Prior art keywords
glass
sealing chamber
top plate
production equipment
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720049981.8U
Other languages
Chinese (zh)
Inventor
刘宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hung Glass Technology Co Ltd
Original Assignee
Anhui Hung Glass Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hung Glass Technology Co Ltd filed Critical Anhui Hung Glass Technology Co Ltd
Priority to CN201720049981.8U priority Critical patent/CN206375828U/en
Application granted granted Critical
Publication of CN206375828U publication Critical patent/CN206375828U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Glass To Other Materials (AREA)

Abstract

The utility model discloses a kind of doubling glass production equipment, including workbench, pedestal is provided with the workbench, the sealing chamber of opening upwards is provided with the pedestal, the sealing intracavitary is provided with horizontally disposed top plate, and the top plate lower end is connected by piston rod with the cylinder of workbench lower end;The top plate upper end left and right sides is symmetrically arranged with the gap that there is matched glass thickness between two pieces of glass fixed blocks for being used to fix glass, the glass fixed block;The sealing chamber upper end is provided with for sealedly covering, and the hole for injecting glue connected with sealing chamber and steam vent are provided with the capping.This new structural design is rationally, easy to use, can avoid and bubble is produced between two glass, improves product quality;Accelerate glass cement dry glue, shorten the production time, accelerate production efficiency;Glass cement is avoided to enter the performance of influence vavuum pump in vavuum pump.

Description

A kind of doubling glass production equipment
Technical field
The utility model is related to a kind of glass production device, specifically a kind of doubling glass production equipment.
Background technology
Doubling glass have shock-proof shatter-resistant and it is anti-riot split function, largely used in construction industry and other industry, doubling glass Glass is by wherein arbitrarily simultaneously scribbling glass cement in one block of glass, then another block of glass is attached to scribble the one of glass cement Face so that together, the production of current doubling glass is by a manually face hand of one block of glass wherein for two pieces of glassy bonds It is dynamic to fill glass cement, then another block of glass is lifted on the glass for being fitted in and scribbling glass cement, because manual gluing is uneven, make The variable thickness of glass glue-line is caused, when with another piece of glass gluing in the middle of can produce bubble, after after glass cement dry glue, bubble Still exist between glass and glass, have a strong impact on the transparency of doubling glass, cause doubling glass quality bad, or even report It is useless, in view of drawbacks described above, is necessary to design a kind of lined adhesive glass production device in fact.
Utility model content
The purpose of this utility model is to provide a kind of doubling glass production equipment, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides following technical scheme:
Set on being provided with a kind of doubling glass production equipment, including workbench, the workbench in pedestal, the pedestal The sealing chamber of opening upwards is equipped with, the sealing intracavitary is provided with horizontally disposed top plate, and the top plate lower end passes through piston rod It is connected with the cylinder of workbench lower end;The top plate upper end left and right sides is symmetrically arranged with two blocks of glass for being used to fix glass and consolidated Determine the gap that there is matched glass thickness between block, the glass fixed block;The sealing chamber upper end is provided with for sealed The hole for injecting glue connected with sealing chamber and steam vent are provided with capping, the capping;The hole for injecting glue upper end is provided with fits therewith The injected rubber hose matched somebody with somebody, the injected rubber hose is connected with outside glue injection equipment;The steam vent upper end is connected by blast pipe with vavuum pump, The observation ball for observation is provided with the blast pipe;The annular heating wire peace against sealing chamber is provided with the pedestal It behave affectedly, heating wire is provided with the heating wire installation cavity;The pedestal lateral wall is provided with heat-insulation layer.
It is used as further program of the utility model:The top plate is provided with sealing ring with sealing chamber contact position.
It is used as the utility model further scheme:The hole for injecting glue matches with injected rubber hose.
It is used as the utility model further scheme:The observation ball is the orbicule that transparent silica gel is made.
It is used as the utility model further scheme:The capping is to be threadedly coupled with sealing chamber.
Compared with prior art, the beneficial effects of the utility model are:Two blocks of glass are individually placed into corresponding glass to consolidate Determine fixed on block, cover lidstock, injected rubber hose is inserted in hole for injecting glue and injecting glue is carried out, while starting vavuum pump, pass through row Tracheae and steam vent discharge the air of sealing intracavitary so that vacuum is formed between two glass, glass cement is covered with two glass completely Between, it is to avoid bubble is produced between two glass, product quality is improved;Heating wire installation cavity and heating wire are set, to sealing intracavitary Heated, accelerate glass cement dry glue, shortened the production time, accelerate production efficiency;Heat-insulation layer is set, heat energy loss is reduced, Energy-conserving and environment-protective;After dry glue is finished, capping is opened, glass is ejected by cylinder and top plate;Steam vent is arranged in capping, Glass cement will not be sucked by being set higher than glass, therefore filling up between glass the front exhaust pipe of glass cement, it is to avoid glass cement enters Enter the performance of influence vavuum pump in vavuum pump;Observation ball is set, conveniently observes and judges whether sealing intracavitary is already filled with, and Because its volume is sufficiently large, play a part of taking glass cement in so that there is time enough to close vavuum pump after injecting glue is finished.
In summary, this new structural design is rationally, easy to use, can avoid and produce bubble between two glass, improves Product quality;Accelerate glass cement dry glue, shorten the production time, accelerate production efficiency;Glass cement is avoided to enter shadow in vavuum pump Ring the performance of vavuum pump.
Brief description of the drawings
Fig. 1 is the structural representation of doubling glass production equipment.
In figure:1- workbench, 2- pedestals, 3- sealing chambers, 4- heating wire installation cavitys, 5- heating wire, 6- top plates, 7- glass is consolidated Determine block, 8- glass, 9- cappings, 10- hole for injecting glue, 11- injected rubber hoses, 12- steam vents, 13- blast pipes, 14- observation balls, 15- vacuum Pump, 16- cylinders, 17- heat-insulation layers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Referring to Fig. 1, a kind of doubling glass production equipment, including workbench 1, pedestal 2 is provided with the workbench 1, It is provided with the pedestal 2 in the sealing chamber 3 of opening upwards, the sealing chamber 3 and is provided with horizontally disposed top plate 6, it is described The lower end of top plate 6 is connected by piston rod with the cylinder 16 of the lower end of workbench 1;The upper end left and right sides of top plate 6 is symmetrically arranged with There is the gap of the thickness of matched glass 8 between two pieces of glass fixed blocks 7 for fixing glass 8, the glass fixed block 7;Institute State the upper end of sealing chamber 3 be provided with for sealedly cover be provided with 9, the capping 9 hole for injecting glue 10 that is connected with sealing chamber 3 and Steam vent 12;The upper end of hole for injecting glue 10 is provided with the injected rubber hose 11 being adapted to therewith, the injected rubber hose 11 and outside glue injection equipment It is connected;The upper end of steam vent 12 is connected by blast pipe 13 with vavuum pump 15, is provided with the blast pipe 13 for observing Observation ball 14;The annular heating wire installation cavity 4 against sealing chamber 3, the heating wire installation cavity are provided with the pedestal 1 Heating wire 5 is provided with 4;The lateral wall of pedestal 1 is provided with heat-insulation layer 17.
Operation principle of the present utility model is:Two blocks of glass 8 are individually placed on corresponding glass fixed block 7 to fixed, lid Upper capping 9 is sealed, and injected rubber hose 11 is inserted in hole for injecting glue 10 and injecting glue is carried out, while starting vavuum pump 15, passes through blast pipe 13 And steam vent 12 discharges the air in sealing chamber 3 so that vacuum is formed between two glass 8, glass cement is covered with two glass 8 completely Between, it is to avoid bubble is produced between two glass 8, product quality is improved;Heating wire installation cavity 4 and heating wire 5 are set, to sealing chamber Heated in 3, accelerate glass cement dry glue, shortened the production time, accelerate production efficiency;Heat-insulation layer 17 is set, heat energy is reduced Loss, energy-conserving and environment-protective;After dry glue is finished, capping 9 is opened, glass 8 is ejected by cylinder 16 and top plate 6;By steam vent 12 Glass will not be sucked by being arranged in capping 9, being set higher than glass 8, therefore fill up between glass 8 front exhaust pipe 12 of glass cement Glass glue, it is to avoid glass cement enters the performance of influence vavuum pump 15 in vavuum pump 15;Observation ball 14 is set, conveniently observes and judges envelope Whether it is already filled with glue chamber 2, and because its volume is sufficiently large, plays a part of taking glass cement in so that finish in injecting glue After have time enough close vavuum pump 15.
In the description of the invention, it is necessary to explanation, the instruction such as term " on ", " under ", "left", "right", " interior ", " outer " Orientation or position relationship be based on orientation shown in the drawings or position relationship, be for only for ease of description the present invention and simplification retouch State, rather than indicate or imply that the device or element of meaning there must be specific orientation, with specific azimuth configuration and operation, Therefore it is not considered as limiting the invention.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It may be appreciated other embodiment.

Claims (5)

1. a kind of doubling glass production equipment, including workbench, it is characterised in that pedestal is provided with the workbench, described The sealing chamber of opening upwards is provided with pedestal, the sealing intracavitary is provided with horizontally disposed top plate, the top plate lower end It is connected by piston rod with the cylinder of workbench lower end;The top plate upper end left and right sides, which is symmetrically arranged with two pieces, to be used to fix glass There is the gap of matched glass thickness between the glass fixed block of glass, the glass fixed block;The sealing chamber upper end is provided with For sealedly covering, the hole for injecting glue connected with sealing chamber and steam vent are provided with the capping;The hole for injecting glue upper end is set The injected rubber hose being adapted to therewith is equipped with, the injected rubber hose is connected with outside glue injection equipment;The steam vent upper end by blast pipe with Vavuum pump is connected, and the observation ball for observation is provided with the blast pipe;The ring against sealing chamber is provided with the pedestal Heating wire is provided with the heating wire installation cavity of shape, the heating wire installation cavity;The pedestal lateral wall is provided with heat-insulation layer.
2. doubling glass production equipment according to claim 1, it is characterised in that the top plate is set with sealing chamber contact position It is equipped with sealing ring.
3. doubling glass production equipment according to claim 1, it is characterised in that the hole for injecting glue and injected rubber hose phase Match somebody with somebody.
4. doubling glass production equipment according to claim 1, it is characterised in that the observation ball is made up of transparent silica gel Orbicule.
5. doubling glass production equipment according to claim 1, it is characterised in that the capping connects with sealing chamber for screw thread Connect.
CN201720049981.8U 2017-01-17 2017-01-17 A kind of doubling glass production equipment Expired - Fee Related CN206375828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720049981.8U CN206375828U (en) 2017-01-17 2017-01-17 A kind of doubling glass production equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720049981.8U CN206375828U (en) 2017-01-17 2017-01-17 A kind of doubling glass production equipment

Publications (1)

Publication Number Publication Date
CN206375828U true CN206375828U (en) 2017-08-04

Family

ID=59400069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720049981.8U Expired - Fee Related CN206375828U (en) 2017-01-17 2017-01-17 A kind of doubling glass production equipment

Country Status (1)

Country Link
CN (1) CN206375828U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113968068A (en) * 2021-11-16 2022-01-25 福建标茂玻璃制品有限公司 Laminated glass wet preparation process with high bubble removal rate
CN117087304A (en) * 2023-10-19 2023-11-21 四川宇光光学玻璃有限公司 Glass sheet PVB intermediate film filling device considering internal stress detection
CN117087304B (en) * 2023-10-19 2024-05-24 四川宇光光学玻璃有限公司 Glass sheet PVB intermediate film filling device considering internal stress detection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113968068A (en) * 2021-11-16 2022-01-25 福建标茂玻璃制品有限公司 Laminated glass wet preparation process with high bubble removal rate
CN117087304A (en) * 2023-10-19 2023-11-21 四川宇光光学玻璃有限公司 Glass sheet PVB intermediate film filling device considering internal stress detection
CN117087304B (en) * 2023-10-19 2024-05-24 四川宇光光学玻璃有限公司 Glass sheet PVB intermediate film filling device considering internal stress detection

Similar Documents

Publication Publication Date Title
CN104626607B (en) A kind of integral forming technique in light-duty carbon fiber compartment
CN105500780A (en) Aerogel vacuum insulated panel and preparation method thereof
CN206375828U (en) A kind of doubling glass production equipment
CN104985655B (en) Aldehyde reducing technology for medium-high density fiberboards
CN207480960U (en) A kind of novel mixer
CN105742557A (en) High-efficiency rotation electrolyte injection mechanism of alkaline dry battery
CN108223334A (en) Low noise sound tube fills air pump
CN207118617U (en) A kind of portable down jackets
CN206317217U (en) Cement steam curing box
CN204487744U (en) Automatic edger spiral upper end glue feeder
CN105586824B (en) A kind of cement pavement crack is clear miscellaneous and the integrated portable unit of grouting
CN107916764A (en) A kind of solid wood PVC stones mould double-layer combined floor
CN206546853U (en) The vacuum liquid filling mechanism of soft package lithium battery filling machine
CN106733291A (en) A kind of plank viscose glue injection equipment
CN209214235U (en) Drying unit is used in a kind of processing of multi-layer board
CN206682511U (en) A kind of three layers of combined heat insulated device of vacuum
CN202802671U (en) Ball exhaust and air tap mounting device
CN206623287U (en) A kind of mould that can improve plastic-wood composite floor processability
CN206609344U (en) A kind of gun barrel cylinder integrative-structure of air gun
CN206009121U (en) Bung flanging injection system
CN210161508U (en) Vacuumizing equipment with anti-shake function
CN207077746U (en) A kind of water cooling plant of injection machine outlet
CN206840769U (en) A kind of hollow sole and die for shoe-sole
CN101531063A (en) Vacuum extractor of drawing die
CN205929334U (en) Inhale vacuum -exhaust structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170804