CN206372471U - Climbers - Google Patents

Climbers Download PDF

Info

Publication number
CN206372471U
CN206372471U CN201621142895.3U CN201621142895U CN206372471U CN 206372471 U CN206372471 U CN 206372471U CN 201621142895 U CN201621142895 U CN 201621142895U CN 206372471 U CN206372471 U CN 206372471U
Authority
CN
China
Prior art keywords
protrusion
slipmat
dop
climbers
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621142895.3U
Other languages
Chinese (zh)
Inventor
唐渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201621142895.3U priority Critical patent/CN206372471U/en
Application granted granted Critical
Publication of CN206372471U publication Critical patent/CN206372471U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a kind of climbers, including head rod, the second connecting rod, the first protrusion and dop.The head rod is connected with second connecting rod.First protrusion is removably installed in the head rod.The dop is installed on second connecting rod, and the dop is provided with dismountable second protrusion.First protrusion and second protrusion are oppositely arranged.By first protrusion and second protrusion and the frictional force of electric pole, climbers being capable of the electric pole that drenches of clamping surface.

Description

Climbers
Technical field
The utility model is related to tool for power construction field, more particularly to a kind of climbers.
Background technology
When power transmission lines overhauling is safeguarded, climbers are a kind of conventional security tools, and for auxiliary repair, personnel step on bar.When When maintainer tramples climbers, a medial surface of climbers catches on electric pole surface, and another medial surface is held in by body weight On electric pole, so that climbers, which produce locking phenomenon, holds electric pole tightly.When maintainer's foot-up, reduction of the climbers because bearing gravity, pin Detain the release electric pole that is horizontal.In this way, maintainer holds or unclamped electric pole tightly using climbers realizes upper boom.
However, when running into thunderstorm weather, because rainwater drenches, electric pole surface is relatively slided.When maintainer tramples climbers, Climbers can not hold electric pole tightly, cause maintainer can not climb up electric pole or be slid from electric pole.
The content of the invention
Based on this, the utility model is to overcome the defect of prior art, and there is provided a kind of climbers that can be anti-skidding.
Its technical scheme is as follows:
A kind of climbers, including head rod, the second connecting rod, the first protrusion and dop, the head rod with The second connecting rod connection, first protrusion is removably installed in the head rod, and the dop is installed on Second connecting rod, the dop is provided with dismountable second protrusion, first protrusion and second protrusion It is oppositely arranged.
In one of the embodiments, first protrusion is provided with screw thread, and the head rod is provided with and the spiral shell The screwed hole that line matches, first protrusion is threadedly coupled with the head rod.
In one of the embodiments, the head rod is provided with the first slipmat, and first protrusion is detachable Ground is installed on first slipmat, and first projecting member portion exposes to the first slipmat surface, and the dop is set There is the second slipmat, second protrusion is removably installed in outside second slipmat, second projecting member portion It is exposed to the second slipmat surface.
In one of the embodiments, first protrusion is several, and first protrusion is evenly mounted on First slipmat, second protrusion is several, and it is anti-skidding that second protrusion is evenly mounted on described second Pad.
In one of the embodiments, first slipmat and the second slipmat surface are equipped with convex stripe.
In one of the embodiments, the dop is metal clip, and second slipmat is removably pacified by bolt It is attached in the metal clip.
In one of the embodiments, the head rod is provided with block, and second connecting rod is provided with first sleeve, The first sleeve is socketed on the head rod, and the first sleeve is located between the dop and the block.
In one of the embodiments, second connecting rod is provided with the second sleeve pipe, and the dop is provided with the 3rd connecting rod, Second sleeve pipe is socketed on the 3rd connecting rod.
In one of the embodiments, including foot-operated and cingulum, it is described it is foot-operated be connected with the 3rd connecting rod, the button Band one end is connected to described foot-operated one end, and the cingulum other end is connected to the foot-operated other end.
In one of the embodiments, the dop is arcuate structure, and the intrados of the dop is prominent towards described first Play part.
The advantage or principle to preceding solution are illustrated below:
1st, above-mentioned climbers, the first protrusion and the second protrusion are oppositely arranged.In use, electric pole is stuck in head rod Contacted between dop, and with the first protrusion and the second protrusion.First protrusion and the second protrusion increase the first company The frictional force of extension bar and dop and electric pole.Therefore, in the case of wet and slippery even in electric pole surface, climbers can also clamp electric pole, Maintainer is avoided to be slid from electric pole.
2nd, above-mentioned climbers, the first protrusion is threadedly coupled with head rod, so as to realize that the first protrusion can Releasably it is installed on head rod.First protrusion and the frictional force of electric pole are more than the friction of head rod surface and electric pole Power.When electric pole surface is wet and slippery, the first protrusion is installed to head rod, so that increase the frictional force of climbers and electric pole, Climbers are enabled to clamp electric pole.When electric pole dry tack free, the frictional force on the surface and electric pole of head rod and dop is just Climbers can be caused to clamp electric pole.Therefore, the first protrusion is disassembled from head rod, so as to reduce climbers and electric pole Frictional force so that maintainer more brisk can climb up electric pole.
3rd, above-mentioned climbers, first sleeve is socketed on head rod, first sleeve be located at head rod and block it Between.According to the diameter of electric pole, first sleeve is moved along head rod between the first protrusion and block, so as to change The distance of first protrusion and the second protrusion so that climbers can clamp various sizes of electric pole.
Brief description of the drawings
Fig. 1 is the structural representation of climbers described in the utility model embodiment;
Fig. 2 for Fig. 1 A to expanded view;
Fig. 3 for Fig. 1 B to expanded view.
Description of reference numerals:
100th, head rod, 101, block, the 200, second connecting rod, 201, first sleeve, the 202, second sleeve pipe, 301, First slipmat, the 302, first protrusion, 400, dop, the 401, second slipmat, the 402, second protrusion, the 403, the 3rd connection Bar, 500, foot-operated.
Embodiment
Embodiment of the present utility model is described in detail below:
As shown in figure 1, a kind of climbers, including head rod 100, the second connecting rod 200, the first protrusion 302 and card First 400.Head rod 100 is connected with the second connecting rod 200.First protrusion 302 is removably installed in head rod 100.Dop 400 is installed on the second connecting rod 200, and dop 400 is provided with dismountable second protrusion 402.First protrusion 302 It is oppositely arranged with the second protrusion 402.
First protrusion 302 and the second protrusion 402 can be screw, steel nail or dentation projection.
In use, when electric pole surface is wet and slippery, electric pole is stuck between head rod 100 and dop 400, and dashed forward with first The protrusion 402 of part 302 and second is played to contact.First protrusion 302 and the second protrusion 402 increase the He of head rod 100 The frictional force of dop 400 and electric pole.Therefore, in the case of wet and slippery on electric pole surface, the first protrusion 302 is installed to the first company On extension bar 100, the second protrusion 402 is installed on dop 400, climbers can clamp electric pole, it is to avoid maintainer is from electric pole It is upper to slide.When electric pole dry tack free, the frictional force on the surface and electric pole of head rod 100 and dop 400 is just enabled to Climbers clamp electric pole.Now, the first protrusion 302 is disassembled from head rod 100, so as to reduce climbers and electric pole Frictional force so that maintainer can more trippingly climb up electric pole.
First protrusion 302 is provided with screw thread.Head rod 100 is provided with the screwed hole matched with screw thread.First projection Part 302 is threadedly coupled with head rod 100.
As shown in Figures 2 and 3, head rod 100 is provided with the first slipmat 301.First protrusion 302 is removably It is installed on the first slipmat 301.The part of first protrusion 302 exposes to the surface of the first slipmat 301.Dop 400 is provided with second Slipmat 401.Second protrusion 402 is removably installed in the second slipmat 401.Specifically, dop 400 is metal clip.The Two slipmat 401 are releasably attached in metal clip by bolt.When the second 401 wear out failure of slipmat, second is anti-skidding Pad 401 can be dismantled and changed from dop 400.
Although the first slipmat 301 and the second slipmat 401 and the frictional force of electric pole are less than the first protrusion 302 and the Two protrusions 402 and the frictional force of electric pole, but in the case of electric pole dry tack free, the first slipmat 301 and the second slipmat 401 disclosure satisfy that climbers clamp the requirement of electric pole with the frictional force of electric pole.The material of first slipmat 301 and the second slipmat 401 Material can be the elastomeric materials such as silica gel, polyurethane resin and polyvinyl chloride.
In one of the embodiments, the first protrusion 302 and the second protrusion 402 are screw, the first slipmat 301 and second slipmat 401 be rubber blanket.Screw just can be embedded in rubber blanket by staff by Philip's head screw pen In.Because rubber has elastic force, screw tightly can be embedded in rubber.When after repeatedly repairing, such as screw weares and teares It is serious and when not reaching safety coefficient requirement, staff can be conveniently and efficiently screw from rubber blanket with Philip's head screw pen In disassemble, and the screw more renewed.In this way, the first protrusion 302, which is realized, is removably installed in the first slipmat 301, the second protrusion 402, which is realized, is removably installed in the second slipmat 401.
For the first slipmat 301 of increase and the second slipmat 401 and the frictional force of electric pole, the first slipmat 301 and second The surface of slipmat 401 is equipped with convex stripe.
As shown in Figures 2 and 3, the first protrusion 302 is several, and the first protrusion 302 is evenly mounted on first and prevented Skidding 301.Second protrusion 402 is several, and the second protrusion 402 is evenly mounted on the second slipmat 401.In this way, the One protrusion 302 and the second protrusion 402 are more balanced with the frictional force distribution of electric pole so that climbers can be pressed from both sides more smoothly Tight electric pole.
Head rod 100 can be welding with the connected mode of the second connecting rod 200, be threadedly coupled and be socketed.
As shown in figure 1, head rod 100 is provided with block 101.Second connecting rod 200 is provided with first sleeve 201.First Sleeve pipe 201 is socketed on head rod 100, and first sleeve 201 is located between dop 400 and block 101.Block 101 prevents Sleeve 201 is separated from head rod 100.In this way, according to the different-diameter of electric pole, first sleeve 201 is connected along first Bar 100 is moved, and adjusts its installation site with head rod 100, so as to change the first protrusion 302 and the second protrusion 402 distance so that climbers can clamp various sizes of electric pole.
Second connecting rod 200 is provided with the second sleeve pipe 202.Dop 400 is provided with the 3rd connecting rod 403.Second sleeve pipe 202 is socketed In the 3rd connecting rod 403.
The climbers also include foot-operated 500 and cingulum.Foot-operated 500 are connected with the 3rd connecting rod 403.Cingulum one end is connected to Foot-operated 500 one end, the cingulum other end is connected to foot-operated 500 other end.In use, people is stepped down on foot-operated 500, and with cingulum by pin Fastened with foot-operated 500.
Dop 400 is arcuate structure.Intrados the first protrusion 302 of direction of dop 400.Because electric pole is shaped as cylinder Shape, so the dop 400 of arcuate structure can be bigger with the contact area of electric pole so that the frictional force of climbers and electric pole is bigger.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of climbers, it is characterised in that including head rod, the second connecting rod, the first protrusion and dop, described first Connecting rod is connected with second connecting rod, and first protrusion is removably installed in the head rod, the card Head is installed on second connecting rod, and the dop is provided with dismountable second protrusion, first protrusion and described the Two protrusions are oppositely arranged.
2. climbers according to claim 1, it is characterised in that first protrusion is provided with screw thread, first connection Bar is provided with the screwed hole matched with the screw thread, and first protrusion is threadedly coupled with the head rod.
3. climbers according to claim 1, it is characterised in that the head rod is provided with the first slipmat, described the One protrusion is removably installed in first slipmat, and first projecting member portion exposes to the first slipmat table Face, the dop is provided with the second slipmat, and second protrusion is removably installed in second slipmat, described second Projecting member portion exposes to the second slipmat surface.
4. climbers according to claim 3, it is characterised in that first protrusion is several, first projection Part is evenly mounted on first slipmat, and second protrusion is several, and second protrusion is equably installed In second slipmat.
5. climbers according to claim 3, it is characterised in that first slipmat and the second slipmat surface are equal Provided with convex stripe.
6. climbers according to claim 3, it is characterised in that the dop is metal clip, second slipmat passes through Bolt is releasably attached in the metal clip.
7. climbers according to claim 1, it is characterised in that the head rod is provided with block, second connection Bar is provided with first sleeve, and the first sleeve is socketed on the head rod, and the first sleeve is located at the dop and institute State between block.
8. climbers according to claim 1, it is characterised in that second connecting rod is provided with the second sleeve pipe, the dop Provided with the 3rd connecting rod, second sleeve pipe is socketed on the 3rd connecting rod.
9. climbers according to claim 8, it is characterised in that including foot-operated and cingulum, described foot-operated and the described 3rd company Extension bar is connected, and described cingulum one end is connected to described foot-operated one end, and the cingulum other end is connected to the foot-operated other end.
10. the climbers according to claim 1~9 any one, it is characterised in that the dop is arcuate structure, described The intrados of dop is towards first protrusion.
CN201621142895.3U 2016-10-20 2016-10-20 Climbers Active CN206372471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621142895.3U CN206372471U (en) 2016-10-20 2016-10-20 Climbers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621142895.3U CN206372471U (en) 2016-10-20 2016-10-20 Climbers

Publications (1)

Publication Number Publication Date
CN206372471U true CN206372471U (en) 2017-08-04

Family

ID=59402582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621142895.3U Active CN206372471U (en) 2016-10-20 2016-10-20 Climbers

Country Status (1)

Country Link
CN (1) CN206372471U (en)

Similar Documents

Publication Publication Date Title
CN206372471U (en) Climbers
CN206700638U (en) A kind of anti-skidding electrician's climbers
CN206128148U (en) Shovel for building multi -functional
CN105126317A (en) Safe climber
CN205100525U (en) Scaffold used for building
CN201735126U (en) Anti-skid foot fastener
CN204754739U (en) Ascending stair cohesion device
CN107877436A (en) A kind of Multifunctional wrench
US10926399B2 (en) Drill assist device and method for use thereof
CN201763276U (en) Clamp for fixing pressure cap of pumping well packing box
CN107829756B (en) Wet spraying machine for channel construction
CN203238976U (en) Elevator shaft protective handrail
CN204760967U (en) Transmission line wire jumper splicing sleeve
CN201370929Y (en) Antiskid poleclimer capable of breaking ice
CN205990780U (en) One kind is safe, easy-to-dismount to face frontier defense protection unit
CN207984990U (en) A kind of spare tyre fixing bolt
CN204339708U (en) A kind of reinforced cone self-unloading instrument
CN112302345A (en) Mortar barrel for building wall
CN206800955U (en) A kind of scaffold of culvert construction
CN204803955U (en) Power shovel fill end fixing device
CN205477687U (en) Mining safe anchor rope ground tackle
CN108894532B (en) Carbon fiber plate anchorage device with self-clamping function
CN204322948U (en) A kind of automobile tire pressure monitoring system projector mounting structure
CN205516269U (en) Take climbers of pedaling after antiskid
CN210341915U (en) Self-locking anti-pulling anchor rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant