CN206282982U - A kind of special temporary facility ground networks - Google Patents

A kind of special temporary facility ground networks Download PDF

Info

Publication number
CN206282982U
CN206282982U CN201621405495.7U CN201621405495U CN206282982U CN 206282982 U CN206282982 U CN 206282982U CN 201621405495 U CN201621405495 U CN 201621405495U CN 206282982 U CN206282982 U CN 206282982U
Authority
CN
China
Prior art keywords
temporary facility
earth mat
building frame
horizontal earth
ground networks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621405495.7U
Other languages
Chinese (zh)
Inventor
冯彦贵
袁新和
李兴富
余佩纹
张艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Fifth Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Fifth Construction Engineering Co Ltd
Priority to CN201621405495.7U priority Critical patent/CN206282982U/en
Application granted granted Critical
Publication of CN206282982U publication Critical patent/CN206282982U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Electrical Connectors (AREA)

Abstract

The utility model discloses a kind of special temporary facility ground networks, it includes the building frame (1) of board house, below ground in building frame (1) bottom sets horizontal earth mat (3), is provided with vertical wire (2) in the corner of the building frame (1) and is connected to form equal pressure zone with horizontal earth mat (3).Be connected to ground networks on temporary facility by the utility model, when temporary facility in there is high-voltage electric shock, too high electric current can be imported the earth by temporary facility, as long as the people in temporary facility does not contact ironwork, just will not be influenceed by electric current, carry out the safety of guarantor with this, can play a part of to carry out security protection to the people in temporary facility under high-tension electricity.

Description

A kind of special temporary facility ground networks
Technical field
The utility model is related to temporary facility technical field in construction, and in particular to a kind of temporary facility grounded screen Network.
Background technology
With developing rapidly for China's infrastructure construction, real estate cause is maked rapid progress, it is necessary in different environments Building construction is carried out, according to different geographical conditions, construction is needed due to construction, and narrow field is run into sometimes, will be faced When facility build in specific position;And situation about this time running into is aiming at having high-tension electricity dangerous in temporary facility is built Position when, for such case, we must just take grounded screen special in one to be connected with temporary facility, to temporary facility Safety necessarily processed.
Utility model content
The purpose of this utility model is to provide a kind of special temporary facility ground networks, to solve in some particular surroundings The security protection problem of the temporary facility of lower build, can play carries out security protection under high-tension electricity to the people in temporary facility Effect.
The technical solution of the utility model is as follows:
The utility model is such a temporary facility ground networks structure, and it includes the building frame of board house, is built at this The horizontal earth mat of below ground setting of base of frame is built, be provided with vertical wire in the corner of the building frame connects with horizontal earth mat Connect to form equal pressure zone.
Wherein, the horizontal earth mat is made up of 40 × 4 band irons, and the buried depth of horizontal earth mat is at least up to 1m, horizontal earth mat The outer 0.8~1.2m wide of length-width ratio building frame.The vertical wire is made up of 40 × 4 band irons, vertical wire and horizontal earth mat It is weldingly connected.The grounding resistance of the ground networks that building frame, vertical wire are constituted with horizontal earth mat is less than 4 Ω.
Be connected to ground networks on temporary facility by the utility model, when temporary facility in there is high-voltage electric shock, temporarily Too high electric current can be imported the earth by facility, as long as the people in temporary facility does not contact ironwork, just will not be influenceed by electric current, with This carrys out the safety of guarantor, can play a part of to carry out security protection to the people in temporary facility under high-tension electricity.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Mark in accompanying drawing for:1- building frames, the vertical wires of 2-, the horizontal earth mats of 3-.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
As shown in figure 1, this ground networks structure of the invention includes the building frame 1 of board house, at the bottom of building frame 1 The below ground in portion sets horizontal earth mat 3, is provided with vertical wire 2 in the corner of the building frame 1 and is connected shape with horizontal earth mat 3 Into equal pressure zone.Horizontal earth mat 3 is made up of 40 × 4 band irons, and the buried depth of horizontal earth mat 3 is at least up to 1m, the length and width of horizontal earth mat 3 Wide 0.8~1.2m outer than building frame 1.Vertical wire 2 is made up of 40 × 4 band irons, and vertical wire 2 welds phase with horizontal earth mat 3 Even.The grounding resistance of the ground networks that building frame 1, vertical wire 2 are constituted with horizontal earth mat 3 is less than 4 Ω.
The utility model is implemented:As shown in figure 1, carrying out excavation foundation trench first, 40 × 4 band irons composition is laid Horizontal earth mat 3, after 40 × 4 band irons vertical wire 2 of composition is welded with horizontal earth mat 3, backfills and assembles board house building frame 1, After the completion of, building frame 1 is welded with vertical wire 2, make building frame 1, vertical wire 2 and horizontal earth mat 3 whole as one Body, grounding resistance is measured less than 4 Ω with ground meter.The horizontal earth mat 3 is made up of 40 × 4 band irons, and horizontal earth mat 3 Buried depth need to meet 1m, and the outer width 1m of length-width ratio building of horizontal earth mat 3 is advisable.
When vertical wire 2 weld with horizontal earth mat 3, length is not not less than 60mm, during single-sided welding for length during two-sided welding Less than 120mm, when two weldering band irons are in 90 °, lap-welded round steel should bend to 90 ° of circular arc type and carry out overlap welding, overlap welding list Edge lengths are not less than 100mm, and weld seam must be full during welding.
Certainly, it is more than concrete application example of the present utility model, the utility model also has other implementation methods, all The technical scheme formed using equivalent or equivalent transformation, is all fallen within the protection domain required by the utility model.

Claims (4)

1. a kind of special temporary facility ground networks, it is characterised in that:It includes the building frame (1) of board house, in the building frame The below ground of frame (1) bottom sets horizontal earth mat (3), and vertical wire (2) and water are provided with the corner of the building frame (1) Level land net (3) connection forms equal pressure zone.
2. special temporary facility ground networks according to claim 1, it is characterised in that:The horizontal earth mat (3) is by 40 × 4 band irons are constituted, and the buried depth of horizontal earth mat (3) is at least up to 1m, and the length-width ratio building frame (1) of horizontal earth mat (3) is wide outward 0.8~1.2m.
3. special temporary facility ground networks according to claim 2, it is characterised in that:The vertical wire (2) is by 40 × 4 band irons are constituted, and the vertical wire (2) is weldingly connected with the horizontal earth mat (3).
4. special temporary facility ground networks according to claim 1, it is characterised in that:Building frame (1), vertical wire (2) grounding resistance of the ground networks constituted with horizontal earth mat (3) is less than 4 Ω.
CN201621405495.7U 2016-12-21 2016-12-21 A kind of special temporary facility ground networks Expired - Fee Related CN206282982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621405495.7U CN206282982U (en) 2016-12-21 2016-12-21 A kind of special temporary facility ground networks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621405495.7U CN206282982U (en) 2016-12-21 2016-12-21 A kind of special temporary facility ground networks

Publications (1)

Publication Number Publication Date
CN206282982U true CN206282982U (en) 2017-06-27

Family

ID=59074026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621405495.7U Expired - Fee Related CN206282982U (en) 2016-12-21 2016-12-21 A kind of special temporary facility ground networks

Country Status (1)

Country Link
CN (1) CN206282982U (en)

Similar Documents

Publication Publication Date Title
CN104901030B (en) A kind of transformer station's electric resistance reducing grounding device construction method
CN104577364B (en) Small-resistance-value grounding grid of large device and design construction method
CN203320127U (en) Buried pipeline cathode protection system of long-distance pipeline process station
CN201975524U (en) Arrangement structure for lightning protection grounding device of power tower
CN204126653U (en) A kind of integrated ground shield lining circular ring structure
CN103603368B (en) Diaphragm wall meets the inverse construction method done of underground utilities
CN104993440B (en) Utilize the lightning protection artificial earthing system and construction method of the external downlead of structure reinforcing bars
CN102856671B (en) Environment-friendly leak-proof moisturizing grounding device and construction method
CN105514750A (en) Power transmission line grounding construction method
CN206282982U (en) A kind of special temporary facility ground networks
CN202550081U (en) Environment-friendly leakage-proof moisturizing grounding device
CN204304011U (en) Limited area, a kind of tower position is with concentrating perpendicular grounding device
CN105098389B (en) A kind of method and structure reducing ground resistance using Equipment Foundations
CN215600577U (en) Transformer substation grounding grid structure
CN102752762A (en) Design method for reducing base station ground screen area by ground screen effective utilization in lightning stroke
CN206401540U (en) Electric power line pole tower earthing or grounding means
CN103928773A (en) Method for improving transformer substation soil moisture content
CN104184015A (en) Installation construction process for grounding device
CN204375987U (en) The little resistance ground network of main equipment
CN203589374U (en) A TN-S system which is used for a steel structure workshop cable and which can be without a protective ground wire
CN208874243U (en) A kind of pipe gallery lightning arrester
CN206801597U (en) A kind of flood mine chamber waterproof construction
CN207217803U (en) Complete web-like no-welding low-voltage ground device
CN204760552U (en) Linear ground structure of steel pipe pole
CN117932981B (en) Arrangement method of double-layer ground network of transformer substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170627

Termination date: 20201221

CF01 Termination of patent right due to non-payment of annual fee