A kind of isolating device separated with people's car with spray dust's function
Technical field
The utility model is related to a kind of isolating device, and in particular to it is a kind of with people's car separate and spray dust's function every
From device.
Background technology
It is well known that either in the street, or on the construction road in plant area, construction site, be required for using one
Plant isolating device to separate people and Che walking passageway, make one car and take their own roads, to ensure the life security of pedestrian.Tradition
People's car isolating device, hard shoulder material is generally concrete, and isolation railing is twice steel pipe, in hard shoulder prefabrication process,
By reserving hole channel, isolation railing is worn for the later stage, the shortcoming of this people's car separation isolating device be consumptive material it is big, not environmentally, ratio
It is heavier, mobile inconvenient;Another relatively advanced isolating device is:Hard shoulder material is rigid plastics, is pacified by splicing
Dress, isolation railing is twice PPR pipe, and the advantage of this people's car separation isolating device is that isolating device is installed, dismantled using assembling
Formula, more convenient, isolation railing can be reused, had the disadvantage by PPR pipe on building sites:Needed inside hard shoulder into
Row fills sand, to increase the weight of hard shoulder, after the completion of dismounting, needs to be collected sand processing again, in-convenience in use.
Utility model content
The technical problems to be solved in the utility model is that existing isolating device needs to fill sand and processing is collected to sand,
In-convenience in use there is provided a kind of isolating device separated with people's car with spray dust's function.
In order to solve the above technical problems, the utility model uses following technical proposals:There is one kind people's car to separate and spray
The isolating device of depositing dust function, including hard shoulder and isolation railing, isolation railing connect hard shoulder through the duct on hard shoulder
Pick up and;Isolation railing is hollow structure, and isolation railing includes upper strata and isolates railing and lower floor's isolation railing, the upper strata isolation
Railing is provided with atomizer, and railing one end is isolated with upper strata and is connected provided with force (forcing) pump;Lower floor's isolation railing is provided with branch
Pipe, branch pipe is provided with water filling port.
The branch pipe is provided with valve I.
Valve II is provided between the adjacent hard shoulder.
The isolation railing is PPR pipe structure.
The adjacent hard shoulder spacing is 2000-3000mm, and hard shoulder is frustum type structure, and hard shoulder is from top to bottom successively
Layer and pier cap are passed through for reservoir bed, isolation railing, duct is arranged on isolation railing and passes through layer, and duct there are twice.
The hard shoulder is provided with reflective tape.
Construction site can be widely used in, on the construction road of plant area using the utility model of said structure, be used for
Carry out human and vehicle shunting, atomizing spray depositing dust.Hard shoulder is processed into by regularization mould, and isolation railing uses PPR pipe, builds work
Journey is constructed the later stage, and PPR pipe can be used for engineering entity after unloading.The utility model standardizes isolating device, and has spray drop concurrently
The effect of dirt, improves construction site civilized construction level.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
Embodiment
As shown in figure 1, the utility model includes hard shoulder 1 and isolation railing 2, isolation railing 2 passes through the hole on hard shoulder 1
Road 11 connects hard shoulder 1;Isolation railing 2 is hollow structure, isolation railing 2 include upper strata isolate railing 21 and lower floor every
From railing 22, the upper strata isolation railing 21 is provided with atomizer 23, and the one end of railing 21 is isolated with upper strata and is connected provided with pressurization
Pump 4;Lower floor's isolation railing 22 is provided with branch pipe 6, and branch pipe 6 is provided with water filling port 24.Force (forcing) pump 4 uses miniature pressurized water
Pump, the booster pump is Full-automatic variable-frequency constant pressure water supply, can save the energy more than 60%, and can be used in turn.
The branch pipe 6 is provided with valve I61.Valve I61 controls on one branch pipe of each hard shoulder correspondence, each branch pipe
The folding of corresponding water filling port 24.It can select to need the hard shoulder of water filling as needed, a hard shoulder is filled and closed after water
Valve closing door I61.
Valve II62 is provided between the adjacent hard shoulder 1.One valve II62 of each hard shoulder correspondence, as needed choosing
Select the position for needing atomizer 23 to spray water.
The isolation railing 2 is PPR pipe structure.
The spacing of adjacent hard shoulder 1 be 2000-3000mm, the adjacent spacing 2500mm of hard shoulder 1 of the utility model, every
It is frustum type structure from pier 1, hard shoulder 1 is followed successively by reservoir bed 12, isolation railing and passes through layer 13 and pier cap 14, duct from top to bottom
11, which are arranged on isolation railing, passes through layer 13, and there are twice in duct 11.Hard shoulder is made of rigid plastics, and middle part isolation railing is passed through
A diameter of 50mm in 13 duct 11 of layer, sets twice duct 11 altogether.
The hard shoulder 1 is provided with reflective tape 15.Whole hard shoulder space outside 150mm pastes yellow reflective tape, so as to
Warning reminding effect is played at night.The water filling of 1 bottom reservoir bed of hard shoulder 12 is provided by lower isolation railing, lower floor's isolation railing
22 set a diameter of 100mm circular holes to be used for water filling through the bottom in duct 11.After the completion of later stage use, it is only necessary to tear hard shoulder open
Remove, the water that bottom is stored is outwelled.Isolation railing uses caliber for DN50 PPR pipe upper and lower two layers, upper strata isolated column
Bar 21 is used as spray, the spacing 2.5m of atomizer 23, is arranged in the middle of two hard shoulders, and the joint between pipeline is using warm
Molten connection;Lower floor's isolation railing 22 is used as hard shoulder internal water flooding, and the joint between pipeline uses hot-melt adhesive paste.Using complete
Cheng Hou, root job site actual conditions, PPR pipe is disconnected in position, for job site, the rate of recovery can reach 60% with
On.The utility model can be used in the four seasons in south, in the north, and the applicable period is March 15 to November 15, and winter should be by
Isolation railing PPR pipe, hard shoulder bottom water storage are drained only, to prevent frost heaving failure.