CN206311222U - For the combination unit of pipeline thermometric - Google Patents
For the combination unit of pipeline thermometric Download PDFInfo
- Publication number
- CN206311222U CN206311222U CN201621369086.6U CN201621369086U CN206311222U CN 206311222 U CN206311222 U CN 206311222U CN 201621369086 U CN201621369086 U CN 201621369086U CN 206311222 U CN206311222 U CN 206311222U
- Authority
- CN
- China
- Prior art keywords
- thermometric
- connection pipe
- pipeline
- pipe body
- blind pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Measuring Temperature Or Quantity Of Heat (AREA)
Abstract
The utility model provides a kind of combination unit for pipeline thermometric, including:Thermometric blind pipe, and it is arranged at the first connection pipe body of the thermometric bore ends of the pipeline;The thermometric blind pipe includes blind end and openend, and the openend sets the second connection pipe body;First connection pipe body is detachably connected with second connection pipe body.Combination unit for pipeline thermometric provided by the utility model, in the thermometric bore ends of pipeline, the first connection pipe body is set, in the openend of thermometric blind pipe, the second connection pipe body is set, first connection pipe body and the second connection pipe body are detachably connected, allow that thermometric blind pipe is easily separated pipeline by operating personnel after thermometric blind pipe goes wrong, and also allow that easily be arranged on the thermometric blind pipe after replacing on pipeline by staff, hence in so that the dismounting and change of thermometric blind pipe more facilitates, the operation of operating personnel more facilitates.
Description
Technical field
The utility model is related to temperature measurement technology, more particularly to a kind of combination unit for pipeline thermometric.
Background technology
The temperature measuring devices such as thermometer generally need the pipeline for having high-velocity fluid in circulation or the container with corrosive fluid
Deng temperature survey is carried out in environment, generally, the temperature measuring device such as thermometer is placed in thermometric blind pipe, and thermometric blind pipe is arranged on into pipe
In road or container, being capable of accurate thermometric to avoid the temperature measuring devices such as thermometer from being damaged and ensure it.
In the prior art, offered at the point for measuring temperature of pipeline or container and its internal thermometer hole for connecting, thermometric blind pipe position
In in pipeline or container, and its openend is welded to connect with the thermometer hole, and the temperature measuring device such as thermometer is by thermometric blind pipe
Openend appears so that operating personnel can pick and place the temperature measuring devices such as thermometer by the openend.Because thermometric blind pipe is long
Phase is in high-velocity fluid or corrosive fluid, therefore thermometric blind pipe is easily perforated, and when thermometric blind pipe is perforated, is just needed
Thermometric blind pipe is changed.
But, thermometric blind pipe openend of the prior art is to be welded to connect with the thermometer hole of pipeline or container, causes to survey
The dismounting of warm blind pipe is complicated.
Utility model content
The utility model provides a kind of combination unit for pipeline thermometric, has surveyed blind pipe in the prior art for solution and has torn open
Unload the problem of complexity.
Combination unit for pipeline thermometric provided by the utility model includes:
Thermometric blind pipe, and it is arranged at the first connection pipe body of the thermometric bore ends of the pipeline;
The thermometric blind pipe includes blind end and openend, and the openend sets the second connection pipe body;
First connection pipe body is detachably connected with second connection pipe body.
Further, internal thread is set on the inwall of first connection pipe body, on the outer wall of second connection pipe body
The external screw thread that setting is adapted with the internal thread, so that second connection pipe body is spirally connected with first connection pipe body.
Further, first flange disk is set in first connection pipe body, second is set in second connection pipe body
Ring flange, the first flange disk is bolted with two ring flange.
Further, there is the first angle between the axis of first connection pipe body and the axis of the pipeline.
Further, the end of second connection pipe body sets nut, and the nut is used to screw the thermometric blind pipe.
Further, it is threaded on the inwall of the second flange disk.
Further, first angle is 45 degree.
Further, the blind end of the thermometric blind pipe is arranged on the body of the thermometric blind pipe, second connection
Body is the body being fixedly connected with the body of the thermometric blind pipe.
Further, first connection pipe body is coaxially disposed with the thermometer hole of the pipeline.
Combination unit for pipeline thermometric provided by the utility model, sets first and connects in the thermometric bore ends of pipeline
Adapter body, the second connection pipe body is set in the openend of thermometric blind pipe, and the first connection pipe body and the second connection pipe body detachably connect
Connect so that thermometric blind pipe easily can be separated pipeline by operating personnel after thermometric blind pipe goes wrong, and also cause work
Making personnel easily can be arranged on pipeline the thermometric blind pipe after replacing, hence in so that the dismounting and change of thermometric blind pipe is more
Convenient, the operation of operating personnel more facilitates.
Brief description of the drawings
In order to illustrate more clearly of the utility model or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for technology description is briefly described, it should be apparent that, drawings in the following description are this practicalities
Some new embodiments, for one of ordinary skill in the art, without having to pay creative labor, also
Other accompanying drawings can be further obtained according to these accompanying drawings.
The pipeline configuration figure of the combination unit embodiment one for pipeline thermometric that Fig. 1 is provided for the utility model;
The thermometric blind pipe structure chart of the combination unit embodiment one for pipeline thermometric that Fig. 2 is provided for the utility model;
The pipeline configuration figure of the combination unit embodiment two for pipeline thermometric that Fig. 3 is provided for the utility model;
The thermometric blind pipe structure chart of the combination unit embodiment two for pipeline thermometric that Fig. 4 is provided for the utility model;
The pipeline and the first connecting tube of the combination unit embodiment three for pipeline thermometric that Fig. 5 is provided for the utility model
Body angle schematic diagram;
Description of reference numerals:
1:Pipeline;
11:Thermometer hole;
12:First connection pipe body;
121:First flange disk;
2:Thermometric blind pipe;
21:Blind end;
22:Openend;
221:Second connection pipe body;
222:Nut;
2211:Second flange disk.
Specific embodiment
To make the purpose of this utility model, technical scheme and advantage clearer, implement below in conjunction with the utility model
Accompanying drawing in example, is clearly and completely described, it is clear that described reality to the technical scheme in the utility model embodiment
It is a part of embodiment of the utility model to apply example, rather than whole embodiments.Based on the embodiment in the utility model, ability
The every other embodiment that domain those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality new
The scope of type protection.
The pipeline configuration figure of the combination unit embodiment one for pipeline thermometric that Fig. 1 is provided for the utility model, Fig. 2 is
The thermometric blind pipe structure chart of the combination unit embodiment one for pipeline thermometric that the utility model is provided, such as Fig. 1 and Fig. 2 institutes
Show, the combination unit for being used for pipeline thermometric includes:
It is arranged at the first connection pipe body 12 on the thermometer hole 11 of pipeline 1, and thermometric blind pipe 2.
Wherein, circulation has high-velocity fluid in pipeline 1, i.e., combination unit provided by the utility model is for testing pipeline
In temperature.Thermometer hole 11 is provided with the duct wall of pipeline 1, thermometer hole 11 is connected with the inside of pipeline 1, by thermometer hole
Middle insertion thermometric blind pipe, it is possible to carry out the temperature survey of pipeline.The thermometric that thermometric blind pipe 2 inserts pipeline 1 is also shown in Fig. 1
Result behind hole 11 is illustrated.
It should be noted that " pipeline " alleged in the utility model can also replace with other being inserted by thermometer hole
Enter thermometric blind pipe and realize container of thermometric etc..
Reference picture 1, the end of the thermometer hole 11 of pipeline 1 is provided with the first connection pipe body 12.
Alternatively, the first connection pipe body 12 and thermometer hole 11 are coaxially disposed.
Reference picture 2, thermometric blind pipe 2 can include blind end 21 and openend 22, wherein, openend 22 is provided with the second company
Adapter body 221, the first connection pipe body 12 and the second connection pipe body 221 are detachably connected.
Wherein, thermometric blind pipe can be the elongate body that the one end being made up of metal material is closed, for placing or pacifying
The temperature measuring devices such as dress thermometer, when in use, the blind end of thermometric blind pipe gos deep into pipeline, so that the temperature being placed in thermometric blind pipe
The temperature measuring devices such as degree meter can measure the temperature of fluids within pipes, and the openend of thermometric blind pipe may be located at outside pipeline thermometer hole,
Can allow the operator to pick and place the temperature measuring devices such as thermometer by the openend.
Specifically, the first connection pipe body 12 is a segment pipe of the extension outside thermometer hole 11, is the part in pipeline,
Second connection pipe body 221 is a segment pipe of the openend of thermometric blind pipe 2, because the first connection pipe body and the second connection pipe body are
Be detachably connected, therefore, when needing to carry out pipeline thermometric, by thermometric blind pipe insertion pipeline thermometer hole in, and by first connect
Adapter body and the second connection pipe body are connected.After thermometric blind pipe is perforated, it is only necessary to by the second connection pipe body from first
Disassembled in connection pipe body, you can thermometric blind pipe is changed.
In the present embodiment, the first connection pipe body is set in the thermometric bore ends of pipeline, is set in the openend of thermometric blind pipe
Second connection pipe body, the first connection pipe body and the second connection pipe body are detachably connected so that grasped after thermometric blind pipe goes wrong
Make personnel easily can separate pipeline by thermometric blind pipe, and also allow staff easily by the thermometric after replacing
Blind pipe is arranged on pipeline, hence in so that the dismounting and change of thermometric blind pipe more facilitates, the operation of operating personnel more facilitates.
On the basis of above-described embodiment, the present embodiment is related to one kind of the first connection pipe body and the second connection pipe body specific
Connected mode.I.e., as in the preceding embodiment, the first connection pipe body 12 and the second connection pipe body 221 are detachably connected, for
It is detachably connected, one of which is specifically detachably connected mode can be:
Internal thread is set on the inwall of the first connection pipe body 12, is set and the interior spiral shell on the outer wall of the second connection pipe body 121
The external screw thread that line is adapted, so that the second connection pipe body 221 is realized being spirally connected with the first connection pipe body 12.
Internal thread is set by the inwall in the first connection pipe body 12, is set on the outer wall of the second connection pipe body 221 and is somebody's turn to do
The external screw thread that internal thread is adapted, realizes the threaded connection of thermometric blind pipe 2 and pipeline 1, so as to realize thermometric blind pipe 2 and pipeline
1 is detachably connected.After thermometric blind pipe 2 is perforated, operating personnel can be separated pipe by screwing thermometric blind pipe 2
Road body 1, then again screws to pipeline body 1 the thermometric blind pipe 2 after replacing, be continuing with so that thermometric blind pipe 2 is torn open
Unload replacing more to facilitate, the operation of operating personnel more facilitates.
Further, referring to Figures 1 and 2, when being attached using above-mentioned screw connection manner, the second connection pipe body 221
End can set nut 222, wherein, nut 222 is used to screw thermometric blind pipe 2.
Specifically, to be coaxially disposed between the connection pipe body 221 of nut 222 and second, nut 222 for example can be hexagonal spiral shell
It is female.When thermometric blind pipe 2 and pipeline 1 are attached, thermometric blind pipe 2 can be inserted staff the thermometric of pipeline 1 first
In hole 11, and then, staff, with the rotation of nut 222, can be connected by spanner screw on nut 222 with nut 222
Second connection pipe body 221 is realized being spirally connected with the first connection pipe body 12 so that thermometric blind pipe 2 is arranged on pipeline 1, makes operating personnel
More convenient operation.
Alternatively, in the above-described embodiments, between thermometric blind pipe 2, the second connection pipe body 221 and nut 222 this three
Connection can be integrated, such connected mode ensure that the bulk strength of thermometric blind pipe 2.
In addition, in a kind of optional implementation method, referring to Fig. 2, the blind end 21 of thermometric blind pipe 2 is arranged on thermometric blind pipe
On 2 body, the second connection pipe body 221 is the body being fixedly connected with the body of thermometric blind pipe 2.
That is, the second connection pipe body 221 is independently of another section of body of the body of thermometric blind pipe 2, rather than thermometric blind pipe 2
Body on one section, be used as the second connection pipe body 221 by being separately provided one section of body, it is ensured that the intensity of thermometric blind pipe,
Extend the service life of thermometric blind pipe.
On the basis of above-described embodiment, the present embodiment is related to the first connection pipe body 12 and the second connection pipe body 221 removable
Unload the specific connected mode of another kind of connection.That is, the first connection pipe body 12 and the second connection pipe body 221 can also be by following
Mode is realized being detachably connected.
The pipeline configuration figure of the combination unit embodiment two for pipeline thermometric that Fig. 3 is provided for the utility model, Fig. 4 is
The thermometric blind pipe structure chart of the combination unit embodiment two for pipeline thermometric that the utility model is provided, such as Fig. 3 and Fig. 4 institutes
Show, first flange disk 121 is set in first connection pipe body, second flange disk 2211 is set in second connection pipe body, wherein, first
Ring flange 121 and second flange disk 2211 are bolted.
Specifically, when needing to be connected thermometric blind pipe 2 with pipeline 1, thermometric blind pipe 2 is inserted pipeline by staff first
In 1 thermometer hole 11, now first flange disk 121 and second flange disk 2211 are combined together, and then use bolt by first
Ring flange 121 and second flange disk 2211 are connected, you can realize the connection of thermometric blind pipe 2 and pipeline 1.When wearing occurs in thermometric blind pipe
When the problems such as hole needs dismounting, staff connects the bolt of first flange disk 121 and second flange disk 2211 by dismantling, will
Thermometric blind pipe 2 separates pipeline 1, and second flange disk 2211 on the thermometric blind pipe 2 after replacing is bolted in pipe again then
On the first flange disk 121 in road 1, it is continuing with so that the dismounting and change of thermometric blind pipe 2 more facilitates, the operation of operating personnel
More facilitate.
Further, in a kind of optional implementation method, can be threaded on the inwall of second flange disk 2211.
Specifically, the temperature measuring device that can be placed in thermometric blind pipe 2 can have various, for example, can be to be directly placed at survey
Thermometer in warm blind pipe 2, or, or itself with regard to screwed metallic thermometer.When the thermometer for being used is
Itself screwed metal temperature timing, by the screw thread being arranged on second flange disk 2211, it is possible to by metal temperature
Meter be spirally connected with second flange disk 2211, that is, allow that metallic thermometer is fixed on thermometric blind pipe 2, thus realize accurately and
Carry out the temperature survey of pipeline A Quan.
The pipeline and the first connecting tube of the combination unit embodiment three for pipeline thermometric that Fig. 5 is provided for the utility model
Body angle schematic diagram, as shown in figure 5, having the first angle between the axis of the first connection pipe body 12 and the axis of pipeline 1.
The axis of the first connection pipe body 12 has the first angle with the axis of pipeline 1, passes through the blind end of thermometric blind pipe 2
First connection pipe body 12 and thermometer hole 11 are inclined and are inserted in pipeline 1.Because the fluid in pipeline is generally in flow at high speed shape
State, has the state of the first angle with the axis of pipeline body 1 by the way that the first connection pipe body 12 is designed as into its axis, can make
Obtaining thermometric blind pipe 2 can be plugged in pipeline body 1 by the first connection pipe body 12 and the inclination of thermometer hole 11, not only avoid survey
Warm blind pipe 2 is impacted to the fluid in pipeline, it is ensured that the thermometric of the temperature measuring device such as thermometer is accurate in thermometric blind pipe 2
Property.
Alternatively, the first angle can be 45 degree.
Finally it should be noted that:Various embodiments above is only used to illustrate the technical solution of the utility model, rather than it is limited
System;Although being described in detail to the utility model with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole
Technical characteristic carries out equivalent;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical scheme of type.
Claims (9)
1. a kind of combination unit for pipeline thermometric, it is characterised in that including:Thermometric blind pipe, and it is arranged at the pipeline
Thermometric bore ends the first connection pipe body;
The thermometric blind pipe includes blind end and openend, and the openend sets the second connection pipe body;
First connection pipe body is detachably connected with second connection pipe body.
2. device according to claim 1, it is characterised in that internal thread is set on the inwall of first connection pipe body,
The external screw thread being adapted with the internal thread is set on the outer wall of second connection pipe body so that second connection pipe body with
First connection pipe body is spirally connected.
3. device according to claim 1, it is characterised in that first flange disk, institute are set in first connection pipe body
Setting second flange disk in the second connection pipe body is stated, the first flange disk is bolted with two ring flange.
4. the device according to claim any one of 1-3, it is characterised in that the axis of first connection pipe body with it is described
There is the first angle between the axis of pipeline.
5. device according to claim 2, it is characterised in that the end of second connection pipe body sets nut, described
Nut is used to screw the thermometric blind pipe.
6. device according to claim 3, it is characterised in that be threaded on the inwall of the second flange disk.
7. device according to claim 4, it is characterised in that first angle is 45 degree.
8. device according to claim 2, it is characterised in that it is blind that the blind end of the thermometric blind pipe is arranged on the thermometric
On the body of pipe, second connection pipe body is the body being fixedly connected with the body of the thermometric blind pipe.
9. device according to claim 1, it is characterised in that first connection pipe body is same with the thermometer hole of the pipeline
Axle is set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621369086.6U CN206311222U (en) | 2016-12-14 | 2016-12-14 | For the combination unit of pipeline thermometric |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621369086.6U CN206311222U (en) | 2016-12-14 | 2016-12-14 | For the combination unit of pipeline thermometric |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206311222U true CN206311222U (en) | 2017-07-07 |
Family
ID=59252130
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621369086.6U Active CN206311222U (en) | 2016-12-14 | 2016-12-14 | For the combination unit of pipeline thermometric |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206311222U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110285885A (en) * | 2019-07-29 | 2019-09-27 | 湖南博云新材料股份有限公司 | A kind of high temperature heat treatment furnace infrared temperature measurement system |
-
2016
- 2016-12-14 CN CN201621369086.6U patent/CN206311222U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110285885A (en) * | 2019-07-29 | 2019-09-27 | 湖南博云新材料股份有限公司 | A kind of high temperature heat treatment furnace infrared temperature measurement system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206311222U (en) | For the combination unit of pipeline thermometric | |
CN104858813B (en) | A kind of multiparameter adjustable ECT sensor grip device | |
CN104912624B (en) | The device that collection engine motor oil sampling is measured with oil temperature | |
CN105318990A (en) | Calorimeter having data display screen with adjustable inclination angle | |
CN206787655U (en) | Water meter with filtering function | |
CN203643213U (en) | Disposable universal urine sample liquid collector | |
CN202350843U (en) | Float flowmeter and water diversion and collection device | |
CN208443497U (en) | A kind of survey liquid thermometer | |
CN203451217U (en) | Oil gun with digital display flow meter | |
CN209085694U (en) | A kind of oil measurement device of high pressure resistant low temperature | |
CN207133063U (en) | A kind of excrement collecting tube | |
CN208505383U (en) | A kind of online installation target type meter | |
CN211340980U (en) | Pipeline with intelligent sensing device mounted to achieve active leakage control effect | |
CN209130335U (en) | A kind of reducing type flow cardan | |
CN206787648U (en) | A kind of intellectual water meter | |
CN208269994U (en) | A kind of split type water meter | |
CN207937279U (en) | A kind of PE feed pipes external pressure test device | |
CN101881461A (en) | Magnetic fuel energy-saving or water processing device | |
CN207268655U (en) | A kind of portable ground water temperature measuring system | |
CN207395819U (en) | A kind of power-saving technology variable frequency excitation electromagnetic flowmeter | |
CN205909001U (en) | Oxygen tee bend divides with structure is adjusted to screw thread | |
CN205642474U (en) | Flow measurement device | |
CN209745332U (en) | Thermal vortex street flowmeter | |
CN204705387U (en) | Blowing type liquid level measuring instrument | |
CN208606958U (en) | A kind of medical endoscope leak detection equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |