CN206268619U - A kind of water conservancy construction pipeline securing device - Google Patents

A kind of water conservancy construction pipeline securing device Download PDF

Info

Publication number
CN206268619U
CN206268619U CN201621425223.3U CN201621425223U CN206268619U CN 206268619 U CN206268619 U CN 206268619U CN 201621425223 U CN201621425223 U CN 201621425223U CN 206268619 U CN206268619 U CN 206268619U
Authority
CN
China
Prior art keywords
arc
snap ring
plate
securing device
tube half
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621425223.3U
Other languages
Chinese (zh)
Inventor
还向勤
还倩青
王宁
王为龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nongken Yancheng Construction Engineering Co Ltd
Original Assignee
Jiangsu Nongken Yancheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nongken Yancheng Construction Engineering Co Ltd filed Critical Jiangsu Nongken Yancheng Construction Engineering Co Ltd
Priority to CN201621425223.3U priority Critical patent/CN206268619U/en
Application granted granted Critical
Publication of CN206268619U publication Critical patent/CN206268619U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of water conservancy construction pipeline securing device, including upper tube half and lower tube half, upper tube half is included for holding snap ring on the arc of water pipe tightly, the two ends of snap ring are respectively arranged with a upper mounted plate on arc, lower tube half is including for snap ring under the arc for holding water pipe tightly, the two ends of snap ring are respectively arranged with a bottom plate under arc, and fastening thread hole is correspondingly arranged on respectively on upper mounted plate and bottom plate;The bottom symmetrical of snap ring is provided with two support blocks under arc, and the lower end of two support blocks is fixedly connected with a barb plate, and barb plate includes level board and is fixed on the barb for extending obliquely at level board two ends, and the lower end of level board is symmetrically arranged with two claws.Construction when water pipe can be placed in upper and lower two snap rings among compress, then be screwed into bolt in the fastening thread hole of upper mounted plate and bottom plate complete fastening.After fixing water pipe, compacting soil and stone around snap ring under arc, barb plate cause that whole securing device is difficult displacement.

Description

A kind of water conservancy construction pipeline securing device
Technical field
The utility model is related to water conservancy construction corollary apparatus technical field, and in particular to a kind of water conservancy construction is firm with pipeline Device.
Background technology
In many hydraulic engineering operations, the situation for needing to lay pipeline, one of which pipe laying scene can be all run into It is pre-buried multistage is sequentially communicated in soil water pipe.In the construction of this water pipeline, the laying steadiness requirement one to water pipe As it is all very high, it is necessary to each section of water pipe is steadily fixed when being buried in the earth, anti-antipriming pipe displacement is excessively deformed upon, and then is led The rough sledding for causing pipe burst etc. complicated.In correlation technique, when water conservancy construction is carried out, otherwise it is directly to be embedded into water pipe In soil, water pipe is consolidated by abundant compacting soil;It is to use a kind of clip to hold water pipe tightly, then by clip deeply reeve soil Compacting, however, the above method finds that its firm effect is general in practice of construction operation, or easily occur water pipe displacement or The situation that clip is released.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of being managed when pipeline is laid for water conservancy construction Road is steadily fixed on the pipeline securing device in soil.
The technical solution of the utility model is to provide a kind of water conservancy construction pipeline securing device, including upper tube half is with Semicanal, the upper tube half includes that the two ends of snap ring are respectively arranged with one on the arc for holding snap ring on the arc of water pipe tightly Upper mounted plate, the lower tube half is including for snap ring under the arc for holding water pipe tightly, the two ends of snap ring are respectively provided with the arc There is a bottom plate, at least one set of fastening thread hole is correspondingly arranged on respectively on fixed plate and the bottom plate;Institute The bottom symmetrical for stating snap ring under arc is provided with two support blocks, and the lower end of two support blocks is fixedly connected with a barb Plate, the barb plate includes level board and is fixed on the barb for extending obliquely at level board two ends, under the level board End is symmetrically arranged with two claws.
Further, a rubber layer is respectively arranged with the madial wall of snap ring under snap ring and the arc on the arc, Multiple evenly distributed rubber raised lines are provided with the inside of the rubber layer.
Further, the lower end of fixed plate is provided with the upper conical bar of multiple equidistantly spaceds, it is described under The upper end of fixed plate is provided with the inferior pyramidal bar of multiple equidistantly spaceds and cooperation mutually nested with the upper conical bar.
Further, draw-in groove on arc is provided with the middle part lateral wall of snap ring on the arc, on fixed plate Two upper through holes connected with draw-in groove on the arc that are running through are provided with, are set on the middle part lateral wall of snap ring under the arc There is arc lower bayonet slot, two lower through-holes connected with the arc lower bayonet slot that are running through are provided with the bottom plate, it is described Upper through hole is corresponding with the lower through-hole.
Further, the fastening thread hole is provided with three groups, and fastening thread hole described in three groups laterally equidistantly arrange by interval Row.
Technical solutions of the utility model have the beneficial effect that:The upper tube half and lower tube half being mutually matched by setting, upper Be correspondingly arranged respectively on semicanal and lower tube half for hold water pipe tightly arc on snap ring under snap ring and arc, can be with construction Water pipe is placed among upper and lower two snap rings and is compressed, then bolt is screwed into the fastening thread hole of upper mounted plate and bottom plate Complete fastening.Snap ring lower end is provided with support block, barb plate and the claw being sequentially connected under arc, before clamp water pipe, can Held so that claw is squeezed into soil, after water pipe is fixed, toward arc under padding and compacting soil and stone around snap ring, if Be equipped with the barb plate of barb so that the whole securing device for assembling be difficult displacement, enhance laying water pipe when pipeline consolidate Property.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme in the utility model embodiment, below will be to needed for embodiment description The accompanying drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some realities of the present utility model Example is applied, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is a kind of structure chart of water conservancy construction pipeline securing device of the utility model embodiment;
Fig. 2 is the structure chart of the utility model embodiment lower tube half;
Fig. 3 is the structure chart of the utility model embodiment upper tube half.
Specific embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refer to shown in Fig. 1, Fig. 2 and Fig. 3, the utility model provides a kind of water conservancy construction pipeline securing device, should Pipeline securing device includes upper tube half 1 and lower tube half 2, wherein, upper tube half 1 is included for holding snap ring 1a on the arc of water pipe tightly, The two ends of snap ring 1a are respectively arranged with a upper mounted plate 1b on arc, and lower tube half 2 is including for snap ring under the arc for holding water pipe tightly 2a, the two ends of snap ring 2a are respectively arranged with a bottom plate 2b under arc, are corresponded to respectively on upper mounted plate 1b and bottom plate 2b It is provided with least one set of fastening thread hole 3;In addition, the bottom symmetrical of snap ring 2a is provided with two support blocks 4, two under arc The lower end of support block 4 is fixedly connected with a barb plate 5, wherein, barb plate 5 includes level board 5a and is fixed on level board 5a two The barb 5b for extending obliquely at end, the lower end of level board 5a is symmetrically arranged with two claws 6.
Specifically, the upper tube half 1 and lower tube half 2 being mutually matched by setting are right respectively in upper tube half 1 and lower tube half 2 Should be provided with for hold water pipe tightly arc on snap ring 2a under snap ring 1a and arc, water pipe can be placed in upper and lower two in construction Compressed among individual snap ring.Bolt is screwed into the fastening thread hole 3 of upper mounted plate 1b and bottom plate 2b again to complete fastening.Arc The lower end of snap ring 2a is provided with support block 4, barb plate 5 and the claw 6 being sequentially connected under shape, before clamp water pipe, can be by Claw 6 is squeezed into soil and held, after water pipe is fixed, toward arc under padding and compacting soil and stone around snap ring 2a, if Be equipped with the barb plate 5 of barb 5b so that the whole securing device for assembling be difficult displacement, enhance laying water pipe when pipeline it is steady Solidity.
Improved as one of which, a rubber is respectively arranged with the madial wall of snap ring 2a under snap ring 1a and arc on arc Layer(It is not shown), multiple evenly distributed rubber raised lines are provided with the inside of rubber layer(It is not shown).
Specifically, rubber layer and multiple raised rubber raised lines can be installed on the water between upper and lower snap ring with elastic compression Pipe, greatly strengthens the frictional force on pre-buried water pipe lateral wall, and relative displacement occurs between anti-antipriming pipe and upper and lower two semicanals And cause water pipe displacement.
Improved as another kind, the lower end of upper mounted plate 1b is provided with the upper conical bar 7 of multiple equidistantly spaceds, under The upper end of fixed plate 2b be provided with multiple equidistantly spaceds and with the inferior pyramidal bar 8 of the mutually nested cooperation of upper conical bar 7.
Specifically, during upper conical bar 7 snaps in the gap between inferior pyramidal bar 8, inferior pyramidal bar 8 is snapped between upper conical bar 7 Gap in so that will not be misplaced in the horizontal direction between upper mounted plate 1b and bottom plate 2b, greatly improved to water The firm effect of pipe.
As one of which implementation method, draw-in groove 9 on arc are provided with the middle part lateral wall of snap ring 1a on arc, it is upper solid Two upper through holes 10 connected with draw-in groove on arc 9 that are running through, the middle part lateral wall of snap ring 2a under arc are provided with fixed board 1b On be provided with arc lower bayonet slot 11, two lower through-holes connected with arc lower bayonet slot 11 that are running through are provided with bottom plate 2b 12, upper through hole 10 is corresponding with lower through-hole 12.
Specifically, draw-in groove 9 and arc lower bayonet slot 13 can be mutually matched corresponding semi-circular recesses on arc, on arc Draw-in groove 9, upper through hole 10, lower through-hole 12 and arc lower bayonet slot 13 are sequentially communicated the circular trough to form a completion, and the circular trough can For after the completion of upper tube half 1 and the assembling of the clamp water pipe of lower tube half 2, a circle iron wire being tightened on circular trough to complete to water pipe Auxiliary fastening.
Preferably, in the present embodiment, above-mentioned fastening thread hole 3 can be provided with three groups, and three groups of fastening thread holes 3 are in laterally Equidistantly spaced.
The above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.Should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (5)

