CN206316812U - A kind of automatic clamping device of puncher - Google Patents

A kind of automatic clamping device of puncher Download PDF

Info

Publication number
CN206316812U
CN206316812U CN201621439024.8U CN201621439024U CN206316812U CN 206316812 U CN206316812 U CN 206316812U CN 201621439024 U CN201621439024 U CN 201621439024U CN 206316812 U CN206316812 U CN 206316812U
Authority
CN
China
Prior art keywords
vertical
base
pulley
steel pipe
sheet material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621439024.8U
Other languages
Chinese (zh)
Inventor
过农
钱惠明
华玉林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Hongcheng Metal Pipe Co Ltd
Original Assignee
Wuxi Hongcheng Metal Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Hongcheng Metal Pipe Co Ltd filed Critical Wuxi Hongcheng Metal Pipe Co Ltd
Priority to CN201621439024.8U priority Critical patent/CN206316812U/en
Application granted granted Critical
Publication of CN206316812U publication Critical patent/CN206316812U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of automatic clamping device of puncher, including base, first vertical Pneumatic hydraulic device and vertical chute is installed on the left of the base, the upper center of the base is provided with rear fixed plate, the upper-end front of the base is provided with horizontal concrete chute, the upper-end front of the horizontal concrete chute is provided with horizontal Pneumatic hydraulic device, both sides are provided with pulley fixed frame before and after the upper end of the base, the upper end of the pulley fixed frame is provided with pulley, the utility model is in sheet material, steel pipe or multiple tube are by the right side of the upper end of base during feeding, it can be placed on first pulley in right side, by manpower by sheet material, steel pipe or multiple tube are pushed to correct position to chassis left side, now, pulley both plays a part of reducing frictional force when promoting, support sheet material is played again, the effect of steel pipe or multiple tube gravity, pass through the setting of rear fixed plate and front shoe, in sheet material, when steel pipe or multiple tube are finished by pulley feeding, front and rear it can clamp sheet material, steel pipe or multiple tube.

Description

A kind of automatic clamping device of puncher
Technical field
The utility model is related to automatic clamping device technical field, specially a kind of automatic clamping device of puncher.
Background technology
Sheet material, steel pipe or multiple tube easily shake in drilling, and drilling in this case is difficult to ensure that precision, past Toward stable clamping and positioning is needed, due to the heavier-weight of sheet material, steel pipe or multiple tube, operation is laborious, existing puncher Clamping device can not be directed to various sheet materials, and steel pipe, multiple tube, the material that can be clamped is more single, and clamping device Automated water It is flat low, therefore, we release a kind of automatic clamping device of puncher.
Utility model content
The purpose of this utility model is to provide a kind of automatic clamping device of puncher, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of automatic clamping device of puncher, bag Include and the first vertical Pneumatic hydraulic device and vertical chute, the first vertical Pneumatic Liquid are installed on the left of base, the base The output end of pressure device is provided with vertical fix bar, and the upper rear of the base is provided with electric boring machine, the base it is upper End middle part is provided with rear fixed plate, and the upper-end front of the base is provided with horizontal concrete chute, and the upper-end front of the horizontal concrete chute is pacified Equipped with horizontal Pneumatic hydraulic device, the output end of the horizontal Pneumatic hydraulic device is connected with front shoe, the base it is upper Both sides are provided with pulley fixed frame before and after end, and the upper end of the pulley fixed frame is provided with the left of pulley, the upper end of the base Second vertical Pneumatic hydraulic device is installed, the output end of the second vertical Pneumatic hydraulic device is provided with vertical lower platen, institute The second vertical Pneumatic hydraulic device is stated between adjacent electric boring machine.
It is preferred that, the rear fixed plate and front shoe, which are, to be placed equidistant.
It is preferred that, the front shoe is slidably connected to the top of horizontal concrete chute.
It is preferred that, the vertical fix bar is slidably connected in vertical chute.
It is preferred that, the pulley is is placed equidistant, and the number of the pulley is at least 4.
Compared with prior art, the beneficial effects of the utility model are:The utility model is in sheet material, steel pipe or multiple tube By that during feeding, can be placed on first pulley in right side on the right side of the upper end of base, by the way that manpower is by sheet material, steel pipe or is combined Pipe is pushed to correct position to chassis left side, now, and pulley both plays a part of reducing frictional force when promoting, and supporting plate is played again The effect of material, steel pipe or multiple tube gravity, by the setting of vertical chute, the first vertical Pneumatic Liquid is passed through in vertical fix bar When the effect of pressure device is protruded upward, vertical fix bar is slidably connected in vertical chute, vertical fix bar sliding stability, by rear solid The setting of fixed board and front shoe, when sheet material, steel pipe or multiple tube are finished by pulley feeding, rear fixed plate and preceding fixation Plate front and rear can clamp sheet material, steel pipe or multiple tube, control vertical lower platen right downwards by the second vertical Pneumatic hydraulic device Sheet material, steel pipe or multiple tube are pushed, to various sheet materials, steel pipe, and multiple tube or so is clamped, and is flattened up and down, Prevent that sheet material during drilling from rocking, it is ensured that borehole accuracy.
Brief description of the drawings
Fig. 1 is the utility model positive structure diagram;
Fig. 2 is the utility model overlooking the structure diagram;
Fig. 3 is the utility model left view structural representation.
In figure:1 electric boring machine, 2 rear fixed plates, 3 pulleys, 4 pulley fixed frames, 5 bases, 6 horizontal concrete chutes, 7 horizontal gas It is hydrodynamic pressure device, 8 first vertical Pneumatic hydraulic devices, 9 vertical chutes, 10 vertical fix bars, 11 front shoes, 12 second vertical Pneumatic hydraulic device, 13 vertical lower platens.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of automatic clamping device of puncher, including Base 5, the left side of the base 5 is provided with the first vertical Pneumatic hydraulic device 8 and vertical chute 9, and described first is vertical pneumatic The output end of hydraulic means 8 is provided with vertical fix bar 10, and the upper rear of the base 5 is provided with electric boring machine 1, the bottom The upper center of seat 5 is provided with rear fixed plate 2, and the upper-end front of the base 5 is provided with horizontal concrete chute 6, the horizontal concrete chute 6 Upper-end front is provided with horizontal Pneumatic hydraulic device 7, and the output end of the horizontal Pneumatic hydraulic device 7 is connected with front shoe 11, both sides are provided with pulley fixed frame 4 before and after the upper end of the base 5, and the upper end of the pulley fixed frame 4 is provided with pulley 3, Second vertical Pneumatic hydraulic device 12 is installed on the left of the upper end of the base 5, the second vertical Pneumatic hydraulic device 12 Output end is provided with vertical lower platen 13, and the second vertical Pneumatic hydraulic device 12 is located between adjacent electric boring machine 1.
Further, the rear fixed plate 2 and front shoe 11 are and are placed equidistant, and pass through rear fixed plate 2 and preceding fixation The setting of plate 11, when sheet material, steel pipe or multiple tube are finished by the feeding of pulley 3, front shoe 11 passes through horizontal Pneumatic Liquid The effect of pressure device 7 promotes sheet material, steel pipe or multiple tube to be moved to rear fixed plate 2, now passes through rear fixed plate 2 and preceding fixation Plate 11 front and rear can clamp sheet material, steel pipe or multiple tube.
Further, the front shoe 11 is slidably connected to the top of horizontal concrete chute 6, by the setting of horizontal concrete chute 6, preceding When fixed plate 11 is slidably connected to the top of horizontal concrete chute 6, front shoe 11 is slided flat by the effect of horizontal Pneumatic hydraulic device 7 Surely.
Further, the vertical fix bar 10 is slidably connected in vertical chute 9, by the setting of vertical chute 9, vertical When fix bar 10 is protruded upward by the effect of the first vertical Pneumatic hydraulic device 8, vertical fix bar 10 is slidably connected to vertical chute 9 It is interior, the vertical sliding stability of fix bar 10.
Further, the pulley 3 is is placed equidistant, and the number of the pulley 3 is at least 4, passes through setting for pulley 3 Put, on the right side of the upper end of sheet material, steel pipe or multiple tube by base 5 during feeding, can be placed on first pulley 3 in right side, Sheet material, steel pipe or multiple tube are pushed to by correct position to the left side of base 5 by manpower, now, pulley 3 had both played reduction and pushed away The effect of frictional force when dynamic, plays a part of support sheet material, steel pipe or multiple tube gravity again.
Specifically, in use, can be placed on during feeding on the right side of the upper end of sheet material, steel pipe or multiple tube by base 5 On the pulley 3 of first, right side, sheet material, steel pipe or multiple tube are pushed to by correct position to the left side of base 5 by manpower, this When, pulley 3 both plays a part of reducing frictional force when promoting, and plays a part of support sheet material, steel pipe or multiple tube gravity again, By the setting of vertical chute 9, when vertical fix bar 10 is protruded upward by the effect of the first vertical Pneumatic hydraulic device 8, Vertical fix bar 10 is slidably connected in vertical chute 9, and the vertical sliding stability of fix bar 10 passes through rear fixed plate 2 and front shoe 11 Setting, when sheet material, steel pipe or multiple tube are finished by the feeding of pulley 3, front shoe 11 is filled by horizontal Pneumatic hydraulic The effect for putting 7 promotes sheet material, steel pipe or multiple tube to be moved to rear fixed plate 2, now passes through rear fixed plate 2 and front shoe 11 Front and rear sheet material, steel pipe or multiple tube can be clamped, control vertical lower platen 13 downward by the second vertical Pneumatic hydraulic device 12 Sheet material, steel pipe or multiple tube are pushed, after the clamping of sheet material, steel pipe or multiple tube, carried out by electric boring machine 1 Drilling operation.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of automatic clamping device of puncher, including base(5), it is characterised in that:The base(5)Left side be provided with First vertical Pneumatic hydraulic device(8)And vertical chute(9), the first vertical Pneumatic hydraulic device(8)Output end be provided with Vertical fix bar(10), the base(5)Upper rear electric boring machine is installed(1), the base(5)Upper center Rear fixed plate is installed(2), the base(5)Upper-end front be provided with horizontal concrete chute(6), the horizontal concrete chute(6)Upper end Front portion is provided with horizontal Pneumatic hydraulic device(7), the horizontal Pneumatic hydraulic device(7)Output end be connected with front shoe (11), the base(5)Upper end before and after both sides pulley fixed frame is installed(4), the pulley fixed frame(4)Upper end install There is pulley(3), the base(5)Upper end on the left of the second vertical Pneumatic hydraulic device is installed(12), the second vertical gas Hydrodynamic pressure device(12)Output end be provided with vertical lower platen(13), the second vertical Pneumatic hydraulic device(12)Positioned at adjacent Electric boring machine(1)Between.
2. a kind of automatic clamping device of puncher according to claim 1, it is characterised in that:The rear fixed plate(2) And front shoe(11)It is and is placed equidistant.
3. a kind of automatic clamping device of puncher according to claim 1, it is characterised in that:The front shoe(11) It is slidably connected to horizontal concrete chute(6)Top.
4. a kind of automatic clamping device of puncher according to claim 1, it is characterised in that:The vertical fix bar (10)It is slidably connected to vertical chute(9)It is interior.
5. a kind of automatic clamping device of puncher according to claim 1, it is characterised in that:The pulley(3)For etc. Away from setting, the pulley(3)Number be at least 4.
CN201621439024.8U 2016-12-26 2016-12-26 A kind of automatic clamping device of puncher Expired - Fee Related CN206316812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621439024.8U CN206316812U (en) 2016-12-26 2016-12-26 A kind of automatic clamping device of puncher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621439024.8U CN206316812U (en) 2016-12-26 2016-12-26 A kind of automatic clamping device of puncher

Publications (1)

Publication Number Publication Date
CN206316812U true CN206316812U (en) 2017-07-11

Family

ID=59259649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621439024.8U Expired - Fee Related CN206316812U (en) 2016-12-26 2016-12-26 A kind of automatic clamping device of puncher

Country Status (1)

Country Link
CN (1) CN206316812U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113246021A (en) * 2021-05-17 2021-08-13 彩虹(合肥)液晶玻璃有限公司 Grinding production control device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113246021A (en) * 2021-05-17 2021-08-13 彩虹(合肥)液晶玻璃有限公司 Grinding production control device

Similar Documents

Publication Publication Date Title
CN105345440B (en) Frame made of aluminum profiles corner brace automatic mounting machine
CN203996998U (en) A kind of automatic placement foaming machine structure of ceramic tile packaging machine
CN206316812U (en) A kind of automatic clamping device of puncher
CN212000494U (en) Asphalt laying device for urban road
CN208195485U (en) A kind of small size stamping parts automatic material connection device
CN207258683U (en) It is a kind of to send board apparatus for the automatic of label production
CN211365140U (en) Carton placing device
CN206107697U (en) A positioner for irritating quick -witted powder box of powder
CN203439314U (en) Novel storage bin of mask machine
CN204430218U (en) Precision molding machine is used in casting
CN213563178U (en) Cold pressing device for core plate adhesion
CN206064751U (en) A kind of sealing system for LED product production
CN205438740U (en) Panel cutting platform device
CN108405752A (en) A kind of flange fixing installation of tank body
CN204872989U (en) Sheet stock dynamic sending machine support body
CN211332048U (en) Riveting device in mould for producing CPU ironware
CN107234570A (en) The clamp mechanism that a kind of agitating device housing is used
CN202370545U (en) Water stopping belt mounting die
CN209716447U (en) A kind of straightening roll die clamp
CN209477806U (en) A kind of cone roller processing tool centre frame
CN207692062U (en) A kind of earphone base Full-automatic assembling machine
CN208408485U (en) The positioning device of jolt ramming platform
CN207131971U (en) A kind of sewage conduct fixing device
CN205889399U (en) System billet isolated plant
CN206105239U (en) Position adjustable welding jig

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170711

Termination date: 20171226