CN206276842U - A kind of construction reinforcing bar apparatus for correcting - Google Patents
A kind of construction reinforcing bar apparatus for correcting Download PDFInfo
- Publication number
- CN206276842U CN206276842U CN201621373344.8U CN201621373344U CN206276842U CN 206276842 U CN206276842 U CN 206276842U CN 201621373344 U CN201621373344 U CN 201621373344U CN 206276842 U CN206276842 U CN 206276842U
- Authority
- CN
- China
- Prior art keywords
- guide pipe
- correction
- reinforcing bar
- hooks
- hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of construction reinforcing bar apparatus for correcting of the utility model discloses one kind in building construction process, and the crowbar device of preliminary aligning is carried out to path reinforcing bar volume.It is characterized in that two upper corrections hook and two under correct to hook and equidistant be staggeredly placed on guide pipe, and upper correction hooks the tie point and the tie point of lower correction hook and guide pipe with guide pipe, in same horizontal line, the upper correction hooks place plane perpendicular to guide pipe axis, the lower correction hooks place plane perpendicular to guide pipe axis, Upper gasket is placed in correction and hooks inner side, lower gasket is placed in lower correction and hooks inner side, bending tube one end is connected with guide pipe one end, and one end of fix bar is vertically arranged on the bending tube other end by bearing.
Description
Technical field
A kind of construction reinforcing bar apparatus for correcting of the utility model, to the sled of reinforcing bar pre-straightening when being related to a kind of construction
Thick stick device, belongs to Architectural Equipment field.More particularly to a kind of crowbar device that preliminary aligning can be carried out to path reinforcing bar volume.
Background technology
In building construction process, the usage amount of reinforcing bar is very big, and the steel of minor diameter are all web-likes, it is necessary to construct
Fang Jinhang stretches interception and uses, the existing online machine straightening device of reinforcing bar, and its structure includes frame and two rows being arranged in frame
The straightener roll being arranged in parallel up and down, reinforcing bar passes through between two rows straightener roll, realizes straightening, and equipment is excessively huge, is applying
Workshop ground it is limited in the case of, its use it is very inconvenient, and the method in the absence of with aligning situation, reinforcing bar roll up straightening process
In, because bending is serious or causes reinforcing bar to be wrapped on straightener roll, cause equipment fault, influence reinforcing bar correction, and then influence to apply
Work progress, but existing pre-straightening device is by manually using crowbar, is corrected for the position for bending serious, the method
Human resources are needed, and the excessive situation of correction easily occurs, can equally influence the operation of straightener, wasted time and energy, efficiency is low
Under.
The content of the invention
In order to improve above-mentioned situation, a kind of construction reinforcing bar apparatus for correcting of the utility model provides one kind and is applied in building
During work, the crowbar device of preliminary aligning is carried out to path reinforcing bar volume.Simple structure, convenient use.
A kind of construction reinforcing bar apparatus for correcting of the utility model is realized in:A kind of construction of the utility model
Reinforcing bar apparatus for correcting is made up of guide pipe, upper correction hook, bending tube, fix bar, bearing, lower correction hook, lower gasket and Upper gasket,
Two upper corrections hook and two under correct hook it is equidistant be staggeredly placed on guide pipe, and upper correction hook and guide pipe tie point and under
The tie point hooked with guide pipe is corrected, in same horizontal line, the upper correction hooks place plane perpendicular to guide pipe axis,
The lower correction hooks place plane perpendicular to guide pipe axis, and Upper gasket is placed in correction and hooks inner side, and lower gasket is placed in lower correction
Inner side is hooked, bending tube one end is connected with guide pipe one end, and the bending tube and guide pipe are integrally formed, one end of fix bar leads to
Bearing is crossed to be vertically arranged on the bending tube other end.
When using, steel ring is placed in fix bar, then passed sequentially through one end of reinforcing bar on two on guide pipe
Correction hook and two under correct and hook, and reinforcing bar is located between Upper gasket and lower gasket, then draw reinforcing bar, reinforcing bar is from steel ring
On be circle when getting off, corrected on entering successively and hooked and after lower correction is hooked, circular amplitude diminishes, and simplifies postorder and stretches work
Pressure, reduction stretches the workload of operation, and auxiliary straightener completes bar straightening.Upper gasket and lower gasket are designed to extension
The service life that upper correction is hooked and lower correction is hooked, reaches the purpose of reinforcing bar tentatively correction.
Beneficial effect.
First, simple structure, it is convenient and practical.
2nd, it is with low cost, it is easy to promote.
3rd, predistortion can be carried out to reinforcing bar, reinforcement metal straightening efficiency is improved.
Brief description of the drawings
Accompanying drawing 1 is a kind of three-dimensional structure diagram of construction reinforcing bar apparatus for correcting of the utility model.
In accompanying drawing
Wherein part is:Guide pipe(1), upper correction hook(2), bending tube(3), fix bar(4), bearing(5), lower correction hook
(6), lower gasket(7), Upper gasket(8).
Specific embodiment:
A kind of construction reinforcing bar apparatus for correcting of the utility model is achieved in that when using, steel ring is placed on solid
Fixed pole(4)On, one end of reinforcing bar is then passed sequentially through into guide pipe(1)On two upper corrections hook(2)With two under correct hook
(6), and reinforcing bar is located at Upper gasket(8)And lower gasket(7)Between, reinforcing bar is then drawn, be when reinforcing bar gets off from steel ring
Circle, corrects on entering successively and hooks(2)Hooked with lower correction(6)Afterwards, circular amplitude diminishes, and simplifies the pressure that postorder stretches work
Power, reduction stretches the workload of operation, and auxiliary straightener completes bar straightening.Upper gasket(8)And lower gasket(7)Be designed to
Corrected in extension and hooked(2)Hooked with lower correction(6)Service life, reach reinforcing bar tentatively correction purpose.
Claims (2)
1. a kind of construction reinforcing bar apparatus for correcting, it is characterized in that:By guide pipe, upper correction hook, bending tube, fix bar, bearing,
Lower correction is hooked, lower gasket and Upper gasket composition, two upper corrections hook and two under correct hook it is equidistant be staggeredly placed on guide pipe, and
Upper correction hooks the tie point and the tie point of lower correction hook and guide pipe with guide pipe, and in same horizontal line, upper correction is hooked
Perpendicular to guide pipe axis, lower correction hooks place plane perpendicular to guide pipe axis to place plane, and Upper gasket is placed in correction and hooks
Inner side, lower gasket is placed in lower correction and hooks inner side, and bending tube one end is connected with guide pipe one end, and one end of fix bar passes through bearing
It is vertically arranged on the bending tube other end.
2. a kind of construction reinforcing bar apparatus for correcting according to claim 1, it is characterised in that the bending tube and guiding
Pipe is integrally formed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621373344.8U CN206276842U (en) | 2016-12-15 | 2016-12-15 | A kind of construction reinforcing bar apparatus for correcting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621373344.8U CN206276842U (en) | 2016-12-15 | 2016-12-15 | A kind of construction reinforcing bar apparatus for correcting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206276842U true CN206276842U (en) | 2017-06-27 |
Family
ID=59072405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621373344.8U Expired - Fee Related CN206276842U (en) | 2016-12-15 | 2016-12-15 | A kind of construction reinforcing bar apparatus for correcting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206276842U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524302A (en) * | 2017-09-12 | 2017-12-29 | 上海建工集团股份有限公司 | Embedded bar Stepwise calibration device and its bearing calibration |
CN112726419A (en) * | 2021-01-13 | 2021-04-30 | 中建八局第一建设有限公司 | Beam body flange plate embedded steel bar correcting device |
-
2016
- 2016-12-15 CN CN201621373344.8U patent/CN206276842U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524302A (en) * | 2017-09-12 | 2017-12-29 | 上海建工集团股份有限公司 | Embedded bar Stepwise calibration device and its bearing calibration |
CN107524302B (en) * | 2017-09-12 | 2019-07-26 | 上海建工集团股份有限公司 | Embedded bar Stepwise calibration device and its bearing calibration |
CN112726419A (en) * | 2021-01-13 | 2021-04-30 | 中建八局第一建设有限公司 | Beam body flange plate embedded steel bar correcting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206276842U (en) | A kind of construction reinforcing bar apparatus for correcting | |
CN203679102U (en) | Full-automatic hydraulic mesh bending device | |
CN207953627U (en) | A kind of pipeline corrosion protection rotating and clamping device | |
CN205551322U (en) | High -efficient angle bending machine | |
CN208613612U (en) | A kind of device for straightening pile crown reinforcing bar | |
CN103008501B (en) | Wire bending self-made tool for steel stranded wire pulling handle | |
CN104475619B (en) | Bracing wire makes specific purpose tool | |
CN203292386U (en) | Straightener for round steel | |
CN204770348U (en) | Major diameter steel reinforcement cage strengthening rib processing equipment | |
CN109877247A (en) | A kind of construction Machines steel bar cut-off device | |
CN203806185U (en) | Manual steel wire binding machine | |
CN205236866U (en) | Tensile alignment device of construction steel bar | |
CN207770683U (en) | A kind of construction Machines steel bar cut-off device | |
CN204212431U (en) | Concrete pump distribution device | |
CN204817566U (en) | Simple and easy pipe straightener | |
CN205253976U (en) | Traditional thread binding putting of laborsaving steel strand wires laos | |
CN204307958U (en) | A kind of multi-functional straightener | |
CN203635828U (en) | Serration-type reinforcing cage processing jig frame | |
CN201915410U (en) | Pile concreting device | |
CN204429912U (en) | A kind of steel pipe straightening machine | |
CN204486660U (en) | A kind of processing unit (plant) of drilled pile reinforcing cage tie hoop | |
CN206689342U (en) | A kind of civil engineering reinforcing bar straightening machine | |
CN204680993U (en) | A kind of device changing porcelain vase for straight corner bar | |
CN203495086U (en) | Cable straightening device | |
CN203356487U (en) | Steel wire straightening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170627 Termination date: 20181215 |
|
CF01 | Termination of patent right due to non-payment of annual fee |