CN206368530U - Overhanging scaffold fixed structure - Google Patents
Overhanging scaffold fixed structure Download PDFInfo
- Publication number
- CN206368530U CN206368530U CN201720019178.XU CN201720019178U CN206368530U CN 206368530 U CN206368530 U CN 206368530U CN 201720019178 U CN201720019178 U CN 201720019178U CN 206368530 U CN206368530 U CN 206368530U
- Authority
- CN
- China
- Prior art keywords
- fixed
- house beam
- support bar
- cantilever beams
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of overhanging scaffold fixed structure, including the Cantilever Beams fixed with upper house beam, the support bar fixed with lower house beam, the termination of the support bar and the termination of the Cantilever Beams join in the outside of upper house beam, vertical rod is fixedly installed between described upper house beam and lower house beam, described vertical rod is fixedly connected with the support bar with the bearing of lower house beam, make Cantilever Beams, the structure of triangle is formed between support bar and vertical rod three, there is higher steadiness between three, make Cantilever Beams compared to more stable in the past, workmen is safer when Cantilever Beams are operated.
Description
Technical field
The utility model is related to building scaffold, more particularly to a kind of overhanging scaffold fixed structure.
Background technology
The place that inside fitting, exterior wall or high level etc. can not directly construct can be there are in construction site, for side
Just workman's construction and surfaceman are usually provided with safely scaffold.Existing building scaffold is divided into three major types:Console mode
Scaffold, attaching scaffold and overhanging scaffold.Console mode scaffold has due to there is height limitation, and to flooring base
Certain processing requirement, therefore it is generally used for median low structure;Attaching scaffold investment is big, it is cumbersome to set up, therefore applies less;
And overhanging scaffold is then widely used in middle-high building.
Notification number is CN202467151U Chinese patent, a kind of suspension beam type scaffold anchored end anchor, including bottom
Seat, sizing open pore steel plate and two groups of bolt-nuts, wherein, the base includes bottom plate and two groups of anchor bolts, two groups of anchors
Fixing bolt interval is fixedly installed on the bottom plate, and the base is embedded in the structure floor in advance, each anchor bolt
Upper end upwardly extended respectively from the structure floor, the sizing open pore steel plate is provided with two groups of through holes, two groups of through holes
Corresponded with two groups of anchor bolts, two groups of bolt-nuts are engaged with two groups of anchor bolts.The practicality is new
Type also discloses a kind of overhanging scaffold support meanss, including overhanging scaffold anchored end anchor and for supporting
The overhanging type steel of scaffold, one end of the overhanging type steel is fixed by above-mentioned overhanging scaffold anchored end anchor pacifies
Loaded on the structure floor, the other end of the overhanging type steel is encorbelmented stretching, and this is easy to dismounting using new, repeatable to make
With.But, steel plate one end is simply fixed in room frame structure by such a overhanging scaffold, and the other end is vacantly set, fixation side
Formula is excessively simple, not firm, easily occurs Personal Risk when anchor loosens.
Utility model content
The purpose of this utility model is to provide a kind of overhanging scaffold fixed structure, and scaffold can be achieved steps up jail
Gu, it is ensured that the safety of workmen, and go for the floor of different height.
Above-mentioned purpose of the present utility model technical scheme is that:
A kind of overhanging type hand cradle fixed structure, including Cantilever Beams, the support bar with the fixation of lower house beam fixed with upper house beam,
The termination of the support bar and the termination of the Cantilever Beams join in the outside of upper house beam, between described upper house beam and lower square beam
Vertical rod is fixedly installed, described vertical rod is fixedly connected with the support bar with the bearing of lower square beam.
By using above-mentioned technical proposal, make the structure that triangle is formed between Cantilever Beams, support bar and vertical rod three, three
There is higher steadiness between person, make Cantilever Beams compared to more stablizing in the past, workmen is operated in Cantilever Beams
Shi Gengjia safety.
The utility model can be further arranged to, and described Cantilever Beams and the fixed part of support bar are provided with the first fixation
Plate, described Cantilever Beams are fixedly installed with the first fixed plate, and support bar is hinged with the first fixed plate.
By using above-mentioned technical proposal, Cantilever Beams are attached with support bar by the first fixed plate, the two can be made
Between connect more firm.
The utility model can be further arranged to, and described support bar is carried out with described lower house beam by the second fixed plate
It is fixed.
By using above-mentioned technical proposal, made by the second fixed plate fixed more firm between support bar and lower house beam.
The utility model can be further arranged to, and described vertical rod is fixed with the second described fixed plate.
The utility model can be further arranged to, and described lower house beam is provided with pre-embedded steel slab, the second described fixed plate
It is detachably connected with described pre-embedded steel slab.
By using above-mentioned technical proposal, the second fixed plate is fixed with pre-embedded steel slab, the second fixed plate and lower square beam
Between fixed more consolidate.
The utility model can be further arranged to, and described Cantilever Beams are fixed with described upper house beam by U-shaped steel bracket
Connection.
By using above-mentioned technical proposal, Cantilever Beams are fixed as one with upper house beam by U-shaped steel bracket, therebetween
More consolidate.
The utility model can be further arranged to, and described U-shaped steel bracket passes through nut through the part of the upper house beam
It is fixed.
By using above-mentioned technical proposal, nut, which fixes U-shaped steel bracket, can prevent U-shaped steel bracket from rocking, and make Cantilever Beams
More consolidate.
In summary, the utility model has the advantages that:
Make that there is higher consolidate between the structure that triangle is formed between Cantilever Beams, support bar and vertical rod three, three
Property, make Cantilever Beams compared to more stablizing in the past, workmen is safer when Cantilever Beams are operated, and described encorbelments
The fixed part of beam and support bar is provided with the first fixed plate, and described Cantilever Beams are fixedly installed with the first fixed plate, support bar with
First fixed plate is hinged, and Cantilever Beams are attached with support bar by the first fixed plate, can make to connect more firm therebetween.
Support bar is fixed with described lower house beam by the second fixed plate, is made by the second fixed plate between support bar and lower house beam
It is fixed more to consolidate.
Brief description of the drawings
Fig. 1 is the structural representation of overhanging scaffold fixed structure;
Fig. 2 is fixing device explosive view.
In figure, 1, Cantilever Beams;2nd, vertical rod;3rd, support bar;4th, the first fixed plate;5th, the second fixed plate;6th, screw;7th, it is pre-buried
Steel plate;8th, upper house beam;9th, lower house beam;10th, the first pole;11st, the second pole;12nd, handle;13rd, U-shaped steel bracket;14th, the 3rd consolidates
Fixed board;15th, nut;16th, fixed block.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
The structural representation of overhanging scaffold fixed structure, referring to the drawings shown in 1, overhanging scaffold fixed structure bag
Include Cantilever Beams 1, vertical rod 2 and support bar 3.Cantilever Beams 1 are located at the upper top of house beam 8, and the one end of Cantilever Beams 1 is arranged on by fixing device
On upper house beam 8, the other end stretches out extraneous hanging set and carries out high-altitude external procedure for workmen;Cantilever Beams 1 stretch out the external world one
End bottom is provided with the first fixed plate 4, and the first fixed plate 4 is fixedly installed with Cantilever Beams 1.
The one end of support bar 3 is realized with the first fixed plate 4 and is hinged, and the rotation of support bar 3 can be achieved, and the other end of support bar 3 is set
The second fixed plate 5 is connected with, the second fixed plate 5 is fixedly installed with support bar 3, and the second fixed plate 5 is arranged on the top of lower house beam 9
It is detachably connected by screw 6 with pre-embedded steel slab 7 in lower house beam 9.The rotation of support bar 3 can make overhanging scaffold be applied to difference
The floor of height, the second fixed plate 5 is connected with the pre-embedded steel slab 7 in floor by screw 6 and is arranged on lower house beam 9, can make to hang
Choose formula scaffold and fix more firm and easy to disassemble, it is reusable.
Vertical rod 2 is vertically set between house beam 8 and lower house beam 9, and vertical rod 2 is socketed 11 groups of the second pole by the first pole 10
Into Collapsible structure, the upper end of the first pole 10 is provided through screw 6, and screw 6 can realize clamping action, spiral shell to the second vertical rod 2
Follow closely 6 outer ends and be fixedly installed rotary handle 12, fastening is realized in 6 pair of second vertical rod 2 of convenient construction personnel rotary screw.First pole
10 lower ends are fixedly installed on the lower top of house beam 9 with the second fixed plate 5, and the upper end of the second pole 11 is provided with the 3rd fixed plate 14, the
Two poles 11 are wholely set with the 3rd fixed plate 14, and the 3rd fixed plate 14 presses closer the bottom of house beam 8.Due to Cantilever Beams 1 hanging one
End can produce pressure to support bar 3, and support bar 3 produces certain pressure by 5 pairs of lower house beams 9 of the second fixed plate, and lower house beam 9
A upward component of reaction can be produced to support bar 3, by setting vertical rod 2, this component can be decomposed in vertical rod 2,
Reduce the stress of support bar 3, preferably realize the fixation of suspension beam type scaffold.
Fixing device explosive view, referring to the drawings shown in 2, fixing device includes two groups of U-shaped steel brackets 13, fixed block 16 and spiral shell
Through hole is correspondingly arranged on mother 15, upper house beam 8 can make U-shaped steel bracket 13 run through upper house beam 8, and the U-shaped top of steel bracket 13 leaves one
Determining space can insert Cantilever Beams 1, and U-shaped steel bracket 13 runs through upper house beam 8, and U-shaped steel bracket 13 passes through solid through the upper bottom of house beam 8
Determine block 16 to fasten with nut 15, U-shaped steel bracket 13 plays a part of fixed Cantilever Beams 1.When overhanging scaffold need not be set
When, U-shaped steel bracket 13 can be taken out from upper house beam 8 by rotating nut 15.
When needing to install overhanging scaffold in construction, first Cantilever Beams 1 are placed on upper house beam 8, by the
Two fixed plates 5 are fixed with the pre-embedded steel slab 7 in lower house beam 9 by screw 6, and the height of regulation vertical rod 2 makes it be applied to required building
Layer, is then punched by drilling machine on upper house beam 8, U-shaped steel bracket 13 is run through upper house beam 8 after Cantilever Beams 1 are compressed
Hole, U-shaped steel bracket 13 fastened through the bottom of upper house beam 8 by fixed block 16 by nut 15.Vertical rod 2, support bar 3 and encorbelment
Beam 1 constitutes triangular structure, can play a part of firm overhanging scaffold, support bar 3 is hinged high with vertical rod 2 with Cantilever Beams 1
Spend the floor that adjustable setting can make overhanging scaffold be applied to different height;U-shaped steel bracket 13 can with upper house beam 8
Dismounting connection, the second fixed plate 5 and the setting being detachably connected of lower house beam 9 can reuse suspension beam type scaffold.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (8)
1. a kind of overhanging scaffold fixed structure, including the Cantilever Beams (1) fixed with upper house beam (8) and lower house beam (9) are fixed
Support bar (3), the termination of the support bar (3) and the termination of the Cantilever Beams (1) join in the outside of upper house beam (8), its
It is characterized in:Vertical rod (2), described vertical rod (2) and the branch are fixedly installed between described upper house beam (8) and lower house beam (9)
Strut (3) is fixedly connected with the bearing of lower house beam (9).
2. a kind of overhanging scaffold fixed structure according to claim 1, it is characterized in that:Described Cantilever Beams (1) with
The fixed part of support bar (3) is provided with the first fixed plate (4), and described Cantilever Beams (1) are fixedly installed with the first fixed plate (4),
Described support bar (3) is hinged with the first fixed plate (4).
3. a kind of overhanging scaffold fixed structure according to claim 1, it is characterized in that:Described support bar (3) with
Described lower house beam (9) is fixed by the second fixed plate (5).
4. a kind of overhanging scaffold fixed structure according to claim 3, it is characterized in that:Described vertical rod (2) and institute
The second fixed plate (5) stated is fixed.
5. a kind of overhanging scaffold fixed structure according to claim 3, it is characterized in that:Described lower house beam (9) is set
Pre-embedded steel slab (7) is equipped with, described the second fixed plate (5) is detachably connected with described pre-embedded steel slab (7).
6. a kind of overhanging scaffold fixed structure according to claim 1, it is characterized in that:Described Cantilever Beams (1) with
Described upper house beam (8) is fixedly connected by U-shaped steel bracket (13).
7. a kind of overhanging scaffold fixed structure according to claim 6, it is characterized in that:Described U-shaped steel bracket
(13) it is fixed by nut (15) through the part of the upper house beam (8).
8. a kind of overhanging scaffold fixed structure according to claim 6, it is characterized in that:Described U-shaped steel bracket
(13) contact site with the upper house beam (8) is provided with fixed block (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720019178.XU CN206368530U (en) | 2017-01-07 | 2017-01-07 | Overhanging scaffold fixed structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720019178.XU CN206368530U (en) | 2017-01-07 | 2017-01-07 | Overhanging scaffold fixed structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206368530U true CN206368530U (en) | 2017-08-01 |
Family
ID=59391702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720019178.XU Expired - Fee Related CN206368530U (en) | 2017-01-07 | 2017-01-07 | Overhanging scaffold fixed structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206368530U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386622A (en) * | 2017-08-22 | 2017-11-24 | 广州协安建设工程有限公司 | Non- built-in type the shaped steel suspension scaffolding and its construction method |
CN114427287A (en) * | 2022-02-23 | 2022-05-03 | 中建八局第二建设有限公司 | Triangular overhanging scaffold support for frame beam and use method thereof |
-
2017
- 2017-01-07 CN CN201720019178.XU patent/CN206368530U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386622A (en) * | 2017-08-22 | 2017-11-24 | 广州协安建设工程有限公司 | Non- built-in type the shaped steel suspension scaffolding and its construction method |
CN114427287A (en) * | 2022-02-23 | 2022-05-03 | 中建八局第二建设有限公司 | Triangular overhanging scaffold support for frame beam and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201261942Y (en) | Stand platform for cantilevered concrete structure construction | |
CN109184190A (en) | It climbs and carries integrated beam type hydraulic climbing platform and its installation method | |
CN101624871A (en) | Instrumental operation platform for shear wall formwork of elevator shaft | |
CN206368530U (en) | Overhanging scaffold fixed structure | |
CN206521932U (en) | overhanging scaffold | |
CN206581577U (en) | Using housing construction builder's jack | |
CN213626572U (en) | Tool type external cantilever operation platform | |
CN206530078U (en) | A kind of support meanss | |
CN210216478U (en) | Open caisson construction work platform | |
CN202148598U (en) | 45-degree inclined large cantilever reinforced concrete structure | |
CN111422758A (en) | Conical steel truss hoisting fixture and hoisting process | |
CN215803085U (en) | Upward-pulling type construction device for cantilever scaffold | |
CN205677081U (en) | The delay of a kind of Super High steel frame core wall structure semi-girder truss connects equipment | |
CN209618738U (en) | The light and small vertical auxiliary stand of heavy-duty hoisting equipment | |
CN113550551A (en) | Construction device and method for pull-up type overhanging scaffold | |
CN205894662U (en) | Modular triangle steel truss template | |
CN217897338U (en) | Evaporate and press aerated concrete slab riser ware | |
CN216587603U (en) | Strong-bearing-capacity scaffold for road and bridge engineering | |
CN211281410U (en) | Construction equipment is built in marine segmentation | |
CN216276830U (en) | Super high-rise core tube formwork lowering construction device | |
CN212743303U (en) | Building management construction bears frame | |
CN218438141U (en) | Tool type cantilever frame | |
JPS5812990Y2 (en) | Building loading platform | |
CN204163369U (en) | A kind of collapsible attaching lifting exterior wall scaffold | |
CN214834668U (en) | Ultra-long support device of all-steel climbing frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170801 Termination date: 20210107 |
|
CF01 | Termination of patent right due to non-payment of annual fee |