CN206292792U - A kind of device that green construction simulation is carried out by BIM - Google Patents

A kind of device that green construction simulation is carried out by BIM Download PDF

Info

Publication number
CN206292792U
CN206292792U CN201621473706.0U CN201621473706U CN206292792U CN 206292792 U CN206292792 U CN 206292792U CN 201621473706 U CN201621473706 U CN 201621473706U CN 206292792 U CN206292792 U CN 206292792U
Authority
CN
China
Prior art keywords
construction
bim
computer
power
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621473706.0U
Other languages
Chinese (zh)
Inventor
孙永庆
张燕
王健健
薛颖
张红霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jining Polytechnic
Original Assignee
Jining Polytechnic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jining Polytechnic filed Critical Jining Polytechnic
Priority to CN201621473706.0U priority Critical patent/CN206292792U/en
Application granted granted Critical
Publication of CN206292792U publication Critical patent/CN206292792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a kind of device that green construction simulation is carried out by BIM, including computer, stand-by power supply and AC power, the computer is connected with cloud server by Internet traffic, the power module is electrically connected with computer, the computer is electrically connected with mobile construction note instrument, the computer includes comparator, central processing unit, arrangement and method for construction data storage storehouse memorizer and BIM model data storehouse memorizers, the power module includes solar energy power generating group, stand-by power supply and AC power, the mobile construction note instrument includes construction digital record module and construction image recording module, the cloud server includes high in the clouds memory and BIM browsers.This carries out the device of green construction simulation by setting up BIM models by BIM, construction plan, data, site environment, scheme etc. are included model, construction simulation is carried out with BIM softwares, live video detection can be carried out to job site, greatly reduce construction quality problem, safety problem.

Description

A kind of device that green construction simulation is carried out by BIM
Technical field
The utility model is related to construction simulation engineering device technique field, and specially one kind carries out green construction simulation by BIM Device.
Background technology
Green construction, as an important stage in building life cycle management, is to realize building field resources conservation and section The key link of energy emission reduction.It is logical on the premise of the basic demands such as quality, safety are ensured during green construction refers to engineering construction Scientific management and technological progress are crossed, the construction activities to environment negative effect are economized on resources and reduce to greatest extent, section is realized , can save land, economize on water, saving material and environmental protection.The expansion applied at home with BIM technology, design by it to architectural engineering, The work such as construction produce far-reaching influence.The various aspects of the model are may include in engineering model by BIM technology drafting Information, thus BIM technology is to solve the efficient of construction overall process data message to collect and share there is provided possible.
In conventional green work progress, various design needs are compared, and comparison procedure is complicated, the relatively time-consuming length of manpower comparing, Accuracy is low;It is extremely difficult to take into account in many ways in conventional green Construction Mode, speed and the accuracy of information transmission turn into problem.
Utility model content
The purpose of this utility model is to provide a kind of device that green construction simulation is carried out by BIM, above-mentioned to solve It is relatively low and be extremely difficult to the problem taken into account in many ways that the traditional construction Model Design proposed in background technology compares accuracy.
To achieve the above object, the utility model provides following technical scheme:One kind carries out green construction simulation by BIM Device, including computer, power module, mobile construction note instrument, cloud server, comparator, central processing unit, construction party Case data storage storehouse memorizer, BIM model datas storehouse memorizer, construction digital record module, construction image recording module, high in the clouds Memory, BIM browsers, solar energy power generating group, stand-by power supply and AC power, the computer lead to cloud server Internet traffic connection is crossed, the power module is electrically connected with computer, the computer is electrical with mobile construction note instrument Connection, the computer includes comparator, central processing unit, arrangement and method for construction data storage storehouse memorizer and BIM model databases Memory, the power module includes solar energy power generating group, stand-by power supply and AC power, the mobile construction note instrument Including construction digital record module and construction image recording module, the cloud server includes that high in the clouds memory and BIM are browsed Device.
Preferably, between the comparator and arrangement and method for construction data storage storehouse memorizer and BIM model data storehouse memorizers It is electrically connected with.
Preferably, it is electrically connected with by LAN between the computer and mobile construction note instrument.
Preferably, it is provided with overshoot protection device between the solar energy power generating group and stand-by power supply.
Preferably, the quantity of the mobile construction note instrument is corresponding with the quantity of project under construction.
Compared with prior art, the beneficial effects of the utility model are:This carries out the device of green construction simulation by BIM By setting up BIM models, construction plan, data, site environment, scheme etc. are included model, applied with BIM softwares Work is simulated, and can carry out live video detection to job site, greatly reduces construction quality problem, and safety problem, reduction is done over again And rectification, and construction information is uploaded in cloud server in real time by computer, respectively can obtain by BIM browsers Proficiency message, is provided with stand-by power supply, prevents power failure suddenly, causes the vital documents such as construction information to damage and loses, and is caused to construction The problem of obstacle.
Brief description of the drawings
Fig. 1 is the utility model structured flowchart schematic diagram;
Fig. 2 is the utility model computer configuation block diagram representation;
Fig. 3 is that the utility model moves construction note instrument structured flowchart schematic diagram;
Fig. 4 is the utility model cloud server structured flowchart schematic diagram;
Fig. 5 is the utility model power module structure block diagram representation.
In figure:1st, computer, 2, power module, 3, mobile construction note instrument, 4, cloud server, 5, comparator, 6, in Central processor, 7, arrangement and method for construction data storage storehouse memorizer, 8, BIM model data storehouse memorizers, 9, construction digital record module, 10th, construct image recording module, 11, high in the clouds memory, 12, BIM browsers, 13, solar energy power generating group, 14, standby electricity Source, 15, AC power.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of technical scheme:It is a kind of that green construction simulation is carried out by BIM Device, including computer 1, power module 2, mobile construction note instrument 3, cloud server 4, comparator 5, central processing unit 6, apply Work scheme data storage storehouse memorizer 7, BIM model datas storehouse memorizer 8, construction digital record module 9, construction drawing picture record mould Block 10, high in the clouds memory 11, BIM browsers 12, solar energy power generating group 13, stand-by power supply 14 and AC power 15, calculate Machine 1 is connected with cloud server 4 by Internet traffic, and power module 2 is electrically connected with computer 1, and computer 1 is applied with movement Work recorder 3 is electrically connected with, and computer 1 includes comparator 5, central processing unit 6, the and of arrangement and method for construction data storage storehouse memorizer 7 BIM model datas storehouse memorizer 8, power module 2 includes solar energy power generating group 13, stand-by power supply 14 and AC power 15, Mobile construction note instrument 3 includes construction digital record module 9 and construction image recording module 10, and cloud server 4 includes high in the clouds Memory 11 and BIM browsers 12.
In above-described embodiment, specifically, comparator 5 and arrangement and method for construction data storage storehouse memorizer 7 and BIM model databases It is electrically connected between memory 8, central processing unit 6 controls comparator 5 to arrangement and method for construction data storage storehouse memorizer in computer 1 Arrangement and method for construction information in 7 and BIM model datas storehouse memorizer 8 is compared judgement, optimal construction process information is obtained, to whole The construction speed of individual engineering, resource and quality are managed collectively and are controlled, and to shorten the duration, reduces cost improves quality, greatly Width improves construction efficiency;
In above-described embodiment, specifically, be electrically connected with by LAN between computer 1 and mobile construction note instrument 3, will Computer 1 is transferred in the current condition of construction of projects, and cloud server 4 is uploaded to by computer 1;
In above-described embodiment, specifically, being provided with overshoot protection dress between solar energy power generating group 13 and stand-by power supply 14 Put, play a part of to prevent from charging to overload;
In above-described embodiment, specifically, the quantity of mobile construction note instrument 3 is corresponding with the quantity of project under construction, it is provided with Multigroup mobile construction note instrument 3, is managed by construction party projects director, and the construction material consumption on the same day and personnel are remembered Record, and film recording is carried out to site operation performance, by local network transport to computer 1, computer 1 again leads to information Cross internet and be uploaded to the memory storage of cloud server 4, be easy to each side to know current condition of construction.
Operation principle:When the device of green construction simulation is carried out by BIM using this, need first to entirely by BIM Carrying out the device of green construction simulation has understanding in a structure, computer 1, power module 2, the mobile and of construction note instrument 3 Cloud server 4 is collectively constituted this and the device of green construction simulation is carried out by BIM.
Further, central processing unit 6 controls comparator 5 to the He of arrangement and method for construction data storage storehouse memorizer 7 in computer 1 Arrangement and method for construction information in BIM model datas storehouse memorizer 8 is compared judgement, optimal construction process information is obtained, to whole The construction speed of engineering, resource and quality are managed collectively and are controlled, and to shorten the duration, reduces cost improves quality, significantly Improve construction efficiency;
Further, multigroup mobile construction note instrument 3 is provided with, is managed by construction party projects director, the same day is applied Work material usage and personnel are recorded, and carry out film recording to site operation performance, by local network transport to meter Information is uploaded to the memory storage of cloud server 4 by calculation machine 1, computer 1 by internet again, is easy to each side to know current Condition of construction;
Further, beyond the clouds in memory 11, construction each side director can for the information Store that cloud server 4 will be uploaded The construction information in high in the clouds memory 11 is transferred by BIM browsers 12 to be browsed, know current condition of construction, obtain Proficiency information, makes each director have the various problems and situation of engineering project at fingertips;
Further, power module 2 includes solar energy power generating group 13, stand-by power supply 14 and AC power 15, exchange Power supply 15 be computer 1 provide 220V voltage, solar energy power generating group 13 to stand-by power supply 14 provide electric energy, and between set There is overshoot protection device, play a part of to prevent to charge and overload, it is standby when supply line's obstacle occurs in job site or power failure Power supply 14 can be powered the very first time to computer 1, prevent computer 1 from powering off suddenly, cause the vital documents such as construction information Damage or lose, obstacle is caused to project under construction.
In sum, general principle of the present utility model, principal character and advantage has been shown and described above.The industry Technical staff it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification only It is to illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model also has Various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model requirement Protection domain is defined by appending claims and its effect thing.

Claims (5)

1. a kind of device that green construction simulation is carried out by BIM, including computer (1), power module (2), mobile construction note Record instrument (3), cloud server (4), comparator (5), central processing unit (6), arrangement and method for construction data storage storehouse memorizer (7), BIM Model data storehouse memorizer (8), construction digital record module (9), construction image recording module (10), high in the clouds memory (11), BIM browsers (12), solar energy power generating group (13), stand-by power supply (14) and AC power (15), it is characterised in that:It is described Computer (1) is connected with cloud server (4) by Internet traffic, and the power module (2) electrically connects with computer (1) Connect, the computer (1) is electrically connected with mobile construction note instrument (3), and the computer (1) includes comparator (5), centre Reason device (6), arrangement and method for construction data storage storehouse memorizer (7) and BIM model datas storehouse memorizer (8), power module (2) bag Solar energy power generating group (13), stand-by power supply (14) and AC power (15) are included, the mobile construction note instrument (3) is including applying Number word logging modle (9) and construction image recording module (10), the cloud server (4) including high in the clouds memory (11) and BIM browsers (12).
2. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:The ratio It is electrically connected with compared between device (5) and arrangement and method for construction data storage storehouse memorizer (7) and BIM model datas storehouse memorizer (8).
3. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:The meter It is electrically connected with by LAN between calculation machine (1) and mobile construction note instrument (3).
4. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:It is described too It is positive overshoot protection device to be provided between photovoltaic generation group (13) and stand-by power supply (14).
5. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:The shifting The quantity of dynamic construction note instrument (3) is corresponding with the quantity of project under construction.
CN201621473706.0U 2016-12-30 2016-12-30 A kind of device that green construction simulation is carried out by BIM Expired - Fee Related CN206292792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621473706.0U CN206292792U (en) 2016-12-30 2016-12-30 A kind of device that green construction simulation is carried out by BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621473706.0U CN206292792U (en) 2016-12-30 2016-12-30 A kind of device that green construction simulation is carried out by BIM

Publications (1)

Publication Number Publication Date
CN206292792U true CN206292792U (en) 2017-06-30

Family

ID=59098451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621473706.0U Expired - Fee Related CN206292792U (en) 2016-12-30 2016-12-30 A kind of device that green construction simulation is carried out by BIM

Country Status (1)

Country Link
CN (1) CN206292792U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107918831A (en) * 2017-11-23 2018-04-17 深圳拎得清软件有限公司 BIM Schedule managements method and its system based on browser
CN109885939A (en) * 2019-02-22 2019-06-14 内蒙古众跃电力有限公司 A kind of photovoltaic plant building method and system based on Building Information Model

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107918831A (en) * 2017-11-23 2018-04-17 深圳拎得清软件有限公司 BIM Schedule managements method and its system based on browser
CN109885939A (en) * 2019-02-22 2019-06-14 内蒙古众跃电力有限公司 A kind of photovoltaic plant building method and system based on Building Information Model

Similar Documents

Publication Publication Date Title
Berral et al. Building green cloud services at low cost
CN112260331B (en) Extra-high voltage alternating current-direct current power grid simulation platform and construction method
KR101298500B1 (en) Micro-Grid Simulation Apparatus and Power Management System
CN205193059U (en) Wireless sensor's network node for water quality monitoring
CN206292792U (en) A kind of device that green construction simulation is carried out by BIM
CN103617318A (en) Method for modeling distribution automation power grid
CN110166533A (en) A kind of method and system quickly accessing integrated control platform
CN105515032A (en) Intelligent micro-grid energy storage control method
CN116307110A (en) Distributed roof photovoltaic power generation aggregation management method and system
Dharshika et al. Green Cloud computing: redefining the future of cloud computing
CN105896613A (en) Microgrid distributed finite time control method based on communication lag
CN106356906A (en) Energy conservation control method and system based on microgrid
CN108629448A (en) A kind of data center's heat abstractor optimal control method and system based on Lyapunov optimizations
CN204719428U (en) Adaptive Fuzzy Control algorithm MPPT controller
CN103236727A (en) Intelligent equipment for controlling sequential charging and discharging of storage battery according to power generation capacity of new energy sources
CN207339719U (en) Build fence photovoltaic generating system
CN109284906A (en) Digitization community intelligent energy-saving managing and control system
CN108711848B (en) The method and device of modular microfluidic grid power Capacity uniformity continuous time control
Zhang et al. Distribution network distributed resources application framework and key technologies based on cloud-edge-device collaboration
CN105760636A (en) Real-time simulation system and method for power generating system
CN106451425B (en) A kind of method for automatic modeling and device of micro-capacitance sensor
CN206421325U (en) A kind of computer hardware power supply circuit
CN206211676U (en) Miniature wind, light, heat complementation energy storage control system
CN204288314U (en) A kind of hand-held job-oriented terminal of electric power with GPS positioning function
CN109656711A (en) A kind of dynamic power supply management method and system based on server cluster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20171230

CF01 Termination of patent right due to non-payment of annual fee