1. a kind of water conservancy construction pipeline securing device, it is characterised in that:Including upper tube half and lower tube half, the upper tube half includes For snap ring on the arc for holding water pipe tightly, the two ends of snap ring are respectively arranged with a upper mounted plate, the lower tube half on the arc Including for snap ring under the arc for holding water pipe tightly, the two ends of snap ring are respectively arranged with a bottom plate under the arc, it is described on At least one set of fastening thread hole is correspondingly arranged on respectively on fixed plate and the bottom plate;The bottom pair of snap ring under the arc Title is provided with two support blocks, and the lower end of two support blocks is fixedly connected with a barb plate, and the barb plate includes level Plate and the barb for extending obliquely at level board two ends is fixed on, the lower end of the level board is symmetrically arranged with two claws.
2. a kind of water conservancy construction pipeline securing device according to claim 1, it is characterised in that:Snap ring on the arc With a rubber layer is respectively arranged with the madial wall of snap ring under the arc, multiple uniform rows are provided with the inside of the rubber layer The rubber raised line of row.
3. a kind of water conservancy construction pipeline securing device according to claim 1, it is characterised in that:Fixed plate Lower end is provided with the upper conical bar of multiple equidistantly spaceds, and the upper end of the bottom plate is provided with multiple equidistantly intervals Arrange and cooperation mutually nested with the upper conical bar inferior pyramidal bar.
4. a kind of water conservancy construction pipeline securing device according to claim 1, it is characterised in that:Snap ring on the arc Middle part lateral wall on be provided with draw-in groove on arc, be provided with fixed plate two it is running through with draw-in groove on the arc The upper through hole of connection, is provided with arc lower bayonet slot on the middle part lateral wall of snap ring under the arc, set on the bottom plate There are two lower through-holes connected with the arc lower bayonet slot that are running through, the upper through hole is corresponding with the lower through-hole.
5. a kind of water conservancy construction pipeline securing device according to claim 1, it is characterised in that:The fastening thread hole Three groups are provided with, fastening thread hole transverse direction equidistantly spaced described in three groups.
CN201621425223.3U 2016-12-23 2016-12-23 A kind of water conservancy construction pipeline securing device Expired - Fee Related CN206268619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621425223.3U CN206268619U (en) 2016-12-23 2016-12-23 A kind of water conservancy construction pipeline securing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621425223.3U CN206268619U (en) 2016-12-23 2016-12-23 A kind of water conservancy construction pipeline securing device

Publications (1)

Publication Number Publication Date
CN206268619U true CN206268619U (en) 2017-06-20

Family

ID=59047814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621425223.3U Expired - Fee Related CN206268619U (en) 2016-12-23 2016-12-23 A kind of water conservancy construction pipeline securing device

Country Status (1)

Country Link
CN (1) CN206268619U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107580816A (en) * 2017-10-24 2018-01-16 潍坊友容实业有限公司 Composite reinforced plug-in salt-soda soil salt discharge filtrate wave duct
KR200491645Y1 (en) * 2020-01-21 2020-05-14 주식회사 덕신엔지니어링 Anti-vibration hanger with split buffer
CN111156350A (en) * 2020-02-27 2020-05-15 玫德集团有限公司 Pipe clamp and pipe clamp assembly

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107580816A (en) * 2017-10-24 2018-01-16 潍坊友容实业有限公司 Composite reinforced plug-in salt-soda soil salt discharge filtrate wave duct
KR200491645Y1 (en) * 2020-01-21 2020-05-14 주식회사 덕신엔지니어링 Anti-vibration hanger with split buffer
CN111156350A (en) * 2020-02-27 2020-05-15 玫德集团有限公司 Pipe clamp and pipe clamp assembly

Similar Documents

Publication Publication Date Title
CN206268619U (en) A kind of water conservancy construction pipeline securing device
CN207017270U (en) Land steel-pipe pile Pile feeder
CN205046851U (en) Building template
CN107916741B (en) Reticulated shell roof reinforcing device
CN207538461U (en) A kind of quick construction formwork system of beam
CN202972194U (en) Cable fixing clamp
CN207089203U (en) A kind of new-energy automobile wire harness pipe clamp
CN210724048U (en) MPP cable sleeve convenient to connect
CN210920373U (en) Farmland hydraulic engineering construction pipe laying and line fixing device
CN204868226U (en) Kuppe after -poppet frock
CN205026208U (en) Pipeline positioning installation device
CN207801428U (en) A kind of prefabricated pipeline for cable laying
CN207896632U (en) Electric power cable bearer is used in a kind of tunnel
CN205135084U (en) Line pole fixing base
CN204728798U (en) A kind of easy-to-dismount emergent electric pole
CN205118445U (en) Cable holder
CN204030519U (en) Zanjon section cable laying device
CN211813124U (en) Assembled wall-attached pull rod of tower crane
CN210069140U (en) Pipeline fixing device is used in municipal works pipe network construction
CN204532431U (en) Two cable many locked grooves tunnel cable hanger
CN205077476U (en) A tamp instrument for having more return pipe says construction
CN210005763U (en) End traction device for erecting communication engineering optical cable
CN203284117U (en) Rope locking device
CN203890886U (en) Connection structure of bridge floor chain and stabilization beam of horizontal chain bridge
CN210739569U (en) Water conservancy pipeline pressure-bearing fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170620

Termination date: 20171223