CN206357148U - Stair tower mast bar disassembling fixture - Google Patents
Stair tower mast bar disassembling fixture Download PDFInfo
- Publication number
- CN206357148U CN206357148U CN201621331439.3U CN201621331439U CN206357148U CN 206357148 U CN206357148 U CN 206357148U CN 201621331439 U CN201621331439 U CN 201621331439U CN 206357148 U CN206357148 U CN 206357148U
- Authority
- CN
- China
- Prior art keywords
- bearing
- bar
- mast
- rack
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
A kind of stair tower mast bar disassembling fixture, including bearing(9), a gear(13)Pass through the first bearing pin(12)On bearing;One rack(10)Inside bearing, and and gear(13)Engagement;One tommy bar(16)Pass through the first bearing pin(12)The outer end of bearing is connected to, and passes through the second bearing pin inside tommy bar(15)Ratchet is installed(14), the free end of ratchet is caught in the slot of gear;Relative angle bar is respectively arranged below in bearing and rack(17), during dismounting mast, the angle bar below bearing and rack is respectively clamped into two adjacent first and second stulls of upper and lower mainmast junction(81、82)Place.The utility model is used to dismantle mast, not only saves the take-down time, alleviates the labor intensity of operator, and ensure that the product quality of mast.
Description
Technical field
The utility model is related to the mast provision for disengagement of engineering driller stair tower, particularly stair tower.
Background technology
Engineering driller is easy due to simple, light, operation, be widely used in industry and civil buildings, railway, bridge,
The engineering exploration in the fields such as water power.And boring tower is rig one of indispensable equipment in work progress, it is mainly used in probing
Drilling rod is removed in work progress or the groundworks such as sleeve pipe are put down.The form of boring tower has many kinds:Such as herringbone tower, four pin towers, building
Graduation house etc., wherein stair tower is easy to use due to Stability Analysis of Structures, using relatively broad.
As shown in Figure 1 and Figure 2, whole stair type boring tower is by a upper mainmast 4, lower mainmast 5, two upper sub-struts
Bar 3, two lower sub-strut bars 2 are constituted, and whole pylon is arranged on by jointed shaft on the underframe of rig 1.
As shown in figure 3, upper mainmast 4 includes setting the first stull 81 between two first side levers 41, two first side levers 41, and
Setting adapter sleeve 6 is respectively welded in the bottom of two first side levers 41, and two adapter sleeves 6 are provided with the first connecting hole 71.Such as Fig. 4 institutes
Show, lower mainmast 5 includes setting the between a base 52 and two second side levers 51 that are arranged on base 52, two second side levers 51
Two stulls 82, and the top of two second side levers 51 sets the second connecting hole 72 respectively.First connecting hole 71 of upper mainmast 4 is with
Second connecting hole 72 of mainmast 5 is connected with.Upper mainmast 4 and the connection of lower mainmast 5 constitute whole stair type boring tower
Mainmast.
For the positional precision of first and second connecting hole 71,72 that ensures upper and lower mainmast 4,5, therefore adopt in process
Completed with the mode with brill, i.e., as shown in figure 5, the lower mainmast 5 not drilled to be inserted to the adapter sleeve being welded on upper mainmast 4
In 6, then clamped one time processes first and second connecting hole 71,72 on upper and lower mainmast simultaneously.
After processing, due to the requirement such as follow-up japanning, carrying, before storage, upper and lower mainmast 4,5 need to be disassembled and,
Due to upper and lower mainmast 4, longer 5 length, heavier-weight and when have the factors such as the corrosion that triggers not in time of dismounting, cause and tear open
The difficulty unloaded.In conventional unloading process, operator taps the in the middle of upper and lower mainmast 4,5 using the instrument such as tup
First, two stull 81,82, so that the purpose for taking upper and lower mainmast apart is reached, but this dismounting mode not only takes, effort,
And very big influence is caused to the quality of product.
Utility model content
Technical problem to be solved in the utility model is torn open in view of the shortcomings of the prior art, providing a kind of stair tower mast bar
Frock is unloaded, it can be by way of time saving, laborsaving and do not influence product quality, and reaching makes the purpose of upper and lower mainmast dismounting.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of stair tower mast bar disassembling fixture,
Including bearing, a gear is arranged on bearing by the first bearing pin;One rack is arranged on inside bearing, and is engaged with gear;One
Tommy bar is connected to the outer end of bearing by the first bearing pin, and installs ratchet, the free end of ratchet by the second bearing pin inside tommy bar
It is caught in the slot of gear;In the relative angle bar that is respectively arranged below of bearing and rack, dismounting mast, bearing and rack
The angle bar of lower section is respectively clamped at two adjacent first and second stulls of upper and lower mainmast junction.
When the utility model is used to dismantle mast, only the angle bar below bearing and rack need to be respectively clamped into upper and lower mainmast
At two adjacent first and second stulls of bar junction, tommy bar is pulled repeatedly, so that it may separate upper and lower mainmast, not only save
Save the take-down time, alleviated the labor intensity of operator, and ensure that the product quality of mast.
The utility model can be used for the dismounting of all kinds of engineering drilling equipment, particularly engineering driller stair tower mast bar.
Brief description of the drawings
Fig. 1 is stair type rig structure schematic diagram.
Fig. 2 is Fig. 1 right view.
Fig. 3 is mainmast structural representation on stair type boring tower.
Fig. 4 is mainmast structural representation under stair type boring tower.
Fig. 5 is the upper and lower mainmast installment state structural representation of stair type boring tower.
Fig. 6 is the utility model stair tower mast bar disassembling fixture structural representation.
