CN206286109U - A kind of leaf spring spray-painting production line - Google Patents

A kind of leaf spring spray-painting production line Download PDF

Info

Publication number
CN206286109U
CN206286109U CN201621422191.1U CN201621422191U CN206286109U CN 206286109 U CN206286109 U CN 206286109U CN 201621422191 U CN201621422191 U CN 201621422191U CN 206286109 U CN206286109 U CN 206286109U
Authority
CN
China
Prior art keywords
track
blanking
feeding
stack pallet
feeding track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621422191.1U
Other languages
Chinese (zh)
Inventor
朱志兰
陈洪
毛廷普
罗勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongqi Spring Co Ltd
Original Assignee
Anhui Hongqi Spring Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hongqi Spring Co Ltd filed Critical Anhui Hongqi Spring Co Ltd
Priority to CN201621422191.1U priority Critical patent/CN206286109U/en
Application granted granted Critical
Publication of CN206286109U publication Critical patent/CN206286109U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to auto parts and components field, more particularly to a kind of leaf spring spray-painting production line, including feeding track, blanking track and the stack pallet that can be advanced on feeding track and blanking track, the feeding track is parallel with blanking track and interval setting, the initiating terminal of the feeding track and blanking track is equipped with the transmission device for driving stack pallet to advance, and being provided between the feeding track and the same side of blanking track makes stack pallet reciprocating transporter between feeding track and blanking track.Steel plate is placed on stack pallet by the utility model, stack pallet carries out feeding, spraying during traveling, air-dries and blanking, by each operation separate operation, therefore improve production efficiency, and just completed in traveling process air-dried, floor space is big in solving the problems, such as traditional work, and because per pass spraying process is all by a machinery or is manually operated, it is ensured that product quality is consistent.

Description

A kind of leaf spring spray-painting production line
Technical field
The utility model is related to auto parts and components field, more particularly to a kind of leaf spring spray-painting production line.
Background technology
Leaf spring is most traditional flexible member in automobile suspension system, if usually by the alloy bullet of dry plate Length discrepancy Spring steel disc is combined into one group and is similar to equicohesive spring beam.The bullet for functioning primarily as automobile suspension system of leaf spring Property element.Leaf spring includes grasswort, clip, more pieces of resilient steel plate and centre bolt, and grasswort sets the two ends of main leaf steel plate, card Bind round for more pieces of resilient steel plate to be linked together;And centre bolt needs to be fastenedly connected through multi-disc steel plate and is incorporated into one Rise.And also first to spray several all over anti-corrosive primer by multi-coat lacquer after production process on spring steel plate, then black colored paint is sprayed, spray Steel plate after painting is just resistant to surroundings corrosion, the chance that reduction is got rusty.
All using artificial spray painting, there is problems with current spraying steel plate:Steel plate is all located on workbench, by workman A steel plate is repeatedly sprayed every time, is thus resulted in the low problem of production efficiency, and the steel plate for having sprayed will also be carried out Air-dry, therefore can not stack, steel plate accounts for floor space greatly, and workman is each, and only carrying out spray painting operation to a steel plate causes each Steel plate lacquer quality is all inconsistent.
Utility model content
The purpose of this utility model is in view of the shortcomings of the prior art, there is provided a kind of leaf spring spray-painting production line, will Steel plate is placed on stack pallet, and stack pallet circulates traveling on feeding track and blanking track track, and people is passed through in its traveling process The mode of work or machinery carries out feeding, spraying, air-dries and blanking.
To solve the above problems, the utility model provides following technical scheme:
A kind of leaf spring spray-painting production line, including feeding track, blanking track and can be in feeding track and blanking track The stack pallet of upper traveling, the feeding track is parallel with blanking track and interval setting, the feeding track and blanking track Initiating terminal is equipped with the transmission device for driving stack pallet to advance, and being provided between the feeding track and the same side of blanking track makes Stack pallet reciprocating transporter between feeding track and blanking track, the leaf spring spray-painting production line is additionally provided with Whether detection stack pallet reaches the detection means in its precalculated position.
Further, the initiating terminal of the feeding track is distributed with the initiating terminal of blanking track in diagonal, the transmission dress Put including setting the first transmission device of feeding track initiating terminal and being arranged on the second transmission device of blanking track initiating terminal.
Further, the transporter includes the first transporter and the second transporter, first transporter It is arranged between feeding track initiating terminal and blanking track end, second transporter sets feeding track end and blanking Between track initiating terminal.
Further, first transmission device is arranged on the inner side of feeding track, under second transmission device is set Expect the inner side of track.
Further, the direct of travel restocking of the blanking track is provided with multiple for air-dried air-cooler.
Further, the feeding track and blanking track are double track.
Further, the end of the feeding track and blanking track is equipped with for spacing slope section.
Beneficial effect:A kind of leaf spring spray-painting production line of the present utility model, stack pallet, stack pallet are placed on by steel plate Circulated on feeding track and blanking track track and advanced, carried out by artificial or mechanical mode in its traveling process Material, spraying, air-dried and blanking, by each operation separate operation, therefore improve production efficiency, and just complete wind in traveling process Dry, floor space is big in solving the problems, such as traditional work, and because per pass spraying process is all by a machinery or people Work is operated, it is ensured that product quality is consistent.
Brief description of the drawings:
Fig. 1 is the utility model dimensional structure diagram,
Fig. 2 is the dimensional structure diagram of the utility model transmission device,
Fig. 3 is the decomposition assembling structure schematic diagram of the utility model transmission device,
Fig. 4 is the dimensional structure diagram of the utility model stack pallet,
Fig. 5 is the partial enlarged drawing of the utility model Fig. 4,
Fig. 6 is the dimensional structure diagram of the utility model transporter
Fig. 7 is the partial enlarged drawing one of the utility model Fig. 6,
Fig. 8 is the partial enlarged drawing two of the utility model Fig. 6,
Fig. 9 is the dimensional structure diagram of the utility model rail relayer,
Figure 10 is the detection components dimensional structure diagram of the utility model the 3rd,
Figure 11 is that the detection components of the utility model the 3rd decompose assembling structure schematic diagram.
Description of reference numerals:Feeding track 1, blanking track 2, slope section 1a, stack pallet 3, main support 31, weld part 31a is supported Contact element 32, position-limited rack 33, steel tank 33a, turning rolls 34, transmission device 4, the first transmission device 4a, the second transmission device 4b, the One gear 41, the first power transmission shaft 411, the first axle bed 412, ring flange 413, the first fixed seat 414, second gear 42, second passes Moving axis 421, the second axle bed 422, the second fixed seat 423, reducing motor 43, the 3rd fixed seat 431, driving-chain 44, push pedal 45 is horizontal Beam 46, mounting rail 47, supporting plate 48, pulley 49, transporter 5, track 51, the second positive stop 511, transfer car(buggy) 52, installation portion 521, hook 522, steel wire rope 523, docking track 53, the first positive stop 531, limited impression 532, motor 54 is driven Wheel 55, drags and draws chain 56, dust cover 57, the first transporter 5a, the second transporter 5b, air-cooler 6, detection means 7, the first inspection Component 7a, the first infrared detector 7a1, the first reflecting plate 7a2, the second detection components 7b, the 3rd detection components 7c are surveyed, second is red The installing plate of the mounting bracket of external detector 7c1, the second reflecting plate 7c2, first 7c3, the second mounting bracket 7c4, second 7c5, first Installing plate 7c6.
Specific embodiment
With reference to Figure of description and embodiment, specific embodiment of the utility model is described in further detail:
Referring to figs. 1 to a kind of leaf spring spray-painting production line of Figure 11, including feeding track 1, blanking track 2 and can be upper The stack pallet 3 advanced in material track 1 and blanking track 2, the feeding track 1 is parallel with blanking track 2 and interval setting, described The initiating terminal of feeding track 1 and blanking track 2 is equipped with the transmission device 4 for driving stack pallet 3 to advance, the He of feeding track 1 Being provided between the same side of blanking track 2 makes the reciprocating transhipment dress between feeding track 1 and blanking track 2 of stack pallet 3 5 are put, the leaf spring spray-painting production line is additionally provided with the detection means 7 whether detection stack pallet 3 reaches its precalculated position, detection Device 7 detects the arrival of stack pallet 3 precalculated position just can operate transporter 5, realize stack pallet 3 in feeding track 1 with Transhipment between material track 2.
With the initiating terminal of blanking track 2 in diagonal distribution, the transmission device 4 includes the initiating terminal of the feeding track 1 The first transmission device 4a that the initiating terminal of feeding track 1 is set and the second transmission device 4b for being arranged on the initiating terminal of blanking track 2.
The transporter 5 includes that the first transporter 5a and the second transporter 5b, the first transporter 5a set Put between the initiating terminal of feeding track 1 and the end of blanking track 2, the second transporter 5b set the end of feeding track 1 and Between the initiating terminal of blanking track 2.
The utility model operationally, first, stack pallet 3 is parked in the initial end position of feeding track 1, via artificial side By steel plate block pattern row pattern on stack pallet 3, the first transmission device 4a at subsequent its top promotes stack pallet 3 for formula or mechanical system Advance, stack pallet 3 is carried out the spraying of multiple tracks by manual type or mechanical system in the traveling process of feeding track 1 to steel plate Operation;When stack pallet 3 advances to feeding 1 end of track, by the second transporter 5b by stack pallet 3 from the end of feeding track 1 End is transported to the initiating terminal of blanking track 2, drives stack pallet 3 to be advanced in blanking track 2 finally by the second transmission device 4b, Also to be air-dried in its traveling process, then advance to blanking track 2 begins to the finished product after air-drying by terminal position Unloading, last empty stack pallet 3 is transported on the initiating terminal of feeding track 1 by the first transporter 5a, carries out repeating work Industry.So move in circles, and multiple stack pallets 3 work simultaneously, realize continuous production.(feeding track and blanking rail in accompanying drawing Road for express clearly only illustrate it is a bit of)
The first transmission device 4a is arranged on the inner side of feeding track 1, the second transmission device 4b and sets blanking rail The inner side in road 2, be arranged on that inner side has been set to save space takes up room.
The direct of travel restocking of the blanking track 2 is provided with multiple for air-dried air-cooler 6 (only illustrating in Fig. 1). Air-cooler 6 is used to accelerate air-drying for paint vehicle.
The feeding track 1 and blanking track 2 are double track, and double track is more stablized, and double track is fixed on the ground.
When a stack pallet 3 is transported via transporter 5, second for closelying follow behind stack pallet 3 in order to prevent its after Continue into causing derailing, therefore be equipped with for spacing slope section 1a in the end of the feeding track 1 and blanking track 2.
First gear 41 and second gear 42 that the transmission device 4 is set up in parallel before and after including, the first gear 41 Rear end be provided with drive first gear 41 rotation reducing motor 43, be provided between the first gear 41 and second gear 42 and The driving-chain 44 of both engagements, the push pedal 45 for being provided with multiple equally distributed L-types on the driving-chain 44, the electricity that slows down Machine 43 drives driving-chain 44 to move and then push pedal 45 is abutted with the side of stack pallet 3.Further stack pallet 3 is set to advance, institute Stating transmission device 4 only promotes a stack pallet 3 to move, a movement for stack pallet 3 and then all sending of promoting on whole track Truck 3 is moved.
The first power transmission shaft 411 is provided with the axle center of the first gear 41, first power transmission shaft 411 is provided with two One axle bed 412, first power transmission shaft 411 is socketed on two the first axle beds 412 and is rotatably assorted therewith, and described first The tail end of power transmission shaft 411 is socketed with ring flange 413, the output that the first gear 41 passes through ring flange 413 and reducing motor 43 End flanges are connected.
Second driving shaft 421 is provided with the axle center of the second gear 42, the second driving shaft 421 is provided with two Two axle beds 422, the second driving shaft 421 is socketed on two the second axle beds 422 and is rotatably assorted therewith.The first gear 41 and second gear 42 setting it is essentially identical, different is only that the tail end of the first power transmission shaft 411 of first gear 41 is socketed with Ring flange 413, thus it is more convenient in maintenance and installation.
The transmission device 4 is also including the first fixed seat 414 for frame first gear 41 high, for frame second gear high 42 the second fixed seat 423 and for the frame fixed seat 431 of reducing motor 43 the 3rd high, first fixed seat 414, second is fixed The fixed seat 431 of seat 423 and the 3rd is contour, and described two first axle beds 412 are fixedly mounted in the first fixed seat 414, described Even second axle bed 422 is fixedly mounted in the second fixed seat 423, and the reducing motor 43 is fixedly mounted on the 3rd fixed seat On 431.First fixed seat 414, the second fixed seat 423 and the 3rd fixed seat 431 are used to make driving-chain 44 and stack pallet 31 Side be in a suitable height.
Being set up between the fixed seat 423 of first fixed seat 414 and second has two crossbeams 46, on described two crossbeams 46 The multiple mounting rails 47 being intervally arranged are provided with, the multiple mounting rail 47 is vertical with crossbeam 46 to be set up, and the mounting rail 47 is outside Prominent, the jag of the mounting rail 47 is located at the underface of driving-chain 44, and the jag of the multiple mounting rail 47 is provided with The L-shaped supporting plate 48 in section, the supporting plate 48 is connected with the upper strata contact of driving-chain 44, and supporting plate 48 holds in the palm the upper strata of driving-chain 44 Firmly make its holding level.Supporting plate 48 is used to hold driving-chain 44, prevents driving-chain 44 from hanging and then makes pushing away on driving-chain 44 Plate 45 and the side uncoupling of stack pallet 3, cause stack pallet 3 can not be promoted to move.
Multiple pulleys 49 are evenly distributed with the supporting plate 48, the driving-chain 44 is slidably matched with multiple pulleys 49.It is sliding Wheel 49 is used to reduce the friction of driving-chain 44 and supporting plate 48, increases the service life of driving-chain 44.
Multiple companies that the stack pallet 3 includes the vertical main support 31 of both sides and is arranged between two main supports 31 A car body for hollow-core construction of beam composition is connect, steel plate Jia is located in two supporting constructions of the composition of main support 31, this structure Steel plate is set to be difficult to slide, the vehicle bottom is provided with four rolling, and the outside positioned at described two main supports 31 is equipped with outwards Prominent collision piece 32, the collision piece 32 is arranged on front bottom end and the rear end bottom of main support 31, the collision piece 32 with The push pedal 45 of transmission device 4 is contradicted and coordinated.Collision piece 32 is provided with four altogether, when stack pallet 3 is located at feeding track 1, car body The collision piece 32 on right side coordinates with the first transmission device 4a transmissions for being located at the inner side of feeding track 1, when stack pallet 3 is located at blanking rail During road 2, the collision piece 32 on the left of car body coordinates with the second transmission device 4b transmissions for being located at the inner side of blanking track 2.
It is reverse V-shaped position-limited rack 33 that the main support 31 is provided with section.Because steel plate is curved, and general main support 31 top is plane, therefore steel plate Jia is located on two main supports 31 risk for still having landing, reverse V-shaped position-limited rack 33 its top are line styles, and steel plate Jia is located on two tops of position-limited rack 33 and does not fall off.
Accordingly, position-limited rack 33 is reverse V-shaped, and the top of general main support 31 is plane, in the mounted state, spacing Frame 33 is difficult location and installation, therefore, it is trapezoidal weld part 31a to be provided with section at the top of the main support 31, described spacing Frame 33 is weldingly fixed on four, the top end points of weld part 31a.
The top of the position-limited rack 33 uniformly sets up multiple steel tank 33a, and the steel tank 33a is spacing with steel plate to be matched somebody with somebody Close.Steel tank 33a prevents steel plate slide anteroposterior.
The stack pallet 3 also includes two turning rolls 34 for installing four rolling, and the four rolling is installed two-by-two On two turning rolls 34, the car body is erected on two turning rolls 34 and by being welded and fixed, and the car body is rolled to two The direction of wheel carrier 34 extends laterally.Transmission device 4 is for setting up in a front end for stack pallet 3 and the front end of another stack pallet 3 Between (be can be seen that in Fig. 2), by the transfer trajectory of stack pallet 3, transmission device 4 will be in the feeding on transporter 5 to transporter 5 Car 3 is pushed in feeding track 1 or blanking track 2, and transporter 5 is transverse shifting, therefore car body must be to two The direction of turning rolls 34 extends laterally, and such transporter 5 could avoid transmission device 4 in transverse shifting.And identical, if It is that the distance that car body stretches out falls short of, in the included angle of straight line that transmission device 4 can be constituted between car body and turning rolls 34 Pass through, but transporter 5 still can be stopped by the first fixed seat 414 of transmission device 4, therefore the first fixed seat 414 can be with L-shaped is set, and transporter 5 is passed through from the bottom notch of the first fixed seat 414.
The transporter 5 includes setting two spaced tracks 51, the track 51 and feeding track 1 and blanking Track 2 is vertically set up, and described two tracks 51 are provided with the transfer car(buggy) 52 being slidably matched with it, and the transporter 5 also includes The reciprocating drive device of transfer car(buggy) 52 is driven, the transfer car(buggy) 52 is provided with docking track 53, under working condition, docking rail Road 53 can be docked with feeding track 1 or blanking track 2.When stack pallet 3 advances to feeding 1 end of track, the second transhipment dress Put 5b to be docked with feeding track 1, stack pallet 3 is then continued to press on to transfer car(buggy) 52 by the first transmission dress, with rear drive equipment The transverse shifting of transfer car(buggy) 52 is driven, by stack pallet 3 from the terminal transit of feeding track 1 to the initiating terminal of blanking track 2, second turn After shipping unit 5b is docked with blanking track 2, the stack pallet 3 being located on transfer car(buggy) 52 is pushed to blanking by the second transmission device 4b On track 2, transfer car(buggy) 52 is driven laterally to return with rear drive equipment.Move back and forth successively and realize switching tracks for stack pallet 3, so that real The continuous production of existing production line.
The drive device include be arranged on the one end of track 51 motor 54 and the other end of track 51 it is driven Wheel 55, the motor 54 is provided with driving wheel, is provided with to drag between the driving wheel and driven pulley 55 and draws chain 56, and described dragging is drawn Chain 56 is engaged with driving wheel with driven pulley 55 respectively, and described dragging is drawn one end of chain 56 and be fixedly connected with the side of transfer car(buggy) 52, institute State and drag the other end for drawing chain 56 and be fixedly connected with the opposite side of transfer car(buggy) 52, drive to drag by the rotating of motor 54 and draw chain 56 operate and then pull transfer car(buggy) 52 to move back and forth.
The transporter also includes the ground groove for installing track 51, and the track 51 is embedded in ground groove It is interior, so that docking track 53, feeding track 1 and blanking track 2 are in same level.
The transporter is additionally provided with for preventing from dragging the chain groove for drawing chain 56 and ground friction, is dragged and is drawn the meeting of chain 56 downwards Hang, it is therefore desirable to chain groove is set increasing and drags the service life for drawing chain 56.
The both sides of the transfer car(buggy) 52 are equipped with drags the installation portion 521 for drawing chain 56 for installation, is set on the installation portion 521 Having draw the hole that the chain pin of the end of chain 56 is passed through for dragging, and described dragging is drawn chain 56 and hung on installation portion 521.Will by way of hanging Drag and draw the both sides that chain 56 is fixedly mounted on transfer car(buggy) 52, cross senior general's chain pin and break to prevent from dragging gravitation, the installation portion 521 Both sides are additionally provided with hook 522, and described dragging is drawn chain 56 and be provided with steel wire rope 523, and the steel wire rope 523 draws the circle of chain 56 1 around dragging, The two ends of steel wire rope 523 are separately fixed on hook 522, and will drag gravitation by the dragging of steel wire rope 523 shares to both sides, it is to avoid chain Pin breaks.
The motor 54 and driven pulley 55 are fixedly mounted on the ground, the motor 54 and driven pulley 55 Top is arranged with dust cover 57.
The end of the docking track 53 is provided with the first positive stop 531, and the first positive stop 531 is used to prevent transmission from filling Put 4 and stack pallet 3 pushed away into docking track 53, on the docking track 53 positioned at docking track 53 rear and front end be additionally provided with it is spacing Groove 532, the limited impression 532 matches with the roller of stack pallet 3, and limited impression 532 is used to prevent transfer car(buggy) 52 laterally When mobile, rocking for generation causes it to derail.
The two ends of the track 51 are provided with the second positive stop 511, and the second positive stop 511 is used to prevent transfer car(buggy) 52 from taking off Liftoff rail 51.
The detection means 7 includes being arranged on the first detection components 7a, the second detection components 7b and the at the two ends of track 51 Three detection components 7c, the first detection components 7a and the second detection components 7b include interval opposition and be vertically arranged first Infrared detector 7a1 and the first reflecting plate 7a2, under working condition, the first infrared detector 7a1 and the first reflecting plate 7a2 distinguishes The both sides of the roller of the end of transfer car(buggy) 52 are built up in, the first detection components 7a and the second detection components 7b is used to detect transfer car(buggy) 52 Whether reach the two ends of track 51, definite be in order to detect docking track 53 whether with feeding track 1 or blanking track 2 pairs Connect, the 3rd detection components 7c includes the second infrared detector 7c1 and the second reflecting plate of interval opposition and tilting setting 7c2, under working condition, the second infrared detector 7c1 and the second reflecting plate 7c2 is built up in the end of transfer car(buggy) 52, and positioned at giving 3 one both sides of main support 31 of truck.
The first detection components 7a and the second detection components 7b in working order under, the first infrared detector 7a1 can send out Infrared light is penetrated, infrared light is reflected and then detected by the detection probe of the first infrared detector 7a1 by the first reflecting plate 7a2, this When transfer car(buggy) 52 not in mated condition, anyway if under mated condition, infrared light can be transported the end of car 52 roller blocking, The detection probe of the first infrared detector 7a1 can't detect infrared light.The detection components 7c of identical the 3rd is also a principle.But It is that the 3rd detection components 7c is whether that detection is to detect stack pallet 3 on transfer car(buggy) 52, infrared light is a master for being fed car 3 Support 31 stops.
Because stack pallet 3 needs traverse motion, in order to not stopped by the 3rd detection components 7c during exercise, therefore not Parallel can hang down and set up.The second infrared detector 7c1 is provided with the first mounting bracket 7c3 of long handle, second infrared detection Device 7c1 is inclined and mounted on the first mounting bracket 7c3, and the second reflecting plate 7c2 is provided with the second mounting bracket 7c4 of short handle, The second reflecting plate 7c2 is inclined and mounted on the second mounting bracket 7c4, and the second mounting bracket 7c4 is built up in the two of stack pallet 3 Between individual main support 31, and between the breach of main support 31 and the composition of turning rolls 34, second during 3 transverse shifting of stack pallet Mounting bracket 7c4 is passed through from breach.
The top of the second mounting bracket 7c4 is hinged and is combined with the second installing plate 7c5, the sidepiece of the second installing plate 7c5 Articulated section is provided with, the second installing plate 7c5 is fixedly mounted on the second mounting bracket by the articulated section by bolt and nut cooperation On 7c4, the second reflecting plate 7c2 is fixedly mounted on second installing plate 7c5, the top of the first mounting bracket 7c3 The the first installing plate 7c6 for being combined with sector is hinged, the second infrared detector 7c1 is fixedly mounted on the first installing plate 7c6, The circle centre position of the first installing plate 7c6 is provided with counterbore, and the first installing plate 7c6 is provided with the deep gouge of arc, described first Installing plate 7c6 is fixed on the first mounting bracket 7c3 by the cooperation of cross screw bolt and nut.
Bolt can be unclamped, the angle of inclination of the second infrared detector 7c1 and the second reflecting plate 7c2 is adjusted, is adjusted with this The test position of the 3rd detector, such as, can adjust its angle of inclination, and its test position is adjusted into the end of stack pallet 3 Steel plate, for detecting on stack pallet 3 whether there is material.
The above, is only preferred embodiment of the present utility model, and not technical scope of the present utility model is made Go out any limitation, thus it is every any trickle amendment made to above example according to technical spirit of the present utility model, equivalent Change and modification, still fall within the range of the technical solution of the utility model.

Claims (7)

1. a kind of leaf spring spray-painting production line, it is characterised in that:Including feeding track (1), blanking track (2) and can be in feeding The stack pallet (3) advanced on track (1) and blanking track (2), the feeding track (1) is parallel with blanking track (2) and is spaced Set, the initiating terminal of the feeding track (1) and blanking track (2) is equipped with the transmission device for driving stack pallet (3) to advance (4), be provided between the feeding track (1) and the same side of blanking track (2) make stack pallet (3) feeding track (1) and under Reciprocating transporter (5) between material track (2), the leaf spring spray-painting production line is additionally provided with detection stack pallet (3) Whether the detection means (7) in its precalculated position is reached.
2. a kind of leaf spring spray-painting production line according to claim 1, it is characterised in that:The feeding track (1) Initiating terminal is distributed with the initiating terminal of blanking track (2) in diagonal, and the transmission device (4) includes setting feeding track (1) starting The first transmission device (4a) held and the second transmission device (4b) for being arranged on blanking track (2) initiating terminal.
3. a kind of leaf spring spray-painting production line according to claim 1, it is characterised in that:Transporter (5) bag The first transporter (5a) and the second transporter (5b) are included, first transporter (5a) is arranged on feeding track (1) and rises Between top and blanking track (2) end, second transporter (5b) sets feeding track (1) end and blanking track (2) between initiating terminal.
4. a kind of leaf spring spray-painting production line according to claim 2, it is characterised in that:First transmission device (4a) is arranged on the inner side of feeding track (1), and second transmission device (4b) sets the inner side of blanking track (2).
5. a kind of leaf spring spray-painting production line according to claim 2, it is characterised in that:The blanking track (2) Direct of travel restocking is provided with multiple for air-dried air-cooler (6).
6. a kind of leaf spring spray-painting production line according to claim 1, it is characterised in that:The feeding track (1) and Blanking track (2) is double track.
7. a kind of leaf spring spray-painting production line according to claim 1, it is characterised in that:The feeding track (1) and The end of blanking track (2) is equipped with for spacing slope section (1a).
CN201621422191.1U 2016-12-23 2016-12-23 A kind of leaf spring spray-painting production line Expired - Fee Related CN206286109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621422191.1U CN206286109U (en) 2016-12-23 2016-12-23 A kind of leaf spring spray-painting production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621422191.1U CN206286109U (en) 2016-12-23 2016-12-23 A kind of leaf spring spray-painting production line

Publications (1)

Publication Number Publication Date
CN206286109U true CN206286109U (en) 2017-06-30

Family

ID=59154390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621422191.1U Expired - Fee Related CN206286109U (en) 2016-12-23 2016-12-23 A kind of leaf spring spray-painting production line

Country Status (1)

Country Link
CN (1) CN206286109U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108097512A (en) * 2017-12-20 2018-06-01 卧龙电气集团股份有限公司 A kind of large and middle size motor auto spray painting line
CN108995570A (en) * 2018-08-02 2018-12-14 中原建港建筑科技有限公司 A kind of component transfer car(buggy) and movement system
CN112960344A (en) * 2021-01-28 2021-06-15 杭萧钢构股份有限公司 Steel member processing production line
CN113247504A (en) * 2021-04-27 2021-08-13 江苏铁科新材料股份有限公司 Intelligent mixed production line and production method for nylon plate parts

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108097512A (en) * 2017-12-20 2018-06-01 卧龙电气集团股份有限公司 A kind of large and middle size motor auto spray painting line
CN108995570A (en) * 2018-08-02 2018-12-14 中原建港建筑科技有限公司 A kind of component transfer car(buggy) and movement system
CN108995570B (en) * 2018-08-02 2024-03-12 中原建港建筑科技有限公司 Component transfer trolley and transfer system
CN112960344A (en) * 2021-01-28 2021-06-15 杭萧钢构股份有限公司 Steel member processing production line
CN113247504A (en) * 2021-04-27 2021-08-13 江苏铁科新材料股份有限公司 Intelligent mixed production line and production method for nylon plate parts

Similar Documents

Publication Publication Date Title
CN206286109U (en) A kind of leaf spring spray-painting production line
CN206288606U (en) A kind of transporter of the stack pallet of leaf spring spray-painting production line
CN206288604U (en) A kind of transmission device of leaf spring spray-painting production line
CN203541900U (en) Vehicle box body welding production line
CN211495735U (en) Forklift tire conveying system
CN206288605U (en) A kind of stack pallet of leaf spring spray-painting production line
CN113979038A (en) Conveying device and conveying method for wheel set coating automatic cleaning line
CN203581979U (en) Automatic plate supplying machine
CN111056226A (en) Drum circulation vertical conveying equipment
CN206107398U (en) Scrapped car disassembly line
CN209160730U (en) Suspension conveying system
CN109967285A (en) Inside gadget sprays noise reduction agent automation equipment
CN206599233U (en) Automobile decoration piece coating transfer line
CN206291852U (en) A kind of detection means of the stack pallet of leaf spring spray-painting production line
CN202864216U (en) Gravity friction drive type conveyor
CN110525905B (en) Front car body rotary sliding trolley conveying system
CN109018897B (en) Automotive interior transportation is with automatic unloading line
CN105290976A (en) Movable roller hoisting continuous or intermittent shot blasting cleaning production line
CN208648216U (en) A kind of goods transport systems
CN211225318U (en) Tire delivery system and forklift production line
CN109733808B (en) Layered ring-shaped storage transmission line for car coupler
CN214558407U (en) Passenger car side wall framework welding assembly line
CN205476692U (en) A carry car tray for stereo garage
CN104477590B (en) A kind of aerial induction system of bumper
CN210824110U (en) Rotary sliding trolley conveying system for front trolley body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20201223

CF01 Termination of patent right due to non-payment of annual fee