CN206292792U - A kind of device that green construction simulation is carried out by BIM - Google Patents
A kind of device that green construction simulation is carried out by BIM Download PDFInfo
- Publication number
- CN206292792U CN206292792U CN201621473706.0U CN201621473706U CN206292792U CN 206292792 U CN206292792 U CN 206292792U CN 201621473706 U CN201621473706 U CN 201621473706U CN 206292792 U CN206292792 U CN 206292792U
- Authority
- CN
- China
- Prior art keywords
- construction
- bim
- computer
- power
- carried out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a kind of device that green construction simulation is carried out by BIM, including computer, stand-by power supply and AC power, the computer is connected with cloud server by Internet traffic, the power module is electrically connected with computer, the computer is electrically connected with mobile construction note instrument, the computer includes comparator, central processing unit, arrangement and method for construction data storage storehouse memorizer and BIM model data storehouse memorizers, the power module includes solar energy power generating group, stand-by power supply and AC power, the mobile construction note instrument includes construction digital record module and construction image recording module, the cloud server includes high in the clouds memory and BIM browsers.This carries out the device of green construction simulation by setting up BIM models by BIM, construction plan, data, site environment, scheme etc. are included model, construction simulation is carried out with BIM softwares, live video detection can be carried out to job site, greatly reduce construction quality problem, safety problem.
Description
Technical field
The utility model is related to construction simulation engineering device technique field, and specially one kind carries out green construction simulation by BIM
Device.
Background technology
Green construction, as an important stage in building life cycle management, is to realize building field resources conservation and section
The key link of energy emission reduction.It is logical on the premise of the basic demands such as quality, safety are ensured during green construction refers to engineering construction
Scientific management and technological progress are crossed, the construction activities to environment negative effect are economized on resources and reduce to greatest extent, section is realized
, can save land, economize on water, saving material and environmental protection.The expansion applied at home with BIM technology, design by it to architectural engineering,
The work such as construction produce far-reaching influence.The various aspects of the model are may include in engineering model by BIM technology drafting
Information, thus BIM technology is to solve the efficient of construction overall process data message to collect and share there is provided possible.
In conventional green work progress, various design needs are compared, and comparison procedure is complicated, the relatively time-consuming length of manpower comparing,
Accuracy is low;It is extremely difficult to take into account in many ways in conventional green Construction Mode, speed and the accuracy of information transmission turn into problem.
Utility model content
The purpose of this utility model is to provide a kind of device that green construction simulation is carried out by BIM, above-mentioned to solve
It is relatively low and be extremely difficult to the problem taken into account in many ways that the traditional construction Model Design proposed in background technology compares accuracy.
To achieve the above object, the utility model provides following technical scheme:One kind carries out green construction simulation by BIM
Device, including computer, power module, mobile construction note instrument, cloud server, comparator, central processing unit, construction party
Case data storage storehouse memorizer, BIM model datas storehouse memorizer, construction digital record module, construction image recording module, high in the clouds
Memory, BIM browsers, solar energy power generating group, stand-by power supply and AC power, the computer lead to cloud server
Internet traffic connection is crossed, the power module is electrically connected with computer, the computer is electrical with mobile construction note instrument
Connection, the computer includes comparator, central processing unit, arrangement and method for construction data storage storehouse memorizer and BIM model databases
Memory, the power module includes solar energy power generating group, stand-by power supply and AC power, the mobile construction note instrument
Including construction digital record module and construction image recording module, the cloud server includes that high in the clouds memory and BIM are browsed
Device.
Preferably, between the comparator and arrangement and method for construction data storage storehouse memorizer and BIM model data storehouse memorizers
It is electrically connected with.
Preferably, it is electrically connected with by LAN between the computer and mobile construction note instrument.
Preferably, it is provided with overshoot protection device between the solar energy power generating group and stand-by power supply.
Preferably, the quantity of the mobile construction note instrument is corresponding with the quantity of project under construction.
Compared with prior art, the beneficial effects of the utility model are:This carries out the device of green construction simulation by BIM
By setting up BIM models, construction plan, data, site environment, scheme etc. are included model, applied with BIM softwares
Work is simulated, and can carry out live video detection to job site, greatly reduces construction quality problem, and safety problem, reduction is done over again
And rectification, and construction information is uploaded in cloud server in real time by computer, respectively can obtain by BIM browsers
Proficiency message, is provided with stand-by power supply, prevents power failure suddenly, causes the vital documents such as construction information to damage and loses, and is caused to construction
The problem of obstacle.
Brief description of the drawings
Fig. 1 is the utility model structured flowchart schematic diagram;
Fig. 2 is the utility model computer configuation block diagram representation;
Fig. 3 is that the utility model moves construction note instrument structured flowchart schematic diagram;
Fig. 4 is the utility model cloud server structured flowchart schematic diagram;
Fig. 5 is the utility model power module structure block diagram representation.
In figure:1st, computer, 2, power module, 3, mobile construction note instrument, 4, cloud server, 5, comparator, 6, in
Central processor, 7, arrangement and method for construction data storage storehouse memorizer, 8, BIM model data storehouse memorizers, 9, construction digital record module,
10th, construct image recording module, 11, high in the clouds memory, 12, BIM browsers, 13, solar energy power generating group, 14, standby electricity
Source, 15, AC power.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-5 are referred to, the utility model provides a kind of technical scheme:It is a kind of that green construction simulation is carried out by BIM
Device, including computer 1, power module 2, mobile construction note instrument 3, cloud server 4, comparator 5, central processing unit 6, apply
Work scheme data storage storehouse memorizer 7, BIM model datas storehouse memorizer 8, construction digital record module 9, construction drawing picture record mould
Block 10, high in the clouds memory 11, BIM browsers 12, solar energy power generating group 13, stand-by power supply 14 and AC power 15, calculate
Machine 1 is connected with cloud server 4 by Internet traffic, and power module 2 is electrically connected with computer 1, and computer 1 is applied with movement
Work recorder 3 is electrically connected with, and computer 1 includes comparator 5, central processing unit 6, the and of arrangement and method for construction data storage storehouse memorizer 7
BIM model datas storehouse memorizer 8, power module 2 includes solar energy power generating group 13, stand-by power supply 14 and AC power 15,
Mobile construction note instrument 3 includes construction digital record module 9 and construction image recording module 10, and cloud server 4 includes high in the clouds
Memory 11 and BIM browsers 12.
In above-described embodiment, specifically, comparator 5 and arrangement and method for construction data storage storehouse memorizer 7 and BIM model databases
It is electrically connected between memory 8, central processing unit 6 controls comparator 5 to arrangement and method for construction data storage storehouse memorizer in computer 1
Arrangement and method for construction information in 7 and BIM model datas storehouse memorizer 8 is compared judgement, optimal construction process information is obtained, to whole
The construction speed of individual engineering, resource and quality are managed collectively and are controlled, and to shorten the duration, reduces cost improves quality, greatly
Width improves construction efficiency;
In above-described embodiment, specifically, be electrically connected with by LAN between computer 1 and mobile construction note instrument 3, will
Computer 1 is transferred in the current condition of construction of projects, and cloud server 4 is uploaded to by computer 1;
In above-described embodiment, specifically, being provided with overshoot protection dress between solar energy power generating group 13 and stand-by power supply 14
Put, play a part of to prevent from charging to overload;
In above-described embodiment, specifically, the quantity of mobile construction note instrument 3 is corresponding with the quantity of project under construction, it is provided with
Multigroup mobile construction note instrument 3, is managed by construction party projects director, and the construction material consumption on the same day and personnel are remembered
Record, and film recording is carried out to site operation performance, by local network transport to computer 1, computer 1 again leads to information
Cross internet and be uploaded to the memory storage of cloud server 4, be easy to each side to know current condition of construction.
Operation principle:When the device of green construction simulation is carried out by BIM using this, need first to entirely by BIM
Carrying out the device of green construction simulation has understanding in a structure, computer 1, power module 2, the mobile and of construction note instrument 3
Cloud server 4 is collectively constituted this and the device of green construction simulation is carried out by BIM.
Further, central processing unit 6 controls comparator 5 to the He of arrangement and method for construction data storage storehouse memorizer 7 in computer 1
Arrangement and method for construction information in BIM model datas storehouse memorizer 8 is compared judgement, optimal construction process information is obtained, to whole
The construction speed of engineering, resource and quality are managed collectively and are controlled, and to shorten the duration, reduces cost improves quality, significantly
Improve construction efficiency;
Further, multigroup mobile construction note instrument 3 is provided with, is managed by construction party projects director, the same day is applied
Work material usage and personnel are recorded, and carry out film recording to site operation performance, by local network transport to meter
Information is uploaded to the memory storage of cloud server 4 by calculation machine 1, computer 1 by internet again, is easy to each side to know current
Condition of construction;
Further, beyond the clouds in memory 11, construction each side director can for the information Store that cloud server 4 will be uploaded
The construction information in high in the clouds memory 11 is transferred by BIM browsers 12 to be browsed, know current condition of construction, obtain
Proficiency information, makes each director have the various problems and situation of engineering project at fingertips;
Further, power module 2 includes solar energy power generating group 13, stand-by power supply 14 and AC power 15, exchange
Power supply 15 be computer 1 provide 220V voltage, solar energy power generating group 13 to stand-by power supply 14 provide electric energy, and between set
There is overshoot protection device, play a part of to prevent to charge and overload, it is standby when supply line's obstacle occurs in job site or power failure
Power supply 14 can be powered the very first time to computer 1, prevent computer 1 from powering off suddenly, cause the vital documents such as construction information
Damage or lose, obstacle is caused to project under construction.
In sum, general principle of the present utility model, principal character and advantage has been shown and described above.The industry
Technical staff it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification only
It is to illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model also has
Various changes and modifications, these changes and improvements are both fallen within the range of claimed the utility model.The utility model requirement
Protection domain is defined by appending claims and its effect thing.
Claims (5)
1. a kind of device that green construction simulation is carried out by BIM, including computer (1), power module (2), mobile construction note
Record instrument (3), cloud server (4), comparator (5), central processing unit (6), arrangement and method for construction data storage storehouse memorizer (7), BIM
Model data storehouse memorizer (8), construction digital record module (9), construction image recording module (10), high in the clouds memory (11),
BIM browsers (12), solar energy power generating group (13), stand-by power supply (14) and AC power (15), it is characterised in that:It is described
Computer (1) is connected with cloud server (4) by Internet traffic, and the power module (2) electrically connects with computer (1)
Connect, the computer (1) is electrically connected with mobile construction note instrument (3), and the computer (1) includes comparator (5), centre
Reason device (6), arrangement and method for construction data storage storehouse memorizer (7) and BIM model datas storehouse memorizer (8), power module (2) bag
Solar energy power generating group (13), stand-by power supply (14) and AC power (15) are included, the mobile construction note instrument (3) is including applying
Number word logging modle (9) and construction image recording module (10), the cloud server (4) including high in the clouds memory (11) and
BIM browsers (12).
2. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:The ratio
It is electrically connected with compared between device (5) and arrangement and method for construction data storage storehouse memorizer (7) and BIM model datas storehouse memorizer (8).
3. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:The meter
It is electrically connected with by LAN between calculation machine (1) and mobile construction note instrument (3).
4. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:It is described too
It is positive overshoot protection device to be provided between photovoltaic generation group (13) and stand-by power supply (14).
5. a kind of device that green construction simulation is carried out by BIM according to claim 1, it is characterised in that:The shifting
The quantity of dynamic construction note instrument (3) is corresponding with the quantity of project under construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621473706.0U CN206292792U (en) | 2016-12-30 | 2016-12-30 | A kind of device that green construction simulation is carried out by BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621473706.0U CN206292792U (en) | 2016-12-30 | 2016-12-30 | A kind of device that green construction simulation is carried out by BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206292792U true CN206292792U (en) | 2017-06-30 |
Family
ID=59098451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621473706.0U Expired - Fee Related CN206292792U (en) | 2016-12-30 | 2016-12-30 | A kind of device that green construction simulation is carried out by BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206292792U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107918831A (en) * | 2017-11-23 | 2018-04-17 | 深圳拎得清软件有限公司 | BIM Schedule managements method and its system based on browser |
CN109885939A (en) * | 2019-02-22 | 2019-06-14 | 内蒙古众跃电力有限公司 | A kind of photovoltaic plant building method and system based on Building Information Model |
-
2016
- 2016-12-30 CN CN201621473706.0U patent/CN206292792U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107918831A (en) * | 2017-11-23 | 2018-04-17 | 深圳拎得清软件有限公司 | BIM Schedule managements method and its system based on browser |
CN109885939A (en) * | 2019-02-22 | 2019-06-14 | 内蒙古众跃电力有限公司 | A kind of photovoltaic plant building method and system based on Building Information Model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Berral et al. | Building green cloud services at low cost | |
CN112260331B (en) | Extra-high voltage alternating current-direct current power grid simulation platform and construction method | |
KR101298500B1 (en) | Micro-Grid Simulation Apparatus and Power Management System | |
CN205193059U (en) | Wireless sensor's network node for water quality monitoring | |
CN206292792U (en) | A kind of device that green construction simulation is carried out by BIM | |
CN103617318A (en) | Method for modeling distribution automation power grid | |
CN110166533A (en) | A kind of method and system quickly accessing integrated control platform | |
CN105515032A (en) | Intelligent micro-grid energy storage control method | |
CN116307110A (en) | Distributed roof photovoltaic power generation aggregation management method and system | |
Dharshika et al. | Green Cloud computing: redefining the future of cloud computing | |
CN105896613A (en) | Microgrid distributed finite time control method based on communication lag | |
CN106356906A (en) | Energy conservation control method and system based on microgrid | |
CN108629448A (en) | A kind of data center's heat abstractor optimal control method and system based on Lyapunov optimizations | |
CN204719428U (en) | Adaptive Fuzzy Control algorithm MPPT controller | |
CN103236727A (en) | Intelligent equipment for controlling sequential charging and discharging of storage battery according to power generation capacity of new energy sources | |
CN207339719U (en) | Build fence photovoltaic generating system | |
CN109284906A (en) | Digitization community intelligent energy-saving managing and control system | |
CN108711848B (en) | The method and device of modular microfluidic grid power Capacity uniformity continuous time control | |
Zhang et al. | Distribution network distributed resources application framework and key technologies based on cloud-edge-device collaboration | |
CN105760636A (en) | Real-time simulation system and method for power generating system | |
CN106451425B (en) | A kind of method for automatic modeling and device of micro-capacitance sensor | |
CN206421325U (en) | A kind of computer hardware power supply circuit | |
CN206211676U (en) | Miniature wind, light, heat complementation energy storage control system | |
CN204288314U (en) | A kind of hand-held job-oriented terminal of electric power with GPS positioning function | |
CN109656711A (en) | A kind of dynamic power supply management method and system based on server cluster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170630 Termination date: 20171230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |