CN201370929Y - Antiskid poleclimer capable of breaking ice - Google Patents

Antiskid poleclimer capable of breaking ice Download PDF

Info

Publication number
CN201370929Y
CN201370929Y CN200820130339U CN200820130339U CN201370929Y CN 201370929 Y CN201370929 Y CN 201370929Y CN 200820130339 U CN200820130339 U CN 200820130339U CN 200820130339 U CN200820130339 U CN 200820130339U CN 201370929 Y CN201370929 Y CN 201370929Y
Authority
CN
China
Prior art keywords
fixed chuck
ice
antiskid
layer
poleclimer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200820130339U
Other languages
Chinese (zh)
Inventor
曲德兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200820130339U priority Critical patent/CN201370929Y/en
Application granted granted Critical
Publication of CN201370929Y publication Critical patent/CN201370929Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Walking Sticks, Umbrellas, And Fans (AREA)

Abstract

The utility model relates to an antiskid poleclimer capable of breaking the ice, comprising a fixed chuck at the front end, a chuck at the rear end and a pedal at the rear end. The antiskid poleclimer capable of breaking the ice is characterized in that the inner side of the section-steel arc surface of the fixed chuck at the front end are inlaid with three hard alloy which are arrayed at different angles in an actinoid shape; the alloy steel pieces are in the shapes of cylinders, and each alloy steel piece is processed by one third length to be in the shape of a pointed cone; auxiliary antiskid rubber which is thinner than the alloy steel piece in the shape of the pointed cone is vulcanized on the inner side of the section-steel arc surface of the fixed chuck; the auxiliary antiskid rubber is matched with the chuck at the rear end under the action of the pedaling force of the worker; and the alloy steel pieces in the shape of the pointed cone can break the ice to be firmly inserted in the surface of a concrete pole. Therefore, the antiskid poleclimer capable of breaking the ice ensures the safety of the electric power engineering worker and makes certain contribution to the safe production.

Description

A kind of anti-skidding pole climber of layer that can open ice
Technical field
It is a kind of anti-skidding pole climber of layer that can open ice that the utility model relates to, and is useful for the Northeast's communication in winter, cement pole operation is stepped in power engineering, and what fully guarantee staff's personal safety must use instrument.
Background technology
The climbers that the construction of power engineering now upper boom is used, its structure is the machine-shaping of metal shaped steel, two fulcrum location lining is gone up rubber, skid preventing, this structural form is when weather conditions are good, can play a role, but regional northeastward winter construction, in the upkeep operation, rainwater is arranged on bar, under the white or icing situation, the climbers of original structure do not satisfy the needs of operation, can't upper boom, also can't guarantee operating personnel's safety even climb up cement pole, according to this kind situation, must innovate, adaptation northern area winter job is developed in courageously practice, and the anti-skidding pole climber of layer can open ice.
Summary of the invention
The utility model provides a kind of anti-skidding pole climber of layer that can open ice, on the certain regular arcwall face of climbers front end fixed chuck, stud with special hard alloy steel, overcome existing pole climber in the winter time or the deficiency of the easy landing of sleety weather upper boom operation, increase safety in production and ensure coefficient.
The utility model solves its anti-skidding technical scheme that technical problem adopted of layer that open ice: climbers front end shaped steel fixed chuck is arranged in its structure, the soldering carbide alloy, the sulfuration anti-slip rubber constitutes, and it is characterized in that: the inboard soldering carbide alloy of front end shaped steel fixed chuck arcwall face.On 90 ° of cambered surfaces that the front end fixed chuck contacts with circular pole face, by tumbling in alloy block on certain radioactive ray angle, alloy block is shaped as the 15mm long cylinder, 1/3 length is tapered wedge angle, along fixed chuck camber position sulfuration one deck anti-slip rubber, is lower than alloy tip 4-5mm as auxiliary anti-slip rubber, when the upper boom operation, cooperate with the rear end movable chuck, step at pin under the effect of power, closing gold pointed portion is destroyed ice sheet, alloy tip position is pricked be stuck on the cement pole face; Technique effect of the present utility model is: area pole face in winter freezes or south has the sleet disaster to take place northeastward, and the anti-skidding pole climber of layer that can open ice can play one's part to the full, and safeguard work personnel's life security improves the efficient of speedily carrying out rescue work.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the utility model scantling plan
Among Fig. 1: [1] front end fixed chuck, [2] rear end movable chuck, [3] rear end is foot-operated.
Fig. 2 be the utility model can open ice the layer an anti-skidding pole climber, the cutaway view of front end fixed chuck.
[1] front end fixed chuck shaped steel among Fig. 2; [2] carbide alloy steel part; [3] sulfuration anti-slip rubber.
The specific embodiment
In embodiment illustrated in fig. 2, stud with three layer anti-skidding alloy steel pieces [2] that open ice on the front end fixed chuck shaped steel [1]; Alloy steel piece is a column type, and long 15mm is processed into tapered tip at 1/3 garden column length, alloy steel piece [2] is welded on the fixed chuck shaped steel [1] with brazing by the radiation technique different angles, and the thickness of sulfuration anti-slip rubber [3] is lower than alloy steel piece [2] 4-5mm for well
Shown in Figure 1: [1] front end fixed chuck, with the rear end movable chuck, the foot-operated assembling mutually in rear end forms the anti-skidding pole climber single unit system of layer that open ice, and engineering staff is when upper boom, rely on pin to step on the power effect and make the front end fixed chuck, act on simultaneously with the rear end movable chuck, ice sheet is destroyed, make to have awl tip alloy steel toe and firmly prick and be stuck on the pole face, can fully guarantee staff's personal safety, reach the effect of anti-slip safety in production.

