CN206370717U - A kind of electric supply installation for batteries of electric automobile group fast replacement system - Google Patents

A kind of electric supply installation for batteries of electric automobile group fast replacement system Download PDF

Info

Publication number
CN206370717U
CN206370717U CN201621258861.0U CN201621258861U CN206370717U CN 206370717 U CN206370717 U CN 206370717U CN 201621258861 U CN201621258861 U CN 201621258861U CN 206370717 U CN206370717 U CN 206370717U
Authority
CN
China
Prior art keywords
electric
energy
storage battery
charging unit
batteries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621258861.0U
Other languages
Chinese (zh)
Inventor
叶伟然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhou Jiachuang Automation Technology Co Ltd
Original Assignee
Huzhou Jiachuang Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huzhou Jiachuang Automation Technology Co Ltd filed Critical Huzhou Jiachuang Automation Technology Co Ltd
Priority to CN201621258861.0U priority Critical patent/CN206370717U/en
Application granted granted Critical
Publication of CN206370717U publication Critical patent/CN206370717U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Abstract

The utility model discloses a kind of electric supply installation for batteries of electric automobile group fast replacement system, including:Electric substation, solar photovoltaic generation system, energy storage battery system, change station power network, power distribution cabinet, the first charging unit, the second charging unit, the 3rd charging unit.It passes through electric substation, solar photovoltaic generation system, energy storage battery system is powered to change station power network, and by power distribution cabinet respectively connect charging unit charged to batteries of electric automobile group, utilize this reproducible clean energy resource of solar energy, the energy is saved, reduce disposal of pollutants, electricity is laid in using the energy storage battery system night electricity low ebb time, charging system is switched to daytime to be charged for battery pack, greatly reduce operating cost, the application of new energy and energy-storage battery is incorporated, realize the variation of electric supply installation power supply mode, improve electrical stability, alleviate the load pressure to power network when battery pack charges, it is safe and reliable, good economy performance.

Description

A kind of electric supply installation for batteries of electric automobile group fast replacement system
Technical field:
The utility model belongs to electric vehicle engineering field, is specifically related to a kind of quick more for batteries of electric automobile group Change the electric supply installation of system.
Background technology:
In recent years, energy-conserving and environment-protective were all being advocated in countries in the world, with the increase year by year of China's automobile sales volume, and the carbon of automobile is arranged High-volume also more and more higher, the research center of gravity of automobile industry is also increasingly turned to low-carbon field, and electric automobile compares to be using gasoline The orthodox car of power, prominent advantage is shown in terms of environmental protection and the saving energy.For the electronic vapour of low-carbon environment-friendly Car, charging device is indispensable, and it can convert the electric energy of power network into the vehicle-mounted battery of electric automobile, be electronic vapour Car provides power.
At present, the charging technique of electric automobile mainly has vehicle charging technique and battery pack quick-replaceable charging technique two Kind.Vehicle charging technique is similar to the gas station of fuel-engined vehicle, and charging pile, only need to be by charging pile just as the fuel charger in gas station On the socket that is connected on electric automobile of attaching plug can be carried out charging service, general accumulator of electric car charging Time is that vehicle occupies substantial amounts of time and place in 2-6 hour, charging process, if to shorten the charging interval, is needed Using rapid nitriding, it is charged to battery and disclosure satisfy that vehicle travels needs substantially, fills cause battery life extremely soon Decay.Battery pack quick-replaceable charging technique is to be reached for electronic vapour by directly changing the on-vehicle battery group in electric automobile Car provides the purpose of charging service, just the battery more renewed can be improved into the convenience of electric automobile generally within a few minutes And agility, the battery pack unified charging of floor power supply device progress to be accessed changed, battery pack quick-replaceable charging skill Art has the advantages such as flow is simple and easy to control, replacing construction is short, and existing floor power supply device is individually powered, it is necessary to electricity using power network The generated energy of net is big, load pressure is high, expend power cost is high, battery pack charging when high current punching is easily caused to power network Hit, security is low.
Utility model content:
Therefore, technical problem to be solved in the utility model be in the prior art be used for batteries of electric automobile group it is quick When the electric supply installation of replacing system needs the high power cost that the generated energy of power network is big, load pressure is high, expend, battery pack charging High current is easily impacted to power network, and security is low, so as to propose a kind of the fast for batteries of electric automobile group of efficient energy-saving The electric supply installation of fast replacing system.
To reach above-mentioned purpose, the technical solution of the utility model is as follows:
A kind of electric supply installation for batteries of electric automobile group fast replacement system, including:Electric substation, photovoltaic hair Electric system, energy storage battery system, change station power network, power distribution cabinet, the first charging unit, the second charging unit, the 3rd charging unit.
The electric substation connects the first input end of the change station power network, the of the change station power network by transformer One output end connects the first charging unit by power distribution cabinet.
The solar photovoltaic generation system connects the second input of the change station power network, institute by the first inverter The second output end for stating change station power network connects the second charging unit by power distribution cabinet.
The energy storage battery system connects the 3rd input of the change station power network, the replacing by the second inverter Stand power network the 3rd output end by power distribution cabinet connect it is described 3rd charging unit.
4th output end of the change station power network connects the energy storage battery system by electrical control cubicles.
As the preferred of above-mentioned technical proposal, 10kV electric substations carried out by the power transformation, the transformer turns 10kV electric energy It is changed to the first input end that 0.4kV electric energy is supplied to the change station power network.
As the preferred of above-mentioned technical proposal, two power supplies, two power supplies are set in the electric substation Two transformers are connected by control device respectively.
As the preferred of above-mentioned technical proposal, the solar photovoltaic generation system includes several solar energy photovoltaic panels, The photovoltaic arrays junction box being connected with the solar energy photovoltaic panel, the DC control cabinet being connected with the photovoltaic arrays junction box, The first inverter being connected with the DC control cabinet.
As the preferred of above-mentioned technical proposal, the energy storage battery system uses all vanadium flow energy-storage battery system.
As the preferred of above-mentioned technical proposal, all vanadium flow energy-storage battery system includes liquid flow energy storage battery, battery Management system, energy conversion system, monitoring system, the monitoring system connect the battery management system and the energy respectively Converting system, the liquid flow energy storage battery connects the energy conversion system and the battery management system, the battery respectively Management system connects the energy conversion system, and the energy conversion system connects change station power network.
As the preferred of above-mentioned technical proposal, all vanadium flow energy-storage battery system is using timing, segmented discharge and recharge Pattern.
As the preferred of above-mentioned technical proposal, the first charging unit, the second charging unit, the 3rd charging Unit distinguishes connecting electric automobile battery pack.
The beneficial effects of the utility model are:It passes through electric substation, solar photovoltaic generation system, energy storage battery system Powered to change station power network, and charging unit is connected by power distribution cabinet respectively and charged to batteries of electric automobile group, using too Positive this reproducible clean energy resource of energy, has saved the energy, has reduced disposal of pollutants, low using energy storage battery system night electricity The paddy time lays in electricity, is switched to charging system daytime and is charged for battery pack, greatly reduces operating cost, has incorporated new The application of the energy and energy-storage battery, realizes the variation of electric supply installation power supply mode, improves electrical stability, alleviate electronic vapour To the load pressure of power network, safe and reliable, good economy performance when car charges.
Brief description of the drawings:
The following drawings is only intended to, in doing the utility model schematic illustration and explanation, not limit model of the present utility model Enclose.Wherein:
Fig. 1 is the electric supply installation knot for batteries of electric automobile group fast replacement system of the utility model one embodiment Structure schematic diagram;
Fig. 2 is the solar photovoltaic generation system structural representation of the utility model one embodiment;
Fig. 3 is the energy storage battery system structural representation of the utility model one embodiment.
Embodiment:
As shown in figure 1, the electric supply installation of the present utility model for batteries of electric automobile group fast replacement system, including: Electric substation, solar photovoltaic generation system, energy storage battery system, change station power network, power distribution cabinet, the first charging unit, second are filled Group of motors, the 3rd charging unit.
The electric substation connects the first input end of the change station power network, the of the change station power network by transformer One output end connects the first charging unit by power distribution cabinet.10kV electric substations carried out by the power transformation, the transformer will 10kV electric energy is converted to the first input end that 0.4kV electric energy is supplied to the change station power network.Two are set in the electric substation Power supply, two power supplies connect two transformers, one of power supply conduct by control device respectively Main power source, another power supply, when main power source breaks down, is set as accessory power supply using accessory power supply as temporary power It is standby, it is ensured that the reliability of power supply.
The solar photovoltaic generation system connects the second input of the change station power network, institute by the first inverter The second output end for stating change station power network connects the second charging unit by power distribution cabinet.As shown in Fig. 2 the solar energy Photovoltaic generating system includes several solar energy photovoltaic panels, the photovoltaic arrays junction box being connected with the solar energy photovoltaic panel and institute State photovoltaic arrays junction box connection DC control cabinet, the first inverter being connected with the DC control cabinet, described first is inverse Become device to send the power in change station power network.
The energy storage battery system connects the 3rd input of the change station power network, the replacing by the second inverter The 3rd output end of power network of standing connects the 3rd charging unit by power distribution cabinet, and the 4th output end of the change station power network is led to Cross electrical control cubicles and connect the energy storage battery system.As shown in figure 3, the energy storage battery system uses all-vanadium liquid flow energy storage battery system System.The all vanadium flow energy-storage battery system includes liquid flow energy storage battery, battery management system, energy conversion system, monitoring system System, the monitoring system connects the battery management system and the energy conversion system, the liquid flow energy storage battery point respectively The energy conversion system and the battery management system are not connected, and the battery management system connects the energy conversion system System, the energy conversion system connects change station power network.The all vanadium flow energy-storage battery system is using timing, segmented charge and discharge Power mode, i.e., charged at night using paddy electricity for energy-storage battery, and daily 22 points to second day 8 points using change station power network to energy storage Battery is charged, and provides electric energy on daytime for change station power network, discharged at daily 8 points to 22 points.
The first charging unit, the second charging unit, the 3rd charger group difference connecting electric automobile electricity Pond group, is filled by the first charging unit, the second charging unit, the 3rd charging unit to electric automobile battery pack to be charged Electricity.
Operation principle:
When daytime, electric substation provides electric energy by transformer to change station power network, and connects described by power distribution cabinet First charging unit, is powered, solar photovoltaic generation system is by the first inverter to more to the described first charging unit Change station power network and electric energy is provided, and by power distribution cabinet connection the second charging unit, be powered to the described second charging unit, energy storage Battery system provides electric energy by the second inverter to change station power network, and by the charging unit of power distribution cabinet connection the 3rd, to institute The 3rd charging unit is stated to be powered.
When night, the electric energy that electric substation is sent into change station power network is charged to energy storage battery system, storage Night cheap electric energy.
When emergency and commercial power interruption electric substation can not to change station power network provide electric energy, using energy-storage battery system System carries out temporary power as emergency set, improves the reliability of power supply.
The electric supply installation for batteries of electric automobile group fast replacement system described in the present embodiment, including:Electric substation, too It is positive can photovoltaic generating system, energy storage battery system, change station power network, power distribution cabinet, the first charging unit, the second charging unit, the Three charging units.It is powered to change station power network by electric substation, solar photovoltaic generation system, energy storage battery system, and led to Cross power distribution cabinet connect respectively charging unit charged to batteries of electric automobile group, utilize this reproducible cleaning energy of solar energy Source, has saved the energy, has reduced disposal of pollutants, lays in electricity using the energy storage battery system night electricity low ebb time, cuts daytime Change to charging system to be charged for battery pack, greatly reduce operating cost, incorporated the application of new energy and energy-storage battery, The variation of electric supply installation power supply mode is realized, electrical stability is improved, the load pressure to power network when battery pack charges is alleviated Power, safe and reliable, good economy performance.
Obviously, above-described embodiment is only intended to clearly illustrate example, and the not restriction to embodiment.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or Among the protection domain that variation is created still in the utility model.

Claims (8)

1. a kind of electric supply installation for batteries of electric automobile group fast replacement system, it is characterised in that including:Electric substation, too It is positive can photovoltaic generating system, energy storage battery system, change station power network, power distribution cabinet, the first charging unit, the second charging unit, the Three charging units;
The electric substation connects the first input end of the change station power network by transformer, and the first of the change station power network is defeated Go out end and the first charging unit is connected by power distribution cabinet;
The solar photovoltaic generation system connects the second input of the change station power network by the first inverter, it is described more The second output end for changing station power network connects the second charging unit by power distribution cabinet;
The energy storage battery system connects the 3rd input of the change station power network, the change station electricity by the second inverter 3rd output end of net connects the 3rd charging unit by power distribution cabinet;
4th output end of the change station power network connects the energy storage battery system by electrical control cubicles.
2. the electric supply installation according to claim 1 for batteries of electric automobile group fast replacement system, it is characterised in that: 10kV electric energy is converted to 0.4kV electric energy and is supplied to the change station electricity by 10kV electric substations carried out by the power transformation, the transformer The first input end of net.
3. the electric supply installation according to claim 2 for batteries of electric automobile group fast replacement system, it is characterised in that: Two power supplies are set in the electric substation, and two power supplies connect two transformations by control device respectively Device.
4. the electric supply installation according to claim 1 for batteries of electric automobile group fast replacement system, it is characterised in that: The solar photovoltaic generation system includes several solar energy photovoltaic panels, the photovoltaic arrays being connected with the solar energy photovoltaic panel Junction box, the DC control cabinet being connected with the photovoltaic arrays junction box, the first inverter being connected with the DC control cabinet.
5. the electric supply installation according to claim 1 for batteries of electric automobile group fast replacement system, it is characterised in that: The energy storage battery system uses all vanadium flow energy-storage battery system.
6. the electric supply installation according to claim 5 for batteries of electric automobile group fast replacement system, it is characterised in that: The all vanadium flow energy-storage battery system include liquid flow energy storage battery, battery management system, energy conversion system, monitoring system, The monitoring system connects the battery management system and the energy conversion system respectively, and the liquid flow energy storage battery connects respectively The energy conversion system and the battery management system are connect, the battery management system connects the energy conversion system, institute State energy conversion system connection change station power network.
7. the electric supply installation according to claim 6 for batteries of electric automobile group fast replacement system, it is characterised in that: The all vanadium flow energy-storage battery system is using timing, segmented charge and discharge mode.
8. the electric supply installation according to claim 1 for batteries of electric automobile group fast replacement system, it is characterised in that: The first charging unit, the second charging unit, the 3rd charger group difference connecting electric automobile battery pack.
CN201621258861.0U 2016-11-23 2016-11-23 A kind of electric supply installation for batteries of electric automobile group fast replacement system Expired - Fee Related CN206370717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621258861.0U CN206370717U (en) 2016-11-23 2016-11-23 A kind of electric supply installation for batteries of electric automobile group fast replacement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621258861.0U CN206370717U (en) 2016-11-23 2016-11-23 A kind of electric supply installation for batteries of electric automobile group fast replacement system

Publications (1)

Publication Number Publication Date
CN206370717U true CN206370717U (en) 2017-08-01

Family

ID=59388768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621258861.0U Expired - Fee Related CN206370717U (en) 2016-11-23 2016-11-23 A kind of electric supply installation for batteries of electric automobile group fast replacement system

Country Status (1)

Country Link
CN (1) CN206370717U (en)

Similar Documents

Publication Publication Date Title
CN107804326B (en) Traction motor power supply system and electric locomotive power supply equipment
CN108407625B (en) Bidirectional charging and discharging system for new energy automobile
CN107571817B (en) Vehicle-mounted composite power supply system
CN105429253B (en) Energy storage direct current quick charge stake system and method
CN204905907U (en) Insert electric formula electric automobile and on -vehicle charging source system thereof
CN102290841A (en) Peak clipping and valley filling electric vehicle swapping station for distribution network
CN204681125U (en) A kind of charging system for electric automobile based on solar energy
CN103151814A (en) Solar wireless electric vehicle charging station
CN203747504U (en) New-energy AC-DC integrated station power system used for transformer station
CN104348235A (en) System for wireless charging of electric vehicle by photovoltaic-storage battery microgrid
CN212921195U (en) Power supply system of new energy mobile energy storage box
CN104795881A (en) Wind-light complementary power supply controller, microgrid system and microgrid system power supply method
CN102868205B (en) Electric vehicle and renewable energy complementary system
CN204145045U (en) Micro-capacitance sensor intelligent flexible charging system
CN206765825U (en) A kind of general Bidirectional charging-discharging device of portable new-energy automobile
CN205992785U (en) A kind of caravan energy control system
CN205176917U (en) Take into account microgrid energy storage power station system of economic nature aassessment
CN202616858U (en) Motor caravan power supply
CN102340150A (en) Electric vehicle charging station and method for charging electric vehicle
CN204119119U (en) A kind of portable photo-voltaic power supply
CN206370717U (en) A kind of electric supply installation for batteries of electric automobile group fast replacement system
CN202978389U (en) Electric vehicle charging station based on flywheel energy storage
CN205646999U (en) Two -way energy storage power system of on -vehicle new forms of energy
CN202142900U (en) Electromobile charging system capable of utilizing multiple energy sources synthetically
CN106787038A (en) A kind of electric supply installation for batteries of electric automobile group fast replacement system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170801

Termination date: 20171123