Fig. 7 is the utility model stair tower mast bar disassembling fixture use state schematic diagram.
In figure:1-rig, 2-lower sub-strut bar, 3-upper sub-strut bar, 4-upper mainmast, the 41-the first side lever, 5-lower lead
Mast, the 51-the second side lever, 52-base, 6-adapter sleeve, the 71-the first connecting hole, the 72-the second connecting hole, 81-the first is horizontal
Support, the 82-the second stull, 9-bearing, 10-rack, 11-bearing, the 12-the first bearing pin, 13-gear, 14-ratchet, 15-
Second bearing pin, 16-tommy bar.
Embodiment
As shown in Figure 6, Figure 7, the utility model stair tower mast bar disassembling fixture it is main by bearing 9, rack 10, bearing 11,
First bearing pin 12, the second bearing pin 15, gear 13, ratchet 14, tommy bar 16 are constituted.
Gear 13 is arranged on bearing 9 by the first bearing pin 12.Rack 10 is arranged on inside bearing 9, and is nibbled with gear 13
Close.Ratchet 14 is arranged on inside tommy bar 16 by the second bearing pin 15, and the free end of ratchet 14 is caught in the slot of gear 13.Tommy bar
16 are connected with bearing 9 by installing the first bearing pin 12 of gear 13.An angle bar has been respectively arranged below in bearing 9 and rack 10
17。
When dismantling mast, by the angle bar 17 of the utility model bearing 9 and the lower section of rack 10 be respectively clamped into upper and lower mainmast 4,
At two adjacent first and second stulls 81,82 of 5 junctions, tommy bar 16 is constantly pulled, tommy bar 16 is from " pulling to " position position one "
Put during two ", the rotate counterclockwise of gear 13 can be promoted with pawl 14 simultaneously, so that the end motion to the right of rack 10.Pull
Bar reach " behind position two ", by tommy bar 16 from " position two " turn back " position one ", turning back " during position one ", ratchet 14
Automatically lift, gear 13 is not rotated.
Above-mentioned action is repeated, the constantly end motion to the right of rack 10 can be achieved, finally separates upper and lower mainmast
Come, reach and do not damage upper and lower mainmast 4,5 and the purpose smoothly dismantled.
It can change conventional by way of mast is dismantled in the violence of the instrument such as tup by using the utility model, not only save
Save the take-down time, alleviated the labor intensity of operator, and ensure that the product quality of mast.
The utility model can be used for the dismounting of all kinds of engineering drilling equipment, particularly engineering driller stair tower mast bar.
Claims (1)
1. a kind of stair tower mast bar disassembling fixture, it is characterised in that including bearing(9), a gear(13)Pass through the first bearing pin(12)
On bearing;One rack(10)Inside bearing, and and gear(13)Engagement;One tommy bar(16)Pass through the first bearing pin
(12)The outer end of bearing is connected to, and passes through the second bearing pin inside tommy bar(15)Ratchet is installed(14), the free end of ratchet is caught in
In the slot of gear;Relative angle bar is respectively arranged below in bearing and rack(17), during dismounting mast, bearing and rack
The angle bar of lower section is respectively clamped into two adjacent first and second stulls of upper and lower mainmast junction(81、82)Place.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621331439.3U CN206357148U (en) | 2016-12-07 | 2016-12-07 | Stair tower mast bar disassembling fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621331439.3U CN206357148U (en) | 2016-12-07 | 2016-12-07 | Stair tower mast bar disassembling fixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206357148U true CN206357148U (en) | 2017-07-28 |
Family
ID=59373554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621331439.3U Expired - Fee Related CN206357148U (en) | 2016-12-07 | 2016-12-07 | Stair tower mast bar disassembling fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206357148U (en) |
-
2016
- 2016-12-07 CN CN201621331439.3U patent/CN206357148U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204199686U (en) | Without outrigger concrete parapet formwork system | |
CN205976476U (en) | Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof | |
CN105258912B (en) | A kind of low-speed wind tunnel model test support meanss based on internal balance | |
CN206357148U (en) | Stair tower mast bar disassembling fixture | |
CN201486579U (en) | Drilling anchor rod hole positioning device | |
CN212613640U (en) | Improved generation building scaffold frame of encorbelmenting | |
CN103243901B (en) | External scaffolding bridging connector | |
CN111827648A (en) | Construction device and method for down-supporting type overhanging scaffold | |
CN209469000U (en) | Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN205804428U (en) | A kind of collapsible peg datum hole detection device | |
CN208088825U (en) | A kind of mounting structure of superimposed sheet for assembled architecture | |
CN207063177U (en) | Cast-in-place concrete floor hanging built-in fitting | |
CN205529917U (en) | A support fixing device that is used for high mound, U type abutment form setting | |
CN205894077U (en) | A complete set of pipe long spiral drilling filling pile brush wall ware | |
CN204531004U (en) | The underpinning device of ultra-wide body of wall | |
CN210947661U (en) | Installation device of socket type overhanging scaffold | |
CN204370564U (en) | Underfloor constructional column concrete pouring structure | |
CN207268083U (en) | Erecting device | |
CN207405498U (en) | A kind of high ferro box beam portable awning portal support device | |
CN208056625U (en) | A kind of toilet drop plate hangs mould | |
CN208396660U (en) | A kind of Multifunctional drill | |
CN206393512U (en) | A kind of assembly mould of steel structural plant roof tie-rod | |
CN105908791B (en) | A kind of collapsible peg datum hole detection means | |
CN202644998U (en) | Wall concrete formwork fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170728 Termination date: 20201207 |