Claims (5)

1, a kind of anti-skidding pole climber of layer that can open ice has climbers front end shaped steel fixed chuck in structure, the soldering hard alloy steel, and the sulfuration anti-slip rubber is formed, and it is characterized in that: the inboard soldering carbide alloy of front end shaped steel fixed chuck arcwall face.
2, a kind of anti-skidding pole climber of layer that can open ice as claimed in claim 1, it is characterized in that: the soldering carbide alloy is cylindrical, wherein 1/3 column length is processed into the pointed shape of awl.
3, a kind of anti-skidding pole climber of layer that can open ice as claimed in claim 1, it is characterized in that: the soldering carbide alloy is to be arranged in front end shaped steel fixed chuck arcwall face inboard by three of radioactive ray different angles.
4, a bar as claimed in claim 1 anti-skidding pole climber of layer that can open ice, it is characterized in that: auxiliary sulfuration anti-slip rubber scope is whole at front end shaped steel fixed chuck segmental arc.
5, a kind of anti-skidding pole climber of layer that can open ice as claimed in claim 1, it is characterized in that: the anti-slip rubber thickness of sulfuration in shaped steel fixed chuck segmental arc inboard should be lower than soldering carbide alloy 4-5mm.
CN200820130339U 2008-12-16 2008-12-16 Antiskid poleclimer capable of breaking ice Expired - Fee Related CN201370929Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200820130339U CN201370929Y (en) 2008-12-16 2008-12-16 Antiskid poleclimer capable of breaking ice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200820130339U CN201370929Y (en) 2008-12-16 2008-12-16 Antiskid poleclimer capable of breaking ice

Publications (1)

Publication Number Publication Date
CN201370929Y true CN201370929Y (en) 2009-12-30

Family

ID=41497008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200820130339U Expired - Fee Related CN201370929Y (en) 2008-12-16 2008-12-16 Antiskid poleclimer capable of breaking ice

Country Status (1)

Country Link
CN (1) CN201370929Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266656A (en) * 2010-06-03 2011-12-07 上海市电力公司 Rod-climbing tool
CN112295179A (en) * 2020-09-24 2021-02-02 国网浙江省电力有限公司衢州供电公司 Anti-skid climber for pole-climbing operation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266656A (en) * 2010-06-03 2011-12-07 上海市电力公司 Rod-climbing tool
CN112295179A (en) * 2020-09-24 2021-02-02 国网浙江省电力有限公司衢州供电公司 Anti-skid climber for pole-climbing operation

Similar Documents

Publication Publication Date Title
CN204017293U (en) A kind of climbers
CN201370929Y (en) Antiskid poleclimer capable of breaking ice
CN201377323Y (en) Improved pick-shaped cutter
CN200973945Y (en) Anti-slip toes clamp
CN105126317A (en) Safe climber
CN201510696U (en) Anti-skidding foot fastener for climbing pole
CN202699976U (en) Novel anti-skidding rod-climbing climber
CN204021196U (en) View communication tower
CN202020863U (en) Novel anti-slip climbing iron
CN201735126U (en) Anti-skid foot fastener
CN201254681Y (en) Tamping pick for railway tamping machine
CN205295941U (en) Anti-skid channel steel
CN2730424Y (en) Sliding-proof feet fastener
CN201194901Y (en) Skidproof crutch tip abrasion-proof sleeve
CN203485146U (en) Operating rod for vehicle
CN211570049U (en) Reinforced aluminum alloy crowbar
CN210263681U (en) Step tread antislip strip
CN204363064U (en) Climbing mechanism during a kind of high pressure pylon floating ice
CN201894808U (en) Antiskid pole climber
CN201543184U (en) Anti-slip climber
CN205399536U (en) Novel high -performance bucket tooth subassembly
CN205516269U (en) Take climbers of pedaling after antiskid
CN204107572U (en) Reinforced sand machine carbide alloy breaker bars processed
CN204219718U (en) One is climbed bar non-slip feet and is climbed
CN203255123U (en) Escape hammer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Qu Dexing

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091230

Termination date: 20141216

EXPY Termination of patent right or utility model