CN206319643U - Plus the fixed structure of build-up layers wall - Google Patents

Plus the fixed structure of build-up layers wall Download PDF

Info

Publication number
CN206319643U
CN206319643U CN201621439773.0U CN201621439773U CN206319643U CN 206319643 U CN206319643 U CN 206319643U CN 201621439773 U CN201621439773 U CN 201621439773U CN 206319643 U CN206319643 U CN 206319643U
Authority
CN
China
Prior art keywords
fixed
parapet
metope
metope purlin
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621439773.0U
Other languages
Chinese (zh)
Inventor
孟建城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiacheng Lifeng Equipment Manufacturing Co Ltd
Original Assignee
Beijing Jiacheng Lifeng Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiacheng Lifeng Equipment Manufacturing Co Ltd filed Critical Beijing Jiacheng Lifeng Equipment Manufacturing Co Ltd
Priority to CN201621439773.0U priority Critical patent/CN206319643U/en
Application granted granted Critical
Publication of CN206319643U publication Critical patent/CN206319643U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model is related to a kind of fixed structure of plus build-up layers wall, including the metope purlin being arranged on the inside of parapet, metope purlin is set higher than parapet, angularly disposed galvanized steel plain sheet is fixed between metope purlin and parapet, provided with the supporting steel angle for compressing galvanized steel plain sheet and being fixed with metope purlin above metope purlin, set in the upper end of supporting steel angle, galvanized steel plain sheet and parapet on the outside of waterproof layer, waterproof layer and be coated with flashing part.Water-proofing treatment is done at the fixed structure added between build-up layers wall and daughter's wall, is reduced plus build-up layers wall and the breakthrough of parapet junction.

Description

Plus the fixed structure of build-up layers wall
Technical field
That the utility model is related to building field plus build wall, in particular, it is related to a kind of consolidating for plus build-up layers wall Fixed structure.
Background technology
With continuing to develop for society, many original areas of building can not meet new demand, for old building, Increase floor height on original building, construction area can be increased, saved the area.Done in old buildings plus layer processing when, it is necessary to The upper end of original building parapet sets up metope purlin, and metope rock wool is set in the outside of metope purlin, and the inside of purlin, which is set, to be protected Warm rock wool, indoor ornament is cooked in the inside of heat preservation rock.
Plus build-up layers are that completion is constructed on the basis of original building, it usually needs adding the connection position of build-up layers and original building Consolidation process is done with concrete silt in the place of putting., for a long time can by wind and weather and in practice, the junction is to reinforce in the later stage There can be rises.
Utility model content
The purpose of this utility model is the fixed structure for providing a kind of plus build-up layers wall, is adding build-up layers wall and parapet Water-proofing treatment is done at fixed structure between body, is reduced plus build-up layers wall and the breakthrough of parapet junction.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of fixation of plus build-up layers wall Structure, including be arranged at the metope purlin on the inside of parapet, metope purlin is set higher than parapet, metope purlin and parapet it Between be fixed with angularly disposed galvanized steel plain sheet, provided with compressing galvanized steel plain sheet and fix with metope purlin above metope purlin Supporting steel angle, sets on the outside of waterproof layer, waterproof layer in the upper end of supporting steel angle, galvanized steel plain sheet and parapet and is coated with flashing Part.
Using above technical scheme, increase metope purlin on the inside of parapet, metope purlin is higher by parapet setting.In wall The galvanized steel plain sheet of the upper end constant tilt of face purlin and parapet, galvanized steel plain sheet dips down from metope purlin to parapet direction Tiltedly.
The one side at supporting steel angle is used to galvanized steel plain sheet being fixed on metope purlin, and another side is perpendicular to metope purlin conduct Fixed plate.Waterproof layer is laid on the upper end of supporting steel angle, galvanized steel plain sheet and parapet, covers supporting steel angle and galvanized steel plain sheet Between joint gap, and galvanized steel plain sheet and the joint gap of parapet upper end, it is to avoid joint gap seeps water.
Flashing part is covered in waterproof layer outsourcing, flashing part is identical with the shape of waterproof layer, is at galvanized steel plain sheet from wall Face purlin is downward-sloping to parapet direction., also can be along general even if there is water to splash on flashing part using such incline structure The inclined-plane of water part flows to outdoor.
The utility model is further arranged to, and galvanized steel plain sheet includes the first canned paragraph fixed with metope purlin, with daughter The second canned paragraph that wall is fixed, the second canned paragraph is downward-sloping from metope purlin to parapet direction.
Using above technical scheme, galvanized steel plain sheet is fixed on metope purlin and parapet upper end, the first canned paragraph and wall Face purlin is fixed, the second canned paragraph connection metope purlin and parapet, while being set to downward from metope purlin to parapet direction Incline structure.The waterproof layer and flashing part laid on the incline structure are incline structure, it is to avoid outside water is flowed to It is indoor.
The utility model is further arranged to, and supporting steel angle includes the first right-angle side fixed with metope purlin, Yi Jiyu First right-angle side is vertical, to the second right-angle side extended away from metope purlin direction.
Using above technical scheme, first right-angle side at supporting steel angle compresses galvanized steel plain sheet, and is fixed in metope purlin On bar.Continue to build on metope purlin plus build-up layers wall, second right-angle side at supporting steel angle is to the side away from metope purlin To extension, the second right-angle side is as fixed plate, for waterproof layer and flashing part to be fixed on plus build-up layers wall.
The utility model is further arranged to, and wall strut is fixed on the outside of the second right-angle side, and wall strut includes Compress the fixed part that flashing part, waterproof layer and the second right-angle side are fixed, and the supporting part that supports wall vertical with fixed part.
Using above technical scheme, metope rock wool is set adding the outside of build-up layers wall.Because flashing part is obliquely installed, such as Fruit directly builds metope rock wool on flashing part, and it is too big that flashing part bears pressure, and needs to set levelling face in addition.Second Fixed wall strut on the outside of right-angle side, the fixed part of wall strut is fixed on the outside for adding build-up layers wall, supporting part conduct The supporter of metope rock wool, fixes metope rock wool on supporting part.
The utility model is further arranged to, and waterproof layer is by the second canned paragraph from the second right-angle side, and receipts terminate in daughter The outside of wall.
Using above technical scheme, waterproof layer is coated on the outside of the second right-angle side, the second canned paragraph and parapet, covering The firmly joint gap of the second right-angle side and the second canned paragraph, and the second canned paragraph and parapet joint gap.Avoid connection Gap location seeps water.
The utility model is further arranged to, and supporting part, fixed part and flashing part enclose to form U-shaped chamber, are set in U-shaped chamber Put mineral wool block.
Using above technical scheme, filling mineral wool block inside the U-shaped chamber formed between the supporting part and flashing part of support member, Ensure to add on the outside of build-up layers wall and be respectively and fixedly provided with rock wool, play insulation effect.
The utility model is further arranged to, and the upper end of metope purlin is provided with heat preservation rock composite plate, and heat preservation rock is combined Bag is provided with seal on the outside of plate.
Using above technical scheme, heat preservation rock composite plate is fixed above metope purlin, and is sealed using seal, Build above it again afterwards plus build-up layers wall.Heat preservation rock composite plate is coated using seal, builds plus builds on seal Layer wall more facilitates.
The utility model is further arranged to, and angle member is fixed between seal and parapet.
, will using angle member in order to ensure the stable connection between seal and parapet using above technical scheme Seal is fixed on parapet.
The utility model is further arranged to, and angle member includes fitting with seal and by seal and heat preservation rock The first L-square that composite plate is fixed, and the second L-square that is vertical with the first L-square and being fixed with parapet.
Using above technical scheme, seal is fixed in heat preservation rock composite plate by the first L-square of angle member, the Two L-squares are fixed with parapet.Ensure the connective stability and fastness between parapet and seal.
In summary, the utility model has the advantages that:Metope purlin on the inside of parapet is higher by parapet and set Put, in metope purlin and the galvanized steel plain sheet of the upper end constant tilt of parapet, galvanized steel plain sheet is from metope purlin to parapet direction It is downward-sloping.Waterproof layer, the outside cladding flashing of waterproof layer are being laid in the upper end of supporting steel angle, galvanized steel plain sheet and parapet Part, it is to avoid outside water flows into indoor.
Waterproof layer reduces the joint gap between supporting steel angle and galvanized steel plain sheet, and galvanized steel plain sheet and parapet upper end Joint gap at seep water.
Brief description of the drawings
Fig. 1 is the connection diagram for adding build-up layers wall and parapet;
Fig. 2 is the connection diagram for adding build-up layers wall and adding build-up layers roof;
Fig. 3 is the enlarged drawing of part A in Fig. 1;
Fig. 4 is the structural representation of wall support part;
Fig. 5 is the enlarged drawing of part B in Fig. 1;
Fig. 6 is the enlarged drawing of C portion in Fig. 2;
Fig. 7 is the enlarged drawing of D parts in Fig. 2;
Fig. 8 is in embodiment two plus the connection diagram of build-up layers wall and parapet;
Fig. 9 is the enlarged drawing of E parts in Fig. 8;
Figure 10 is the enlarged drawing of F parts in Fig. 8;
Figure 11 is the connection diagram of metope purlin and roof purline.
In figure, 1, parapet;2nd, metope purlin;3rd, build-up layers wall is added;31st, metope rock wool;311st, nail-concealed type embedded structure; 312nd, it is fitted together to projection;313rd, embeded slot;314th, secret nail plate;315th, caulking groove;316th, projection;32nd, heat preservation rock;33rd, inner trim panels; 34th, heat preservation rock composite plate;341st, seal;4th, waterproof construction;41st, galvanized steel plain sheet;411st, the first canned paragraph;412nd, second consolidates Determine section;42nd, supporting steel angle;421st, the first right-angle side;422nd, the second right-angle side;43rd, the first waterproof layer;44th, flashing part;45th, wall Plate support;451st, fixed part;452nd, supporting part;453rd, protection portion;46th, mineral wool block;47th, angle member;471st, the first L-square; 472nd, the second L-square;5th, roof purline;51st, hard rock wool;52nd, fiber cement board pressure;53rd, asphalt water-proof coiled material;54th, press Shape steel plate;55th, tapping screw;551st, pad;552nd, arc section;6th, edge pressing structure;61st, steel plate;62nd, the second waterproof layer;63rd, it is hidden Follow closely support;631st, fixed component;632nd, clamping part;64th, bound edge steel plate;641st, bending segment;7th, window frame;71st, decorative panel;72、 Window flashing part suitable for reading;73rd, angle steel.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Embodiment one:
The fixed structure of a kind of plus build-up layers wall, as shown in figure 1, for directly being built plus build-up layers on existing building The junction of wall 3.Metope purlin 2 is built in the inner side of parapet 1, metope purlin 2 is slightly above parapet 1 and set, in metope Fixed plus build-up layers wall 3, is used as the metope for increasing layer on purlin 2.The outside of build-up layers wall 3 is being added to fix metope rock wool 31, It is concordant in the end face for adding build-up layers wall 3 and metope purlin 2 to extend to indoor direction, and fix heat preservation rock in the end face 32, fix inner trim panels 33 in the inner side of heat preservation rock 32.Parapet 1 and plus the junction of build-up layers wall 3 set fixed anti- Water-bound 4.Plus after build-up layers wall 3 is put up, adding the top of build-up layers wall 3 to build plus build-up layers roof, taken using roof purline 5 It build on metope purlin 2, hard rock wool 51, fiber cement board pressure 52 and asphalt waterproofing is fixed successively in the top of roof purline 5 Coiled material 53.
With reference to Figure 11, if plus build-up layers wall 3 by dry wall surface purlin 2 superposition construct, metope purlin 2 be used for wall load-bearing.Wall Face purlin 2 and roof purlin are C-shaped or Z-shaped steel, and metope purlin 2 and the mutual welding of roof purlin form steel frame construction and formed Supporter.
With reference to Fig. 1 and Fig. 3, on metope purlin 2 before fixed plus build-up layers wall 3, the fixed insulation on metope purlin 2 Rock wool-steel plywood 34, coats seal 341, the cross section of seal 341 is U-shaped, seal in heat preservation rock composite plate 34 341 bottom surface is fitted with adding the lower end of build-up layers wall 3, and a side wall of seal 341 is fitted with the metope of parapet 1, another Side wall is fitted with heat preservation rock 32.Received in two side walls and form extension.Angle member is fixed between seal 341 and parapet 1 47.Angle member 47 include fitting with seal 341 and by seal 341 and heat preservation rock composite plate 34 fix it is first straight Gusset 471, and the second L-square 472 that is vertical with the first L-square 471 and being fixed with parapet 1.
The bottom of metope rock wool 31 is connected by waterproof construction 4 with parapet 1, and the top of metope rock wool 31 passes through flanging knot Structure 6 is fixed with adding build-up layers wall 3.
With reference to Fig. 3, waterproof construction 4 includes the galvanized steel plain sheet 41 for being fixed on the bottom surface of seal 341 and the upper surface of parapet 1, Galvanized steel plain sheet 41 includes the first canned paragraph 411 and the second canned paragraph 412, and the bottom surface of the first canned paragraph 411 and metope purlin 2 is pasted Close, the second canned paragraph 412 is connected with the first canned paragraph 411, and from the bottom surface of metope purlin 2 to the upper end side of parapet 1 Tilted to extension.Second canned paragraph 412 is fixed on to the upper end of parapet 1 using bolt.
Supporting steel angle 42 is fixed with the first canned paragraph 411, supporting steel angle 42 includes the first right-angle side 421 and second First canned paragraph 411 is pressed on seal 341 by right-angle side 422, the first right-angle side 421, and by bolt by the first right angle Side 421, the first canned paragraph 411 and seal 341 are fixed in heat preservation rock composite plate 34.Second right-angle side 422 and first straight The arm of angle 421 is vertical, extends to away from the direction of metope purlin 2.Second right-angle side 422 is with seal 341 close to the side of parapet 1 Wall is concordant.
The first waterproof layer 43, the first waterproof layer 43 are laid on the second right-angle side 422, the second canned paragraph 412 and parapet 1 Envelope the second right-angle side 422, the upper surface of parapet 1 is fixed on by the second canned paragraph 412.First waterproof layer 43 is enveloped The joint gap of second right-angle side 422 and the second canned paragraph 412, and the second canned paragraph 412 and the upper surface of parapet 1 connection Gap, it is to avoid these joint gaps seep water.
The cladding flashing part 44 in the outside of the first waterproof layer 43, flashing part 44 protects the first waterproof layer 43, it is to avoid it seeps water.It is general Water part 44 is coated on the outside of the first waterproof layer 43, identical with the structure of the first waterproof layer 43, from the second right-angle side 422, by the Two canned paragraphs 412 are fixed on the outside of parapet 1.Fixed between flashing part 44 and parapet 1 using cement nail, and in cement nail With perfusion fluid sealant at the joint gap of flashing part 44 and parapet 1.
In the fixed wall strut 45 in the outside of flashing part 44 close to the second right-angle side 422, wall strut 45 is bending Into the steel plate 61 of S-shaped.With reference to Fig. 4, wall strut 45 includes fixed part 451, the supporting part 452 vertical with fixed part 451, with And the protection portion 453 with end vertical of the supporting part 452 away from fixed part 451, fixed part 451 and protection portion 453 are placed in branch The both sides of support part 452.Fixed part 451 is arranged on the outside of flashing part 44, by bolt by fixed part 451, flashing part 44, first The right-angle side 422 of waterproof layer 43 and second, which is fixed on, to be added on build-up layers wall 3.Support member is used to be supported and fixed on wall strut 45 Metope rock wool 31, protection side protection wall rock wool avoid its lower end be damaged.
Supporting part 452, fixed part 451 and the flashing part 44 of wall strut 45 constitute U-shaped cavity, in U-shaped cavity inside Mineral wool block 46 is filled, the gap location of mineral wool block 46 and U-shaped cavity uses sealant sealing, to ensure to add the outside of build-up layers wall 3 Filled with mineral wool block 46, function of heat insulation is played.
With reference to Fig. 1 and Fig. 5, metope rock wool 31 is fixed on the supporting part 452 of wall strut 45, if metope rock wool 31 by Dry rock wool-steel plywood is chimeric to be spliced, and its junction is connected using nail-concealed type embedded structure 311.Nail-concealed type embedded structure 311 Chimeric raised 312 including being fixed on rock wool-steel plywood lower end, the rock wool-steel plywood upper end adjacent with the rock wool-steel plywood is provided with With the embeded slot 313 of chimeric raised 312 grafting matching, the outside of chimeric projection 312 is additionally provided with the secret nail plate for blocking nail 314.Between secret nail plate 314 and chimeric projection 312, and chimeric projection 312 is offered in the side of close plus build-up layers wall 3 For the caulking groove 315 of two side wall insertions of embeded slot 313.After chimeric projection 312 and the grafting of embeded slot 313 coordinate, self tapping is used Embeded slot 313 is fixed on by nail to be added on build-up layers wall 3.Embeded slot 313 is hidden away from adding the side of build-up layers wall 3 to be provided with projection 316 Nail-plate 314 extends to projection 316 away from the outside for adding build-up layers wall 3, and secret nail plate 314, projection 316 and embeded slot 313 enclose shape Into secret nail space, secret nail plate 314 covers on the outside of self threading pin, blocks self threading pin.
Fixed with reference to Fig. 1 and Fig. 2, plus build-up layers wall 3 upper end using edge pressing structure 6 and the upper end of heat preservation rock 32.Wall Face rock wool 31 extends to away from the direction of parapet 1, and metope purlin 2 and heat preservation rock 32 are also prolonged to away from the direction of parapet 1 Stretch.Metope purlin 2 and heat preservation rock 32 are less than metope rock wool 31, and heat preservation rock is fixed on metope purlin 2 and heat preservation rock 32 Composite plate 34, heat preservation rock composite plate 34 is concordant with the upper end of metope rock wool 31.Heat preservation rock composite plate 34 at this is with preventing The mounting structure of heat preservation rock composite plate 34 at water-bound 4 is similar, the U-shaped opening direction of seal 341 plus the upper end of build-up layers wall 3 Outside open up.Self threading pin pass through wall surface rock wool 31 and seal 341 are fixed in heat preservation rock composite plate 34.
With reference to Fig. 2, side, the self sealss part 341 of steel plate 61 are received using steel plate 61 in the outside of seal 341 and heat preservation rock 32 Rise and pass through heat preservation rock 32, receive the upper end for terminating in roof purline 5.
The second waterproof layer is laid outside the corner that metope rock wool 31, heat preservation rock composite plate 34 and heat preservation rock 32 are constituted 62, the second waterproof layer 62 is from from the upper end of the self threading pin of metope rock wool 31, by heat preservation rock composite plate 34 and heat preservation rock 32, Receive the upper end for terminating in asphalt water-proof coiled material 53 on roof purline 5.
With reference to Fig. 6, secret nail support 63 is fixed in the lower end of the self threading pin of metope rock wool 31, secret nail support 63 includes and metope rock The fixed component 631 that cotton 31 is fixed, and be connected and to the clamping part 632 away from metope rock wool 31 with fixed part 451, it is hidden The fixed component 631 of nail support 63 is fixed by screws on metope rock wool 31.Stayed between clamping part 632 and metope rock wool 31 There is clamping gap, fix bound edge steel plate 64 in the outside of the second waterproof layer 62, one end of bound edge steel plate 64 curves inwardly to form curved Hook-shaped to be stuck in clamping gap location, bound edge steel plate 64 is bypassed in being wrapped in from clamping gap location, by secret nail support 63 and self threading pin The upper end of metope rock wool 31, heat preservation rock composite plate 34, which are received, terminates in the side that heat preservation rock composite plate 34 is connected with heat preservation rock 32. Bound edge steel plate 64, waterproof layer and steel plate 61 are fixed in heat preservation rock composite plate 34 using bolt.Bound edge steel plate 64 and secret nail The junction of support 63 is further fixed on the bending segment 641 of clamping secret nail support 63, it is to avoid bound edge steel plate 64 and secret nail support 63 are de- From.
With reference to Fig. 2 and Fig. 7, the roof purline 5 top fixed profiled sheet 54 adjacent with heat preservation rock 32, profiled sheet 54 Close to the side of heat preservation rock 32, bolt-through profiled sheet 54 and edge pressing structure 6 are fixed on roof purline 5, profiled sheet 54 other positions fitted with roof purline 5 are also fixed using bolt.Hard rock wool 51 is fixed in the top of profiled sheet 54, firmly The fixed some self threading pins in the top of matter rock wool 51, in top anchoring fiber cement pressure plate 52 and the asphalt waterproofing successively of hard rock wool 51 Coiled material 53.Tapping screw 55 is fixed close to the side of heat preservation rock 32 in the upper end of asphalt water-proof coiled material 53, tapping screw 55 passes through pad Piece 551 is fixed on hard rock wool 51.Asphalt water-proof coiled material 53 is extended in the waterproof layer for adding the upper end of build-up layers wall 3 to fix On.In order to avoid tapping screw 55 punctures waterproof layer, the two ends of pad 551 be folded upward at after inflection again, pad 551 and waterproof layer Contact position be arc section 552, it is to avoid pad 551 punctures waterproof layer.
Embodiment two:
The present embodiment and the difference of embodiment one are:As shown in figure 8, with reference to can on Fig. 9 and Figure 10, plus build-up layers wall 3 Window frame 7 is set, that is, expands the original position for filling out mineral wool block 46, installs window frame 7 additional at the position.Set in the upper end of rock wool-steel plywood Decorative panel 71 is put, decorative panel 71 and inner side inner trim panels 33 are connected, waterproof construction 4 is in the outside attachment structure of parapet 1 with implementing Example one is identical, and the first waterproof layer 43 extends and coats the bottom of window frame 7, and flashing part 44 is coated on the first waterproof layer 43, window frame 7 It is pressed on flashing part 44, the inner side of window frame 7 bonds the junction of the first waterproof layer 43 and decorative panel 71 by sealant sealing.Window frame 7 tops set window flashing part 72 suitable for reading, and gap is left between the end of protection portion 453 of wall strut 45 and metope rock wool 31, Angle steel 73 is fixed in gap location, the one end of angle steel 73 is plugged on gap location, and the other end is connected to the end of protection portion 453, and window is suitable for reading The one end of flashing part 72 is stuck on angle steel 73 and fixed using bolt, and other end is fixed on window frame 7 and heat preservation rock composite plate 34 Interval.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (9)

1. a kind of fixed structure of plus build-up layers wall, including the metope purlin (2) on the inside of parapet (1) is arranged at, its feature exists In:Metope purlin (2) is set higher than parapet (1), and angularly disposed plating is fixed between metope purlin (2) and parapet (1) Provided with the supporting steel for compressing galvanized steel plain sheet (41) and being fixed with metope purlin (2) above zinc steel plate (41), metope purlin (2) Angle (42), waterproof layer, the outside of waterproof layer are set in the upper end of supporting steel angle (42), galvanized steel plain sheet (41) and parapet (1) It is coated with flashing part (44).
2. fixed structure according to claim 1, it is characterised in that:Galvanized steel plain sheet (41) includes solid with metope purlin (2) Fixed the first canned paragraph (411), fixed the second canned paragraph (412) with parapet (1), the second canned paragraph (412) is from metope purlin Bar (2) is downward-sloping to parapet (1) direction.
3. fixed structure according to claim 1, it is characterised in that:Supporting steel angle (42) includes solid with metope purlin (2) Fixed the first right-angle side (421), and it is vertical with the first right-angle side (421), to second extended away from metope purlin (2) direction Right-angle side (422).
4. fixed structure according to claim 3, it is characterised in that:The fixed wallboard branch on the outside of the second right-angle side (422) Support member (45), wall strut (45) includes compressing the fixed fixed part of flashing part (44), waterproof layer and the second right-angle side (422) (451), and vertical with fixed part (451) support wall supporting part (452).
5. fixed structure according to claim 1, it is characterised in that:Waterproof layer passes through from the second right-angle side (422) Two canned paragraphs (412), receive the outside for terminating in parapet (1).
6. fixed structure according to claim 4, it is characterised in that:Supporting part (452), fixed part (451) and flashing part (44) enclose to form U-shaped chamber, mineral wool block (46) is set in U-shaped chamber.
7. fixed structure according to claim 1, it is characterised in that:The upper end of metope purlin (2) is multiple provided with heat preservation rock Bag is provided with seal (341) on the outside of plywood (34), heat preservation rock composite plate (34).
8. fixed structure according to claim 7, it is characterised in that:Fixed angles between seal (341) and parapet (1) Steel part(47).
9. fixed structure according to claim 8, it is characterised in that:Angle member(47)Including being fitted with seal (341), And by seal (341) and the first fixed L-square of heat preservation rock composite plate (34)(471), and with the first L-square (471)The second fixed L-square vertically and with parapet (1)(472).
CN201621439773.0U 2016-12-24 2016-12-24 Plus the fixed structure of build-up layers wall Expired - Fee Related CN206319643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621439773.0U CN206319643U (en) 2016-12-24 2016-12-24 Plus the fixed structure of build-up layers wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621439773.0U CN206319643U (en) 2016-12-24 2016-12-24 Plus the fixed structure of build-up layers wall

Publications (1)

Publication Number Publication Date
CN206319643U true CN206319643U (en) 2017-07-11

Family

ID=59259069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621439773.0U Expired - Fee Related CN206319643U (en) 2016-12-24 2016-12-24 Plus the fixed structure of build-up layers wall

Country Status (1)

Country Link
CN (1) CN206319643U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112538973A (en) * 2020-12-03 2021-03-23 中国建筑第二工程局有限公司 Blind nail transverse floor structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112538973A (en) * 2020-12-03 2021-03-23 中国建筑第二工程局有限公司 Blind nail transverse floor structure and construction method thereof

Similar Documents

Publication Publication Date Title
US20170030072A1 (en) System and method for panelized, superinsulated building envelopes
CN207597740U (en) The water proof structure of gutter in a kind of flat roof deck parapet
CN206319642U (en) Plus the binding structure of build-up layers wall
CN2929033Y (en) External wall heat insulation structure of building water-proof and anti-cracks
CN206319643U (en) Plus the fixed structure of build-up layers wall
CN206418914U (en) The prefabricated window that floats
CN207484711U (en) A kind of antiseep construction of horizontal structure deformation joint
CN109403518A (en) A kind of Double-side laminated co-clip heart heat-insulation wall plate waterproofing node construction and its installation method
CN206319644U (en) Plus build-up layers wall and the attachment structure for adding build-up layers roof
CN209413009U (en) A kind of assembling type outer wall interlayer fireproof blocking construction
CN111155792A (en) Prefabricated house and construction method thereof
CN209494046U (en) It is bolted the board-like one storey house system of modularization steel frame entirely
CN211899837U (en) Assembled house
CN213359129U (en) Outdoor square skylight
CN206467883U (en) Insulation wallboard and heat-preserving heat-insulating wall
CN214738982U (en) Embedded outsourcing structure of steel construction assembled house ALC side fascia
CN211080616U (en) Roofing expansion joint structure under prefabricated apron
CN209494067U (en) Steel structural plant roof deformation joint structure
JPH03119241A (en) Composite floor of deck plate and grc panel, and dty method composite roof
CN208009768U (en) A kind of double wave ribbon skylight node upper end connecting structure
CN206053398U (en) Masonry structure historical building seismic reinforcing structure
CN112031288B (en) Outdoor square glass brick skylight and construction method
CN205134625U (en) Prefabricated wall body in sealed damp -proofing roof
CN217400125U (en) Porous brick parapet node structure
CN216130607U (en) Waterproof roof for flat-to-slope roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711

Termination date: 20181224

CF01 Termination of patent right due to non-payment of annual fee