CN206309847U - A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang - Google Patents

A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang Download PDF

Info

Publication number
CN206309847U
CN206309847U CN201620878153.0U CN201620878153U CN206309847U CN 206309847 U CN206309847 U CN 206309847U CN 201620878153 U CN201620878153 U CN 201620878153U CN 206309847 U CN206309847 U CN 206309847U
Authority
CN
China
Prior art keywords
cylinder
poromerics
overhang
groove
erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620878153.0U
Other languages
Chinese (zh)
Inventor
陈俊超
叶必卿
陈雨晴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University of Technology ZJUT
Original Assignee
Zhejiang University of Technology ZJUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Technology ZJUT filed Critical Zhejiang University of Technology ZJUT
Priority to CN201620878153.0U priority Critical patent/CN206309847U/en
Application granted granted Critical
Publication of CN206309847U publication Critical patent/CN206309847U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Actuator (AREA)

Abstract

The utility model discloses a kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang, including bounce cylinder, cylinder fixed seat, electromagnet, cushion pad and buffer spring, bounce cylinder is fixed in cylinder fixed seat, cushion pad and buffer spring are also set with the piston rod of bounce cylinder, bounce cylinder is provided with air inlet away from one end of electromagnet, air inlet connects admission line, choke valve is provided with admission line, an outlet pipe is additionally provided with admission line, outlet pipe is provided with one-way pressure regulating valve;The inner wall of cylinder of brake cylinder is provided with poromerics groove.The utility model can effectively absorb the energy produced by inertia when suspension arrangement brakes, and prevent suspension arrangement from producing influence to sun wing plate because of inertia motion;Bounce cylinder is connected the air cavity of piston both sides by poromerics groove when piston is by poromerics groove, so as to prevent piston direct resilience under the action of the spring, so that buffering effect is better.

Description

A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang
Technical field
The utility model is related to solar wing ground simulation erecting by overhang technical field, with specifically more particularly to a kind of The brake cylinder of brake buffering is carried out to sun wing plate erecting by overhang.
Background technology
Solar wing is the energy source of satellite.I.e. solar energy sailboard, is a kind of collection solar device, is commonly used to The energy supply of satellite, spaceship, it can also be used to installed in eco-friendly car top.Solar wing is the energy source of satellite.Satellite Solar wing is in folded state during transmitting, and the satellite and the rocket are opened and the continuous adjustment direction during satellite flight after separating, and make the sun Battery is directed at the sun, for the work of whole star provides energy.Solar wing supervision camera can shoot solar wing spreading process and work shape State, judges whether solar wing state is normal;Under rail control cooperation, the earth and lunar map picture can be also shot.To make the ground of acquisition The moon, image was preferable, and the camera employs a telephoto lens.Solar energy sailboard has power supply and the two big functions that charge, equivalent to one Compact Power Plant.Solar energy sailboard is not same things with solar sail, and solar energy sailboard is a kind of dress for collecting solar energy Put, and solar sail is to carry out a kind of cosmonautic spacecraft using the optical pressure of sunshine.
Sun wing plate is installed with weightless environment in space, therefore, carry out various simulations on ground and launch During experiment, we must be hung, and in the environment of ground, not carrying out hanging sun wing plate just cannot normally run And work;The bindiny mechanism such as sun wing plate and hinge is designed according under weightlessness, if not solving the problems, such as gravity Solar wing cannot just be operated on ground, so we must be hung up when testing on earth, and ensure Solar wing carries out barycenter hanging in standard attitude, so as to offset the influence of gravity, the weightlessness of simulation space carries out one The action of a little row.
Although being weightless environment in space, inertia remains presence, although solar wing is not subject in space Gravity influences, but being received during its expansion can still be kept motion by the effect of inertia, and its inertial impulse is by its hinge Or other bindiny mechanisms offset.In the hanging of ground simulation sun wing plate launches experiment, generally using erecting by overhang Sun wing plate is hung, the movement of sun wing plate is driven when erecting by overhang is moved, when erecting by overhang is in brake, too The inertia motion of positive wing plate in itself does not have any problem, but if sun wing plate is to carry out inertia fortune by erecting by overhang dragging Dynamic, then substantially in abnormal attitude, this inertia motion needs to overcome, it is therefore desirable to hanging is filled using stopping means Put carry out it is spacing.The inertia motion of sun wing plate in itself simultaneously need not go to be interfered, but the inertia motion of erecting by overhang is necessary Interference, prevents erecting by overhang in stop position transition reach dragging sun wing plate movement or because the resilience of erecting by overhang will too The past situation about pulling back of positive wing plate.In order to position is forward or resilience when solving the problems, such as that erecting by overhang brakes, and because cannot be complete Complete solution is determined erecting by overhang preshoot in itself or resilience motion problems, and we are made that and a kind of reduce this preshoot or resilience campaign Device, by the buffer unit that brakes by erecting by overhang because the energy absorption that inertia motion is produced is fallen, it is to avoid use block direct gear The impact several times problem for firmly occurring during sun wing plate.
Utility model content
The purpose of this utility model is to solve sun wing plate to cause itself with the preshoot of erecting by overhang or resilience The affected problem of inertia motion, there is provided using a kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang, The energy of erecting by overhang is absorbed by special bounce cylinder, so as to avoid inertia motion when erecting by overhang brakes to solar wing The influence of plate inertia motion in itself.
The utility model is achieved through the following technical solutions above-mentioned purpose:It is a kind of that sun wing plate erecting by overhang is stopped The brake cylinder of car buffering, for being erected on rectilinear orbit and the erecting by overhang that can be moved along a straight line along rectilinear orbit Carry out brake buffering, absorption iron block be installed on erecting by overhang, including bounce cylinder, cylinder fixed seat, electromagnet, cushion pad and Buffer spring, the bounce cylinder is fixed in cylinder fixed seat, and cylinder fixed seat is fixed on rectilinear orbit, bounce cylinder The end of piston rod is fixed with electromagnet, and cushion pad and buffer spring, the electromagnetism are also set with the piston rod of bounce cylinder The position of iron is corresponding with the position of the absorption iron block, electromagnet and absorption iron block phase when erecting by overhang moves to normal danger Contact;The bounce cylinder is provided with air inlet away from one end of electromagnet, and the air inlet connects admission line, the air inlet Choke valve is provided with pipeline, an outlet pipe is additionally provided with the admission line, the outlet pipe is provided with unidirectional tune Pressure valve;The inner wall of cylinder of the bounce cylinder is radially provided with poromerics groove along inner wall of cylinder, and the poromerics groove is by micro- Porous materials are made, and poromerics groove is arranged on the middle part of bounce cylinder.
Further, the poromerics groove is provided with along circumferentially uniform a plurality of of inner wall of cylinder.
Further, the length of the poromerics groove is the 1/3~2/3 of inner wall of cylinder overall length.
Technology design of the present utility model is:Erecting by overhang is carried out using bounce cylinder, cushion pad and buffer spring Buffering, buffer spring is used to offset the power produced when erecting by overhang brakes, and bounce cylinder is used to be produced when offsetting erecting by overhang brake Raw displacement, because bounce cylinder and buffering spring attachment locations belong to being rigidly connected, buffering is provided with its junction Pad, on the one hand strengthens the buffering effect of the present apparatus, buffering elastic when on the other hand preventing bounce cylinder and buffer spring directly contact Spring or bounce cylinder are subject to excessive pressure and are damaged;In an initial condition, cushion pad, bounce cylinder are in non-telescoping state, The piston of bounce cylinder is located near one end of electromagnet, now opens the switch valve of gas tank, is supplied in bounce cylinder, because Admission line is provided with pressure regulator valve, although but the speed that can enter outlet enter outlet is all slow comparing, and is reached in pressure The pressure check valve on preceding outlet pipe will not be opened to a certain extent;Electromagnet is in normal open state, works as erecting by overhang When moving to normal danger, electromagnet is adsorbed to the absorption iron block on erecting by overhang, and erecting by overhang is gentle to buffer spring The piston rod of qi of chong channel ascending adversely cylinder is compressed, and buffer spring is gradually tapered up, and the piston rod of simultaneous buffering cylinder is because unexpected stress, piston Position can be moved to the direction away from electromagnet, the air cavity Volume Changes of the piston rod both sides of bounce cylinder cause piston two Pressure change in the air cavity of side, now bounce cylinder compressed away from the air cavity of electromagnet side, the pressure on outlet pipe Power check valve is in out gaseity;When piston is stretched out outside piston by one end of poromerics groove and poromerics groove, buffering The air cavity of piston both sides is connected by poromerics groove, and the gas of both sides slowly realizes pressure by poromerics groove Balance, it is to avoid abrupt pressure change, so that ensure that piston can be moved slowly, and piston directly will not move back, it is living What the air cavity of the plug left and right sides was finally connected together because of poromerics groove, poised state is may eventually reach, so piston meeting Poised state is reached after the moving back and forth of small range, the buffering of erecting by overhang is realized.
The beneficial effects of the utility model are:The utility model is simple and compact for structure, low production cost, can effectively inhale The energy produced by inertia when suspension arrangement brakes is received, prevents suspension arrangement from producing influence to sun wing plate because of inertia motion; Row buffering is entered to suspension arrangement using cushion pad, bounce cylinder, spring triple buffer device, buffering effect is good, and by electricity Magnet adsorption lives the absorption iron block being fixed on suspension arrangement, so that suspension arrangement absorbs suspension by moving back and forth The energy of device, buffering is rapid;Bounce cylinder is passed through poromerics groove when piston is by poromerics groove by the utility model The air cavity of piston both sides is connected, so as to prevent piston direct resilience under the action of the spring, it is to avoid too fast the carrying out of gas Transfer, so that buffering effect is better.
Brief description of the drawings
Fig. 1 is a kind of original state of the brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang of the utility model Schematic diagram.
Fig. 2 is a kind of working condition of the brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang of the utility model Schematic diagram.
In figure, 1- bounce cylinders, 2- electromagnet, 3- cushion pads, 4- buffer springs, 5- admission lines, 6- choke valves, 7- go out Feed channel, 8- one-way pressure valves, 9- poromerics grooves.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Fig. 1~2, a kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang, for setting up On rectilinear orbit and the erecting by overhang that can be moved along a straight line along rectilinear orbit carries out brake buffering, installed on erecting by overhang There are absorption iron block, including bounce cylinder 1, cylinder fixed seat, electromagnet 2, cushion pad 3 and buffer spring 4, the bounce cylinder 1 It is fixed in cylinder fixed seat, cylinder fixed seat is fixed on rectilinear orbit, the end of the piston rod of bounce cylinder 1 is fixed with electricity Magnet 2, is also set with cushion pad 3 and buffer spring 4, the position of the electromagnet 2 and the suction on the piston rod of bounce cylinder 1 The position of attached iron block is corresponding, and electromagnet 2 is in contact with absorption iron block when erecting by overhang moves to normal danger;The buffering gas Cylinder 1 is provided with air inlet away from one end of electromagnet 2, and the air inlet connects admission line 5, is set on the admission line 5 There is choke valve 6, an outlet pipe 7 is additionally provided with the admission line 5, the outlet pipe 7 is provided with one-way pressure regulating valve 8; The inner wall of cylinder of the bounce cylinder is radially provided with poromerics groove 9 along inner wall of cylinder, and the poromerics groove 9 is by micropore material Material is made, and poromerics groove 9 is arranged on the middle part of bounce cylinder 1.
The poromerics groove 9 is provided with along circumferentially uniform a plurality of of inner wall of cylinder, and the length of the poromerics groove 9 is cylinder The 1/3~2/3 of cylinder inwall overall length.
Above-described embodiment is preferred embodiment of the present utility model, is not the limit to technical solutions of the utility model System, as long as the technical scheme that can be realized on the basis of above-described embodiment without creative work, is regarded as falling into In the rights protection scope of the utility model patent.

Claims (1)

1. it is a kind of to sun wing plate erecting by overhang carry out brake buffering brake cylinder, it is characterised in that:For straight to being erected at On trajectory and the erecting by overhang that can be moved along a straight line along rectilinear orbit carries out brake buffering, suction is installed on erecting by overhang Attached iron block, including bounce cylinder (1), cylinder fixed seat, electromagnet (2), cushion pad (3) and buffer spring (4), the buffering gas Cylinder (1) is fixed in cylinder fixed seat, and cylinder fixed seat is fixed on rectilinear orbit, the end of the piston rod of bounce cylinder (1) Electromagnet (2) is fixed with, cushion pad (3) and buffer spring (4), the electromagnetism are also set with the piston rod of bounce cylinder (1) The position of iron (2) is corresponding with the position of the absorption iron block, electromagnet (2) and absorption when erecting by overhang moves to normal danger Iron block is in contact;The bounce cylinder (1) is provided with air inlet away from one end of electromagnet (2), and the air inlet connects air inlet Pipeline (5), is provided with choke valve (6) on the admission line (5), an outlet pipe is additionally provided with the admission line (5) (7), the outlet pipe (7) is provided with one-way pressure regulating valve (8);The inner wall of cylinder of the bounce cylinder (1) is along inner wall of cylinder Poromerics groove (9) is radially provided with, the poromerics groove (9) is made up of poromerics, and poromerics groove (9) is arranged on buffering The middle part of cylinder (1);
The poromerics groove (9) is provided with along circumferentially uniform a plurality of of inner wall of cylinder;
The length of the poromerics groove (9) is the 1/3~2/3 of inner wall of cylinder overall length.
CN201620878153.0U 2016-08-12 2016-08-12 A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang Withdrawn - After Issue CN206309847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620878153.0U CN206309847U (en) 2016-08-12 2016-08-12 A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620878153.0U CN206309847U (en) 2016-08-12 2016-08-12 A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang

Publications (1)

Publication Number Publication Date
CN206309847U true CN206309847U (en) 2017-07-07

Family

ID=59242189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620878153.0U Withdrawn - After Issue CN206309847U (en) 2016-08-12 2016-08-12 A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang

Country Status (1)

Country Link
CN (1) CN206309847U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184766A (en) * 2019-06-05 2019-08-30 厦门语瑶贸易有限公司 A kind of textile yarn support drawing drying unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110184766A (en) * 2019-06-05 2019-08-30 厦门语瑶贸易有限公司 A kind of textile yarn support drawing drying unit

Similar Documents

Publication Publication Date Title
CN103587728B (en) Netting formula space debris is arrested and scavenge system
CN104627390B (en) A kind of mars exploration Landing Buffer device
CN103407586B (en) Electromagnetic butt joint system
CN101858403B (en) Six-shaft vibration and shock isolation platform for moving carrier carrying equipment
CN106438824B (en) A kind of brake cylinder being exclusively used in sun wing plate erecting by overhang
CN206036109U (en) Cylinder is used to annular circumference breathable type solar wing board cable suspension device brake buffering
CN206309847U (en) A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang
CN103587730A (en) Two-stage launching and unfolding method of spatial flying net
CN206036111U (en) Solar wing board cable suspension device's brake cylinder is exclusively used in
CN206111928U (en) Device for brake buffering with purpose -built cylinder is to solar wing board cable suspension device
CN206092800U (en) Solar wing board air supporting cable suspension device's brake buffer device
CN106151362A (en) A kind of annular, peripheral ventilation type sun wing plate erecting by overhang brake buffering cylinder
CN106122356B (en) A kind of bounce cylinder for sun wing plate erecting by overhang with multistep buffering effect
CN206036108U (en) A brake buffer device for solar wing board cable suspension device
CN206036112U (en) A brake bounce cylinder for solar wing board cable suspension device
CN106122354B (en) A kind of brake cylinder that brake buffering is carried out to sun wing plate erecting by overhang
CN106122363B (en) A kind of brake buffer unit of sun wing plate air supporting erecting by overhang
CN206031815U (en) Solar wing board cable suspension device's brake buffer device
CN206036110U (en) A bounce cylinder for solar wing board cable suspension device has a multistep buffering effect
CN106151360B (en) A kind of sun wing plate erecting by overhang brake gear with brake pooling feature
CN106114904B (en) A kind of brake buffer unit of sun wing plate erecting by overhang
CN106122355B (en) A kind of brake bounce cylinder for sun wing plate erecting by overhang
CN106286690B (en) A kind of bounce cylinder for being exclusively used in sun wing plate erecting by overhang
CN211442797U (en) Unmanned aerial vehicle for power network line inspection
CN106151361A (en) Utilize special cylinder that sun wing plate erecting by overhang carries out the device of brake buffering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170707

Effective date of abandoning: 20180105

AV01 Patent right actively abandoned

Granted publication date: 20170707

Effective date of abandoning: 20180105