CN205565573U - Cable testing bridge installing support based on photovoltaic support - Google Patents

Cable testing bridge installing support based on photovoltaic support Download PDF

Info

Publication number
CN205565573U
CN205565573U CN201620134683.4U CN201620134683U CN205565573U CN 205565573 U CN205565573 U CN 205565573U CN 201620134683 U CN201620134683 U CN 201620134683U CN 205565573 U CN205565573 U CN 205565573U
Authority
CN
China
Prior art keywords
support
cable testing
testing bridge
channel
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620134683.4U
Other languages
Chinese (zh)
Inventor
李辉
吴旭日
陈耀麟
孙玉红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201620134683.4U priority Critical patent/CN205565573U/en
Application granted granted Critical
Publication of CN205565573U publication Critical patent/CN205565573U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a cable testing bridge installing support based on photovoltaic support, it includes connects support and trailing arm, the connection support is the channel -section steel, and the edge of a wing lower part of channel -section steel both sides is equipped with the breach, and it has two at least through -holes to open on the channel -section steel, the trailing arm is a riser, its vertical upper portion of connecting the support of locating. The utility model discloses to connect the stand of the breach alignment photovoltaic support on the support, the reuse steel ring passes the through -hole of connecting on the support, and the stand that entangles the photovoltaic support is fixed, and the cable testing bridge is fixed on the trailing arm, the cable testing bridge installation is simple, practices thrift the section bar, improves pleasing to the eyely and the installation rate.

Description

Cable testing bridge mounting bracket based on photovoltaic bracket
Technical field
This utility model relates to a kind of mounting bracket, specifically cable testing bridge mounting bracket based on photovoltaic bracket.
Background technology
Large-scale ground station cable uses direct-buried mode, and power station, mountain region is hard due to hardening rock, and excavation difficulty uses bridge Frame system of laying.Crane span structure installation difficulty so that engineering progress is slow.
Summary of the invention
This utility model is intended to overcome the defect of prior art, it is provided that a kind of cable testing bridge based on photovoltaic bracket is installed and propped up Frame, the ingenious photovoltaic bracket column that utilizes, Fast Installation mountain region photovoltaic plant cable testing bridge.
In order to solve above-mentioned technical problem, this utility model is achieved in that
A kind of cable testing bridge mounting bracket based on photovoltaic bracket, it is characterised in that: it includes connecting bearing and trailing arm, institute Stating connection bearing is channel-section steel, and the bottom, the edge of a wing of channel-section steel both sides is provided with breach, and channel-section steel has at least two through hole;Trailing arm is one piece Riser, it is vertically located at the top connecting bearing.
Described cable testing bridge mounting bracket based on photovoltaic bracket, it is characterised in that: the number of openings on described channel-section steel It it is four.
The beneficial effects of the utility model are: by the column of the notch alignment photovoltaic bracket on connection bearing, then use steel ring Through the through hole connected on bearing, the column entangling photovoltaic bracket is fixed, and cable testing bridge is fixed on trailing arm;Cable testing bridge is installed Simply, save section bar, improve attractive in appearance and installation rate.
Accompanying drawing explanation
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
As shown in Figure 1: a kind of cable testing bridge mounting bracket based on photovoltaic bracket, it includes connecting bearing 1 and trailing arm 2, Described connection bearing is channel-section steel, and the bottom, the edge of a wing of channel-section steel both sides is provided with breach 3, and channel-section steel has four through holes 4;Trailing arm is one piece Riser, it is vertically located at the top connecting bearing.
By the column of the notch alignment photovoltaic bracket on connection bearing, then with steel ring through the through hole connected on bearing, set The column living photovoltaic bracket is fixed, and cable testing bridge is fixed on trailing arm;Cable testing bridge is installed simple, saves section bar, improves attractive in appearance And installation rate.

Claims (2)

1. a cable testing bridge mounting bracket based on photovoltaic bracket, it is characterised in that: it includes connecting bearing and trailing arm, described Connection bearing is channel-section steel, and the bottom, the edge of a wing of channel-section steel both sides is provided with breach, and channel-section steel has at least two through hole;Trailing arm is one piece and stands Plate, it is vertically located at the top connecting bearing.
Cable testing bridge mounting bracket based on photovoltaic bracket the most according to claim 1, it is characterised in that: on described channel-section steel Number of openings be four.
CN201620134683.4U 2016-02-23 2016-02-23 Cable testing bridge installing support based on photovoltaic support Expired - Fee Related CN205565573U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620134683.4U CN205565573U (en) 2016-02-23 2016-02-23 Cable testing bridge installing support based on photovoltaic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620134683.4U CN205565573U (en) 2016-02-23 2016-02-23 Cable testing bridge installing support based on photovoltaic support

Publications (1)

Publication Number Publication Date
CN205565573U true CN205565573U (en) 2016-09-07

Family

ID=56819737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620134683.4U Expired - Fee Related CN205565573U (en) 2016-02-23 2016-02-23 Cable testing bridge installing support based on photovoltaic support

Country Status (1)

Country Link
CN (1) CN205565573U (en)

Similar Documents

Publication Publication Date Title
CN203626273U (en) Construction device suitable for oblique face curtain wall
CN104179365B (en) Overall steel tower displacement constructional method
CN201864516U (en) Lifting appliance special for overhauling isolating switch
CN103663302B (en) L-type portal installation frame
CN208292485U (en) TBM headstock turnniing over and lifting device
CN204216515U (en) The mounting structure of distribution engineering cable testing bridge
CN205565573U (en) Cable testing bridge installing support based on photovoltaic support
CN204938800U (en) Tower crane rood beam basis
CN204691020U (en) A kind of T-shaped supporting steel keel of curtain wall
CN201778531U (en) Fixing base of auxiliary embraced bar
CN204005140U (en) Outdoor electronic display screen support
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN104818995A (en) Method for assembling confined concrete arch frames
CN203701282U (en) Pre-buried channel and support structure matched with same
CN204162250U (en) Elevator lower beam device
CN104389348B (en) A kind of installation method with covering arch structure
CN203890893U (en) Supporting bracket for integral lifting of hollow slab girder
CN202706271U (en) Assembly skeleton for miniature slabstones of curtain wall and suspension apparatus
CN201817838U (en) Fixing support of excavator counterweight and excavator main frame
CN208519318U (en) A kind of slidably concrete pump pipe pump line support
CN202109682U (en) Adjustable triaxial tile hook structure
CN204059213U (en) Protecting net upright post suspension column connecting structure
CN205689897U (en) A kind of detachable cable support
CN204059392U (en) A kind of tower crane stood on steel column column cap
CN203984320U (en) A kind of earth anchor photovoltaic bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

CF01 Termination of patent right due to non-payment of annual fee