevity Life;In addition, the other end and the other end of the 3rd support member 123 also beneficial to second support member 122 is respectively welded in described The both sides of the end of upper backup pad 11, because two pieces of connecting plates 111 are respectively perpendicular located at the both sides of the upper backup pad 11, The other end and the other end of the 3rd support member 123 and two pieces of connecting plates 111 of second support member 122 can be increased Bonding area, so as to increase the intensity of its connection, increases service life.
Further, first support member 121, the second support member 122 are identical with the structure of the 3rd support member 123;
First support member 121 includes the first supporting plate 1211 and the second supporting plate 1212;
First supporting plate 1211 is vertically installed in the side of second supporting plate 1212.
First support member 121, the second support member 122 are identical with the structure of the 3rd support member 123, i.e., between three Versatility is high, can also improve the efficiency of its manufacture;First supporting plate 1211 is vertically installed in second supporting plate 1212 Side, by increasing capacitance it is possible to increase the structural strength of first support member 121, can also add first support member 121, second The direct bonding area of 122 and the 3rd support member of support member 123, so as to increase its service life.
Further, the hose pressure experimental rig also includes multiple universal wheels, and the universal wheel is respectively arranged on described the The two ends of the bottom of one support member 121, the universal wheel is provided with brake gear.
By the universal wheel, the hose pressure experimental rig can be easily promoted, power saving moving is improved described soft The mobility of pipe pressure experimental rig;By operating the brake gear, the universal wheel can be checked, then just can be steady Surely experiment work is carried out to the flexible pipe.
Further, the hose pressure experimental rig also includes solar panel, battery and LED, is respectively arranged on The upper surface of the upper backup pad 11, the LED and solar panel are connected with the storage battery respectively.
The battery can be powered for the LED, the LED can make the hose pressure experimental rig compared with Dark local normal work, when sunny, the solar panel can be battery charging, energy-conserving and environment-protective.
Technical principle of the present utility model is described above in association with specific embodiment.These descriptions are intended merely to explain this reality With new principle, and the limitation to the utility model protection domain can not be construed in any way.Based on explanation herein, Those skilled in the art, which would not require any inventive effort, can associate other embodiments of the present utility model, These modes are fallen within protection domain of the present utility model.

Claims (8)

1. a kind of high hose pressure experimental rig of operating efficiency, it is characterised in that:Including support frame, the first connecting tube, second Connecting tube, fastening device of hose, test gas pipe, exhaust-valve, pressure gauge and test gas source;
Support frame as described above includes upper backup pad and end supporting part, and the quantity of the end supporting part is two, and is respectively arranged on described The two ends of supporting plate;
The end supporting part include the first support member, the second support member and the 3rd support member, one end of second support member and One end of 3rd support member is respectively arranged at first support member, the other end of second support member and the 3rd support member The other end is respectively arranged at the both sides of the end of the upper backup pad, first support member, the second support member and the 3rd support Part constitutes the end supporting part of triangle;
First connecting tube and the second connecting tube are located at the upper backup pad;
One end of first connecting tube is cased with the fastening device of hose, and the other end of first connecting tube is connected with described Pressure gauge;
One end of second connecting tube is cased with the fastening device of hose, and the other end of second connecting tube is connected to described One end of test gas pipe, the other end of the test gas pipe is connected to the test gas source, and the exhaust-valve is located at institute State test gas pipe.
2. hose pressure experimental rig according to claim 1, it is characterised in that:One end of second support member and One end of three support members is respectively welded in the upper surface of first support member, the other end of second support member and the 3rd The other end of support member is respectively welded in the both sides of the end of the upper backup pad.
3. a kind of high hose pressure experimental rig of operating efficiency according to claim 1, it is characterised in that:Described first Connecting tube and the second connecting tube are curved pipe;
One end of first connecting tube and one end of the second connecting tube are respectively facing the outside at the two ends of the upper backup pad, institute State the other end of the first connecting tube and the other end of the second connecting tube pass through its upper surface from the lower surface of the upper backup pad, And it is welded in the upper backup pad.
4. a kind of high hose pressure experimental rig of operating efficiency according to claim 1, it is characterised in that:The emptying Valve is vertical at the side of the test gas pipe.
5. a kind of high hose pressure experimental rig of operating efficiency according to claim 1, it is characterised in that:The upper branch Fagging also includes two pieces of connecting plates, and two pieces of connecting plates are respectively perpendicular located at the both sides of the upper backup pad.
6. a kind of high hose pressure experimental rig of operating efficiency according to claim 1, it is characterised in that:Described first The structure of support member, the second support member and the 3rd support member is identical;
First support member includes the first supporting plate and the second supporting plate;
First supporting plate is vertically installed in the side of second supporting plate.
7. a kind of high hose pressure experimental rig of operating efficiency according to claim 1, it is characterised in that:The flexible pipe Pressure experimental device also includes multiple universal wheels, and the universal wheel is respectively arranged on the two ends of the bottom of first support member, institute Universal wheel is stated provided with brake gear.
8. a kind of high hose pressure experimental rig of operating efficiency according to claim 1, it is characterised in that:The flexible pipe Pressure experimental device also includes solar panel, battery and LED, is respectively arranged on the upper surface of the upper backup pad, institute LED and solar panel is stated to be connected with the storage battery respectively.
CN201720093301.2U 2017-01-24 2017-01-24 A kind of high hose pressure experimental rig of operating efficiency Active CN206378374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720093301.2U CN206378374U (en) 2017-01-24 2017-01-24 A kind of high hose pressure experimental rig of operating efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720093301.2U CN206378374U (en) 2017-01-24 2017-01-24 A kind of high hose pressure experimental rig of operating efficiency

Publications (1)

Publication Number Publication Date
CN206378374U true CN206378374U (en) 2017-08-04

Family

ID=59401062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720093301.2U Active CN206378374U (en) 2017-01-24 2017-01-24 A kind of high hose pressure experimental rig of operating efficiency

Country Status (1)

Country Link
CN (1) CN206378374U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107328658A (en) * 2017-08-08 2017-11-07 宁波鄞州竹创信息科技有限公司 A kind of fire hose pressure intelligent detection means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107328658A (en) * 2017-08-08 2017-11-07 宁波鄞州竹创信息科技有限公司 A kind of fire hose pressure intelligent detection means
CN107328658B (en) * 2017-08-08 2019-10-18 浙江天雁控股有限公司 A kind of fire hose pressure intelligent detection device

Similar Documents

Publication Publication Date Title
CN202561310U (en) Pipe installation connecting device
CN201603993U (en) Centering and aligning device for pipeline flanges
CN206378374U (en) A kind of high hose pressure experimental rig of operating efficiency
CN105954101A (en) Concrete electric pole movable test platform
CN208830982U (en) A kind of carbon dioxide drive feeder
CN204062245U (en) A kind of buried drain pipe glass fiber reinforced plastic clamping joint
CN206974827U (en) A kind of detection structure of the pressure-resistant performance of the circumferential weld of pressure vessel
CN204924574U (en) Sealing performance checking machine constructs for semiconductor device
CN205898583U (en) Novel steel pipe water pressure test machine
CN106769495A (en) Metal hose water test unit
CN110594522B (en) Automatic plugging device for pipeline and application method thereof
CN205938363U (en) Support of steel band check out test set
CN209416151U (en) A kind of heat exchanger with loose lining structure
CN2180864Y (en) Directly-buried disposable bellows expand joint
CN110449720A (en) A kind of steel-plastics composite pipe welding quality detection method
CN104671181A (en) Mobile hydrochloric acid loading crane pipe
CN205562275U (en) Pole testing platform
CN104555877A (en) Rotating arm crane pipe for loading hydrochloric acid
CN218118900U (en) Novel choke manifold device for oil well
CN214185973U (en) Pipeline leaking stoppage welding jig
CN218994630U (en) High-pressure hose gas tightness detection device
CN219775160U (en) Stainless steel pipeline repairing device
CN205351280U (en) Vertical takeover foreign body proof device of steam generator
CN211924430U (en) Pressure accumulator tank with exhaust safety valve and air compressor
CN209802462U (en) Horizontal vertical meter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200226

Address after: 332000 Spark Industrial Park, Yongxiu County Economic Development Zone, Jiujiang City, Jiangxi Province

Patentee after: JIANGXI HUATE ELECTRONIC CHEMICAL CO., LTD.

Address before: 330013 West Street, Nanchang economic and Technological Development Zone, Jiangxi, Yuping

Co-patentee before: JIANGXI HUATE ELECTRONIC CHEMICAL CO., LTD.

Patentee before: Jiangxi Huadong Special Gas Co., Ltd.