CN206376620U - Umbrella awning support meanss - Google Patents

Umbrella awning support meanss Download PDF

Info

Publication number
CN206376620U
CN206376620U CN201621273503.7U CN201621273503U CN206376620U CN 206376620 U CN206376620 U CN 206376620U CN 201621273503 U CN201621273503 U CN 201621273503U CN 206376620 U CN206376620 U CN 206376620U
Authority
CN
China
Prior art keywords
connecting plate
pillar
support meanss
supporting leg
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621273503.7U
Other languages
Chinese (zh)
Inventor
邵校
蒋官业
李冉冉
李明威
陈轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201621273503.7U priority Critical patent/CN206376620U/en
Application granted granted Critical
Publication of CN206376620U publication Critical patent/CN206376620U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a kind of umbrella awning support meanss, including connecting plate, supporting leg, pillar, steel wire rope and electric block;The supporting leg and the pillar are arranged on the both sides of the connecting plate;The electric block is connected by the steel wire rope with the pillar.In use, the bottom of supporting leg to be welded on to the top of lattice column, one end of steel wire rope is located on pillar, the other end is connected with radial direction girder steel, and electric block is set on a steel cord;The horizontal level of radial direction girder steel is adjusted by adjusting electric block, behind the position for adjusting radial direction girder steel, radial direction girder steel can be welded together with ring beam, so can ensure that construction precision.A piece radial direction girder steel is often installed, all the radial direction girder steel and pillar are connected by steel wire rope, firm steel beam action can be played, so as to further improve overall construction precision.After overall awning installation, umbrella awning support meanss are removed, you can installation that is convenient, fast, being accurately performed awning.

Description

Umbrella awning support meanss
Technical field
The utility model is related to the realm of building construction, more particularly to a kind of umbrella awning support meanss.
Background technology
With continuing to develop for China's economic level, the people's material and cultural life level has reached a new height.People To building, the demand idea of particularly public building also there occurs that essence changes, for example, to function, safety requirements day While benefit is improved, also there is higher demand than ever to building performance attractive in appearance.In recent years between, domestic all kinds of structure types are new Clever, peculiarly shaped steel building emerges in an endless stream, for example, steel structure canopy uses moulding more more and more in public building Plus umbrella awning structure attractive in appearance.
In the prior art, umbrella awning structure is generally installed using moulding bed supporting way.However, in work progress, by In factors such as construction environment complexity, cause moulding bed that inconvenience, influence installation accuracy and construction speed are installed.
Utility model content
Technical problem to be solved in the utility model is to be easily installed umbrella awning there is provided one kind and can ensure construction The umbrella awning support meanss of precision.
The utility model is achieved in that a kind of umbrella awning support meanss of offer, including connecting plate, supporting leg, pillar, Steel wire rope and electric block;The supporting leg and the pillar are arranged on the both sides of the connecting plate;The electric block passes through institute Steel wire rope is stated to be connected with the pillar.
Further, the connecting plate is made of steel plate.
Further, multiple supporting legs are symmetrically disposed in the first side of the connecting plate;The pillar is vertically set Put in the second side of the connecting plate.
Further, the multiple supporting leg is symmetrically disposed in the first side of the connecting plate with different connected modes.
Further, it is formed with slotted hole on the connecting plate;A supporting leg in the multiple supporting leg passes through welding side Formula is fixed to the first side of the connecting plate, and remaining supporting leg passes through matching somebody with somebody between bolt slotted hole corresponding with the connecting plate Close the first side for being installed to the connecting plate.
Further, it is formed with mounting hole on the free end of the pillar;One end of the steel wire rope is located in the peace Fill in hole.
When umbrella awning support meanss in the embodiment of the utility model one are used to install umbrella awning, by the bottom of supporting leg The top of lattice column is welded on, one end of steel wire rope is located on pillar, the other end is connected with radial direction girder steel, and electric block Set on a steel cord;The horizontal level of radial direction girder steel is adjusted by adjusting electric block, the position of radial direction girder steel is adjusted Afterwards, radial direction girder steel can be welded together with ring beam, so can ensure that construction precision.Moreover, a radial direction girder steel is often installed, All the radial direction girder steel and pillar are connected by steel wire rope, firm steel beam action can be played, so as to further improve Overall construction precision.After overall awning installation, umbrella awning support meanss are removed, you can convenient, fast, accurate Ground completes the installation of awning.
Brief description of the drawings
Fig. 1 is the structural representation of umbrella awning support meanss in the embodiment of the utility model one.
Fig. 2 is the bottom schematic view of umbrella awning support meanss in Fig. 1.
Fig. 3 is used to install structural representation during umbrella awning for umbrella awning support meanss in Fig. 1.
Fig. 4 is used to install dimensional structure diagram during umbrella awning for umbrella awning support meanss in Fig. 1.
Embodiment
In order that technical problem to be solved in the utility model, technical scheme and beneficial effect are more clearly understood, with Lower combination drawings and Examples, the utility model is further elaborated.It should be appreciated that specific reality described herein Example is applied only to explain the utility model, is not used to limit the utility model.
Fig. 1 show the structural representation of umbrella awning support meanss in the embodiment of the utility model one.Fig. 2 is in Fig. 1 The bottom schematic view of umbrella awning support meanss.Fig. 3 is used to install knot during umbrella awning for umbrella awning support meanss in Fig. 1 Structure schematic diagram.As shown in Figure 1 to Figure 3, umbrella awning support meanss 100 include connecting plate 110, supporting leg 120, pillar 130, steel wire Rope 140 and electric block 150.Wherein, supporting leg 120 and pillar 130 are arranged on the both sides of connecting plate 110, and electric block 150 passes through Steel wire rope 140 is connected with pillar 130.
Specifically, connecting plate 110 can be made of steel plate.In one embodiment, connecting plate 110 can be that thickness is 30mm Circular steel plate.
Supporting leg 120 is arranged on the first side of connecting plate 110 if bottom side is (when umbrella awning support meanss 100 are in shown in Fig. 1 During position).In one embodiment, multiple supporting legs 120 are arranged substantially symmetrically in the first side of connecting plate 110.For example, in Fig. 1 In shown embodiment, 3 supporting legs 120 can be arranged substantially symmetrically in connecting plate 110 by modes such as welding, bolt connections First side.In other embodiments, multiple supporting legs 120 can also different connected modes be arranged substantially symmetrically in connecting plate 110 the first side;For example, as shown in Fig. 2 a supporting leg 120a in 3 supporting legs 120 can be fixed to connection by welding manner First side of plate 110, and other two supporting leg 120b can be by between the slotted hole 112 corresponding with connecting plate 110 of bolt 122 Coordinate the first side for being installed to connecting plate 110, so as to carry out the regulation of certain amplitude to leg location, and then meet different Construction environment requirement.
Pillar 130 is arranged on the second side of connecting plate 110 if top side is (when umbrella awning support meanss 100 are in shown in Fig. 1 During position).In one embodiment, pillar 130 is generally perpendicularly arranged on the second side of connecting plate 110.The free end of pillar 130 On be formed with mounting hole 132, for wearing steel wire rope 140.
Electric block 150 is connected by steel wire rope 140 with pillar 130.
Above-mentioned is the concrete structure of umbrella awning support meanss 100 in the embodiment of the utility model one, brief description one Plant application method.
As shown in figure 3, when umbrella awning support meanss 100 are used to install umbrella awning, the bottom of supporting leg 120 is welded On the ring beam 210 on the top of lattice column 200.One end of steel wire rope 140 is located in the mounting hole 132 on pillar 130, separately One end is connected with radial direction girder steel 220, and electric block 150 is arranged on steel wire rope 140.Adjusted by adjusting electric block 150 Pitch diameter, can be by radial direction girder steel 220 and ring beam 210 behind the position for adjusting radial direction girder steel 220 to the horizontal level of girder steel 220 Weld together, so can ensure that construction precision.As shown in figure 4, often installing a radial direction girder steel 220, all pass through steel wire rope 140 The radial direction girder steel 220 and pillar 130 are connected, firm steel beam action can be played, so as to further improve entirety Construction precision.After overall awning installation, umbrella awning support meanss 100 are removed, you can convenient, fast, accurately Complete the installation of awning.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (6)

1. a kind of umbrella awning support meanss, it is characterised in that including connecting plate, supporting leg, pillar, steel wire rope and electric block; The supporting leg and the pillar are arranged on the both sides of the connecting plate;The electric block passes through the steel wire rope and the pillar Connection.
2. umbrella awning support meanss according to claim 1, it is characterised in that the connecting plate is made of steel plate.
3. umbrella awning support meanss according to claim 1, it is characterised in that multiple supporting legs are symmetrically disposed in First side of the connecting plate;The pillar is vertically disposed at the second side of the connecting plate.
4. umbrella awning support meanss according to claim 3, it is characterised in that the multiple supporting leg is with different connections Mode is symmetrically disposed in the first side of the connecting plate.
5. umbrella awning support meanss according to claim 3, it is characterised in that be formed with the connecting plate oval Hole;A supporting leg in the multiple supporting leg is fixed to the first side of the connecting plate by welding manner, and remaining supporting leg is logical The cooperation crossed between bolt slotted hole corresponding with the connecting plate is installed to the first side of the connecting plate.
6. the umbrella awning support meanss according to any one of claim 1 to 5, it is characterised in that the pillar Mounting hole is formed with free end;One end of the steel wire rope is located in the mounting hole.
CN201621273503.7U 2016-11-22 2016-11-22 Umbrella awning support meanss Active CN206376620U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621273503.7U CN206376620U (en) 2016-11-22 2016-11-22 Umbrella awning support meanss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621273503.7U CN206376620U (en) 2016-11-22 2016-11-22 Umbrella awning support meanss

Publications (1)

Publication Number Publication Date
CN206376620U true CN206376620U (en) 2017-08-04

Family

ID=59401864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621273503.7U Active CN206376620U (en) 2016-11-22 2016-11-22 Umbrella awning support meanss

Country Status (1)

Country Link
CN (1) CN206376620U (en)

Similar Documents

Publication Publication Date Title
CN103485290B (en) Track traffic externally-hung sound barrier
CN202073109U (en) Post tensioned prestressing cylinder infrastructure
CN206376620U (en) Umbrella awning support meanss
CN104389262A (en) Novel wooden trestle structure based on ecological landscape
CN204781327U (en) Positioner of space curved surface rack node normal line
CN204627001U (en) PC structure floor assembled prefabricated post diagonal brace support system
CN204624885U (en) A kind of standard knot support chassis of elevator
CN205637809U (en) Consolidate sections tower base
CN204645668U (en) The top support structure of shape steel support installed by a kind of rack
CN206524800U (en) The windproof photovoltaic bracket of one kind damping
CN202166668U (en) Installing support of software Rogowski coil lightning current sensor
CN202865849U (en) Counter-guiding control device for one-column-one-pile perpendicularity in frame reverse building method
CN103266780B (en) Tree-shaped steel column assembled moulding bed combined system and tree-shaped steel column assembling and construction method
CN205604281U (en) Double entry rock long anchor rod formula foundation structure
CN207583572U (en) Novel 4.0MW wind turbines rear min bearing seat
CN203322485U (en) Novel petroleum platform pipeline protecting tube
CN217054356U (en) Regulator
CN205421315U (en) Marine fan inlays batholith plinth suitable for batholith sea bed
CN203984320U (en) A kind of earth anchor photovoltaic bracket
CN205565573U (en) Cable testing bridge installing support based on photovoltaic support
CN202039348U (en) Wear-increasing subsidence-reducing diameter-variable pile
CN204356900U (en) A kind of box batter post supporting member for variable cross-section
CN204252004U (en) A kind of Novel wooden plank road structure based on ecoscape
CN103072279B (en) Wind driven generator blade web positioning device
CN208638306U (en) A kind of solar photovoltaic bracket improving wind loading rating using reinforcing rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District Che Kung Temple Binhe Tairan industry tipping 17 storey building No. 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address