CN205894077U - A complete set of pipe long spiral drilling filling pile brush wall ware - Google Patents

A complete set of pipe long spiral drilling filling pile brush wall ware Download PDF

Info

Publication number
CN205894077U
CN205894077U CN201620629932.7U CN201620629932U CN205894077U CN 205894077 U CN205894077 U CN 205894077U CN 201620629932 U CN201620629932 U CN 201620629932U CN 205894077 U CN205894077 U CN 205894077U
Authority
CN
China
Prior art keywords
bucket
brush wall
link
full
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620629932.7U
Other languages
Chinese (zh)
Inventor
陈刚
金郎
金一郎
陈晨光
沈新波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Teng Foundation Engineering Co Ltd
Original Assignee
Shanghai Teng Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Teng Foundation Engineering Co Ltd filed Critical Shanghai Teng Foundation Engineering Co Ltd
Priority to CN201620629932.7U priority Critical patent/CN205894077U/en
Application granted granted Critical
Publication of CN205894077U publication Critical patent/CN205894077U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model provides a complete set of pipe long spiral drilling filling pile brush wall ware, including brush wall bucket, brush wall bucket periphery evenly is equipped with the telescopic link, and the telescopic link outer end is equipped with blunt knife, brush wall bucket below is equipped with receives mud and counter weight bucket, and brush wall bucket passes through the connecting piece and receive mud and counter weight bucket to be connected, brush wall bucket top is located to the link, and the link also is connected through connecting piece and brush wall bucket. Adopting the crawler crane to hang the link, will brushing during the wall ware hangs the steel casing pipe perpendicularly, scrape the remaining adhesion soil of steel casing pipe inner wall through blunt knife, the adhesion soil that is scraped drops in receipts mud and counter weight bucket. The device provided by the utility model the simple structure, through the cooperation of scalable string of trowel, receipts mud and counter weight bucket, can be clear totally with overlapping the remaining adhesion soil of inside pipe wall, the simple operation, only 2~3 minutes whole process time, low cost, steel structural member can process by oneself, use stably, through testing repeatedly, the result of use is good, has effectively guaranteed construction quality.

Description

Full-sleeve long screw auger drilling deposited pile brush wall device
Technical field
This utility model is related in a kind of civil engineering (pile foundation) technical field, for the perfusion of full-sleeve long auger In the work progress such as stake, interlocking pile, remove the device of internal surface of sleeve pipe adhesion soil.
Background technology
In civil engineering (pile foundation) technical field, cast-in-situ bored pile is the pile-type commonly using, conventional use of machine Tool equipment is rotary drilling rig, gps rig, but the said equipment and its construction technology have following technique disadvantage: low construction efficiency;Become Need during hole to prevent collapse hole using mud off, there is mud emission pollution problem, and there is easy collapse hole, reaming, necking down, hole The common quality defects such as bottom residue thickness;Pile body perpendicularity is only 1/150.
For overcoming above-mentioned technique disadvantage, by improvement for equipments and process, adopt more advanced full-sleeve long screw auger at present Hole pouring pile equipment and its construction technology cast-in-situ bored pile, it uses sleeve pipe and auger stem to work in coordination with rotation and sink, sleeve pipe The interior soil body rises with helical blade, and progressively delivery port creeps into projected depth, lifts auger stem, then in sleeve pipe Decentralization reinforcing bar, concrete perfusion, finally pull out sleeve pipe, have no collapse hole, reaming, necking down, perpendicularity reaches 1/300, and no mud The advantages such as discharge.But during this equipment and construction technology, between existing necessarily between internal surface of sleeve pipe and auger stem blade Away from, after the completion of leading to fetch earth in sleeve pipe, internal surface of sleeve pipe has certain thickness adhesion soil to be needed to remove.
For the problems referred to above, it is the adhesion soil by manual cleaning internal surface of sleeve pipe in prior art, this mode exists clearly Wash the problem that not in place, some dead angles will not be cleaned by, meanwhile, manual cleaning inefficiency, wastes time and energy.
Utility model content
The technical problems to be solved in the utility model be provide that a kind of structure is simple, simple operation, with low cost, using steady Fixed, the device of the adhesion soil of internal surface of sleeve pipe residual can be removed.
In order to solve above-mentioned technical problem, the technical solution of the utility model is to provide a kind of full-sleeve long auger to fill Note stake brush wall device it is characterised in that: include brush wall bucket, brush wall bucket periphery is uniformly provided with expansion link, expansion link outer end is provided with scrapes mud Knife;It is provided with receipts mud and counterweight bucket, brush wall bucket is passed through connector and is connected with receipts mud and counterweight bucket below brush wall bucket;Link is located at brush wall Above bucket, link is connected with brush wall bucket also by connector.
Preferably, described connector is chain cable.
Preferably, described receive mud and counterweight bucket with diameter greater than described brush wall bucket.
Preferably, it is provided with the spring for adjustable telescopic rod length inside described expansion link.
Preferably, described spring in the raw when, brush wall bucket comprise its periphery expansion link overall diameter be more than set Bore.
Preferably, described trowel, expansion link, receipts mud and counterweight bucket, chain cable, the link scraped is steel structure member.
Preferably, described trowel of scraping is provided with 6.
During use, treat that steel thimble sinks down into a bottom absolute altitude, auger stem lifting is fetched earth after finishing;Extension is hung using crawler crane Ring, brush wall device is vertically hung in steel thimble, vertical drop;By scraping trowel, the adhesion soil part that steel bushing inside pipe wall remains is scraped Fall, the adhesion soil being scraped drops in receipts mud and counterweight bucket;Lifting brush wall device, brush wall device is ratated 90 degrees, vertical again under Fall;By scraping trowel, the adhesion soil that steel bushing inside pipe wall remains all is scraped;Lift brush wall device again, brush wall soil clearly terminates.
The full-sleeve long screw auger drilling deposited pile brush wall device that this utility model provides, by easy, effective structure, solves The problem of full-sleeve long screw auger drilling deposited pile construction technology middle sleeve inwall adhesion soil, has been effectively ensured construction quality.
Compared to existing technology, the device that this utility model provides has the advantages that
1st, simple structure: by the scalable cooperation scraping trowel, receipts mud and counterweight bucket, you can by gluing that internal surface of sleeve pipe remains Attached soil is fully erased;
2nd, simple operation: whole only 2~3 minutes process time;
3rd, with low cost: steel structure member, can voluntarily process;
4th, using stable: through repeatedly testing, using effect is good.
Brief description
The full-sleeve long screw auger drilling deposited pile brush wall device front view that Fig. 1 provides for the present embodiment;
The full-sleeve long screw auger drilling deposited pile brush wall device top view that Fig. 2 provides for the present embodiment.
Specific embodiment
With reference to specific embodiment, this utility model is expanded on further.It should be understood that these embodiments are merely to illustrate this Utility model rather than restriction scope of the present utility model.In addition, it is to be understood that in the content having read this utility model instruction Afterwards, those skilled in the art can make various changes or modifications to this utility model, and these equivalent form of values equally fall within this Shen Please appended claims limited range.
Fig. 1 and Fig. 2 is respectively full-sleeve long screw auger drilling deposited pile brush wall device front view and the vertical view that the present embodiment provides Figure, described full-sleeve long screw auger drilling deposited pile brush wall device is by scraping trowel 1, expansion link 2, receive mud and counterweight bucket 3, chain cable 4, hang Ring 5 grade forms.It has been evenly arranged expansion link 2 in brush wall bucket periphery, expansion link 2 outer end is fixed with scrapes trowel 1.Cloth below brush wall bucket It is equipped with receipts mud and counterweight bucket 3, brush wall bucket is passed through chain cable 4 and is connected with receipts mud and counterweight bucket 3.Link 5 is arranged in above brush wall bucket, It is connected with brush wall bucket by chain cable 4.
Receive mud and counterweight bucket 3 with diameter greater than brush wall bucket, be easy to receive and scrape the mud that trowel 1 scrapes.
It is provided with the spring 6 for adjustable telescopic rod length inside expansion link 2.Spring 6 in the raw when, brush wall bucket bag Expansion link 2 containing its periphery is more than casing inner diameter with the overall diameter scraping trowel 1.When brush wall bucket and expansion link 2 stretch in sleeve pipe During portion, spring 6 shrinks automatically, makes to scrape trowel 1 and withstands internal surface of sleeve pipe.
Scrape trowel 1, expansion link 2, receipts mud and counterweight bucket 3, chain cable 4, link 5 and be steel structure member.
The specifically used method of the full-sleeve long screw auger drilling deposited pile brush wall device that the present embodiment provides is as follows:
1st, treat that sleeve pipe sinks down into a bottom absolute altitude, auger stem lifting is fetched earth after finishing;Link 5 is hung using crawler crane, will Brush wall device vertically hangs in sleeve pipe, and spring 6 shrinks automatically, makes to scrape trowel 1 and withstands internal surface of sleeve pipe.
2nd, vertical drop;By scraping trowel 1, the adhesion soil part that internal surface of sleeve pipe remains is scraped, the adhesion soil being scraped falls Fall in receipts mud and counterweight bucket 3;
3rd, lift brush wall device;
4th, brush wall device is ratated 90 degrees, vertical drop again;By scraping the adhesion soil that internal surface of sleeve pipe remains by trowel 1 all Scrape;
5th, lift brush wall device again, brush wall soil clearly terminates.

Claims (7)

1. a kind of full-sleeve long screw auger drilling deposited pile brush wall device it is characterised in that: include brush wall bucket, brush wall bucket periphery uniformly sets There is expansion link (2), expansion link (2) outer end is provided with scrapes trowel (1);It is provided with receipts mud and counterweight bucket (3), brush wall bucket leads to below brush wall bucket Cross connector to be connected with receipts mud and counterweight bucket (3);, above brush wall bucket, link (5) is also by connector and brush wall for link (5) Bucket connects.
2. as claimed in claim 1 a kind of full-sleeve long screw auger drilling deposited pile brush wall device it is characterised in that: described connector For chain cable (4).
3. as claimed in claim 1 a kind of full-sleeve long screw auger drilling deposited pile brush wall device it is characterised in that: described receipts mud and Counterweight bucket (3) with diameter greater than described brush wall bucket.
4. as claimed in claim 1 a kind of full-sleeve long screw auger drilling deposited pile brush wall device it is characterised in that: described expansion link (2) the internal spring (6) being provided with for adjustable telescopic rod (2) length.
5. as claimed in claim 4 a kind of full-sleeve long screw auger drilling deposited pile brush wall device it is characterised in that: described spring (6) when in the raw, expansion link (2) that brush wall bucket comprises its periphery and scrape the overall diameter of trowel (1) and be more than in sleeve pipe Footpath.
6. a kind of full-sleeve long screw auger drilling deposited pile brush wall device as described in any one of Claims 1 to 5 it is characterised in that: Described trowel (1), expansion link (2), receipts mud and counterweight bucket (3), chain cable (4), the link (5) scraped is steel structure member.
7. as claimed in claim 1 a kind of full-sleeve long screw auger drilling deposited pile brush wall device it is characterised in that: described scrape trowel (1) it is provided with 6.
CN201620629932.7U 2016-06-23 2016-06-23 A complete set of pipe long spiral drilling filling pile brush wall ware Active CN205894077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620629932.7U CN205894077U (en) 2016-06-23 2016-06-23 A complete set of pipe long spiral drilling filling pile brush wall ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620629932.7U CN205894077U (en) 2016-06-23 2016-06-23 A complete set of pipe long spiral drilling filling pile brush wall ware

Publications (1)

Publication Number Publication Date
CN205894077U true CN205894077U (en) 2017-01-18

Family

ID=57768847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620629932.7U Active CN205894077U (en) 2016-06-23 2016-06-23 A complete set of pipe long spiral drilling filling pile brush wall ware

Country Status (1)

Country Link
CN (1) CN205894077U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988313A (en) * 2017-05-18 2017-07-28 上海金泰工程机械有限公司 Stake holes wall mud-scraping apparatus
CN112610186A (en) * 2020-12-03 2021-04-06 深圳市工勘岩土集团有限公司 Method for cleaning hole wall of section for resisting pile pulling in rock

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988313A (en) * 2017-05-18 2017-07-28 上海金泰工程机械有限公司 Stake holes wall mud-scraping apparatus
CN112610186A (en) * 2020-12-03 2021-04-06 深圳市工勘岩土集团有限公司 Method for cleaning hole wall of section for resisting pile pulling in rock

Similar Documents

Publication Publication Date Title
CN206845146U (en) A kind of water-stop and antipriming to be drawn water for Geology Drilling layering
CN206429215U (en) A kind of horizontal well casing pipe intraclast cleans fishing tool
CN104018792A (en) Reducing screw displacement pile drilling tool and construction method thereof
CN107816324A (en) A kind of tiltedly steel-pipe pile borehole cleaning and the construction method and system for reducing sediment thickness
CN105041255A (en) Hole bottom combined drilling tool used for fishing broken falling objects in drilled hole and fishing method of hole bottom combined drilling tool
CN205894077U (en) A complete set of pipe long spiral drilling filling pile brush wall ware
CN203821461U (en) Sampling device for deep underground concrete
CN205387708U (en) Clear stake device of disposable rotary -cut formula of a complete set of pipe
CN107869146A (en) A kind of method with clean-out machine Dewatering well
CN104088278B (en) A kind of construction method of powerful water column hole reaming of anchor rod and device
RU89602U1 (en) DEVICE FOR CLEANING THE OPERATION COLUMN WALLS AND WELL BORE
CN106759296A (en) One kind draining odd-shaped cross section ring pile tube and its can take root in formula construction method
CN103711121B (en) The underlying original state in stake top fetches earth the construction method of cast-with-pressure concrete pile
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area
CN100434595C (en) Piling method and piling device for borehole pump pouring large flow concrete ring pile
CN200943204Y (en) Peg forming device for drilling pump filling large flowing concrete finger ring peg
CN204357355U (en) Combined screw thread soil compaction pore-forming sand drain drill bit
CN209761331U (en) Eccentric casing drilling construction structure for anchoring engineering
CN204571935U (en) Whirling rabbit
CN208563419U (en) A kind of set digging device
CN206600153U (en) A kind of Telescopic continuous flushing device
CN103104202B (en) For removing the pumping system revolving and dig the soft formation soil body bottom stake holes
JP2013142244A (en) Device and method for sampling underground specimen
CN106836228A (en) Filling type stake hollow drill
CN206941666U (en) A kind of snag concrete sampler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant