- CN206128648U CN206128648U CN201621017667.3U CN201621017667U CN206128648U CN 206128648 U CN206128648 U CN 206128648U CN 201621017667 U CN201621017667 U CN 201621017667U CN 206128648 U CN206128648 U CN 206128648U
- Authority
- CN
- China
- Prior art keywords
- pipe
- concrete pump
- pump pipe
- platform
- sedimentation tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a high -rise concrete pump pipe tails is retrieved and system of recycling, is including arranging material pipeline and collecting pit, row expect that the pipeline is become by the multisection material nest of tubes, the height of every section material pipe is the same with the floor height and adopt the pipe mounting to fix at corresponding floor, through the speed reduction corner joint between adjacent each section material is managed, the collecting pit includes removal of materials pond, sedimentation tank and sump pit, is provided with to subtract in the one side in removal of materials pond and dashes the platform, subtracts the inclined plane, the bottom surface that dash the platform and all is provided with the rubber pad, be equipped with the filter screen in the bottom in removal of materials pond, the removal of materials pond is through delivery port on its pool wall I and sedimentation tank intercommunication, and the sedimentation tank is through the II run -on ditches of delivery port on its pool wall and through the top intercommunication of escape canal with the sump pit, the method that is used for high -rise concrete pump pipe tails to retrieve and recycle this system is: aim at the feeding tube entrance on concrete placement layer with the pump line, tails in just can direct displacement pump pipe and wash the water of pump line, easy operation, convenience, efficient, green.
Description
Technical field
This utility model is related to technical field of building construction, and particularly a kind of high-rise concrete pump pipe tailing is reclaimed and sharp again
Use system.
Background technology
In high-rise, Super High concrete structure construction, after concrete has been poured, the discharge of pump line tailing generally has following
Two methods:
First, by the tailing in pump line under elevator or outrigger row:This method causes a large amount of wastes of material, while
Body structure surface or outrigger safety net are polluted, construction environment unrest is made, civilized construction image is poor;
2nd, using suspension bucket reclaiming:The method is before concreting and first hopper to be hung in pre-determined bit after finishing
Put, concreting after finishing is discharged into the tailing in pump line in hopper, and hopper is hung predetermined ground finally by tower crane
Side;The method does not cause body structure surface pollution, environment filthy because of discharge material in can ensureing concreting process, lead to
Cross rational method also salvage material can be utilized, but not can determine that tailing can be received by the several hoppers of needs in operation
Collection, operating process trouble, and it is irregular, efficiency is low.
Application for a patent for invention of the patent publication No. for CN105155650A, discloses a kind of concrete pump pipe cleaning Water Sproading
Using system, mainly for the recycling of pump line rinse water, the patent application concrete pump pipe rinse water recycling system
In, for the pump line rinse water for reaching sedimentation tank only has precipitation, it is impossible to by filtration of material, isolate, it is impossible to by concrete
Middle raw material is recycled in time, causes concrete material to waste, secondly, no material deceleration device and impact-reducing device,
During discharge material, impulsive force is big, certain impact can be caused to substructure, corresponding construction is caused damage, therefore, the invention
Patent application technology is not applied to for the recovery for having poured pump line tailing after concrete.
The content of the invention
The purpose of this utility model is to provide a kind of high-rise concrete pump pipe tailing and reclaims and reutilization system, the system energy
Concrete pump pipe tailing and the Water Sproading for rinsing concrete pump pipe are recycled, and meet environmental protection theory, it is existing to solve
With the presence of the problems referred to above of technology.
The technical scheme for solving the above problems is:A kind of high-rise concrete pump pipe tailing is reclaimed and reutilization system, including
Drainage line and collecting pit, it is characterised in that:Described drainage line is made up of n material-saving pipes, the height and building of each material-saving pipe
Layer height is identical and is fixed using pipe fixture in corresponding floor, is connected by deceleration elbow between adjacent each material-saving pipe
Connect;The collecting pit includes material recovery pond, sedimentation tank and catch pit, is provided with to subtract in the side in material recovery pond and rushes platform, should
Subtract the outlet for platform being rushed just to orlop expects pipe, subtract and rush the inclined-plane of platform, bottom surface and be provided with rubber blanket;In the bottom in material recovery pond
Drainage screen is provided with, described material recovery pond is connected with sedimentation tank by its pool wall upper water-out mouth I, sedimentation tank is by its pool wall
The connection of outlet II gutter connected with the top of catch pit by gutter;The span of above-mentioned n is:N be 10~
Arbitrary integer between 100.
The high-rise concrete pump pipe tailing is reclaimed and the further technical characteristic of reutilization system is:
The twice of a diameter of concrete pump pipe diameter of described expects pipe and deceleration elbow.
Described pipe fixture is cone shape frame structure, including two halves formula cone type frame, fixed mount and stop,
There is fastening bolt at the upper and lower semicircular ring of pipe fixture, in the assembled condition, two halves formula cone type frame top annulus is entangled
Deceleration elbow, bottom annulus entangle expects pipe, are tightened by bolt, so as to two halves formula cone type frame is closed up into circular cone build
Frame, and expects pipe and deceleration elbow are connected, then expects pipe and deceleration elbow are fixed on floor by fixed mount and stop.
There is discharge groove the rubber blanket top that rushes platform inclined-plane is subtracted, discharge groove depth is 80~120mm, width and expects pipe diameter
It is identical.
Described catch pit locates below ground level, equal with ground at the top of which, is provided with and uses armored concrete at the top of catch pit
Made by catch pit cover plate, the catch pit cover plate is reserved with clean-up port, cleaning velar plate is provided with clean-up port。
Due to adopting above-mentioned technical proposal, the again a kind of high-rise concrete pump pipe tailing green reclaim of this utility model and profit
With system compared with prior art, have the advantages that:
1. by concrete pump pipe tailing and the Water Sproading recycling of concrete pump pipe can be rinsed, meet environmental protection reason
Read:
This utility model system includes the material recovery pond that the expects pipe being vertically arranged and level be sequentially connected, sedimentation tank, collection
Puddle and water utilization apparatus, subtract the side for rushing that platform is located in material recovery pond, and the bottom just to expects pipe;From mixing that pump line is discharged
Solidifying soil tailing is filtered and water is separated with other materials through expects pipe, along subtracting to rush platform and fall into material recovery pond, Jing, material recovery pond
Interior water enters sedimentation tank, catch pit is flowed into after precipitation in sedimentation tank, and last water utilization apparatus are by water pump from catch pit
In pull water out utilization;Other materials after separation reclaims reprocessing of advancing, for non bearing structure or temporary facility;Collect
Water is used to rinse construction road and vehicles passing in and out;
In sum, this utility model system not only solves the irregular discharge of concrete tailing and its exhaust emission building body
Problem, and the deficiency in terms of solving pump concrete MAT'L recycling and commerical ready-mixed concrete material are a large amount of in construction
The problem of waste, reaches the purpose of green reclaim recycling, while improve the standardization civilized construction level in building site.
2. reclaim concrete tailing and rinse concrete pump pipe water method is simple, convenient, efficiency high:
Using this utility model recovery system, when concrete tailing is discharged, only concrete pump pipe need to be directed at concrete
The expects pipe mouth of LIFT, you can disposably tailing is racked up, until under the water for rinsing concrete pump pipe is all arranged from pipeline,
Without the need for other equipment, without worry material spill and leakage or pollution building body, simple, convenient, efficiency high.
3. system is safe and reliable, long service life:
In this utility model system, take it is various slow down material falling down speed and reduce impact of the falling material to structure
Measure, first, the drainage line in system is made up of more piece expects pipe, and the height of each section is identical with story height, adjacent segments
Connected by elbow, slow down material falling down speed by elbow;Secondly, it is provided with to subtract and rushes platform, material is returned with reducing tailing
The impact of receives pond, the 3rd, subtract and rush the inclined-plane of platform 7, bottom surface and be provided with rubber blanket, to reduce impact of the falling material to structure,
And arcuate groove has been made, make the regular whereabouts of material;4th, drainage line diameter is about two times larger than Diameter of pump tube, it is ensured that its
Discharge is unobstructed;Due to the collective effect of these protective measures, make that system operation is safe and reliable, long service life |.
4. can comprehensively utilize, reduce construction cost:
After the completion of building body concrete structure construction, the system of this utility model can be used to discharge floor building waste, subtract
Lack the workload of labor cleaning's floor building waste, saved labour force, reduce construction cost.
Below, in conjunction with the accompanying drawings and embodiments a kind of high-rise concrete pump pipe tailing of this utility model is reclaimed and is recycled
The technical characteristic of system is further described.
Description of the drawings
Fig. 1 is the high level concrete pump pipe tailing recovery of this utility model and the overall structure diagram of reutilization system;
Fig. 2 is pipeline fixer structural representation;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is to subtract to rush platform structural representation(Rubber blanket is installed);
Fig. 5 is the right view of Fig. 4.
In figure:
1- expects pipes, 2- deceleration elbows, 3- pipe fixtures, 31- two halves formula cone type frame, 32- fixed mounts, 33- stops,
34- bolts;4- floors or building body other structures, 5- ground, 6- material recovery pond, 7- subtract and rush platform, 8- sedimentation tanks,
9- gutters, 10- catch pit cover plates, 101- clean-up ports, 11- cleaning velar plates, 12- rubber blankets, 1201- discharges
Groove,
13- drainage screens;1401- outlets I, 1402- outlets II, 15- catch pits, 16- water utilization apparatus.
Specific embodiment
A kind of high-rise concrete pump pipe tailing is reclaimed and reutilization system.
As shown in figure 1, high-rise concrete pump pipe tailing recovery and reutilization system include the drainage line vertically set up
With horizontally disposed collecting pit, described drainage line is made up of n material-savings pipe 1, height and the story height phase of each material-saving pipe
It is fixed together and using pipe fixture 3 in corresponding floor, is connected by deceleration elbow 2 between adjacent each material-saving pipe;It is described
Collecting pit includes material recovery pond 6, sedimentation tank 8 and catch pit 15, is provided with to subtract in the side in material recovery pond 6 and rushes platform 7, and this subtracts
Rush the longitudinal section of platform 7 for triangular form clinohedral, subtract and rush the inclined-plane of platform 7, bottom surface and be provided with rubber blanket 12(Referring to Fig. 4-figure
5), outlet of its inclined-plane just to orlop expects pipe 1 be provided with drainage screen 13, described material recovery in the bottom in material recovery pond 6
Pond 6 is connected with sedimentation tank 8 by its pool wall upper water-out mouth I 1401, and sedimentation tank 8 is connected by the outlet II 1402 on its pool wall
Gutter 9 is simultaneously connected with the top of catch pit 15 by gutter 9;The value of joint number n of expects pipe 1 is identical with the number of plies of high level,
Typically, the span of n is:N is the arbitrary integer between 10~100.
The effect of above-mentioned each part is:
The expects pipe 1 is made using the screwed coating steel pipe in end, and internal diameter is not preferably less than 300mm, for emptying pump
Floor detritus rubbiss after the completion of the water or concrete works of the tailing and flushing concrete pump pipe of pipe;
Connecting bend of the deceleration elbow 2 for upper and lower two expects pipes of connection, which is less than 45 with expects pipe vertical direction angulation
Degree, arranges the deceleration elbow 2 in pipeline junction, its effect be slow down discharge material after the speed that falls and connection expects pipe;
The twice of a diameter of concrete pump pipe diameter of described expects pipe 1 and deceleration elbow 2, it is unobstructed to ensure its discharge.
As shown in Figure 2 and Figure 3, described pipe fixture 3 is a cone shape frame structure, including two halves formula cone
Type frame 31, fixed mount 32 and stop 33, have fastening bolt at the upper and lower semicircular ring of pipe fixture, by two halves formula cone
31 top annulus of type frame entangles deceleration elbow 2, bottom annulus and entangles expects pipe, is tightened by bolt 34, so as to by two halves formula circular cone
Build frame 31 closes up into cone type frame, and expects pipe and deceleration elbow are connected, then (general by fixed mount 32 and stop 33
Stop adopts bolt) expects pipe and deceleration elbow are fixed on the floor, it is ensured that drainage line stable connection;
Material recovery pond 6 is used for concrete tailing of the storage under expects pipe row and rinses the water of concrete pump pipe;
Subtract that to rush platform 7, the effect of rubber blanket 12 be to reduce lower impact of the material to structure of expects pipe row, prevent from causing unfavorable to structure
Affect;
Sedimentation tank 8 is used for the water that deposited material recovery pond flows through, and sedimentation tank is less than material recovery pond 300mm, it is ensured that good
Sedimentation effect;
Water in the discharge of gutter 9 sedimentation tank is to catch pit;
Catch pit cover plate 10 covers catch pit, and reserved clean-up port 101 is convenient to clean, and general catch pit cover plate 10 is mixed for reinforcing bar
Concrete board;
Utilization is conveniently collected and re-worked to filtration of material net 13 for filtering the sand in tailing, stone;
Outlet I 1401 is the outlet in material recovery pond, and outlet II 1402 is the outlet of sedimentation tank, outlet II
Less than the outlet I in material recovery pond;
The water that catch pit 15 is used in discharging material of the storage after catch pit is filtered and sedimentation tank is precipitated;
Catch pit water utilization apparatus 16 are generally water pump.
Further, there is a discharge groove 121 subtracting 12 top of rubber blanket that rushes 7 inclined-plane of platform, 121 depth of discharge groove is 80~
120mm, width are identical with 1 diameter of expects pipe, be easy to material it is regular fallen;
Described catch pit 15 is equal with ground 5 below 5, at the top of which positioned at ground, is provided with and uses reinforcing bar at the top of catch pit 15
Catch pit cover plate 10 made by concrete, the catch pit cover plate 10 are reserved with clean-up port 101, and installation at clean-up port is made of steel plate
Cleaning velar plate 11, with tapered end pin, can just open during cleaning.
Described water utilization apparatus 16 extract the water in catch pit 15 by water pump and are circulated utilization.
In this utility model embodiment, each part of the recovery of high-rise concrete pump pipe tailing and reutilization system is constituted(Bag
Include expects pipe 1, deceleration elbow 2, pipe fixture 3, rubber blanket 12, drainage screen 13)It is can commercially to have bought or art technology
Personnel can be made using prior art, material recovery pond, sedimentation tank, gutter, subtract that to rush platform and gutter be also all ability
Field technique personnel can be made using prior art, and here is omitted.
This utility model high level concrete pump pipe tailing is reclaimed and reutilization system is used for high-rise concrete pump pipe tailing
Reclaim and the method for recycling is:Pump line is directed at into the expects pipe mouth of concrete lift, so that it may directly discharge the tailing in pump line
And rinse the water of pump line;Simple, convenient, efficiency high, environmental protection.
Claims (5)
1. a kind of high-rise concrete pump pipe tailing is reclaimed and reutilization system, including drainage line and collecting pit, it is characterised in that:
Described drainage line is by n material-saving pipes(1)Composition, the height of each material-saving pipe is identical with story height and adopts in corresponding floor
Use pipe fixture(3)It is fixed, between adjacent each material-saving pipe, passes through deceleration elbow(2)Connection;The collecting pit includes material
Recovery pond(6), sedimentation tank(8)And catch pit(15), in material recovery pond(6)Side be provided with to subtract and rush platform(7), this subtracts and rushes platform
(7)Just to orlop expects pipe(1)Outlet, subtract and rush platform(7)Inclined-plane, bottom surface be provided with rubber blanket(12);In material recovery
Pond(6)Bottom be provided with drainage screen(13), described material recovery pond(6)By its pool wall upper water-out mouth I(1401)With precipitation
Pond(8)Connection, sedimentation tank(8)By the outlet II on its pool wall(1402)Connection gutter(9)And by gutter and collection
Puddle(15)Top connection;The span of above-mentioned n is:N is the arbitrary integer between 10~100.
2. high-rise concrete pump pipe tailing according to claim 1 is reclaimed and reutilization system, it is characterised in that:Described
Expects pipe(1)With deceleration elbow(2)A diameter of concrete pump pipe diameter twice.
3. high-rise concrete pump pipe tailing according to claim 1 is reclaimed and reutilization system, it is characterised in that:Described
Pipe fixture(3)For cone shape frame structure, including two halves formula cone type frame(31), fixed mount(32)And stop
(33), there is fastening bolt at the upper and lower semicircular ring of pipe fixture, in the assembled condition, two halves formula cone type frame(31)On
Portion's annulus entangles deceleration elbow(2), bottom annulus entangle expects pipe, by bolt(34)Tighten, so as to by two halves formula circular cone build
Frame(31)Close up into cone type frame, and expects pipe and deceleration elbow are connected, then by fixed mount(32)And stop(33)Will
Expects pipe and deceleration elbow are fixed on floor.
4. high-rise concrete pump pipe tailing according to claim 1 is reclaimed and reutilization system, it is characterised in that:Subtracting punching
Platform(7)The rubber blanket on inclined-plane(12)Discharge groove is arranged at top(121), discharge groove depth is 80~120mm, width and expects pipe(1)Directly
Footpath is identical.
5. high-rise concrete pump pipe tailing according to claim 1 is reclaimed and reutilization system, it is characterised in that:Described
Catch pit(15)Positioned at ground(5)Below, it is equal with ground at the top of which, catch pit(15)Top is provided with is made with armored concrete
Catch pit cover plate(10), the catch pit cover plate(10)It is reserved with clean-up port(101), cleaning velar plate is installed at clean-up port
(11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621017667.3U CN206128648U (en) | 2016-08-31 | 2016-08-31 | High -rise concrete pump pipe tails is retrieved and system of recycling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621017667.3U CN206128648U (en) | 2016-08-31 | 2016-08-31 | High -rise concrete pump pipe tails is retrieved and system of recycling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206128648U true CN206128648U (en) | 2017-04-26 |
Family
ID=58567865
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621017667.3U Withdrawn - After Issue CN206128648U (en) | 2016-08-31 | 2016-08-31 | High -rise concrete pump pipe tails is retrieved and system of recycling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206128648U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193609A (en) * | 2016-08-31 | 2016-12-07 | 广西建工集团第五建筑工程有限责任公司 | High-rise concrete pump pipe tailing recycling and reusing system and method for recycling high-rise concrete pump pipe tailing |
-
2016
- 2016-08-31 CN CN201621017667.3U patent/CN206128648U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193609A (en) * | 2016-08-31 | 2016-12-07 | 广西建工集团第五建筑工程有限责任公司 | High-rise concrete pump pipe tailing recycling and reusing system and method for recycling high-rise concrete pump pipe tailing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106193132B (en) | Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof | |
CN206128648U (en) | High -rise concrete pump pipe tails is retrieved and system of recycling | |
CN106193609B (en) | High-rise concrete pump pipe tailing recycling and reusing system and method for recycling high-rise concrete pump pipe tailing | |
CN102287003B (en) | Dam concrete cabin surface water accumulation hidden pipe discharge method | |
CN107354949B (en) | Cyclic utilization system for the Metro station excavation water resource close to high slope | |
CN207944780U (en) | A kind of green construction enclosure wall that can be recycled | |
CN112814126A (en) | Municipal road-based rainwater collection device and construction method thereof | |
CN206621875U (en) | A kind of sewage-treatment plant | |
CN106869301B (en) | Old residential quarters septic tank cleaning method | |
CN207436237U (en) | A kind of hoisting type device for dragging dregs | |
CN211659476U (en) | Concrete waste water cyclic utilization device | |
CN212956838U (en) | Super high-rise construction floor water interception structure | |
CN207672711U (en) | A kind of equipment recycling clout in drag pump pump line | |
CN215736298U (en) | Multilayer livestock and poultry house blowdown structure | |
CN207959346U (en) | A kind of extracting inverted well applied to contaminated sites groundwater remediation engineering | |
CN216865339U (en) | High-rise pump line sparge water recovery cyclic utilization system | |
CN217041683U (en) | Concrete pump pipe washes waste water treatment system of recycling | |
CN205935168U (en) | A scrubbing purifier for municipal drainage pipe road junction | |
CN206205106U (en) | One kind collection is collected, stored, purifying, transferring integrated early-stage rainwater cleaning system | |
CN215654245U (en) | House building construction waste water recycling device | |
CN212641492U (en) | Foundation pit cement separating box | |
CN215785267U (en) | Environment-friendly concrete placement pump line rinse-system | |
CN210620292U (en) | Concrete mixing plant waste water recovery pond | |
CN209760347U (en) | Concrete spreader washs water treatment facilities | |
CN215291501U (en) | Novel high-rise building waste treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20170426 Effective date of abandoning: 20190405 |
|