CN206319402U - It is easy to the practical sludge pumping plant of management - Google Patents
It is easy to the practical sludge pumping plant of management Download PDFInfo
- Publication number
- CN206319402U CN206319402U CN201621136463.1U CN201621136463U CN206319402U CN 206319402 U CN206319402 U CN 206319402U CN 201621136463 U CN201621136463 U CN 201621136463U CN 206319402 U CN206319402 U CN 206319402U
- Authority
- CN
- China
- Prior art keywords
- sludge
- main chamber
- rear pump
- easy
- connecting tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of practical sludge pumping plant for being easy to manage, including main chamber and sludge reflux room, and sludge reflux room is connected with returned sludge outlet, and main chamber, which has, be equiped with sludge input port, main chamber the first sludge rear pump;The input port of first sludge rear pump is located in main chamber, and its delivery outlet is communicated in sludge reflux room;Main chamber is connected with excess sludge delivery pipe;It is provided with outside main chamber for the first sludge rear pump to be automatically taken out into the lowering or hoisting gear being put into, downwardly open snap fit is provided with the first sludge rear pump, the buckle convex portion being adapted is provided with connecting tube, the delivery outlet of first sludge rear pump docks conducting with the entrance of connecting tube, and snap fit is then hooked on buckle convex portion.Thereby, realize to the collecting of sludge, heavy put shunting, on demand selection backflow etc., it is ensured that the smooth progress that sludge reflux and excess sludge are exported, meanwhile, its is simple and reasonable, it is easy to control management, the dismounting of first sludge rear pump is very convenient, and practicality is very strong.
Description
Technical field
The utility model is related to sewage disposal technology, refers in particular to a kind of practical sludge pumping plant for being easy to manage.
Background technology
Generally, sewage treatment project can all produce sludge, and sludge still needs to further processing.In the prior art, general meeting
Use sludge pumping plant(Also sludge pump house can be claimed), for example, setting intermediate lift pump room, returned sludge pump house, excess sludge pump house
Deng in actual applications, there is the defects such as management inconvenience, control trouble in it, and multiple pump house floor spaces are larger, overall structure phase
To complex.
Accordingly, it would be desirable to work out a kind of new technical scheme to solve the above problems.
Utility model content
In view of this, in view of the existing deficiencies of the prior art, its main purpose is to provide one kind and is easy to pipe the utility model
The practical sludge pumping plant of reason, it realizes to the collecting of sludge, heavy puts shunting, on demand selection backflow etc., it is ensured that sludge time
Stream and the smooth progress of excess sludge output, meanwhile, its is simple and reasonable, it is easy to control management, the first sludge rear pump
Dismounting is very convenient, and practicality is very strong.
To achieve the above object, the utility model is using following technical scheme:
A kind of practical sludge pumping plant for being easy to manage, includes main chamber and the dirt connected by main chamber side and with main chamber
Mud return passage, the inner bottom surface of the sludge reflux room is higher than the inner bottom surface of main chamber, and sludge reflux room is connected with returned sludge outlet, should
Main chamber has sludge input port, and the first sludge rear pump is equiped with the main chamber, and the input port of the first sludge rear pump is located at
In main chamber, the delivery outlet of the first sludge rear pump is connected with a connecting tube, and the outlet of connecting tube is stretched into sludge reflux room;It is main
Correspondence sludge reflux room lower position is connected with excess sludge delivery pipe on room, and it is defeated that excess sludge delivery pipe is connected with the second sludge
Go out pump, the input port of the first sludge rear pump is higher than the entrance of excess sludge delivery pipe;And, being provided with outside the main chamber is used for
First sludge rear pump is automatically taken out to the lowering or hoisting gear being put into, one is connected between the lowering or hoisting gear and the first sludge rear pump
Draw and be provided with downwardly open snap fit on the outside of the correspondence delivery outlet of its own on connector, the first sludge rear pump, it is foregoing
Be provided with the buckle convex portion being adapted in connecting tube on the outside of its own entrance of correspondence, lowering or hoisting gear by the first sludge rear pump to
Decline, snap fit is then hooked on buckle convex portion, and the delivery outlet of the first sludge rear pump docks conducting with the entrance of connecting tube.
As a kind of preferred scheme, main chamber's inner bottom surface is provided with the progressively lower formula in side towards where excess sludge delivery pipe and inclined
The first oblique drainage ramp structure.
As a kind of preferred scheme, side where correspondence input port is provided with slow heavy folded plate, the slow heavy folding in the main chamber
Plate has bottom wall and side wall, and its bottom wall is towards the inclined second drainage ramp structure of the progressively lower formula in side where input port, the bottom
Wall maintains spacing with main chamber's inner bottom surface, and the least significant end of the bottom wall offers the intercommunicating pore of the main chamber of connection downwards.
It is used as a kind of preferred scheme, the delivery outlet end face of the first sludge rear pump, the entrance face difference of connecting tube
A pair of the magnet rings mutually adsorbed are provided with, when the delivery outlet of the first sludge rear pump with the entrance of connecting tube docks conducting, both
Magnet ring also mutually fix by absorption.
As a kind of preferred scheme, the traction connector is metal bracelet.
As a kind of preferred scheme, the lowering or hoisting gear includes motor and the runner by motor drive connection, foregoing to lead
Draw that connector is detachable to be wound on runner.
The utility model has clear advantage and beneficial effect compared with prior art, specifically, by above-mentioned technology
Scheme understands that it is mainly designed by special constructions such as main chamber, sludge reflux room, the first sludge rear pumps in sludge pumping plant,
Realize to the collecting of sludge, heavy put shunting, on demand selection backflow etc., it is ensured that it is smooth that sludge reflux and excess sludge are exported
Carry out, meanwhile, its is simple and reasonable, it is easy to which control management, the dismounting of the first sludge rear pump is very convenient, and practicality is very
By force.
More clearly to illustrate architectural feature of the present utility model and effect, come below in conjunction with the accompanying drawings with specific embodiment pair
The utility model is described in detail.
Brief description of the drawings
Fig. 1 is the general configuration schematic diagram of the embodiment of the utility model;
Fig. 2 is the close-up schematic view at the first sludge rear pump in Fig. 1.
Accompanying drawing identifier declaration:
10th, main chamber 11, the first drainage ramp structure
12nd, sludge input port 13, slow heavy folded plate
150th, the second drainage ramp structure 131, intercommunicating pore
14th, excess sludge delivery pipe 20, sludge reflux room
21st, returned sludge exports the 30, first sludge rear pump
31st, snap fit 40, lowering or hoisting gear
41st, traction connector 50, connecting tube
51st, buckle convex portion.
Embodiment
It refer to shown in Fig. 1 and Fig. 2, that show the concrete structure of the embodiment of the utility model;The sludge pump
Station mainly includes main chamber 10 and the sludge reflux room 20 connected by the side of main chamber 10 and with main chamber 10.
Generally, the inner bottom surface of the sludge reflux room 20 is higher than the inner bottom surface of main chamber 10, and the inner bottom surface of main chamber 10 is provided with
Towards the inclined first drainage ramp structure 11 of the progressively lower formula in place side of excess sludge delivery pipe 14.The main chamber 10 is inputted with sludge
Correspondence input port place side is provided with slow heavy folded plate 13 in mouth 12, the main chamber 10, described to delay heavy folded plate 13 with bottom wall and side
Wall, its bottom wall be towards the inclined second drainage ramp structure 150 of the progressively lower formula in side where input port, the bottom wall with main chamber 10
Bottom surface maintains spacing, and the least significant end of the bottom wall offers the intercommunicating pore 131 of the main chamber 10 of connection downwards.Installed in the main chamber 10
There is the first sludge rear pump 30, the input port of the first sludge rear pump 30 is located in main chamber 10, the first sludge rear pump 30
Delivery outlet be connected with a connecting tube 50, the outlet of connecting tube 50 is stretched into sludge reflux room 20, and sludge reflux room 20 is connected with
Returned sludge is exported;The lower position of correspondence sludge reflux room 20 is connected with excess sludge delivery pipe 14, excess sludge in main chamber 10
Delivery pipe 14 is connected with the second sludge rear pump, input port the entering higher than excess sludge delivery pipe 14 of the first sludge rear pump 30
Mouthful.And, position of sludge sensor is equiped with the main chamber 10, passes through sludge in position of sludge sensor feedback main chamber 10
Amount.
In the present embodiment, the first sludge rear pump 30 can be dismounted automatically, be provided with outside the main chamber 10 for by the
One sludge rear pump 30 automatically takes out the lowering or hoisting gear 40 being put into, and is connected between the sludge rear pump 30 of lowering or hoisting gear 40 and first
There are a traction connector, decision design, the traction connector is metal bracelet.Herein, the lowering or hoisting gear 40 includes electricity
Machine and the runner by motor drive connection, foregoing traction connector is detachable to be wound on runner.The first sludge rear pump
Correspond to be provided with the outside of the delivery outlet of its own in downwardly open snap fit 31, foregoing connecting tube 50 on 30 and correspond to entering for its own
The buckle convex portion 51 being adapted is provided with the outside of mouthful, lowering or hoisting gear 40 is by the first sludge rear pump 30 to decline, and snap fit 31 is then hooked
In on buckle convex portion 51, the delivery outlet of the first sludge rear pump 30 docks conducting with the entrance of connecting tube 50.
The entrance face of delivery outlet end face, connecting tube 50 in foregoing first sludge rear pump 30, which is respectively arranged with, mutually to be adsorbed
A pair of magnet rings, when the delivery outlet of the first sludge rear pump 30 with the entrance of connecting tube 50 docks conducting, both magnet rings also phase
Absorption is fixed, so that, it further ensure that to connect between the delivery outlet of the first sludge rear pump 30 and the entrance of connecting tube 50 and determine
The accuracy and stability of position.
Design focal point of the present utility model is that it mainly passes through main chamber, sludge reflux room, the first dirt in sludge pumping plant
The special constructions such as mud rear pump are designed, realize to the collecting of sludge, it is heavy put shunting, on demand selection flow back etc., it is ensured that sludge
Backflow and the smooth progress of excess sludge output, meanwhile, its is simple and reasonable, it is easy to control management, the first sludge rear pump
Dismounting it is very convenient, practicality is very strong.
The above, is only preferred embodiment of the present utility model, and not technical scope of the present utility model is made
Any limitation, therefore every any trickle amendment made according to technical spirit of the present utility model to above example, equivalent change
Change with modification, in the range of still falling within technical solutions of the utility model.
Claims (7)
1. a kind of practical sludge pumping plant for being easy to manage, it is characterised in that:Include main chamber and by the main chamber side and with master
The sludge reflux room of room connection, the inner bottom surface of the sludge reflux room is higher than the inner bottom surface of main chamber, and sludge reflux room is connected with backflow
Sludge outlet, the main chamber has sludge input port, and the first sludge rear pump is equiped with the main chamber, the first sludge rear pump
Input port is located in main chamber, and the delivery outlet of the first sludge rear pump is connected with a connecting tube, and sludge is stretched into the outlet of connecting tube
In return passage;Correspondence sludge reflux room lower position is connected with excess sludge delivery pipe, the connection of excess sludge delivery pipe in main chamber
There is the second sludge rear pump, the input port of the first sludge rear pump is higher than the entrance of excess sludge delivery pipe;And, outside the main chamber
Portion is provided with for the first sludge rear pump to be automatically taken out into the lowering or hoisting gear being put into, the lowering or hoisting gear and the first sludge rear pump
Between be connected with a traction connector, be provided with the first sludge rear pump on the outside of its own delivery outlet of correspondence downwardly open
Snap fit, be provided with the buckle convex portion being adapted in foregoing connecting tube on the outside of the correspondence entrance of its own, lowering or hoisting gear is by first
Sludge rear pump is to decline, and snap fit is then hooked on buckle convex portion, the delivery outlet of the first sludge rear pump and the entrance pair of connecting tube
Connect conducting.
2. the practical sludge pumping plant according to claim 1 for being easy to manage, it is characterised in that:Main chamber's inner bottom surface is set
It is equipped with the inclined first drainage ramp structure of the progressively lower formula in side towards where excess sludge delivery pipe.
3. the practical sludge pumping plant according to claim 1 for being easy to manage, it is characterised in that:Correspondence is defeated in the main chamber
Side where entrance is provided with slow heavy folded plate, and the slow heavy folded plate has bottom wall and side wall, and its bottom wall is towards side where input port
The progressively lower inclined second drainage ramp structure of formula, the bottom wall maintains spacing, the least significant end of the bottom wall with main chamber's inner bottom surface
Offer the intercommunicating pore of the main chamber of connection downwards.
4. the practical sludge pumping plant according to claim 1 for being easy to manage, it is characterised in that:The first sludge output
The delivery outlet end face of pump, the entrance face of connecting tube are respectively arranged with a pair of the magnet rings mutually adsorbed, when the first sludge rear pump
Delivery outlet docks conducting with the entrance of connecting tube, and both magnet rings also mutually fix by absorption.
5. the practical sludge pumping plant according to claim 1 for being easy to manage, it is characterised in that:It is described traction connector be
Metal bracelet.
6. the practical sludge pumping plant according to claim 1 for being easy to manage, it is characterised in that:The lowering or hoisting gear includes
There are motor and the runner by motor drive connection, foregoing traction connector is detachable to be wound on runner.
7. the practical sludge pumping plant according to claim 1 for being easy to manage, it is characterised in that:It is equiped with the main chamber
Position of sludge sensor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621136463.1U CN206319402U (en) | 2016-10-19 | 2016-10-19 | It is easy to the practical sludge pumping plant of management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621136463.1U CN206319402U (en) | 2016-10-19 | 2016-10-19 | It is easy to the practical sludge pumping plant of management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206319402U true CN206319402U (en) | 2017-07-11 |
Family
ID=59262912
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621136463.1U Active CN206319402U (en) | 2016-10-19 | 2016-10-19 | It is easy to the practical sludge pumping plant of management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206319402U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067302A (en) * | 2019-05-06 | 2019-07-30 | 湖北威尔达海绵城市建设有限公司 | Integral rain pumping plant |
-
2016
- 2016-10-19 CN CN201621136463.1U patent/CN206319402U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067302A (en) * | 2019-05-06 | 2019-07-30 | 湖北威尔达海绵城市建设有限公司 | Integral rain pumping plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213924344U (en) | Circulating energy-saving integrated sewage treatment equipment | |
CN206319402U (en) | It is easy to the practical sludge pumping plant of management | |
CN206428782U (en) | Rainwater-collecting reclaiming system | |
CN206599477U (en) | A kind of student life water cycle utilization device | |
CN205688486U (en) | A kind of energy saving building with rain water collecting system | |
CN209990195U (en) | Construction of wisdom city is with multi-functional management pavilion | |
CN204023697U (en) | A kind of secondary water-supply current stabilization bidirectional compensating system | |
CN104294880A (en) | Roof rainwater recycling device of environment-friendly building | |
CN205591317U (en) | Municipal drainage system | |
CN205275412U (en) | Sewage treatment plant of self -adaptation sewage inflow | |
CN206191121U (en) | Give, drain pipe reducing connecting device | |
CN206121273U (en) | Rainwater riser separator | |
CN206092426U (en) | Pipeline sewage discharging pump | |
CN206089335U (en) | Sludge returning device | |
CN205892817U (en) | Water treatment facilities in membrane | |
CN107308719A (en) | One kind building water filtration purifier | |
CN219681933U (en) | Heating pipeline filter equipment | |
CN110726312A (en) | Energy-saving and emission-reducing equipment with side-stream water | |
CN204983125U (en) | Dirty confluence pump station of integration rain | |
CN216191442U (en) | Water source recycling device for green building | |
CN211358178U (en) | Dust collecting equipment for industrial processing | |
CN214552110U (en) | Dust fall water circle device | |
CN214884934U (en) | Roof fair-faced concrete ditch structure | |
CN219264537U (en) | Constant pressure water supplementing device | |
CN219231587U (en) | Filter equipment for construction water supply and drainage engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |