CN206298948U - A kind of hydraulic(-ash) sluicing device - Google Patents
A kind of hydraulic(-ash) sluicing device Download PDFInfo
- Publication number
- CN206298948U CN206298948U CN201621390173.XU CN201621390173U CN206298948U CN 206298948 U CN206298948 U CN 206298948U CN 201621390173 U CN201621390173 U CN 201621390173U CN 206298948 U CN206298948 U CN 206298948U
- Authority
- CN
- China
- Prior art keywords
- ash
- collection
- ashpit
- hydraulic
- collection ashpit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
A kind of hydraulic(-ash) sluicing device, including water pump, slush pump, collection ashpit and removing ash pipeline, wherein, the collection ashpit is arranged at the bottom of fiber bag precipitator, collection ashpit water inlet and collection ashpit delivery port are provided with the collection ashpit, the delivery port of the water pump is connected with collection ashpit water inlet conduit, the collection ashpit delivery port is connected with the water inlet conduit of slush pump, the removing ash pipeline is obliquely installed and is connected with the delivery port of slush pump positioned at one end of eminence, and the other end is extended in the accident trench for centralized collection ore pulp.The hydraulic(-ash) sluicing apparatus structure is simple, can avoid reentrainment of dust during ash discharge, save human cost, met ecological requirements.
Description
Technical field
The utility model is related to smelting equipment technical field, specifically provides a kind of hydraulic(-ash) sluicing device.
Background technology
Now, horse selects the crushing-ore system deduster in workshop to carry out dedusting using pulse bag formula deduster mostly, and collection is removed
Dirt ash is transported to horse and is selected workshop main building using loading machine, is poured under pallet again in manually hydrodynamic cleaning to accident trench,
After ore dressing tailings reservoir for piling is delivered to by Sending tailings.Dedusting ash can produce secondary pollution in transporting, toppling over, influence
Surrounding enviroment, in addition, dedusting ash transport, the high cost toppled over, labor strength are big.
Therefore, secondary pollution of the dedusting ash in transport and toppling process how is avoided, while reducing what is transported and topple over
Human cost, as people's problem demanding prompt solution.
Utility model content
In consideration of it, the purpose of this utility model is to provide a kind of hydraulic(-ash) sluicing device, at least to solve dedusting ash in fortune
The problems such as human cost for can produce secondary pollution in defeated and toppling process, transporting and toppling over is high.
The utility model provide technical scheme be:A kind of hydraulic(-ash) sluicing device, including water pump, slush pump, collection ashpit and
Removing ash pipeline, wherein, the collection ashpit is arranged at the bottom of fiber bag precipitator, and collection ashpit water inlet is provided with the collection ashpit
Mouth and collection ashpit delivery port, the delivery port of the water pump are connected with collection ashpit water inlet conduit, collection ashpit delivery port and the mud
The water inlet conduit connection of stock pump, the removing ash pipeline is obliquely installed and the delivery port positioned at one end of eminence and slush pump connects
Connect, the other end is extended in the accident trench for centralized collection ore pulp.
It is preferred that, the removing ash pipeline is insulating tube.
Further preferably, the outside of the removing ash pipeline is surrounded with steamtraced piping.
Further preferably, the hydraulic(-ash) sluicing device also include the controller of the control water pump and slush pump start and stop and with
The timer of the controller connection, the signal that the controller is used to be sent according to the timer controls water pump and mud
The start and stop of pump.
Further preferably, the collection ashpit water inlet is located at the top of the collection ashpit, and the collection ashpit delivery port is located at
The bottom of the collection ashpit.
Further preferably, the bottom surface for integrating ashpit is inclined-plane, and the inclined-plane is inclined to the collection ashpit delivery port direction.
Further preferably, described hydraulic(-ash) sluicing device also includes the Chi Gai coordinated with the collection ashpit, and the pond covers
It is provided with through hole corresponding with the ash bucket of fiber bag precipitator.
The hydraulic(-ash) sluicing device that the utility model is provided, collection ashpit is arranged at the lower section of fiber bag precipitator, and the inside is pre-
A certain amount of water is first stored, the dedusting ash that sack cleaner is collected is discharged in the water in collection ashpit by ash bucket and forms ore pulp, removed
Grey process is as follows:Water pump and slush pump are opened, ash flushing water enters collection ashpit through water pump, and in the presence of slush pump, by ore pulp
Accident trench is discharged to through removing ash pipeline, wherein, the removing ash pipeline being obliquely installed avoids dedusting ash and is precipitated in removing ash pipeline, makes
Ore pulp can smoothly reach accident trench.
The utility model provide hydraulic(-ash) sluicing device is reasonable in design, simple structure, can avoid during ash discharge two
Secondary airborne dust, saved transport and topple over the human cost of dedusting ash, meet ecological requirements.
Brief description of the drawings
Below in conjunction with the accompanying drawings and implementation method is described in further detail to the utility model:
Fig. 1 is the structural representation of hydraulic(-ash) sluicing device.
Specific embodiment
The utility model is further explained below in conjunction with specific embodiment, but does not limit to this practicality
It is new.
As shown in figure 1, the utility model provides a kind of hydraulic(-ash) sluicing device, including water pump 1, slush pump 2, collection ashpit 3
With removing ash pipeline 4, wherein, the collection ashpit 3 is arranged at the bottom of fiber bag precipitator, and collection ash is provided with the collection ashpit 3
Pond water inlet 31 and collection ashpit delivery port 32, the delivery port of the water pump 1 are connected with the pipeline of collection ashpit water inlet 31, the collection ash
Pond delivery port 32 is connected with the water inlet conduit of slush pump 2, and the removing ash pipeline 4 is obliquely installed and positioned at one end of eminence and mud
The delivery port connection of stock pump 2, the other end is extended in the accident trench for centralized collection ore pulp.
The hydraulic(-ash) sluicing device, collection ashpit is arranged at the lower section of fiber bag precipitator, and the inside prestores a certain amount of
Water, the dedusting ash that sack cleaner is collected is discharged in the water in collection ashpit by ash bucket and forms ore pulp, and ash disposal process is as follows:Open
Water pump and slush pump, ash flushing water enter collection ashpit through water pump, and in the presence of slush pump, ore pulp are discharged into thing through removing ash pipeline
Old place ditch, wherein, the removing ash pipeline being obliquely installed can avoid dedusting ash from being precipitated in removing ash pipeline, ore pulp is smoothly arrived
Up to accident trench.
In order to prevent the ore pulp in removing ash pipeline from freezing in winter, used as the improvement of technical scheme, removing ash pipeline has to be protected
Temperature function, specific implementation at least includes the following two kinds:
1st, the removing ash pipeline 4 is insulating tube.
2nd, the outside of the removing ash pipeline 4 is surrounded with steamtraced piping.
In order to realize automatically controlling the duration of each ash discharge, as the improvement of technical scheme, described hydraulic(-ash) sluicing device
Also including the timer for controlling the controller of the water pump 1 and the start and stop of slush pump 2 and be connected with the controller, the controller
The start and stop of signal control water pump 1 and slush pump 2 for being sent according to the timer, in addition, passing through controller and timing
Device can also set the interval of ash discharge.
Used as the improvement of technical scheme, the collection ashpit water inlet 31 is located at the top of the collection ashpit 3, the collection ashpit
Delivery port 32 is located at the bottom of the collection ashpit 3.
For the ease of dedusting ash discharge collection ashpit, used as the improvement of technical scheme, the bottom surface for integrating ashpit 3 is inclined-plane,
The inclined-plane is inclined to the direction of collection ashpit delivery port 32.
Used as the improvement of technical scheme, described hydraulic(-ash) sluicing device also includes the Chi Gai coordinated with the collection ashpit 3, institute
State pond and cover and be provided with through hole corresponding with the ash bucket of fiber bag precipitator.
Specific embodiment of the present utility model is write according to progressive mode, highlights each embodiment party
The difference of case, its similar portion can be with cross-reference.
Implementation method of the present utility model is elaborated above in conjunction with accompanying drawing, but the utility model is not limited to
Above-mentioned implementation method, in the ken that those of ordinary skill in the art possess, can also not depart from the utility model
Various changes can be made on the premise of objective.
Claims (7)
1. a kind of hydraulic(-ash) sluicing device, it is characterised in that including water pump (1), slush pump (2), collection ashpit (3) and removing ash pipeline
(4), wherein, collection ashpit (3) is arranged at the bottom of fiber bag precipitator, collection ashpit is provided with the collection ashpit (3) and is entered
The mouth of a river (31) and collection ashpit delivery port (32), the delivery port of the water pump (1) are connected with collection ashpit water inlet (31) pipeline, described
Collection ashpit delivery port (32) is connected with the water inlet conduit of slush pump (2), and the removing ash pipeline (4) is obliquely installed and positioned at eminence
One end be connected with the delivery port of slush pump (2), the other end is extended in the accident trench for centralized collection ore pulp.
2. according to the hydraulic(-ash) sluicing device described in claim 1, it is characterised in that:The removing ash pipeline (4) is insulating tube.
3. according to the hydraulic(-ash) sluicing device described in claim 1, it is characterised in that:The external rings winding of the removing ash pipeline (4)
It is equipped with steamtraced piping.
4. according to the hydraulic(-ash) sluicing device described in claim 1, it is characterised in that:Also include the control water pump (1) and mud
The controller of pump (2) start and stop and the timer being connected with the controller, the controller are used to be sent according to the timer
The signal for coming controls the start and stop of water pump (1) and slush pump (2).
5. according to the hydraulic(-ash) sluicing device described in claim 1, it is characterised in that:Collection ashpit water inlet (31) is positioned at described
The top of collection ashpit (3), the collection ashpit delivery port (32) is positioned at the bottom of collection ashpit (3).
6. according to the hydraulic(-ash) sluicing device described in claim 1, it is characterised in that:The bottom surface for integrating ashpit (3) is inclined-plane, institute
Inclined-plane is stated to be inclined to described collection ashpit delivery port (32) direction.
7. according to the hydraulic(-ash) sluicing device any one of claim 1 to 6, it is characterised in that:Also include and the collection ash
The Chi Gai that pond (3) coordinates, the pond covers and is provided with through hole corresponding with the ash bucket of fiber bag precipitator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621390173.XU CN206298948U (en) | 2016-12-16 | 2016-12-16 | A kind of hydraulic(-ash) sluicing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621390173.XU CN206298948U (en) | 2016-12-16 | 2016-12-16 | A kind of hydraulic(-ash) sluicing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206298948U true CN206298948U (en) | 2017-07-04 |
Family
ID=59214389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621390173.XU Expired - Fee Related CN206298948U (en) | 2016-12-16 | 2016-12-16 | A kind of hydraulic(-ash) sluicing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206298948U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111346454A (en) * | 2020-03-30 | 2020-06-30 | 中蓝长化工程科技有限公司 | Dust discharging device of bag-type dust collector |
-
2016
- 2016-12-16 CN CN201621390173.XU patent/CN206298948U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111346454A (en) * | 2020-03-30 | 2020-06-30 | 中蓝长化工程科技有限公司 | Dust discharging device of bag-type dust collector |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107261587A (en) | A kind of filter screen automatically cleaning dregs filter | |
CN106014301B (en) | A kind of bored concrete pile removing slag from pile bottom equipment and the clinker removal method using the equipment | |
CN203494265U (en) | Solid and liquid separation device of construction waste collecting system | |
CN206298948U (en) | A kind of hydraulic(-ash) sluicing device | |
CN108643963A (en) | For the pressure relief device of underground filling plugging, method and back-filling system | |
CN209011838U (en) | TBM vacuum slag-tapping system | |
CN204266957U (en) | A kind of filter net type Slarry cycling appts | |
CN102287003B (en) | Dam concrete cabin surface water accumulation hidden pipe discharge method | |
CN205965256U (en) | Clout treatment facility of superelevation layer concrete pumping system | |
CN104963383B (en) | A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device | |
CN107362610A (en) | A kind of shield machine mud filter residue system | |
CN208594964U (en) | Pressure relief device and back-filling system for underground filling plugging | |
CN208493498U (en) | Device for separating mud and water | |
CN206128648U (en) | High -rise concrete pump pipe tails is retrieved and system of recycling | |
CN207130780U (en) | A kind of inspection shaft | |
CN208023525U (en) | A kind of drawing water structure of hydraulic and hydroelectric engineering | |
CN202671279U (en) | Cyclic utilization system for ash water of coal fired boiler | |
CN205777547U (en) | Appts. for transferring ready-mixed concrete | |
CN107284609B (en) | Shield residue soil mud pumping shipping system and method | |
CN207499329U (en) | Skyscraper can have enough to meet the need assembled garbage retrieving system | |
CN206203426U (en) | Blast Furnace Dust Removal Ash Conveying Device | |
CN214366190U (en) | Mine underground sludge discharge system | |
CN108379929A (en) | Concrete pump pipe cleans waste water and dregs orientation drainage hierarchical processing method | |
CN210507709U (en) | Concrete foundation surface's belt cleaning device | |
CN220839722U (en) | Sand blasting recovery device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170704 Termination date: 20171216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |