CN206357148U - Stair tower mast bar disassembling fixture - Google Patents

Stair tower mast bar disassembling fixture Download PDF

Info

Publication number
CN206357148U
CN206357148U CN201621331439.3U CN201621331439U CN206357148U CN 206357148 U CN206357148 U CN 206357148U CN 201621331439 U CN201621331439 U CN 201621331439U CN 206357148 U CN206357148 U CN 206357148U
Authority
CN
China
Prior art keywords
bearing
bar
mast
rack
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621331439.3U
Other languages
Chinese (zh)
Inventor
余海炼
黄建
孔中捷
肖光红
邹煜时
戴圣海
肖燕波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Institute Of Geology And Mineral Resources Exploration And Development
Original Assignee
Hunan Institute Of Geology And Mineral Resources Exploration And Development
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Institute Of Geology And Mineral Resources Exploration And Development filed Critical Hunan Institute Of Geology And Mineral Resources Exploration And Development
Priority to CN201621331439.3U priority Critical patent/CN206357148U/en
Application granted granted Critical
Publication of CN206357148U publication Critical patent/CN206357148U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

A kind of stair tower mast bar disassembling fixture, including bearing(9), a gear(13)Pass through the first bearing pin(12)On bearing;One rack(10)Inside bearing, and and gear(13)Engagement;One tommy bar(16)Pass through the first bearing pin(12)The outer end of bearing is connected to, and passes through the second bearing pin inside tommy bar(15)Ratchet is installed(14), the free end of ratchet is caught in the slot of gear;Relative angle bar is respectively arranged below in bearing and rack(17), during dismounting mast, the angle bar below bearing and rack is respectively clamped into two adjacent first and second stulls of upper and lower mainmast junction(81、82)Place.The utility model is used to dismantle mast, not only saves the take-down time, alleviates the labor intensity of operator, and ensure that the product quality of mast.

Description

Stair tower mast bar disassembling fixture
Technical field
The utility model is related to the mast provision for disengagement of engineering driller stair tower, particularly stair tower.
Background technology
Engineering driller is easy due to simple, light, operation, be widely used in industry and civil buildings, railway, bridge, The engineering exploration in the fields such as water power.And boring tower is rig one of indispensable equipment in work progress, it is mainly used in probing Drilling rod is removed in work progress or the groundworks such as sleeve pipe are put down.The form of boring tower has many kinds:Such as herringbone tower, four pin towers, building Graduation house etc., wherein stair tower is easy to use due to Stability Analysis of Structures, using relatively broad.
As shown in Figure 1 and Figure 2, whole stair type boring tower is by a upper mainmast 4, lower mainmast 5, two upper sub-struts Bar 3, two lower sub-strut bars 2 are constituted, and whole pylon is arranged on by jointed shaft on the underframe of rig 1.
As shown in figure 3, upper mainmast 4 includes setting the first stull 81 between two first side levers 41, two first side levers 41, and Setting adapter sleeve 6 is respectively welded in the bottom of two first side levers 41, and two adapter sleeves 6 are provided with the first connecting hole 71.Such as Fig. 4 institutes Show, lower mainmast 5 includes setting the between a base 52 and two second side levers 51 that are arranged on base 52, two second side levers 51 Two stulls 82, and the top of two second side levers 51 sets the second connecting hole 72 respectively.First connecting hole 71 of upper mainmast 4 is with Second connecting hole 72 of mainmast 5 is connected with.Upper mainmast 4 and the connection of lower mainmast 5 constitute whole stair type boring tower Mainmast.
For the positional precision of first and second connecting hole 71,72 that ensures upper and lower mainmast 4,5, therefore adopt in process Completed with the mode with brill, i.e., as shown in figure 5, the lower mainmast 5 not drilled to be inserted to the adapter sleeve being welded on upper mainmast 4 In 6, then clamped one time processes first and second connecting hole 71,72 on upper and lower mainmast simultaneously.
After processing, due to the requirement such as follow-up japanning, carrying, before storage, upper and lower mainmast 4,5 need to be disassembled and, Due to upper and lower mainmast 4, longer 5 length, heavier-weight and when have the factors such as the corrosion that triggers not in time of dismounting, cause and tear open The difficulty unloaded.In conventional unloading process, operator taps the in the middle of upper and lower mainmast 4,5 using the instrument such as tup First, two stull 81,82, so that the purpose for taking upper and lower mainmast apart is reached, but this dismounting mode not only takes, effort, And very big influence is caused to the quality of product.
Utility model content
Technical problem to be solved in the utility model is torn open in view of the shortcomings of the prior art, providing a kind of stair tower mast bar Frock is unloaded, it can be by way of time saving, laborsaving and do not influence product quality, and reaching makes the purpose of upper and lower mainmast dismounting.
In order to solve the above technical problems, the technical solution adopted in the utility model is:A kind of stair tower mast bar disassembling fixture, Including bearing, a gear is arranged on bearing by the first bearing pin;One rack is arranged on inside bearing, and is engaged with gear;One Tommy bar is connected to the outer end of bearing by the first bearing pin, and installs ratchet, the free end of ratchet by the second bearing pin inside tommy bar It is caught in the slot of gear;In the relative angle bar that is respectively arranged below of bearing and rack, dismounting mast, bearing and rack The angle bar of lower section is respectively clamped at two adjacent first and second stulls of upper and lower mainmast junction.
When the utility model is used to dismantle mast, only the angle bar below bearing and rack need to be respectively clamped into upper and lower mainmast At two adjacent first and second stulls of bar junction, tommy bar is pulled repeatedly, so that it may separate upper and lower mainmast, not only save Save the take-down time, alleviated the labor intensity of operator, and ensure that the product quality of mast.
The utility model can be used for the dismounting of all kinds of engineering drilling equipment, particularly engineering driller stair tower mast bar.
Brief description of the drawings
Fig. 1 is stair type rig structure schematic diagram.
Fig. 2 is Fig. 1 right view.
Fig. 3 is mainmast structural representation on stair type boring tower.
Fig. 4 is mainmast structural representation under stair type boring tower.
Fig. 5 is the upper and lower mainmast installment state structural representation of stair type boring tower.
Fig. 6 is the utility model stair tower mast bar disassembling fixture structural representation.
Fig. 7 is the utility model stair tower mast bar disassembling fixture use state schematic diagram.
In figure:1-rig, 2-lower sub-strut bar, 3-upper sub-strut bar, 4-upper mainmast, the 41-the first side lever, 5-lower lead Mast, the 51-the second side lever, 52-base, 6-adapter sleeve, the 71-the first connecting hole, the 72-the second connecting hole, 81-the first is horizontal Support, the 82-the second stull, 9-bearing, 10-rack, 11-bearing, the 12-the first bearing pin, 13-gear, 14-ratchet, 15- Second bearing pin, 16-tommy bar.
Embodiment
As shown in Figure 6, Figure 7, the utility model stair tower mast bar disassembling fixture it is main by bearing 9, rack 10, bearing 11, First bearing pin 12, the second bearing pin 15, gear 13, ratchet 14, tommy bar 16 are constituted.
Gear 13 is arranged on bearing 9 by the first bearing pin 12.Rack 10 is arranged on inside bearing 9, and is nibbled with gear 13 Close.Ratchet 14 is arranged on inside tommy bar 16 by the second bearing pin 15, and the free end of ratchet 14 is caught in the slot of gear 13.Tommy bar 16 are connected with bearing 9 by installing the first bearing pin 12 of gear 13.An angle bar has been respectively arranged below in bearing 9 and rack 10 17。
When dismantling mast, by the angle bar 17 of the utility model bearing 9 and the lower section of rack 10 be respectively clamped into upper and lower mainmast 4, At two adjacent first and second stulls 81,82 of 5 junctions, tommy bar 16 is constantly pulled, tommy bar 16 is from " pulling to " position position one " Put during two ", the rotate counterclockwise of gear 13 can be promoted with pawl 14 simultaneously, so that the end motion to the right of rack 10.Pull Bar reach " behind position two ", by tommy bar 16 from " position two " turn back " position one ", turning back " during position one ", ratchet 14 Automatically lift, gear 13 is not rotated.
Above-mentioned action is repeated, the constantly end motion to the right of rack 10 can be achieved, finally separates upper and lower mainmast Come, reach and do not damage upper and lower mainmast 4,5 and the purpose smoothly dismantled.
It can change conventional by way of mast is dismantled in the violence of the instrument such as tup by using the utility model, not only save Save the take-down time, alleviated the labor intensity of operator, and ensure that the product quality of mast.
The utility model can be used for the dismounting of all kinds of engineering drilling equipment, particularly engineering driller stair tower mast bar.

Claims (1)

1. a kind of stair tower mast bar disassembling fixture, it is characterised in that including bearing(9), a gear(13)Pass through the first bearing pin(12) On bearing;One rack(10)Inside bearing, and and gear(13)Engagement;One tommy bar(16)Pass through the first bearing pin (12)The outer end of bearing is connected to, and passes through the second bearing pin inside tommy bar(15)Ratchet is installed(14), the free end of ratchet is caught in In the slot of gear;Relative angle bar is respectively arranged below in bearing and rack(17), during dismounting mast, bearing and rack The angle bar of lower section is respectively clamped into two adjacent first and second stulls of upper and lower mainmast junction(81、82)Place.
CN201621331439.3U 2016-12-07 2016-12-07 Stair tower mast bar disassembling fixture Expired - Fee Related CN206357148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621331439.3U CN206357148U (en) 2016-12-07 2016-12-07 Stair tower mast bar disassembling fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621331439.3U CN206357148U (en) 2016-12-07 2016-12-07 Stair tower mast bar disassembling fixture

Publications (1)

Publication Number Publication Date
CN206357148U true CN206357148U (en) 2017-07-28

Family

ID=59373554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621331439.3U Expired - Fee Related CN206357148U (en) 2016-12-07 2016-12-07 Stair tower mast bar disassembling fixture

Country Status (1)

Country Link
CN (1) CN206357148U (en)

Similar Documents

Publication Publication Date Title
CN204199686U (en) Without outrigger concrete parapet formwork system
CN205976476U (en) Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof
CN105258912B (en) A kind of low-speed wind tunnel model test support meanss based on internal balance
CN206357148U (en) Stair tower mast bar disassembling fixture
CN201486579U (en) Drilling anchor rod hole positioning device
CN212613640U (en) Improved generation building scaffold frame of encorbelmenting
CN103243901B (en) External scaffolding bridging connector
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN209469000U (en) Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate
CN104453235B (en) Current conversion station fire wall construction technology
CN205804428U (en) A kind of collapsible peg datum hole detection device
CN208088825U (en) A kind of mounting structure of superimposed sheet for assembled architecture
CN207063177U (en) Cast-in-place concrete floor hanging built-in fitting
CN205529917U (en) A support fixing device that is used for high mound, U type abutment form setting
CN205894077U (en) A complete set of pipe long spiral drilling filling pile brush wall ware
CN204531004U (en) The underpinning device of ultra-wide body of wall
CN210947661U (en) Installation device of socket type overhanging scaffold
CN204370564U (en) Underfloor constructional column concrete pouring structure
CN207268083U (en) Erecting device
CN207405498U (en) A kind of high ferro box beam portable awning portal support device
CN208056625U (en) A kind of toilet drop plate hangs mould
CN208396660U (en) A kind of Multifunctional drill
CN206393512U (en) A kind of assembly mould of steel structural plant roof tie-rod
CN105908791B (en) A kind of collapsible peg datum hole detection means
CN202644998U (en) Wall concrete formwork fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

Termination date: 20201207