CN206319256U - A kind of Bailey beam support supporting drops sandbox - Google Patents

A kind of Bailey beam support supporting drops sandbox Download PDF

Info

Publication number
CN206319256U
CN206319256U CN201621372905.2U CN201621372905U CN206319256U CN 206319256 U CN206319256 U CN 206319256U CN 201621372905 U CN201621372905 U CN 201621372905U CN 206319256 U CN206319256 U CN 206319256U
Authority
CN
China
Prior art keywords
helix tube
base
sandbox
core cylinder
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621372905.2U
Other languages
Chinese (zh)
Inventor
李国瑞
唐果良
付敏
李坚
余继成
崔健
刘清
罗宗强
赵冠辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201621372905.2U priority Critical patent/CN206319256U/en
Application granted granted Critical
Publication of CN206319256U publication Critical patent/CN206319256U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model is related to a kind of Bailey beam support supporting and drops sandbox, including base and core cylinder, the base includes base plate and the first helix tube, first helix tube is on base plate, fine sand layer is provided with first helix tube, the first helix tube bottom opening, the core cylinder includes top board and the second helix tube, second helix tube is on top board, concrete layer is provided with second helix tube, the core cylinder is on the base, the top board keeps level, second helix tube of the core cylinder is put into the first helix tube of the base, the fine sand layer is contacted with the concrete layer.The utility model simplifies the installing/dismounting work of decentering of scaffold system, can more effectively control decentering of scaffold speed, make Cast-in-situ Beam line style and the gradient more accurate, greatly improve the security of decentering of scaffold construction;Make box beam pour complete can reach the aesthetics of expected design;Construction cost has been saved to a certain extent.

Description

A kind of Bailey beam support supporting drops sandbox
Technical field
The utility model is related to a kind of supporting and drops sandbox, and especially a kind of Bailey beam support supporting drops sandbox, belongs to Bridges in highway engineering rack construction technical field.
Background technology
In the construction of prestressed concrete cast-in-place box beam bracket, when most units drop support using bowl button holder jacking and Sulphur-bonded mortar bearing.However, bowl button holder jacking and sulphur-bonded mortar bearing are installed, trouble, supporting force are not enough, box beam it is linear not It is easily controlled,
Pour that beam is linear and precision of the gradient is not enough, pour box beam horizontal component and also have an impact to support, in face of above-mentioned deficiency, Be badly in need of that a kind of installation operation is easy, supporting force is big, can preferably control box beam it is linear, safe and reliable support supporting unload Knockout case.
Utility model content
In order to simplify the installing/dismounting work for dropping sandbox, preferably control decentering of scaffold speed, preferably controls base plate Elevation and flatness, make Cast-in-situ Beam linear and the gradient is more accurate, the utility model using jack operation principle there is provided A kind of Bailey beam support supporting drops sandbox, including base and core cylinder, and the base includes base plate and the first helix tube, the first spiral shell Coil is provided with fine sand layer on base plate in first helix tube, the first helix tube bottom opening, the core cylinder includes Top board and the second helix tube, the second helix tube are provided with concrete layer on top board in second helix tube, the core cylinder is set In on the base, second steel plate keeps level, and the second helix tube of the core cylinder is put into the first spiral of the base Guan Zhong, the fine sand layer is contacted with the concrete layer.Base and tube filler are applied in combination, support supporting is formed and drops system. Support supporting is carried out using the sandbox and drops construction, is easy to dismount, is avoided influence of the cast-in-situ box girder horizontal component to support, carries The high stability and supporting structure security of cast-in-place support.
Further, the height of first helix tube and the second helix tube is 30cm, and the first helix tube is a diameter of 529mm, a diameter of 426cm of the second helix tube.
Further, the top board and base plate are 800 × 800 × 15mm steel plate., can according to the elevation that measurement is given The elevation of top surface of each sandbox is more effectively controlled, so as to ensure the linear smooth degree of bottom die of box-beam, is pouring box beam Into the aesthetics of expected design can be reached.
Further, the leakage sand hole is uniformly arranged 4, is respectively positioned on the diagonal of base plate, and then, when falling frame, Fine sand in same row's upright post base flows out sandbox base by sand losing opening, the Bailey beam on sandbox top uniformly, is integrally fallen, from And reach the purpose of frame.
The beneficial effects of the utility model are as follows:
1st, supporting drops the installing/dismounting work that sandbox simplifies decentering of scaffold system, and during dropping, can Decentering of scaffold speed more effectively is controlled, preferably control floor elevation and flatness, make Cast-in-situ Beam line style and the gradient more Precisely, the security of decentering of scaffold construction is greatly improved.Compared to bowl fastener holder jacking and sulphur-bonded mortar temporary support system Make simple, installation operation is easy, supporting force is big, can preferably control the linear of box beam, it is to avoid cast-in-situ box girder horizontal component Influence to support, is a kind of safe and reliable support supporting lowering device.
2nd, according to the given elevation of measurement, the elevation of top surface of each sandbox can be more effectively controlled, so that guard box The linear smooth degree of beam bottom board, make box beam pour complete can reach the aesthetics of expected design.
3rd, by using unnecessary construction fragment data, construction cost has been saved to a certain extent.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the sectional view of Section A-A in Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the present embodiment is carried out clear, complete Site preparation is described, it is clear that described embodiment is only the example to a part of example of the utility model, rather than whole.Base Embodiment in the utility model, the institute that those of ordinary skill in the art are obtained under the premise of creative work is not paid There is other embodiment, belong to the scope of the utility model protection.
As shown in Figure 1-2, a kind of Bailey beam support supporting of the present embodiment drops sandbox, including base and core cylinder, described Base includes the helix tube 3 of base plate 4 and first, and the first helix tube 3 is provided with fine sand layer on base plate 4 in first helix tube 3 7, the bottom open-drain sand hole 5 of the first helix tube 3, the leakage sand hole is uniformly arranged 4, on the diagonal of base plate, The core cylinder includes the helix tube 2 of top board 1 and second, and the second helix tube 2 is on top board 1, provided with mixed in second helix tube 2 Solidifying soil layer 6, the core cylinder is on the base, and the top board 1 keeps level, and the second helix tube 2 of the core cylinder is put into institute In the first helix tube 3 for stating base, the fine sand layer 6 is contacted with the concrete layer 7.
As further preferred, the height of the helix tube 2 of the first helix tube 3 and second is 30cm, and the first helix tube is straight Footpath is 529mm, a diameter of 426cm of the second helix tube.The top board and base plate can be 800 × 800 × 15mm steel plates.
The first helix tube and 800 × 800 × 15mm steel plates sealing in base are tight, and the first spiral bottom of the tube opens 30 × 20mm sand losing openings, the built-in evengranular fine sand of base.Sand used must sieve, and remove excessive particle, and sand is entering It must dry or dry before case.
The second helix tube and 800 × 800 × 15mm steel plates sealing in tube filler is tight, and it is unnecessary to pour cushion cap pier shaft Fragmentary filling concrete enters tube filler, after the completion for the treatment of that every row's helix tube column is erected, the base plate of sandbox base and the spiral shell of bracket upright post Coil is welded, and ensures necessary level at the top of sandbox.After the completion of support is set up, according to the altitude traverse position after checking, by base and Tube filler is applied in combination, and forms support supporting and drops system.
Application method of the present utility model is as follows:
(1)Install before sandbox, field technician must calculate the elevation of top surface H of sandbox;
(2)When sandbox is installed, fine sand is inserted in the base first, core cylinder is put into base, now core cylinder elevation of top surface palpus Calculating elevation of top surface H than sandbox is slightly higher;By measuring after the actual elevation of top surface of sandbox, each end points of calculating sandbox core cylinder top board Height h1, h2, h3, the h4 that need to decline, after the completion of repetition measurement each point elevation, can checking computations sandbox meet beam body horizontal wall inscription and longitudinal slope will Ask.
By adjusting the fine sand amount at different leakage sand hole positions in sandbox base, so as to control the height of core cylinder four end points of top surface Journey, and then the elevation of sandbox top Bailey beam and continuous box girder base plate is controlled, reach control box beam base plate horizontal wall inscription and circuit longitudinal slope Purpose.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modifications, equivalent substitutions and improvements made etc. should be included in the utility model Protection domain within.

Claims (4)

1. a kind of Bailey beam support supporting drops sandbox, it is characterised in that:Including base and core cylinder, the base include base plate and First helix tube, the first helix tube is provided with fine sand layer, the first spiral bottom of the tube on base plate in first helix tube Open-drain sand hole, the core cylinder includes top board and the second helix tube, and the second helix tube is set on top board in second helix tube There is concrete layer, the core cylinder is on the base, and the top board keeps level, and the second helix tube of the core cylinder is put into institute In the first helix tube for stating base, the fine sand layer is contacted with the concrete layer.
2. a kind of Bailey beam support supporting according to claim 1 drops sandbox, it is characterised in that:First helix tube Height with the second helix tube is 30cm, a diameter of 529mm of the first helix tube, a diameter of 426cm of the second helix tube.
3. a kind of Bailey beam support supporting according to claim 1 drops sandbox, it is characterised in that:The top board and base plate For 800 × 800 × 15mm steel plate.
4. a kind of Bailey beam support supporting according to claim 1 drops sandbox, it is characterised in that:The leakage sand hole is uniform 4 are set, is respectively positioned on the diagonal of base plate.
CN201621372905.2U 2016-12-14 2016-12-14 A kind of Bailey beam support supporting drops sandbox Expired - Fee Related CN206319256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621372905.2U CN206319256U (en) 2016-12-14 2016-12-14 A kind of Bailey beam support supporting drops sandbox

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621372905.2U CN206319256U (en) 2016-12-14 2016-12-14 A kind of Bailey beam support supporting drops sandbox

Publications (1)

Publication Number Publication Date
CN206319256U true CN206319256U (en) 2017-07-11

Family

ID=59267519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621372905.2U Expired - Fee Related CN206319256U (en) 2016-12-14 2016-12-14 A kind of Bailey beam support supporting drops sandbox

Country Status (1)

Country Link
CN (1) CN206319256U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114875805A (en) * 2022-06-15 2022-08-09 中国电建市政建设集团有限公司 Air rapid intersection and butt joint construction method for large special-shaped steel components

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114875805A (en) * 2022-06-15 2022-08-09 中国电建市政建设集团有限公司 Air rapid intersection and butt joint construction method for large special-shaped steel components
WO2023240766A1 (en) * 2022-06-15 2023-12-21 中国电建市政建设集团有限公司 Overhead rapid joining and butt-joint connection construction method for large special-shaped steel member

Similar Documents

Publication Publication Date Title
CN109487822B (en) Method for installing and adjusting steel pipe column in reverse construction and control device
CN108643217B (en) Construction method for high-speed railway roadbed contact net stand column foundation
CN102535353A (en) Construction method for box beam swinging body striding on expressways and railways in rail transit
CN108677747A (en) Cable-stayed bridge plane rotation swivel construction method
CN102733307B (en) Method for constructing cast-in-place beam falsework
CN206319256U (en) A kind of Bailey beam support supporting drops sandbox
CN117211554A (en) Restoration method for ancient building wall
CN113829493B (en) Processing method of prefabricated greening retaining wall
CN105804110A (en) Construction method of foundation bolts of railway contact net and mounting bracket
CN106013803A (en) Installing process of aluminum formwork
CN113863330A (en) Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method
CN203160708U (en) Accurate leveling device for cast-in-situ one-step forming concrete floor
CN207047889U (en) A kind of device for installing forging machine main frame embedded part
CN217811023U (en) Guide frame for positioning construction of foundation pit support structure upright post pile and lattice post
CN206189853U (en) Cast -in -place beam formwork support system with door opening
CN113832842B (en) Spherical support mounting and leveling method
CN213773301U (en) Fixing device is buried underground to side direction soil pressure cell
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
CN202099878U (en) Embedded part for evacuation platform of magnetic suspension project
CN107476336A (en) A kind of steel pipe column positioning construction method
CN114753267A (en) Bridge rotation body support leveling device and leveling method thereof
CN108098978A (en) A kind of assembled underground pipe gallery epimere producing device and production method
CN211006750U (en) Measurement observation platform
CN113106821A (en) Hoisting and positioning device and method for assembly type cement concrete pavement slab
CN106835863B (en) A kind of pulley-type device and method for non-fragment orbit lifting correction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711

CF01 Termination of patent right due to non-payment of annual fee