CN206346117U - A kind of Bailey beam dismounting work anchor - Google Patents

A kind of Bailey beam dismounting work anchor Download PDF

Info

Publication number
CN206346117U
CN206346117U CN201621232620.9U CN201621232620U CN206346117U CN 206346117 U CN206346117 U CN 206346117U CN 201621232620 U CN201621232620 U CN 201621232620U CN 206346117 U CN206346117 U CN 206346117U
Authority
CN
China
Prior art keywords
work
clip sheet
work clip
spring
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621232620.9U
Other languages
Chinese (zh)
Inventor
康卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201621232620.9U priority Critical patent/CN206346117U/en
Application granted granted Critical
Publication of CN206346117U publication Critical patent/CN206346117U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of Bailey beam dismounting work anchor, including work anchor and work clip sheet, one end of the work anchor opens up fluted, the work anchor offers tipper away from groove one end correspondence string holes, activity is inserted with work clip sheet in the tipper, the tipper bottom wall of inner cavity symmetrically offers mounting groove in string holes both sides, the first spring and second spring are installed with respectively in the symmetrical mounting groove of each two, first spring and the other end of second spring are fixedly connected with work clip sheet, middle part of the present utility model offers the string holes for interting steel strand wires, the clamping to steel strand wires can be played with loosening;And can effectively prevent work clip sheet free dropping from falling, and work clip sheet is after tipper is jumped out, and will not be separated with work anchor, when needing to use again, directly gets back into tipper work clip sheet with hand, steel strand wires are fixed, and it is very convenient.

Description

A kind of Bailey beam dismounting work anchor
Technical field
The utility model is related to Bailey beam dismantling technology field, specially a kind of Bailey beam dismounting work anchor.
Background technology
With developing rapidly for China's economy, the transport development of one of infrastructure is also quickly grown, and Bailey beam is used as one Very convenient and efficient branch stake tool is planted to be widely present in across in the work progress such as the continuous Cast-in-situ Beam in highway, cross a river road.
In the unloading process of Bailey beam, oil pressure centre-hole jack drives steel strand wires to move, and the fixed of steel strand wires is needed Work anchor is used to realize, but the backhaul with oil pressure centre-hole jack can be transported with journey, steel strand wires are pushed up in work anchor Dynamic, in the prior art, work anchor is not attached to work clip sheet, causes work clip sheet in work anchor free dropping therewith, so Need often to retighten the work clip sheet in work anchor in unloading process, inconvenient operation.
Utility model content
The purpose of this utility model is to provide a kind of Bailey beam dismounting work anchor, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the utility model provides following technical scheme:
A kind of Bailey beam dismounting work anchor, including work anchor and work clip sheet, one end of the work anchor offer recessed Insertion offers some string holes in groove, the work anchor, and the work anchor offers tipper away from groove one end correspondence string holes, Activity is inserted with work clip sheet in the tipper, and the tipper bottom wall of inner cavity symmetrically offers mounting groove in string holes both sides, The first spring and second spring, first spring and the second bullet are installed with respectively in the symmetrical mounting groove of each two The other end of spring is fixedly connected with work clip sheet.
It is preferred that, the work clip sheet includes work clip sheet one and work clip sheet two, the work clip sheet one and filing appliance Piece two is flexibly connected, and the described one end of first spring away from its corresponding mounting groove is fixedly connected on the bottom of work clip sheet one, The one end of the second spring away from its corresponding mounting groove is fixedly connected on the bottom of work clip sheet two.
It is preferred that, the inwall of the work clip sheet one and work clip sheet two is equipped with screw thread.
It is preferred that, form clamp hole between the work clip sheet one and work clip sheet two, the clamp hole and correspond to therewith String holes diameter it is identical and in the same vertical plane.
It is preferred that, the angle of inclination of the outer wall of the work clip sheet one and the outer wall of work clip sheet two with tipper inwall It is identical.
It is preferred that, the corner of the groove is disposed as fillet.
Compared with prior art, the beneficial effects of the utility model are:Middle part of the present utility model is offered for interting The string holes of steel strand wires, and tipper is offered in one end of string holes, the setting of tipper is for grafting work clip sheet, Er Qiegong Make intermediate plate directly by spring with work anchor to be connected, by this connected mode, work clip sheet can be met in cooperating Effect when anchor works, can play the clamping to steel strand wires with loosening;And effectively can prevent work clip sheet from freely taking off Fall, and work clip sheet is after tipper is jumped out, and will not be separated with work anchor, directly will with hand when needing to use again Work clip sheet is got back into tipper, and steel strand wires are fixed, very convenient.
Brief description of the drawings
Fig. 1 is the utility model structure main view profile;
Fig. 2 is the utility model structure top view;
Fig. 3 is the utility model structure upward view;
Fig. 4 is utility model works intermediate plate one and the connection diagram of work clip sheet two;
Fig. 5 is the A portions enlarged drawing in Fig. 1;
Fig. 6 is the B portions enlarged drawing in Fig. 1.
In figure:1 work anchor, 2 grooves, 3 string holes, 4 tippers, 5 work clip sheets one, 51 work clip sheets two, 6 mounting grooves, 7 One spring, 71 second springs, 8 clamp holes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to this reality 0 with novel protected scope.
Fig. 1-6 are referred to, the utility model provides a kind of technical scheme:
A kind of Bailey beam dismounting work anchor, including work anchor 1 and work clip sheet, one end of work anchor 1 open up fluted 2, groove 2 is used for coordinating oil pressure centre-hole jack, is conveniently plugged in oil pressure centre-hole jack, the corner of groove 2 is equal It is set to fillet, it is to avoid cause damage to oil pressure centre-hole jack when with oil pressure centre-hole jack grafting, destroys equipment, Cause economic loss.
Insertion offers some string holes 3 in work anchor 1, and string holes 3 is used for interting steel strand wires, and work anchor 1 is away from the one end of groove 2 Correspondence string holes 3 offers tipper 4, and the angle of inclination of tipper 4 is preferably 30 degree, facilitates the grafting and cooperation of work clip sheet, inclines Activity is inserted with work clip sheet in skewed slot 4, and steel strand wires are fixed after steel strand wires are interspersed in string holes 3 for work clip sheet.
The bottom wall of inner cavity of tipper 4 is symmetrically offered in mounting groove 6, the symmetrical mounting groove 6 of each two respectively in the both sides of string holes 3 The first spring 7 and second spring 71 are installed with, on the one hand the setting of the first spring 7 and second spring 71 is played to work The connection function of intermediate plate 1 and work clip sheet 2 51, on the other hand can also make work clip sheet 1 and work clip sheet 2 51 more Easily reset, work clip sheet includes work clip sheet 1 and work clip sheet 2 51, work clip sheet 1 and the activity of work clip sheet 2 51 Connection, facilitates work clip sheet 1 and work clip sheet 2 51 after being spun off from tipper 4, can make work clip sheet 1 and work Make intermediate plate 2 51 to separate, steel strand wires are loosened.
Clamp hole 8, clamp hole 8 and the diameter of corresponding string holes 3 are formed between work clip sheet 1 and work clip sheet 2 51 It is identical and in the same vertical plane so that clamp hole 8 can align with string holes 3 so that interspersed more convenient, the work of steel strand wires The inwall for making intermediate plate 1 and work clip sheet 2 51 is equipped with screw thread, can provide bigger to the steel strand wires being interspersed in clamp hole 8 Frictional force so that clamping effect more preferably, the other end of the first spring 7 and second spring 71 is fixedly connected with work clip sheet, The one end of first spring 7 away from its corresponding mounting groove 6 is fixedly connected on the bottom of work clip sheet 1, makes work clip sheet 1 With work anchor 1 without departing from the one end of second spring 71 away from its corresponding mounting groove 6 is fixedly connected on work clip sheet 2 51 Bottom, makes work clip sheet 2 51 with work anchor 1 also without departing from the outer wall of work clip sheet 1 and the outer wall of work clip sheet 2 51 It is identical with the angle of inclination of the inwall of tipper 4 so that work clip sheet 1 can be good at and tipper with work clip sheet 2 51 4 coordinate grafting, realize good grafting and the fixation to steel strand wires.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of Bailey beam dismounting work anchor, including work anchor (1) and work clip sheet, it is characterised in that:The work anchor (1) One end open up fluted (2), insertion offers some string holes (3) in the work anchor (1), and the work anchor (1) is away from recessed Groove (2) one end correspondence string holes (3) offers activity in tipper (4), the tipper (4) and is inserted with work clip sheet, described to incline Skewed slot (4) bottom wall of inner cavity is symmetrically offered in string holes (3) both sides to be divided in mounting groove (6), the symmetrical mounting groove (6) of each two It is not installed with the first spring (7) and second spring (71), the other end of first spring (7) and second spring (71) is equal It is fixedly connected on work clip sheet.
2. a kind of Bailey beam dismounting work anchor according to claim 1, it is characterised in that:The work clip sheet includes work Make intermediate plate one (5) and work clip sheet two (51), the work clip sheet one (5) and work clip sheet two (51) are flexibly connected, described the The one end of one spring (7) away from its corresponding mounting groove (6) is fixedly connected on the bottom of work clip sheet one (5), second bullet The one end of spring (71) away from its corresponding mounting groove (6) is fixedly connected on the bottom of work clip sheet two (51).
3. a kind of Bailey beam dismounting work anchor according to claim 2, it is characterised in that:The work clip sheet one (5) Screw thread is equipped with the inwall of work clip sheet two (51).
4. a kind of Bailey beam dismounting work anchor according to claim 1 or 2, it is characterised in that:The work clip sheet one (5) clamp hole (8) are formed between work clip sheet two (51), the clamp hole (8) is identical with corresponding string holes (3) diameter And in same vertical plane.
5. a kind of Bailey beam dismounting work anchor according to claim 1 or 2, it is characterised in that:The work clip sheet one (5) outer wall and the outer wall of work clip sheet two (51) is identical with the angle of inclination of tipper (4) inwall.
6. a kind of Bailey beam dismounting work anchor according to claim 1, it is characterised in that:The turning of the groove (2) Place is disposed as fillet.
CN201621232620.9U 2016-11-17 2016-11-17 A kind of Bailey beam dismounting work anchor Expired - Fee Related CN206346117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621232620.9U CN206346117U (en) 2016-11-17 2016-11-17 A kind of Bailey beam dismounting work anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621232620.9U CN206346117U (en) 2016-11-17 2016-11-17 A kind of Bailey beam dismounting work anchor

Publications (1)

Publication Number Publication Date
CN206346117U true CN206346117U (en) 2017-07-21

Family

ID=59316949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621232620.9U Expired - Fee Related CN206346117U (en) 2016-11-17 2016-11-17 A kind of Bailey beam dismounting work anchor

Country Status (1)

Country Link
CN (1) CN206346117U (en)

Similar Documents

Publication Publication Date Title
CN208100550U (en) Perforating device is used in a kind of bookbinding of Financial Information
CN206346117U (en) A kind of Bailey beam dismounting work anchor
CN207017506U (en) A kind of building glass cladding glass installation fixing device
CN208252544U (en) A kind of improvement pin
CN208252570U (en) Flatness adjustment structure
CN207503597U (en) A kind of vocational guidance planning displaying device
CN208508220U (en) A kind of data line core wire folder
CN208719571U (en) A kind of card code installation part
CN207143932U (en) A kind of artificial digging pile concrete support device
CN207297652U (en) A kind of Noval bearing seat
CN207558296U (en) A kind of packaged type display board of industrial and commercial administration
CN206237675U (en) The splicing construction of pcb board
CN206788540U (en) A kind of projecting apparatus of convenient dismounting
CN206872084U (en) A kind of conveying device accessory
CN209174943U (en) A kind of electric power laying pairing anchor ear process equipment
CN209163867U (en) It is a kind of to be easily installed with the plug-in conduit compared with stiff stability
CN207534633U (en) A kind of ceramic ring chamfering device
CN213844710U (en) Scroll fixing device
CN207115804U (en) A kind of College Chinese teacher board of education
CN205844732U (en) Projector fixing device is used in a kind of teaching
CN206221450U (en) A kind of tube connection piece
CN206682255U (en) A kind of anchor chain sprocket wheel
CN207633836U (en) A kind of garage pilot pin
CN206907372U (en) For puting on display the display device used
CN204964328U (en) Expanded polystyrene (EPS) sag check out test set

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170721

Termination date: 20171117

CF01 Termination of patent right due to non-payment of annual fee