CN206338821U - A kind of energy-saving clinker process units - Google Patents

A kind of energy-saving clinker process units Download PDF

Info

Publication number
CN206338821U
CN206338821U CN201621295492.2U CN201621295492U CN206338821U CN 206338821 U CN206338821 U CN 206338821U CN 201621295492 U CN201621295492 U CN 201621295492U CN 206338821 U CN206338821 U CN 206338821U
Authority
CN
China
Prior art keywords
chamber
preheating
heating chamber
fuel
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621295492.2U
Other languages
Chinese (zh)
Inventor
官美红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Changyuan Plastic Product Co Ltd
Original Assignee
Dongguan Changyuan Plastic Product Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Changyuan Plastic Product Co Ltd filed Critical Dongguan Changyuan Plastic Product Co Ltd
Priority to CN201621295492.2U priority Critical patent/CN206338821U/en
Application granted granted Critical
Publication of CN206338821U publication Critical patent/CN206338821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)

Abstract

The utility model discloses a kind of energy-saving clinker process units, including combustion chamber, feed heating chamber and preheating chamber, the preheating chamber bottom is provided with preheating heating chamber, the combustion chamber bottom is provided with fuel chamber, the fuel chamber bottom is connected with fuel gas inlet, the fuel chamber side is connected with air inlet pipe, the air inlet pipe is controlled by externally mounted control valve door, the combustion chamber and charging heating chamber are linked together by junction chamber, the combustion chamber top side is linked together by blast pipe and preheating heating chamber, the preheating heating chamber two ends are separately installed with feed pipe and escaping pipe, realize that fuel enters and tail gas discharge, the preheating chamber top is provided with dog-house, the conveying of material is realized by connecting tube and charging heating chamber connection in preheating chamber side, the device discharges the gas produced after combustion heating after reusing, energy-conserving and environment-protective can be realized, pass through preheating, improve the quality of production.

Description

A kind of energy-saving clinker process units
Technical field
The utility model is related to clinker production technical field, specially a kind of energy-saving clinker process units.
Background technology
The rich ore powder that will be produced during fine ore obtained by ore dressing and exploitation and broken rich ore, makes by high temperature agglomeration Into sintering deposit or pellet be called clinker.Blast furnace is smelted using clinker, can improve yield and reduction coke ratio.Current each national capital It is directed to improving the grog of blast furnace feeding, clay or other raw materials are size-reduced is mixed into batch in silicate industry, then The powder of certain granules composition is ground into after high-temperature calcination.In batch for ceramics and refractory material, lean be turned into can be played With, you can the plasticity of reduction batch, and contraction of the base substrate when drying and burning till can be reduced.Cement raw material is through grinding Cheng Sheng Material.Frit after calcining is also referred to as clinker.Clinker, usually says that clinker refers to Portland clinker, i.e., international ripple Special orchid clinker abbreviation clinker, it is worn into appropriate proportion carefully by the raw material containing CaO, SiO2, Al2O3, Fe2O3 Powder burns till partially molten state, is able to the cement that calcium silicates is usually said for the hydraulic cement material of main mineral constituent Just refer to portland cement, it is by portland cement clinker, appropriate gypsum and a small amount of lime stone or the levigate hydraulic being made of Granulated slag Property binder materials, divided silicic acid salt cement and Portland cement, distinguish it is made a distinction with mixing material addition, due to ripe Expect in production process, hot gas after the heating is directly discharged, and not only causes heat waste, while the imperfect combustion shadow of fuel Air quality is rung, is unfavorable for environmental protection, and directly heat the calcining influence quality of production.
Utility model content
For problem above, the utility model provides a kind of energy-saving clinker process units, will be produced after combustion heating Tail gas by complete again heating after discharge, it is possible to achieve energy-conserving and environment-protective, while being preheated in advance to material, can reach More preferable production effect, the problem of effectively can solving in background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of energy-saving clinker process units, including Combustion chamber, charging heating chamber and preheating chamber, the preheating chamber bottom are provided with preheating heating chamber, and the combustion chamber bottom is provided with Fuel chamber, the fuel chamber bottom is connected with fuel gas inlet, and the fuel chamber side is connected with air inlet pipe, and the air inlet pipe passes through Externally mounted control valve door is controlled, and the combustion chamber and charging heating chamber are linked together by junction chamber, pass through combustion Burn room to heat charging heating chamber, the combustion chamber top side is linked together by blast pipe and preheating heating chamber, The preheating heating chamber two ends are separately installed with feed pipe and escaping pipe, realize that fuel enters and tail gas discharge, the preheating chamber Top is provided with dog-house, and the preheating chamber side realizes the conveying of material by connecting tube and charging heating chamber connection.
As a kind of preferred technical scheme of the utility model, the charging heating chamber opposite side is connected with discharge nozzle, and Charging heating chamber top hinge is connected to top cover.
As a kind of preferred technical scheme of the utility model, the escaping pipe, blast pipe use refractory Fe-base alloy Deng heat-resisting alloy material.
As a kind of preferred technical scheme of the utility model, the exhaust tube wall is provided with heat-insulated vacuum layer.
Compared with prior art, the beneficial effects of the utility model are:The energy-saving clinker process units, is fired by setting Burn room and preheating chamber, it is possible to achieve material is heated and warming up, so as to ensure the more preferable quality of production, be vented by setting Pipe, the gas with heat that combustion chambers burn is produced, including imperfect combustion combustion gas, are discharged into preheating heating chamber, fill Divide to utilize and discharge the heat that gas is carried, and make it that unburnt gas burns completely, improve the utilization rate of the energy, play The effects of energy-conserving and environment-protective.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
In figure:1- fuel gas inlets;2- fuel chamber;3- combustion chambers;4- discharge nozzles;5- air inlet pipe;6- control valves;7- is vented Pipe;8- escaping pipes;9- connecting tubes;10- preheating chambers;11- preheats heating chamber;12- dog-houses;13- top covers;14- feeds heating chamber; 15- feed pipes;16- junction chambers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Embodiment:
Referring to Fig. 1, the utility model provides a kind of technical scheme:A kind of energy-saving clinker process units, including burning Room 3, charging heating chamber 14 and preheating chamber 10, the bottom of preheating chamber 10 are provided with preheating heating chamber 11, the bottom of combustion chamber 3 Fuel chamber 2 is installed, the bottom of fuel chamber 2 is connected with fuel gas inlet 1, and the side of fuel chamber 2 is connected with air inlet pipe 5, institute State air inlet pipe 5 to be controlled by externally mounted control valve door 6, the combustion chamber 3 and charging heating chamber 14 pass through junction chamber 16 link together, and are heated by 3 pairs of combustion chamber charging heating chamber 14, the top of combustion chamber 3 side passes through blast pipe 7 Linked together with preheating heating chamber 11, preheating heating chamber 11 two ends are separately installed with feed pipe 15 and escaping pipe 8, realize Fuel enters and tail gas discharge, and the top of preheating chamber 10 is provided with dog-house 12, and the side of preheating chamber 10 passes through connecting tube 9 The conveying for realizing material is connected with charging heating chamber 14.
The charging opposite side of heating chamber 14 is connected with discharge nozzle 4, and the charging top hinge of heating chamber 14 is connected to top Lid 13, the escaping pipe 8, blast pipe 7 are using heat-resisting alloy materials such as refractory Fe-base alloys, and the outer wall of blast pipe 7 is set There is heat-insulated vacuum layer.
Operation principle of the present utility model:Combustion gas and fuel are discharged into by feed pipe 15, air inlet pipe 5 and fuel gas inlet 1, made Obtain combustion chamber 3 and preheating heating chamber 11 starts burning and heated, put into what needs were produced to preheating chamber 10 by dog-house 12 Material, is completed after preheating by preheating heating chamber 11, is discharged into charging heating chamber 14 by connecting tube 9, is produced using combustion chamber 3 Heat carry out high-temperature heating, while the fuel combustion of combustion chamber 3 produce gas preheating heating chamber is discharged into by blast pipe 7 11, realize that the secondary of heat is used inside preheating heating chamber 11, and make it that gas imperfect combustion in combustion chamber 3 fires completely Burn,, just can will production gained clinker discharge as discharge nozzle 4 after heating and calcining is completed so as to make full use of the energy.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (4)

1. a kind of energy-saving clinker process units, including combustion chamber(3), charging heating chamber(14)And preheating chamber(10), its feature It is:The preheating chamber(10)Bottom is provided with preheating heating chamber(11), the combustion chamber(3)Bottom is provided with fuel chamber(2), The fuel chamber(2)Bottom is connected with fuel gas inlet(1), the fuel chamber(2)Side is connected with air inlet pipe(5), the air inlet Pipe(5)Pass through externally mounted control valve door(6)It is controlled, the combustion chamber(3)With charging heating chamber(14)Pass through connection Room(16)Link together, pass through combustion chamber(3)To charging heating chamber(14)Heated, the combustion chamber(3)Top is sideways Pass through blast pipe(7)With preheating heating chamber(11)Link together, the preheating heating chamber(11)Two ends are separately installed with charging Pipe(15)And escaping pipe(8), realize that fuel enters and tail gas discharge, the preheating chamber(10)Top is provided with dog-house(12), The preheating chamber(10)Side passes through connecting tube(9)With charging heating chamber(14)The conveying of material is realized in connection.
2. a kind of energy-saving clinker process units according to claim 1, it is characterised in that:The charging heating chamber(14) Opposite side is connected with discharge nozzle(4), and the charging heating chamber(14)Top hinge is connected to top cover(13).
3. a kind of energy-saving clinker process units according to claim 1, it is characterised in that:The escaping pipe(8), exhaust Pipe(7)Using heat-resisting alloy materials such as refractory Fe-base alloys.
4. a kind of energy-saving clinker process units according to claim 1, it is characterised in that:The blast pipe(7)Outer wall It is provided with heat-insulated vacuum layer.
CN201621295492.2U 2016-11-30 2016-11-30 A kind of energy-saving clinker process units Expired - Fee Related CN206338821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621295492.2U CN206338821U (en) 2016-11-30 2016-11-30 A kind of energy-saving clinker process units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621295492.2U CN206338821U (en) 2016-11-30 2016-11-30 A kind of energy-saving clinker process units

Publications (1)

Publication Number Publication Date
CN206338821U true CN206338821U (en) 2017-07-18

Family

ID=59307250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621295492.2U Expired - Fee Related CN206338821U (en) 2016-11-30 2016-11-30 A kind of energy-saving clinker process units

Country Status (1)

Country Link
CN (1) CN206338821U (en)

Similar Documents

Publication Publication Date Title
CN102942314B (en) Oil well cement and production method thereof
CN103435277B (en) A kind of internal combustion gas-burned vertical limekiln for the production of light calcined magnesia and method
CN100534941C (en) Cement presintering production method and system
CN101570406A (en) Calcination process of active lime
CN102976644B (en) Moderate-heat silicate cement clinker and production method thereof
CN102826833B (en) Porcelain grey tile without carburization and sintering method thereof
CN105698524B (en) Heat accumulating type multistage heating rotary kiln device
CN106187239A (en) Low creep flint clay composite refractory brick and its preparation method and application
CN106187236A (en) Flint clay composite refractory brick and its preparation method and application
CN203033894U (en) Parallel flow heat storage double chamber kiln support arch structure
CN106242593A (en) Low creep andalusite composite refractory brick and its preparation method and application
CN106187240A (en) Low-creep refractory brick and its preparation method and application
CN106187241A (en) Low creep high RUL refractory brick and its preparation method and application
CN110054503A (en) A kind of composite refractory lightweight rotary kiln insulating brick
CN104003633B (en) Preparation method of silicate clinker and cement and rotary kiln for preparing silicate clinker
CN106278299A (en) Andalusite composite refractory brick and its preparation method and application
CN201297860Y (en) Device for calcining cement by utilizing acetylene sludge to completely substitute the limestone
CN105347702B (en) A kind of rotary kiln device for producing cement
CN109868360A (en) A kind of energy saving technique of sinter production
CN107324821B (en) Silicon carbide wear-resistant castable with high absorption rate and high heat conductivity for CFB boiler water wall
CN206339102U (en) A kind of practical clinker production equipment
CN202511622U (en) Device using carbide slag to manufacture cement
CN102260052B (en) Unlimited compatible method for producing cement clinker by using carbide slag and limestone as raw material
CN204923825U (en) Alumina shaft kiln is calcined to flaring formula circular section
CN206338821U (en) A kind of energy-saving clinker process units

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170718

Termination date: 20171130